FACTANKER · measured, cited, anchored official records connected

Germany · renewables

Wind power in Rendsburg-Eckernförde

281 wind turbines with 1.02 GW of gross capacity were in operation in Rendsburg-Eckernförde (Schleswig-Holstein) as of 2026-11-05, with a further 96 units (553.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/schleswig-holstein/rendsburg-eckernfoerde

Questions this page answers

How many wind turbines are registered in Rendsburg-Eckernförde (Schleswig-Holstein), and how large are they, as of 2026-11-05?
281 wind turbines with 1.02 GW of gross capacity were in operation in Rendsburg-Eckernförde (Schleswig-Holstein) as of 2026-11-05, with a further 96 units (553.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Rendsburg-Eckernförde?
281 wind turbines with 1.02 GW of gross capacity were in operation in Rendsburg-Eckernförde as of 2026-11-05, with a further 96 units (553.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Rendsburg-Eckernförde in 2025?
34 wind turbines with 181.5 MW went into operation in Rendsburg-Eckernförde in 2025; the strongest year of the last two decades was 2025 with 181.5 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Rendsburg-Eckernförde?
Windpark Holtsee Lindau GmbH & Co. KG operates 10 wind turbines with 72.0 MW in Rendsburg-Eckernförde, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Rendsburg-Eckernförde?
Vestas Deutschland GmbH leads with 109 wind turbines and 561.7 MW in Rendsburg-Eckernförde (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Rendsburg-Eckernförde?
The largest registered wind turbine in Rendsburg-Eckernförde has 7.20 MW of gross capacity and is operated by Windpark Holtsee Lindau GmbH & Co. KG, commissioned 2026-03-05 (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Rendsburg-Eckernförde distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW260.20 MW221
30 to 100 kW10.08 MW10
over 100 kW3791.61 GW25895

How much wind power capacity was commissioned in Rendsburg-Eckernförde each year?

Commissioning yearUnitsCapacity added
202644261.2 MW
202534181.5 MW
20241157.3 MW
20231767.5 MW
20222499.3 MW
2021730.3 MW
202020.01 MW
201820.04 MW
201726.37 MW
20162473.2 MW
201545114.4 MW
20142056.0 MW
20131224.8 MW
2012613.5 MW
201152.02 MW
201032.31 MW
200711.50 MW
200646.50 MW

How many wind turbines in Rendsburg-Eckernförde are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation2811.02 GW
planned96553.1 MW
permanently decommissioned2836.8 MW
temporarily shut down10.00 MW

Which wind turbines are registered in Rendsburg-Eckernförde?

