Germany · renewables
Wind power in Schleswig-Holstein
3,678 wind turbines with 10.19 GW of gross capacity were in operation in Schleswig-Holstein as of 2026-11-05, with a further 554 units (3.17 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — by district, size class, year and operator, from the Marktstammdatenregister.
Questions this page answers
- How much wind power capacity does Schleswig-Holstein have, and which districts have the most, as of 2026-11-05?
- 3,678 wind turbines with 10.19 GW of gross capacity were in operation in Schleswig-Holstein as of 2026-11-05, with a further 554 units (3.17 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — by district, size class, year and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Schleswig-Holstein?
- 3,678 wind turbines with 10.19 GW of gross capacity were in operation in Schleswig-Holstein as of 2026-11-05, with a further 554 units (3.17 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Schleswig-Holstein in 2025?
- 168 wind turbines with 803.5 MW went into operation in Schleswig-Holstein in 2025; the strongest year of the last two decades was 2014 with 1.30 GW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Schleswig-Holstein?
- Bürgerwindpark Reußenköge GmbH & Co. KG operates 91 wind turbines with 319.8 MW in Schleswig-Holstein, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Schleswig-Holstein?
- ENERCON GmbH leads with 1,372 wind turbines and 3.72 GW in Schleswig-Holstein (Bundesnetzagentur, Marktstammdatenregister).
- Which district in Schleswig-Holstein has the most wind power capacity?
- Nordfriesland has the most wind power capacity in operation in Schleswig-Holstein with 2.63 GW in 1,009 wind turbines, ahead of Dithmarschen with 2.39 GW (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity is in operation and planned in each district of Schleswig-Holstein?
| Area | Units in operation | Capacity in operation | Planned units | Planned capacity | All registered units |
|---|---|---|---|---|---|
| Nordfriesland | 1,009 | 2.63 GW | 115 | 657.3 MW | 1,228 |
| Dithmarschen | 900 | 2.39 GW | 67 | 375.7 MW | 1,101 |
| Schleswig-Flensburg | 525 | 1.40 GW | 79 | 466.9 MW | 663 |
| Rendsburg-Eckernförde | 281 | 1.02 GW | 96 | 553.1 MW | 406 |
| Ostholstein | 345 | 959.4 MW | 67 | 379.6 MW | 487 |
| Steinburg | 299 | 874.1 MW | 43 | 267.7 MW | 431 |
| Segeberg | 125 | 494.2 MW | 32 | 167.1 MW | 175 |
| Herzogtum Lauenburg | 64 | 155.6 MW | 16 | 83.6 MW | 94 |
| Stormarn | 40 | 89.1 MW | 7 | 32.3 MW | 60 |
| Flensburg | 25 | 73.2 MW | 0 | 0.00 MW | 25 |
| Pinneberg | 15 | 45.9 MW | 2 | 12.0 MW | 27 |
| Plön | 32 | 37.4 MW | 29 | 173.4 MW | 72 |
| Lübeck | 17 | 14.7 MW | 0 | 0.00 MW | 17 |
| Kiel | 1 | 0.07 MW | 1 | 0.00 MW | 2 |
How are the wind turbines in Schleswig-Holstein distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 328 | 2.59 MW | 302 | 12 |
| 30 to 100 kW | 20 | 1.46 MW | 17 | 1 |
| over 100 kW | 4,440 | 14.07 GW | 3,359 | 541 |
How much wind power capacity was commissioned in Schleswig-Holstein each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 123 | 646.6 MW |
| 2025 | 168 | 803.5 MW |
| 2024 | 136 | 574.5 MW |
| 2023 | 263 | 1.22 GW |
| 2022 | 140 | 544.6 MW |
| 2021 | 84 | 269.1 MW |
| 2020 | 47 | 125.3 MW |
| 2019 | 20 | 39.7 MW |
| 2018 | 61 | 138.8 MW |
| 2017 | 198 | 577.6 MW |
| 2016 | 221 | 633.2 MW |
| 2015 | 332 | 904.4 MW |
| 2014 | 486 | 1.30 GW |
| 2013 | 171 | 408.8 MW |
| 2012 | 163 | 323.7 MW |
| 2011 | 155 | 286.3 MW |
| 2010 | 135 | 237.6 MW |
| 2009 | 117 | 249.6 MW |
| 2008 | 49 | 106.7 MW |
| 2007 | 74 | 169.3 MW |
| 2006 | 63 | 147.8 MW |
How many wind turbines in Schleswig-Holstein are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 3,678 | 10.19 GW |
| planned | 554 | 3.17 GW |
| permanently decommissioned | 553 | 716.3 MW |
| temporarily shut down | 3 | 0.01 MW |
Which are the largest wind turbines in Schleswig-Holstein?
