Wind power in Dithmarschen
900 wind turbines with 2.39 GW of gross capacity were in operation in Dithmarschen (Schleswig-Holstein) as of 2026-11-05, with a further 67 units (375.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Dithmarschen (Schleswig-Holstein), and how large are they, as of 2026-11-05?
- 900 wind turbines with 2.39 GW of gross capacity were in operation in Dithmarschen (Schleswig-Holstein) as of 2026-11-05, with a further 67 units (375.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Dithmarschen?
- 900 wind turbines with 2.39 GW of gross capacity were in operation in Dithmarschen as of 2026-11-05, with a further 67 units (375.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Dithmarschen in 2025?
- 7 wind turbines with 32.4 MW went into operation in Dithmarschen in 2025; the strongest year of the last two decades was 2023 with 372.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Dithmarschen?
- Bürgerwindpark Eider GmbH & Co. KG operates 22 wind turbines with 72.9 MW in Dithmarschen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Dithmarschen?
- ENERCON GmbH leads with 505 wind turbines and 1.25 GW in Dithmarschen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Dithmarschen?
- The largest registered wind turbine in Dithmarschen has 7.20 MW of gross capacity and is operated by Windpark Volsemenhusen Nord GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Dithmarschen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 64 | 0.54 MW | 61 | 2 |
| 30 to 100 kW | 2 | 0.13 MW | 1 | 1 |
| over 100 kW | 1,035 | 2.90 GW | 838 | 64 |
How much wind power capacity was commissioned in Dithmarschen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 7 | 32.4 MW |
| 2025 | 7 | 32.4 MW |
| 2024 | 26 | 120.2 MW |
| 2023 | 76 | 372.4 MW |
| 2022 | 27 | 104.7 MW |
| 2021 | 14 | 41.2 MW |
| 2020 | 8 | 10.9 MW |
| 2018 | 10 | 16.3 MW |
| 2017 | 47 | 141.8 MW |
| 2016 | 63 | 181.0 MW |
| 2015 | 98 | 265.6 MW |
| 2014 | 91 | 243.2 MW |
| 2013 | 65 | 156.4 MW |
| 2012 | 77 | 177.9 MW |
| 2011 | 85 | 179.5 MW |
| 2010 | 70 | 138.6 MW |
| 2009 | 52 | 109.1 MW |
| 2008 | 9 | 16.9 MW |
| 2007 | 4 | 3.16 MW |
| 2006 | 7 | 9.95 MW |
How many wind turbines in Dithmarschen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 900 | 2.39 GW |
| planned | 67 | 375.7 MW |
| permanently decommissioned | 133 | 131.8 MW |
| temporarily shut down | 1 | 0.00 MW |
Which wind turbines are registered in Dithmarschen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Volsemenhusen Nord 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Volsemenhusen Nord GmbH & Co. KG |
| Volsemenhusen Nord 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Volsemenhusen Nord GmbH & Co. KG |
| WEA 2 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 5 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 3 - 018 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Doseweg GmbH & Co. KG |
| WEA 02 N163 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Betreibergesellschaft Hemme I KG |
| Hedwigenkoog Schettiger | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windkraft Schettiger GmbH & Co. KG |
| Neuenkrug II | 7.00 MW | Nordex SE | planned | planned 2029 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| WEA 8 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 1 E175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EWK EIDER-WIND-KRAFT GmbH & Co. Wulfenhusen KG |
| Hedwigenkoog von Hemm | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark von Hemm GmbH & Co. KG |
| WEA 5 - 020 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Doseweg GmbH & Co. KG |
| unit operated by a private individual | 7.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 01 N163 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Betreibergesellschaft Repowering Hemme I GmbH & Co. KG |
| Hedwigenkoog BWP | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwindpark Hedwigenkoog GmbH & Co. KG |
| WEA 4 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 1 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA/ NR -Wärmepumpe- | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Buergerwindpark Hennstedt Gmbh & Co. KG |
| WEA 3 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 6 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| WEA 4 - 019 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Doseweg GmbH & Co. KG |
| WEA 7 - N163/6.X | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | WP Dingen GmbH & Co. KG |
| Neuenkrug I | 7.00 MW | Nordex SE | planned | planned 2029 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| WEA 1 - 016 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Doseweg GmbH & Co. KG |
| WEA 2 - 017 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Doseweg GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Repowering Sophienhof GmbH & Co. KG |
| Neuenkrug III | 7.00 MW | Nordex SE | planned | planned 2029 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| Hedwigenkoog Deichwind | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Deichwind GmbH & Co. KG |
| WEA 2 E175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | EWK EIDER-WIND-KRAFT GmbH & Co. Wulfenhusen KG |
| WEA1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Wöhrden I Repowering GmbH & Co. KG |
| WEA 03 N163 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Betreibergesellschaft Hemme I KG |
| Windpark Kanzlei WEA 11 | 6.80 MW | Nordex Energy GmbH | in operation | 2024-10-07 | Windpark Kanzlei GmbH & Co. KG |
| SG-6600299-06 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2025-04-08 | Nordermeldorf-Wind GmbH & Co. KG |