UnitCapacityManufacturerStatusCommissionedOperator
WEA 2 / 2543987.20 MWVestas Deutschland GmbHin operation2026-03-05Windpark Holtsee Lindau GmbH & Co. KG
WEA3 / 2543997.20 MWVestas Deutschland GmbHin operation2026-05-07Windpark Holtsee Lindau GmbH & Co. KG
WEA 7 / 2544037.20 MWVestas Deutschland GmbHin operation2026-03-03Windpark Holtsee Lindau GmbH & Co. KG
WEA 10 / 2544067.20 MWVestas Deutschland GmbHin operation2026-03-12Windpark Holtsee Lindau GmbH & Co. KG
WEA 8 / 2544047.20 MWVestas Deutschland GmbHin operation2026-05-06Windpark Holtsee Lindau GmbH & Co. KG
WEA 01 / 2543977.20 MWVestas Deutschland GmbHin operation2026-05-16Windpark Holtsee Lindau GmbH & Co. KG
WEA 06 / 2544027.20 MWVestas Deutschland GmbHin operation2026-05-12Windpark Holtsee Lindau GmbH & Co. KG
WEA 9 / 2544057.20 MWVestas Deutschland GmbHin operation2026-03-13Windpark Holtsee Lindau GmbH & Co. KG
WEA 04 / 2544007.20 MWVestas Deutschland GmbHin operation2026-06-22Windpark Holtsee Lindau GmbH & Co. KG
WEA 05 / 2544017.20 MWVestas Deutschland GmbHin operation2026-05-15Windpark Holtsee Lindau GmbH & Co. KG
WEA 047.00 MWNordex SEplannedplanned 2027get:power 1. Betriebsgesellschaft mbH & Co. KG
WEA 3 / Thumby7.00 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
WKA 67.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
WEA 2 / 974617.00 MWNordex Energy GmbHin operation2026-10-01GREE Groß Buchwald-Bissee GmbH & Co. KG
WKA 47.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
WKA 57.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
WEA 1 / Thumby7.00 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
WEA Bannwiese7.00 MWNordex Germany GmbHin operation2026-07-22Windenergie Glüsing GmbH
WEA 1 / 974607.00 MWNordex Energy GmbHin operation2026-10-08GREE Groß Buchwald-Bissee GmbH & Co. KG
WKA 17.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
WKA 37.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
WEA Neuland7.00 MWNordex Germany GmbHin operation2026-07-22Windenergie Glüsing GmbH
WEA 3 / 974627.00 MWNordex Energy GmbHin operation2026-10-14GREE Groß Buchwald-Bissee GmbH & Co. KG
K03 Karlsburger Au 37.00 MWNordex Germany GmbHplannedplanned 2027ENERTRAG SE
WKA 27.00 MWNordex Energy GmbHplannedplanned 2027Bürgerwindpark Ehndorf GmbH & Co. KG
K01 Karlsburger Au 17.00 MWNordex Germany GmbHplannedplanned 2027ENERTRAG SE
K02 Karlsburger Au 27.00 MWNordex Germany GmbHplannedplanned 2027ENERTRAG SE
WEA 057.00 MWNordex SEplannedplanned 2029Windpark Groß Buchwald Bissee GmbH & Co. KG
WEA 2 / Thumby7.00 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
WEA 066.80 MWNordex SEplannedplanned 2027Windpark Groß Buchwald Bissee GmbH & Co. KG
BBO 016.60 MWSiemens Gamesa Renewable Energy GmbH & Co. KGin operation2025-04-14iTerra Wind BBO GmbH & Co. KG
6600242 / Holtsee-Altenhof Erw.6.60 MWSiemens Gamesa Renewable Energy GmbH & Co. KGin operation2024-04-13Windpark Holtsee-Altenhof Erweiterung West GmbH & Co. KG
BBO 026.60 MWSiemens Gamesa Renewable Energy GmbH & Co. KGin operation2025-04-14BBO Wind GmbH & Co. KG
6600241 / Holtsee-Altenhof Erw.6.60 MWSiemens Gamesa Renewable Energy GmbH & Co. KGin operation2024-03-22Windpark Holtsee-Altenhof Erweiterung Ost GmbH & Co. KG
WP Altenkattbek WEA 46.20 MWVestas Deutschland GmbHplannedplanned 2027Windpark Altenkattbek GmbH & Co. KG
BWP Altenkattbek WKA 36.20 MWVestas Deutschland GmbHplannedplanned 2027Bürgerwindpark Altenkattbek GmbH & Co. KG
G20-2021-137_WKA 66.20 MWVestas Deutschland GmbHin operation2026-01-17BWP GT Betriebs GmbH & Co. KG
G20-2021-138_WKA 76.20 MWVestas Deutschland GmbHin operation2025-12-16BWP GT Betriebs GmbH & Co. KG
WP Altenkattbek WEA 16.20 MWVestas Deutschland GmbHplannedplanned 2027Windpark Altenkattbek GmbH & Co. KG
WP Wulfshagen WEA 076.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
WP Wulfshagen WEA 056.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
WP Altenkattbek WEA 56.20 MWVestas Deutschland GmbHplannedplanned 2028Windpark Altenkattbek GmbH & Co. KG
WP Wulfshagen WEA 016.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
G20-2021-140_WKA 96.20 MWVestas Deutschland GmbHin operation2025-11-19BWP GT Betriebs GmbH & Co. KG
WP Wulfshagen WEA 066.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
WP Altenkattbek WEA 26.20 MWVestas Deutschland GmbHplannedplanned 2027Windpark Altenkattbek GmbH & Co. KG
WP Wulfshagen WEA 086.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
G20-2021-135_WKA 46.20 MWVestas Deutschland GmbHin operation2025-12-16BWP GT Betriebs GmbH & Co. KG
WP Wulfshagen WEA 026.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
G20-2021-133_WKA 26.20 MWVestas Deutschland GmbHin operation2026-01-15BWP GT Betriebs GmbH & Co. KG
BWP Altenkattbek WKA 66.20 MWVestas Deutschland GmbHplannedplanned 2027Bürgerwindpark Altenkattbek GmbH & Co. KG
WP Wulfshagen WEA 046.20 MW–plannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