| Unit | District | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|---|
| Fl. 54 - WEA 4 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| WEA 2 / 254398 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-05 | Windpark Holtsee Lindau GmbH & Co. KG |
| WEA 10 - Vestas EnVentus V162-7.2 MW - V250685 | Schleswig-Flensburg | 7.20 MW | Vestas Deutschland GmbH | in operation | 2024-08-08 | Bürgerwindpark Janneby eG |
| Volsemenhusen Nord 1 | Dithmarschen | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Volsemenhusen Nord GmbH & Co. KG |
| Fl. 52 - WEA 2 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| WEA 03 [V02] - Vestas V172/7200 | Schleswig-Flensburg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Janneby eG |
| Fl. 51 - WEA 1 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| Fl. 54 - WEA 3 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| WEA5 | Steinburg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Betriebsgesellschaft 5. Heeck UG (haftungsbeschränkt) |
| WEA3 / 254399 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-07 | Windpark Holtsee Lindau GmbH & Co. KG |
| WEA 7 / 254403 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-03 | Windpark Holtsee Lindau GmbH & Co. KG |
| Fl. 54 - WEA 2 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| Curau WEA 1 | Ostholstein | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bismarck Wind GmbH & Co.KG |
| Fl. 51 - WEA 4 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| Fl. 53 - WEA 3 | Nordfriesland | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwindpark Veer Dörper GmbH & Co. KG |
| WEA2 | Segeberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Betriebsgesellschaft 9. Heeck UG (haftungsbeschränkt) |
| WEA 8 / Stubben-Rehorst | Segeberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 10 / 254406 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-12 | Windpark Holtsee Lindau GmbH & Co. KG |
| WEA 8 / 254404 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-06 | Windpark Holtsee Lindau GmbH & Co. KG |
| WEA 7 / Stubben-Rehorst | Segeberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 01 / 254397 | Rendsburg-Eckernförde | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-16 | Windpark Holtsee Lindau GmbH & Co. KG |
| WEA3 | Steinburg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Betriebsgesellschaft 5. Heeck UG (haftungsbeschränkt) |
| WEA1 | Segeberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Betriebsgesellschaft 9. Heeck UG (haftungsbeschränkt) |
| Curau WEA 2 | Ostholstein | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bismarck Wind GmbH & Co.KG |
| WEA4 | Steinburg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Betriebsgesellschaft 5. Heeck UG (haftungsbeschränkt) |
Which organisations operate the most wind power capacity in Schleswig-Holstein?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerwindpark Reußenköge GmbH & Co. KG | 91 | 319.8 MW |
| Bürgerwindpark Veer Dörper GmbH & Co. KG | 62 | 219.9 MW |
| Bürgerwindpark Galmsbüll GmbH & Co. KG | 39 | 153.8 MW |
| Bürgerwindpark im Kirchspiel Medelby GmbH & Co. KG | 37 | 152.2 MW |
| Windpark Fehmarn-Mitte GmbH& Co.KG | 38 | 131.6 MW |
| Bürgerwindpark Bordelum III GmbH & Co. KG | 26 | 85.4 MW |
| Bürgerwindpark Ockholm-Langenhorn | 19 | 73.4 MW |
| Bürgerwindpark Eider GmbH & Co. KG | 22 | 72.9 MW |
| Windpark Holtsee Lindau GmbH & Co. KG | 10 | 72.0 MW |
| Windenergie Gönnebek I GmbH & Co. KG | 12 | 67.5 MW |
Which manufacturer accounts for the most wind power capacity in Schleswig-Holstein?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 1,372 | 3.72 GW |
| Vestas Deutschland GmbH | 932 | 3.20 GW |
| Nordex Germany GmbH | 266 | 1.53 GW |
| Nordex Energy GmbH | 358 | 1.52 GW |
| Senvion Deutschland GmbH | 490 | 1.45 GW |
| Nordex SE | 136 | 673.9 MW |
| Siemens Wind Power GmbH & Co. KG | 156 | 443.8 MW |
| REpower Systems SE | 122 | 292.7 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 43 | 271.2 MW |
| Sonstige | 206 | 238.0 MW |
Wind power in all German states · All energy sources
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How much wind power capacity does Schleswig-Holstein have, and which districts have the mo can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.