Germany · renewables
Wind power in Stormarn
40 wind turbines with 89.1 MW of gross capacity were in operation in Stormarn (Schleswig-Holstein) as of 2026-11-05, with a further 7 units (32.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Stormarn (Schleswig-Holstein), and how large are they, as of 2026-11-05?
- 40 wind turbines with 89.1 MW of gross capacity were in operation in Stormarn (Schleswig-Holstein) as of 2026-11-05, with a further 7 units (32.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Stormarn?
- 40 wind turbines with 89.1 MW of gross capacity were in operation in Stormarn as of 2026-11-05, with a further 7 units (32.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Stormarn in 2025?
- 5 wind turbines with 22.8 MW went into operation in Stormarn in 2025; the strongest year of the last two decades was 2025 with 22.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Stormarn?
- Windpark Stubben-Rehhorst GmbH & Co. KG operates 6 wind turbines with 32.2 MW in Stormarn, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Stormarn?
- ENERCON GmbH leads with 15 wind turbines and 39.6 MW in Stormarn (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Stormarn?
- The largest registered wind turbine in Stormarn has 6.00 MW of gross capacity and is operated by Windpark Stubben-Rehhorst GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Stormarn distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 5 | 0.02 MW | 3 | 1 |
| 30 to 100 kW | 1 | 0.08 MW | 1 | 0 |
| over 100 kW | 54 | 138.1 MW | 36 | 6 |
How much wind power capacity was commissioned in Stormarn each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 3 | 8.40 MW |
| 2025 | 5 | 22.8 MW |
| 2023 | 4 | 16.8 MW |
| 2021 | 1 | 0.00 MW |
| 2019 | 3 | 10.3 MW |
| 2017 | 1 | 0.01 MW |
| 2016 | 1 | 3.05 MW |
How many wind turbines in Stormarn are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 40 | 89.1 MW |
| planned | 7 | 32.3 MW |
| permanently decommissioned | 13 | 16.8 MW |
Which wind turbines are registered in Stormarn?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 6 / Stubben-Rehorst | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 1_WP Lasbek 2 | 5.70 MW | Nordex SE | in operation | 2025-12-04 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 3 / Stubben-Rehorst | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 5 / Stubben-Rehorst | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 4_WP Lasbek 2 | 5.70 MW | Nordex SE | in operation | 2025-12-04 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 2_WP Lasbek 2 | 5.70 MW | Nordex SE | in operation | 2025-12-04 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 4 / Stubben-Rehorst | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 2 / Stubben-Rehorst | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| WEA 3_WP Lasbek 2 | 5.70 MW | Nordex SE | in operation | 2025-12-04 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Schadehorn, WKA 02 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-06 | Stadtwerke Bad Oldesloe |
| WEA 01 - WP Heilshoop | 4.20 MW | ENERCON GmbH | in operation | 2026-08-17 | Windpark Heilshoop GmbH & Co. KG |
| WP Schadehorn, WKA 01 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-20 | Stadtwerke Bad Oldesloe |
| WP Schadehorn, WKA 04 | 4.20 MW | ENERCON GmbH | in operation | 2023-03-24 | Stadtwerke Bad Oldesloe |
| WEA 02 - WP Heilshoop | 4.20 MW | ENERCON GmbH | in operation | 2026-08-18 | Windpark Heilshoop GmbH & Co. KG |
| WP Schadehorn, WKA 03 | 4.20 MW | ENERCON GmbH | in operation | 2023-05-12 | Stadtwerke Bad Oldesloe |
| WEA 1 / Stubben-Rehorst | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Stubben-Rehhorst GmbH & Co. KG |
| 231229 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-19 | Windpark Barkhorst GmbH & Co. KG |
| 231230 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-18 | Windpark Barkhorst GmbH & Co. KG |
| 231228 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-18 | Windpark Barkhorst GmbH & Co. KG |
| Bad Oldesloe | 3.05 MW | ENERCON GmbH | in operation | 2016-03-31 | Stormarn-Wind Energie GmbH Wolkenwehe & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-08 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-07 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-09 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-09 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-09 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-09-03 | private individual |
| WEA 6 / 70205 | 1.50 MW | – | in operation | 2002-11-30 | Windpark Havighorst GmbH & Co. Betriebs KG |
| 23243 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-29 | AT Windpark Rethwisch ApS & Co. KG |