G20-2021-134_WKA 36.20 MWVestas Deutschland GmbHin operation2025-12-16BWP GT Betriebs GmbH & Co. KG
WP Wulfshagen WEA 036.20 MWVestas Deutschland GmbHplannedplanned 2026WP Wulfshagen Repowering GmbH & Co. KG
WKA 76.00 MWVestas Deutschland GmbHplannedplanned 2027Bürgerwindpark Altenkattbek GmbH & Co. KG
GZ3 Gnutz 36.00 MWVestas Deutschland GmbHplannedplanned 2056ENERTRAG SE
WP Altenkattbek WEA 86.00 MWVestas Deutschland GmbHplannedplanned 2028Windpark Altenkattbek GmbH & Co. KG
WP Gnutz Ost WEA 15 (254498)6.00 MWVestas Deutschland GmbHin operation2026-05-28WKN Wertewind Winpark Gnutz Drei GmbH & Co. KG
WKA 36.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 78 GmbH & Co. KG
GZ2 Gnutz 26.00 MWVestas Deutschland GmbHplannedplanned 2056ENERTRAG SE
WKA 36.00 MWVestas Deutschland GmbHplannedplanned 2028Bürgerwindpark Arpsdorf-Padenstedt GmbH & Co. KG
WEA46.00 MWVestas Deutschland GmbHplannedplanned 2027MLK Windpark Schülldorf Nr. 114 GmbH & Co. KG
WKA 26.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 79 GmbH & Co. KG
G20-2021-139_WKA 86.00 MWVestas Deutschland GmbHin operation2025-11-19BWP GT Betriebs GmbH & Co. KG
WEA36.00 MWVestas Deutschland GmbHplannedplanned 2027MLK Windpark Schülldorf Nr. 114 GmbH & Co. KG
WKA 46.00 MWVestas Deutschland GmbHplannedplanned 2028Bürgerwindpark Arpsdorf-Padenstedt GmbH & Co. KG
G20-2021-141_WKA 106.00 MWVestas Deutschland GmbHin operation2025-12-16BWP GT Betriebs GmbH & Co. KG
WEA16.00 MWVestas Deutschland GmbHplannedplanned 2027MLK Windpark Schülldorf Nr. 114 GmbH & Co. KG
WKA 16.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 79 GmbH & Co. KG
WP Gnutz Ost WEA 14 (V255000)6.00 MWVestas Deutschland GmbHin operation2026-04-29WKN Wertewind Winpark Gnutz Drei GmbH & Co. KG
WKA 16.00 MWVestas Deutschland GmbHplannedplanned 2026Windpark Ehndorf GmbH & Co. KG
G20-2021-136_WKA 56.00 MWVestas Deutschland GmbHin operation2026-08-11wpd Windpark Gnutz-Nord GmbH & Co. KG
WEA16.00 MWVestas Deutschland GmbHplannedplanned 2028Windpark Betriebsgesellschaft 13. Heeck UG (haftungsbeschränkt)
WEA26.00 MWVestas Deutschland GmbHplannedplanned 2027MLK Windpark Schülldorf Nr. 114 GmbH & Co. KG
WKA 26.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 78 GmbH & Co. KG
G20-2021-142_WKA 116.00 MWVestas Deutschland GmbHin operation2026-02-09BWP GT Betriebs GmbH & Co. KG
WKA 16.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 78 GmbH & Co. KG
WP Gnutz Ost WEA 166.00 MWVestas Deutschland GmbHin operation2026-06-11WKN Wertewind Winpark Gnutz Drei GmbH & Co. KG
WKA 56.00 MWVestas Deutschland GmbHplannedplanned 2028e3 Projekt 79 GmbH & Co. KG
Windpark Rieseby II GmbH & Co. KG - WEA 25.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby II GmbH & Co. KG
Windpark Rieseby II GmbH & Co. KG - WEA 65.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby II GmbH & Co. KG
Windpark Rieseby II GmbH & Co. KG - WEA 35.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby II GmbH & Co. KG
WEA FLI-15.70 MWNordex Germany GmbHin operation2025-09-11VSB Windpark Flintbek GmbH & Co. KG
WKA 25.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
WEA 65.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 1 / Owschlag5.70 MWNordex Energy GmbHplannedplanned 2026GREE Owschlag Repowering GmbH & Co. KG
WEA 6 / 956545.70 MWNordex Energy GmbHin operation2025-09-01WP Waabs Süd GmbH & Co. KG
Osdorf-WEA-25.70 MWNordex Germany GmbHin operation2025-03-19Windpark Osdorf GmbH & Co. KG
WEA 85.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 5 / 956535.70 MWNordex Energy GmbHin operation2025-09-01WP Waabs Süd GmbH & Co. KG
Windpark Rieseby GmbH & Co. KG - WEA 55.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby GmbH & Co. KG
WKA 2 - 939475.70 MWNordex Germany GmbHin operation2025-04-15Windpark Nortorf GmbH & Co. KG
Windpark Rieseby II GmbH & Co. KG - WEA 15.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby II GmbH & Co. KG
WEA 1 / 956495.70 MWNordex Energy GmbHin operation2025-09-04GREE Waabs Nord GmbH & Co. KG
Loop-Schönbek 45.70 MWNordex Energy GmbHin operation2026-09-24Windpark Loop-Schönbek GmbH & Co. KG
Gnutz-Nord-WEA-25.70 MWNordex Germany GmbHin operation2026-07-02wpd Windpark Gnutz-Nord GmbH & Co. KG
WEA 02 - WP Schülp5.70 MWNordex Germany GmbHin operation2025-11-24Windpark Schülp-Jevenstedt GmbH & Co. KG
WEA 55.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 2 / Owschlag5.70 MWNordex Energy GmbHplannedplanned 2026GREE Owschlag Repowering GmbH & Co. KG
WEA 25.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 5 / Thumby5.70 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
Loop-Schönbek 35.70 MWNordex Energy GmbHin operation2026-09-24Windpark Loop-Schönbek GmbH & Co. KG
Windpark Rieseby II GmbH & Co. KG - WEA 45.70 MWNordex Energy GmbHplannedplanned 2026Windpark Rieseby II GmbH & Co. KG
Gnutz-Nord-WEA-35.70 MWNordex Germany GmbHin operation2026-06-24wpd Windpark Gnutz-Nord GmbH & Co. KG
WEA 2 / 956505.70 MWNordex Energy GmbHin operation2025-09-04GREE Waabs Nord GmbH & Co. KG
WEA 15.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
Loop-Schönbek 15.70 MWNordex Energy GmbHin operation2026-09-24Windpark Loop-Schönbek GmbH & Co. KG
WEA 3 / Owschlag5.70 MWNordex Germany GmbHplannedplanned 2026GREE Owschlag Repowering GmbH & Co. KG
WEA 4 / 956525.70 MWNordex Energy GmbHin operation2025-09-01WP Waabs Süd GmbH & Co. KG
WKA 25.70 MWNordex Germany GmbHplannedplanned 2027wpd Windpark Bokel-Ellerdorf Erweiterung GmbH & Co. KG
WEA 7 / Thumby Dörphof5.70 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
WEA 3 / 956515.70 MWNordex Energy GmbHin operation2025-09-04GREE Waabs Nord GmbH & Co. KG
WEA 45.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 01 - WP Schülp5.70 MWNordex Germany GmbHin operation2025-11-24Windpark Schülp-Jevenstedt GmbH & Co. KG
WEA 95.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WEA 7 / 956555.70 MWNordex Energy GmbHin operation2025-09-01WP Waabs Süd GmbH & Co. KG
WEA 35.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
Osdorf-WEA-15.70 MWNordex Germany GmbHin operation2025-03-19Windpark Osdorf GmbH & Co. KG
Bürgerwindpark Gnutz-Nord WEA 15.70 MWNordex SEin operation2026-06-24Bürgerwindpark Gnutz-Nord Betriebs GmbH & Co. KG
WEA 6 / Thumby Dörphof5.70 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
WKA 1 - 939465.70 MWNordex Germany GmbHin operation2025-04-15Windpark Nortorf GmbH & Co. KG
WEA 03 / 952135.70 MWNordex Energy GmbHin operation2026-10-19Windpark Quarnbek 2 GmbH & Co. KG
WKA 35.70 MWNordex Germany GmbHplannedplanned 2027wpd Windpark Bokel-Ellerdorf Erweiterung GmbH & Co. KG
Nienborstel / 939025.70 MWNordex Germany GmbHin operation2024-08-13Mittelholsteiner Windkraft GmbH & Co. KG
WEA 01 / 952115.70 MWNordex Energy GmbHin operation2026-10-19Windpark Quarnbek 2 GmbH & Co. KG
WEA FLI-25.70 MWNordex Germany GmbHin operation2025-09-11VSB Windpark Flintbek GmbH & Co. KG
WEA 02 / 952125.70 MWNordex Energy GmbHin operation2026-10-19Windpark Quarnbek 2 GmbH & Co. KG
WEA 4 / Thumby5.70 MWNordex Energy GmbHplannedplanned 2026Windpark Grünholz GmbH & Co. KG
Loop-Schönbek 55.70 MWNordex Energy GmbHin operation2026-09-24Windpark Loop-Schönbek GmbH & Co. KG
Gnutz-Nord-WEA-45.70 MWNordex Germany GmbHin operation2026-07-02wpd Windpark Gnutz-Nord GmbH & Co. KG
WKA 65.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
Loop-Schönbek 25.70 MWNordex Energy GmbHin operation2026-09-24Windpark Loop-Schönbek GmbH & Co. KG
WEA 75.70 MWNordex Energy GmbHplannedplanned 2028Windpark Bredenbek GmbH
WKA 35.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
Windpark Rieseby III GmbH & Co. KG - WEA 75.70 MWNordex SEplannedplanned 2028Windpark Rieseby III GmbH & Co. KG
WKA 15.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
WKA 55.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
WKA 15.70 MWNordex Germany GmbHplannedplanned 2027wpd Windpark Bokel-Ellerdorf Erweiterung GmbH & Co. KG
WKA 45.70 MWNordex Germany GmbHplannedplanned 2029Windpark Bokel GmbH & Co. KG
Windpark Rieseby III GmbH & Co. KG - WEA 85.70 MWNordex SEplannedplanned 2028Windpark Rieseby III GmbH & Co. KG
Windpark Aukrug WEA45.60 MWVestas Deutschland GmbHin operation2026-08-10ERG Windpark Aukrug GmbH & Co. KG
WP Gnutz West II WEA 45.60 MWVestas Deutschland GmbHin operation2025-05-09WKN WERTEWIND Windpark Gnutz Zwei GmbH & Co. KG
WP Gnutz West II WEA 65.60 MWVestas Deutschland GmbHin operation2025-05-09WKN WERTEWIND Windpark Gnutz Zwei GmbH & Co. KG
Windpark Aukrug WEA15.60 MWVestas Deutschland GmbHin operation2026-06-26ERG Windpark Aukrug GmbH & Co. KG
Windpark Aukrug WEA35.60 MWVestas Deutschland GmbHin operation2026-07-22ERG Windpark Aukrug GmbH & Co. KG
Windpark Aukrug WEA25.60 MWVestas Deutschland GmbHin operation2026-07-15ERG Windpark Aukrug GmbH & Co. KG
WP Gnutz West II WEA 35.60 MWVestas Deutschland GmbHin operation2025-05-09WKN WERTEWIND Windpark Gnutz Zwei GmbH & Co. KG
WP Gnutz West II WEA 55.60 MWVestas Deutschland GmbHin operation2025-05-09WKN WERTEWIND Windpark Gnutz Zwei GmbH & Co. KG
WEA 5 / 5524487055.50 MWGE Wind Energy GmbHin operation2025-08-16Windpark Groß Buchwald-Negenharrie GmbH & Co. KG
WEA 1 / 552124905.50 MWGE Renewable Germany GmbHin operation2022-11-22Windpark Groß Buchwald-Negenharrie GmbH & Co. KG
WEA 3 / 552124895.50 MWGE Renewable Germany GmbHin operation2022-12-13Windpark Groß Buchwald-Negenharrie GmbH & Co. KG
WEA 2 / 552124915.50 MWGE Renewable Germany GmbHin operation2022-11-16Windpark Groß Buchwald-Negenharrie GmbH & Co. KG
WEA 4 / 5524487065.50 MWGE Wind Energy GmbHin operation2025-08-20Windpark Groß Buchwald-Negenharrie GmbH & Co. KG
Jahrsdorf / 5520163765.50 MWGE Wind Energy GmbHin operation2022-11-30Mittelholsteiner Windkraft GmbH & Co. KG
Remmels / 5520163775.50 MWGE Renewable Germany GmbHin operation2022-09-14Mittelholsteiner Windkraft GmbH & Co. KG