| WEA 1 / 70220 | 1.50 MW | – | in operation | 2002-11-30 | Windpark Havighorst GmbH & Co. Betriebs KG |
| WEA 2 / 70221 | 1.50 MW | – | in operation | 2002-12-02 | Windpark Havighorst GmbH & Co. Betriebs KG |
| WEA 04: 16011 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-10-17 | EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG |
| WEA 01: 16012 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-10-17 | EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG |
| 23244 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-29 | AT Windpark Rethwisch ApS & Co. KG |
| 23242 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-29 | AT Windpark Rethwisch ApS & Co. KG |
| WEA 3 / 70206 | 1.50 MW | – | in operation | 2002-11-28 | Windpark Havighorst GmbH & Co. Betriebs KG |
| WEA 05: 16013 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-10-17 | EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG |
| WEA 02: 16014 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-10-17 | EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG |
| WEA 4 / 70189 | 1.50 MW | – | in operation | 2002-11-27 | Windpark Havighorst GmbH & Co. Betriebs KG |
| WEA 03: 16015 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-10-17 | EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG |
| WEA 5 / 70190 | 1.50 MW | – | in operation | 2002-11-19 | Windpark Havighorst GmbH & Co. Betriebs KG |
| AN 1300-986-04 | 1.30 MW | AN Windenergie GmbH | in operation | 2004-07-01 | Windpark Eichede GmbH & Co. KG |
| AN 1300-991-03 | 1.30 MW | AN Windenergie GmbH | in operation | 2004-07-07 | Windpark Eichede GmbH & Co. KG |
| AN 1300-989-01 | 1.30 MW | AN Windenergie GmbH | in operation | 2004-07-14 | Windpark Eichede GmbH & Co. KG |
| AN 1300-988-02 | 1.30 MW | AN Windenergie GmbH | in operation | 2004-07-09 | Windpark Eichede GmbH & Co. KG |
| WEA 3 / 56016 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| WEA 6 / 56019 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| WEA 4 / 56017 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| WEA 5 / 56018 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| WEA 2 / 56015 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| WEA 1 / 56014 | 1.00 MW | – | permanently decommissioned | 1998-10-05 | Denker & Wulf AG |
| V2151 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-02-15 | Windpark Eurowind DE GmbH & Co. KG |
| VS WEA Blumendorf | 0.50 MW | ENERCON GmbH | in operation | 1995-11-10 | Vereinigte Stadtwerke GmbH |
| 150 558 | 0.15 MW | AN Windanlagen GmbH | in operation | 1992-12-23 | Windpark Eurowind DE GmbH & Co. KG |
| 150 559 | 0.15 MW | Sonstige | in operation | 1992-12-23 | Windpark Eurowind DE GmbH & Co. KG |
| Windrad | 0.08 MW | ENERCON GmbH | in operation | 1990-11-27 | Stadtwerke Reinfeld |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | in operation | 2017-02-03 | private individual |
| unit operated by a private individual | 0.00 MW | BRAUN Windturbinen GmbH | in operation | 2021-04-13 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | permanently decommissioned | 2025-03-31 | private individual |
| . | 0.00 MW | SkyWind GmbH | in operation | 2026-07-23 | Grundstücksgemeinschaft Schröder & Wöhrl eGbR |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2025 | private individual |
Which organisations operate the most wind power capacity in Stormarn?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Stubben-Rehhorst GmbH & Co. KG | 6 | 32.2 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 4 | 22.8 MW |
| Stadtwerke Bad Oldesloe | 4 | 16.8 MW |
| Windpark Barkhorst GmbH & Co. KG | 3 | 10.3 MW |
| Windpark Havighorst GmbH & Co. Betriebs KG | 6 | 9.00 MW |
| Windpark Heilshoop GmbH & Co. KG | 2 | 8.40 MW |
| EREM European Renewable Energy Management GmbH & Co. 1. German Wind KG | 5 | 7.50 MW |
| Denker & Wulf AG | 6 | 6.00 MW |
| Windpark Eichede GmbH & Co. KG | 4 | 5.20 MW |
| AT Windpark Rethwisch ApS & Co. KG | 3 | 4.50 MW |
Which manufacturer accounts for the most wind power capacity in Stormarn?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 15 | 39.6 MW |
| Nordex SE | 4 | 22.8 MW |
| Nordex Energy GmbH | 4 | 22.8 MW |
| Vestas Deutschland GmbH | 6 | 20.4 MW |
| NEG Micon Deutschland GmbH | 8 | 12.0 MW |
| AN Windenergie GmbH | 4 | 5.20 MW |
| Sonstige | 2 | 0.15 MW |
| AN Windanlagen GmbH | 1 | 0.15 MW |
| PSW-Energiesysteme GmbH | 1 | 0.01 MW |
| BRAUN Windturbinen GmbH | 1 | 0.00 MW |
Wind power in Schleswig-Holstein · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Stormarn (Schleswig-Holstein), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.