Remmels / 5520163785.50 MWGE Renewable Germany GmbHin operation2022-09-14Mittelholsteiner Windkraft GmbH & Co. KG
WP Bondenschiften III5.00 MWENERCON GmbHin operation2023-02-22Windpark Bondenschiften GmbH & Co. KG
WP Bondenschiften II5.00 MWENERCON GmbHin operation2023-02-28Windpark Bondenschiften GmbH & Co. KG
WP Bondenschiften5.00 MWENERCON GmbHin operation2023-03-20Windpark Bondenschiften GmbH & Co. KG
WEA1 (NX92763)4.80 MWNordex Energy GmbHin operation2024-09-02Energiepark Mitttelschwansen Verwaltung GmbH
NX-94011-014.80 MWNordex Germany GmbHin operation2024-11-12Windpark Waabs GmbH & Co. KG
NX-94010-024.80 MWNordex Germany GmbHin operation2024-11-12Windpark Waabs GmbH & Co. KG
WEA 2 / Padenstedt4.80 MWNordex Germany GmbHplannedplanned 2027Denker & Wulf AG
WEA 3 / Padenstedt4.80 MWNordex Germany GmbHplannedplanned 2027Denker & Wulf AG
WEA 4 / Padenstedt4.80 MWNordex Germany GmbHplannedplanned 2027Denker & Wulf AG
WEA4 (NX92764)4.80 MWNordex Energy GmbHin operation2024-09-02Energiepark Mitttelschwansen Verwaltung GmbH
NX-94012-034.80 MWNordex Germany GmbHin operation2024-11-12Windpark Waabs GmbH & Co. KG
WEA 02 Bokel4.80 MWNordex Energy GmbHin operation2022-09-19Windpark Bokelfeld GmbH & Co. KG
WEA2 (NX92765)4.80 MWNordex Energy GmbHin operation2024-09-03Energiepark Mitttelschwansen Verwaltung GmbH
WEA 4 / Owschlag4.80 MWNordex Energy GmbHplannedplanned 2026GREE Owschlag Repowering GmbH & Co. KG
NX-94013-044.80 MWNordex Germany GmbHin operation2024-11-12Windpark Waabs GmbH & Co. KG
WEA3 (NX92766)4.80 MWNordex Energy GmbHin operation2024-09-02Energiepark Mitttelschwansen Verwaltung GmbH
WEA 1 / Padenstedt4.80 MWNordex Germany GmbHplannedplanned 2027Denker & Wulf AG
WP Holstentor WEA 3 (89345)4.50 MWNordex Energy GmbHin operation2021-12-23WKN WERTEWIND Windpark Holstentor GmbH & Co. KG
WEA 03 Bokel4.50 MWNordex Energy GmbHin operation2022-09-16Windpark Bokelfeld GmbH & Co. KG
WEA 01 Bokel4.50 MWNordex Energy GmbHin operation2022-09-16Windpark Bokelfeld GmbH & Co. KG
WP Holstentor WEA 1 (89347)4.50 MWNordex Energy GmbHin operation2021-12-28WKN WERTEWIND Windpark Holstentor GmbH & Co. KG
WEA 04 Bokel4.50 MWNordex Energy GmbHin operation2022-09-16Windpark Bokelfeld GmbH & Co. KG
WP Holstentor WEA 2 (89346)4.50 MWNordex Energy GmbHin operation2021-12-23WKN WERTEWIND Windpark Holstentor GmbH & Co. KG
WEA 64.26 MWENERCON GmbHplannedplanned 2026Lorica Windpark Gammelby GmbH & Co. KG
WEA 34.26 MWENERCON GmbHplannedplanned 2027Lorica Windpark Gammelby GmbH & Co. KG
WEA 14.26 MWENERCON GmbHplannedplanned 2026Lorica Windpark Gammelby GmbH & Co. KG
WEA 44.26 MWENERCON GmbHplannedplanned 2026Lorica Windpark Gammelby GmbH & Co. KG
WEA 54.26 MWENERCON GmbHplannedplanned 2026Lorica Windpark Gammelby GmbH & Co. KG
WEA 24.26 MWENERCON GmbHplannedplanned 2026Lorica Windpark Gammelby GmbH & Co. KG
WKA 74.20 MWENERCON GmbHin operation2025-04-09Bürgerwindpark Wilhelmsburg
WP Aukrug WEA24.20 MWVestas Deutschland GmbHin operation2021-07-19Windpark Aukrug GmbH & Co. KG
WP Bendorf Ost II WEA 144.20 MWVestas Deutschland GmbHin operation2025-05-20Windpark Bendorf Ost II GmbH & Co. KG
WEA 6 - 2464524.20 MWVestas Deutschland GmbHin operation2023-05-12Bürgerwindpark Jevenstedt GmbH & Co. KG
WEA 5 - 2464514.20 MWVestas Deutschland GmbHin operation2023-05-16Bürgerwindpark Jevenstedt GmbH & Co. KG
WP Aukrug WEA44.20 MWVestas Deutschland GmbHin operation2021-07-19Windpark Aukrug GmbH & Co. KG
WP Bendorf-Ost WEA 114.20 MWVestas Deutschland GmbHin operation2022-05-11Windpark Bendorf Ost II GmbH & Co. KG
Neuwittenbek_THEE_II4.20 MWVestas Deutschland GmbHplannedplanned 2026THEE Projektentwicklungs GmbH & Co. KG
WEA 3 - 2464494.20 MWVestas Deutschland GmbHin operation2023-05-12Bürgerwindpark Jevenstedt GmbH & Co. KG
WP Bendorf-Ost WEA 134.20 MWVestas Deutschland GmbHin operation2022-05-13Windpark Bendorf Ost II GmbH & Co. KG
2560064.20 MWVestas Deutschland GmbHin operation2026-07-21wpd Windpark Wasbek-Ehndorf GmbH & Co. KG
WEA 9 - 2464554.20 MWVestas Deutschland GmbHin operation2023-05-12Bürgerwindpark Jevenstedt GmbH & Co. KG
WKA 34.20 MWVestas Deutschland GmbHin operation2026-06-22e3 WP Wasbek-Ehndorf Betriebs GmbH & Co. KG
WP Aukrug WEA34.20 MWVestas Deutschland GmbHin operation2021-07-19Windpark Aukrug GmbH & Co. KG
WP Bendorf-Ost WEA 124.20 MWVestas Deutschland GmbHin operation2022-05-18Windpark Bendorf Ost II GmbH & Co. KG
WKA 44.20 MWVestas Deutschland GmbHin operation2026-07-06e3 WP Wasbek-Ehndorf Betriebs GmbH & Co. KG
WEA 8 - 2464544.20 MWVestas Deutschland GmbHin operation2023-05-12Bürgerwindpark Jevenstedt GmbH & Co. KG
WEA 2 - 2464484.20 MWVestas Deutschland GmbHin operation2023-05-31Bürgerwindpark Jevenstedt GmbH & Co. KG
Bürgerwindpark Beldorf GmbH & Co. KG WEA 64.20 MWENERCON GmbHin operation2022-12-02Bürgerwindpark Beldorf GmbH & Co. KG
WP Bendorf-Ost WEA 104.20 MWVestas Deutschland GmbHin operation2022-05-11Windpark Bendorf Ost II GmbH & Co. KG
WP Gnutz Eins WEA 2 (244057)4.20 MWVestas Deutschland GmbHin operation2022-06-16WKN WERTEWIND Windpark Gnutz Eins GmbH & Co. KG
2560094.20 MWVestas Deutschland GmbHin operation2026-07-25wpd Windpark Wasbek-Ehndorf GmbH & Co. KG
WEA 3 WP Thaden4.20 MWVestas Deutschland GmbHin operation2022-04-25Stadtwerke Kiel AG
WP Gnutz Eins WEA 1 (244056)4.20 MWVestas Deutschland GmbHin operation2022-06-23WKN WERTEWIND Windpark Gnutz Eins GmbH & Co. KG
Neuwittenbek_THEE_I4.20 MWVestas Deutschland GmbHplannedplanned 2026THEE Projektentwicklungs GmbH & Co. KG
WP Aukrug WEA14.20 MWVestas Deutschland GmbHin operation2021-07-23Windpark Aukrug GmbH & Co. KG
WEA 14.20 MWVestas Deutschland GmbHin operation2023-04-1911. Projektgesellschaft Loop GmbH & Co. KG
WEA 4 - 2464504.20 MWVestas Deutschland GmbHin operation2023-05-12Bürgerwindpark Jevenstedt GmbH & Co. KG
WEA 7 - 2464534.20 MWVestas Deutschland GmbHin operation2023-05-16Bürgerwindpark Jevenstedt GmbH & Co. KG
WP Bendorf Ost II WEA 154.20 MWVestas Deutschland GmbHin operation2025-05-16Windpark Bendorf Ost II GmbH & Co. KG
WKA 14.20 MWVestas Deutschland GmbHin operation2026-06-29e3 WP Wasbek-Ehndorf Betriebs GmbH & Co. KG
WEA 1 - 2464474.20 MWVestas Deutschland GmbHin operation2023-06-16Bürgerwindpark Jevenstedt GmbH & Co. KG
WEA 014.00 MWVestas Deutschland GmbHplannedplanned 2026Bürgerwindpark Tüttendorf GmbH & Co. KG
WEA 2 WP Thaden3.60 MWVestas Deutschland GmbHin operation2022-03-17Stadtwerke Kiel AG
unit operated by a private individual3.60 MWNordex Energy GmbHin operation2022-12-20private individual
WEA 4 WP Thaden3.60 MWVestas Deutschland GmbHin operation2022-03-31Stadtwerke Kiel AG
WEA 1 WP Thaden3.60 MWVestas Deutschland GmbHin operation2022-03-10Stadtwerke Kiel AG
NX 918763.60 MWNordex Energy GmbHin operation2023-12-01Windpark Felm GmbH & Co. KG
WP Altenkattbek WEA 93.45 MWVestas Deutschland GmbHplannedplanned 2028Windpark Altenkattbek GmbH & Co. KG
2440713.45 MWVestas Deutschland GmbHin operation2023-04-20Windpark Loop GmbH & Co. KG
2440703.45 MWVestas Deutschland GmbHin operation2023-04-18Windpark Loop GmbH & Co. KG
Papenkamp / 3013513.37 MWSenvion Deutschland GmbHin operation2017-06-22WP Papenkamp GmbH & Co. KG
WEA 2 / 32006303.20 MWSiemens Wind Power GmbH & Co. KGin operation2016-12-07Quarnbek Windenergie 1 GmbH & Co. KG
WEA 1 / 32006293.20 MWSiemens Wind Power GmbH & Co. KGin operation2016-11-30Quarnbek Windenergie 2 GmbH & Co. KG
WEA 3 / 32006313.20 MWSiemens Wind Power GmbH & Co. KGin operation2016-12-09Bürgerwind Quarnbek GmbH & Co. KG
WEA 11 / 3006783.17 MWSenvion Deutschland GmbHin operation2015-12-10GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 6 / 3006393.17 MWSenvion Deutschland GmbHin operation2014-12-10Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 7 / 6006643.17 MWSenvion Deutschland GmbHin operation2015-01-26GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 10 / 3007703.17 MWSenvion Deutschland GmbHin operation2015-11-25GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 1 / 3006683.17 MWSenvion Deutschland GmbHin operation2015-02-10GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 9 / 3006693.17 MWSenvion Deutschland GmbHin operation2015-11-20Bürgerwindpark Mittelholstein GmbH & Co. KG
WEA 1 / 3001523.17 MWSenvion Deutschland GmbHin operation2012-12-19GREE Windpark Holtsee GmbH & Co. KG
WEA 1 / 3006383.17 MWSenvion Deutschland GmbHin operation2014-11-26Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 3 / 3005053.17 MWSenvion Deutschland GmbHin operation2014-02-18Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 6 / 3006753.17 MWSenvion Deutschland GmbHin operation2015-01-27Bürgerwindpark Mittelholstein GmbH & Co. KG
WEA 8 / 3005033.17 MWSenvion Deutschland GmbHin operation2013-12-20Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 5 / 3005093.17 MWSenvion Deutschland GmbHin operation2014-11-14Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 3 / 3002243.17 MWSenvion Deutschland GmbHin operation2012-12-22GREE Windpark Holtsee GmbH & Co. KG
WEA 4 / 3005043.17 MWSenvion Deutschland GmbHin operation2013-12-31Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 7 / 3005073.17 MWSenvion Deutschland GmbHin operation2014-04-11Bürgerwindpark Holtsee-Altenhof GmbH & Co. KG
WEA 8 / 3006763.17 MWSenvion Deutschland GmbHin operation2015-02-09GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 2 / 3006673.17 MWSenvion Deutschland GmbHin operation2015-02-04Bürgerwindpark Mittelholstein GmbH & Co. KG
WEA 4 / 3006653.17 MWSenvion Deutschland GmbHin operation2015-02-02GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 3 / 3006663.17 MWSenvion Deutschland GmbHin operation2015-02-05GREE Mittelholstein Windenergie GmbH & Co. KG
WEA 2 / 3006373.17 MWSenvion Deutschland GmbHin operation2014-12-04Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 9 / 3005083.17 MWSenvion Deutschland GmbHin operation2014-04-30Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 5 / 3006743.17 MWSenvion Deutschland GmbHin operation2015-01-26Bürgerwindpark Mittelholstein GmbH & Co. KG
WEA 2 / 3002303.17 MWSenvion Deutschland GmbHin operation2012-12-19GREE Windpark Holtsee GmbH & Co. KG
WEA 12 / 3006703.17 MWSenvion Deutschland GmbHin operation2015-12-16GREE Mittelholstein Windenergie GmbH & Co. KG
Clara von Mahlsteyn3.17 MWSenvion Deutschland GmbHin operation2015-11-26Ilewind GmbH & Co. KG
WEA 10 / 3005063.17 MWSenvion Deutschland GmbHin operation2014-04-23Holtsee-Altenhof Windenergie GmbH & Co. KG
WEA 3 / 834363.15 MWNordex SEin operation2015-02-03Windpark Sehestedt GmbH & Co. KG
WEA 4 / 834373.15 MWNordex SEin operation2015-01-06Windpark Sehestedt GmbH & Co. KG
WEA 2 / 834353.15 MWNordex SEin operation2015-01-02Windpark Sehestedt GmbH & Co. KG
WEA 1 / 834343.15 MWNordex Energy GmbHin operation2014-12-17Windpark Sehestedt GmbH & Co. KG
V 201984-043.08 MWVestas Deutschland GmbHin operation2013-11-12P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
V 201983-033.08 MWVestas Deutschland GmbHin operation2013-12-09P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
V 201982-023.08 MWVestas Deutschland GmbHin operation2013-11-21P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
V 201981-013.08 MWVestas Deutschland GmbHin operation2013-12-09P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
V 201985-053.08 MWVestas Deutschland GmbHin operation2013-12-11P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
V 201986-063.08 MWVestas Deutschland GmbHin operation2013-11-12P & T Windpark Bokel/Ellerdorf GmbH & Co. Betriebs-KG Renditefonds
WEA 0023.05 MWENERCON GmbHin operation2016-03-25Bürgerwindpark Seefeld-Gokels GmbH & Co.KG
WP Bendorf WEA 13.05 MWENERCON GmbHin operation2014-12-30Bürgerwindpark Bendorf-Oersdorf GmbH & Co. KG
WEA 4 / 10112493.05 MWENERCON GmbHin operation2016-03-11Bürgerwindpark Mittelholstein GmbH & Co. KG
Bendorf 043.05 MWENERCON GmbHin operation2014-11-14Trianel Onshore-Windkraftwerk Bendorf-Oersdorf GmbH & Co. KG
WP Bendorf WEA 23.05 MWENERCON GmbHin operation2014-12-01Bürgerwindpark Bendorf-Oersdorf GmbH & Co. KG
WEA 0063.05 MWENERCON GmbHin operation2016-06-22Bürgerwindpark Seefeld-Gokels GmbH & Co.KG
WEA 2 / 10112473.05 MWENERCON GmbHin operation2016-06-30Bürgerwindpark Mittelholstein GmbH & Co. KG
WEA 3 / 10112483.05 MWENERCON GmbHin operation2016-01-21DW-Bürger Mittelholstein GmbH & Co. KG
Bendorf 073.05 MWENERCON GmbHin operation2014-11-14Trianel Onshore-Windkraftwerk Bendorf-Oersdorf GmbH & Co. KG
10112423.05 MWENERCON GmbHin operation2016-06-14Windpark GmbH & Co. Seefeld-Gokels KG
10112393.05 MWENERCON GmbHin operation2016-05-11Windpark GmbH & Co. Seefeld-Gokels KG
WEA 1 / 10112463.05 MWENERCON GmbHin operation2016-06-21GREE Mittelholstein Windenergie GmbH & Co. KG
WP Bendorf WEA 53.05 MWENERCON GmbHin operation2014-11-24Bürgerwindpark Bendorf-Oersdorf GmbH & Co. KG
WEA 5 / 10112503.05 MWENERCON GmbHin operation2016-04-29GREE Mittelholstein Windenergie GmbH & Co. KG
Bendorf 063.05 MWENERCON GmbHin operation2014-10-21Trianel Onshore-Windkraftwerk Bendorf-Oersdorf GmbH & Co. KG
WEA 0033.05 MWENERCON GmbHin operation2016-06-20Bürgerwindpark Seefeld-Gokels GmbH & Co.KG
10112453.05 MWENERCON GmbHin operation2016-06-30Windpark GmbH & Co. Seefeld-Gokels III KG
10112433.05 MWENERCON GmbHin operation2016-06-17Windpark GmbH & Co. Seefeld-Gokels II KG
Bendorf 083.05 MWENERCON GmbHin operation2014-11-26Trianel Onshore-Windkraftwerk Bendorf-Oersdorf GmbH & Co. KG
Bendorf 033.05 MWENERCON GmbHin operation2014-11-14Trianel Onshore-Windkraftwerk Bendorf-Oersdorf GmbH & Co. KG
WP Bendorf WEA 93.05 MWENERCON GmbHin operation2014-12-15RoSa Wind GmbH Co. KG
83924-N1173.00 MWNordex SEin operation2015-08-19Bürgerwindpark Osterstedt GmbH & Co. KG
84722-033.00 MWNordex Energy GmbHin operation2016-08-24Energiepark Schlei-Ostsee
unit operated by a private individual3.00 MWNordex Energy GmbHin operation2016-06-02private individual
84720-053.00 MWNordex Energy GmbHin operation2016-09-09Energiepark Schlei-Ostsee
84723-043.00 MWNordex Energy GmbHin operation2016-09-16Energiepark Schlei-Ostsee
unit operated by a private individual3.00 MWNordex Energy GmbHin operation2016-05-09private individual
WEA Hamdorf 1 (NX85522)3.00 MWNordex SEin operation2017-09-29Windpark Hamdorf GmbH & Co. KG
84721-023.00 MWNordex Energy GmbHin operation2016-09-01Energiepark Schlei-Ostsee
83922-N1173.00 MWNordex SEin operation2015-08-04Bürgerwindpark Osterstedt GmbH & Co. KG
unit operated by a private individual3.00 MWNordex Energy GmbHin operation2016-05-26private individual
unit operated by a private individual3.00 MWNordtank Energy Groupin operation2016-05-17private individual
83923-N1173.00 MWNordex SEin operation2015-08-12Bürgerwindpark Osterstedt GmbH & Co. KG
83925-N1173.00 MWNordex SEin operation2015-08-25Bürgerwindpark Osterstedt GmbH & Co. KG

The 300 largest units are listed.

Which organisations operate the most wind power capacity in Rendsburg-Eckernförde?

OperatorUnitsCapacity
Windpark Holtsee Lindau GmbH & Co. KG1072.0 MW
BWP GT Betriebs GmbH & Co. KG955.2 MW
Windpark Bredenbek GmbH951.3 MW
WP Wulfshagen Repowering GmbH & Co. KG849.6 MW
Windpark Grünholz GmbH & Co. KG743.8 MW
Bürgerwindpark Ehndorf GmbH & Co. KG642.0 MW
Bürgerwindpark Jevenstedt GmbH & Co. KG937.8 MW
Windpark Altenkattbek GmbH & Co. KG634.2 MW
Windpark Bokel GmbH & Co. KG634.2 MW
ENERTRAG SE533.0 MW

Which manufacturer accounts for the most wind power capacity in Rendsburg-Eckernförde?

ManufacturerUnitsCapacity
Vestas Deutschland GmbH109561.7 MW
Nordex Energy GmbH96417.6 MW
Nordex Germany GmbH35198.8 MW
ENERCON GmbH48145.0 MW
Senvion Deutschland GmbH38108.8 MW
Nordex SE1462.4 MW
GE Renewable Germany GmbH527.5 MW
Siemens Gamesa Renewable Energy GmbH & Co. KG426.4 MW
GE Wind Energy GmbH316.5 MW
Sonstige1912.7 MW

Wind power in Schleswig-Holstein · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Rendsburg-Eckernförde (Schleswig-Holstein), and h can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.