| SG-6600300-07 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2025-04-15 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA-1 | 6.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-05-31 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA-2 | 6.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-06-14 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA-5 | 6.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-05-08 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA-4 | 6.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-06-09 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA-3 | 6.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2023-06-15 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA6 S/N: 246041 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-04-29 | Repowering Wöhrden Poolgesellschaft |
| WEA4 S/N: 246039 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-03-31 | Repowering Wöhrden Poolgesellschaft |
| WEA 1 - 249846 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-04-23 | Mohr Windkraft GmbH & Co. KG |
| WEA2 S/N: 246037 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-03-31 | Repowering Wöhrden Poolgesellschaft |
| WEA1 S/N: 246036 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-04-13 | Repowering Wöhrden Poolgesellschaft |
| WEA7 S/N: 246042 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-05-07 | Repowering Wöhrden Poolgesellschaft |
| WEA5 S/N: 246040 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-04-20 | Repowering Wöhrden Poolgesellschaft |
| 246038 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2023-05-04 | Windpark Looft-Pehrsenweg GmbH & Co. KG |
| WEA Lohe | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-06-13 | Looft-Schmidt GmbH & Co. 4. Betriebs KG |
| WP Tensbüttel WEA1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-05-04 | Looft-Schmidt GmbH & Co. 3. Betriebs KG |
| WEA 1 - 244062 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-04-08 | Windenergie Norderhamme GmbH & Co. KG |
| WEA 1 - 250055 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-09-16 | Neuhofer Nord Windenergie GmbH & Co. KG |
| WEA 5 - 246834 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-11-13 | Windpark Gudendorf I GmbH & Co. KG |
| WEA 3 - 250054 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-08-22 | Neuhofer Windenergie GmbH & Co. KG |
| WEA 1 - 246830 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-08-15 | Windpark Gudendorf I GmbH & Co. KG |
| WEA 4-250052 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-08-13 | Energie für die Geest eG |
| WEA 7-250057 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-08-08 | Eggstedter Windkraft GmbH & Co. KG |
| WEA 3 - 246832 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-07-26 | Windpark Gudendorf I GmbH & Co. KG |
| WEA 2 - 246831 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-06 | Windpark Gudendorf I GmbH & Co. KG |
| WEA 1 Tiebensee | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-06-27 | Norderdithmarscher Wind 2 GmbH & Co. KG |
| WP Tensbüttel WEA2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-05-24 | Looft-Schmidt GmbH & Co. 3. Betriebs KG |
| WEA 2 - 244063 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-04-20 | Windenergie Norderhamme GmbH & Co. KG |
| WEA 5 Tiebensee | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-06-23 | Windpark Tiebensee WEA 5 GmbH & Co. KG |
| WEA 2 - 250053 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-09-16 | Neuhofer Windenergie GmbH & Co. KG |
| WEA Hägen- 244064 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-05-25 | Bürgerwindpark Hägen GmbH & Co. KG |
| WEA 6 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-10-04 | Tiebensee Energie II GmbH & Co. KG |
| WEA 6-250056 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-08-06 | Bürgerwind Südergeest Erweiterung GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-05-09 | Tiebensee Energie I GmbH & Co. KG |
| WEA 4 Tiebensee | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-06-30 | Piening Wind TS GmbH & Co. KG |
| WEA 3 Tiebensee | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-06-28 | Norderdithmarscher Wind 1 GmbH & Co. KG |
| WEA 4 - 246833 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-10-10 | Windpark Gudendorf I GmbH & Co. KG |
| WEA 5-250058 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-08-06 | Bürgerwind Südergeest Erweiterung GmbH & Co. KG |
| WEA Schlickland | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| WEA Schultz | 5.70 MW | Nordex Energy GmbH | in operation | 2023-10-20 | WEA Schultz GmbH & Co. KG |
| WEA / Marner Neuenkoogsdeich Erw. II | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | Denker & Wulf AG |
| WEA 2 – 90403 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-12-06 | Vettenbüttel Wind GmbH & Co. KG |
| WP WöNW 1 | 5.70 MW | Nordex SE | in operation | 2026-03-31 | Looft-Schmidt GmbH & Co. 6.Betriebs KG |
| WEA 1 – 90404 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-12-16 | Vettenbüttel Wind GmbH & Co. KG |
| Wiemerstedt WEA3 | 5.70 MW | Nordex SE | in operation | 2024-02-06 | EnBW Windkraftprojekte GmbH |
| WP Mittelkoog WEA 2 neu | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Mittelkoog GmbH & Co. KG |
| WEA 3 - 90405 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-12-08 | Vettenbüttel Wind GmbH & Co. KG |
| WEA 5 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| Hemme Repowering N149 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-06-15 | Uhl Windkraft Objekt 104 GmbH & Co. KG |
| N 149 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-03-26 | Bürgerwindpark Süderdeich |
| WP WöNW 3 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-03-31 | Sibirien Wind GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| WEA Balje | 5.70 MW | Nordex Energy GmbH | in operation | 2023-10-20 | WEA Balje GmbH & Co. KG |
| Windpark Kanzlei WEA 12 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-10-08 | Windpark Kanzlei GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| WP WöNW 2 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-03-31 | Looft-Schmidt GmbH & Co. 5. Betriebs KG |
| Windpark Wiemerstedt WEA2 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-02-06 | Windpark Wiemerstedt GmbH & Co. KG |
| WEA 2 - 92845 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-07-15 | Koogwind GmbH & Co. KG |
| Trennewurth N 149 | 5.70 MW | Nordex SE | in operation | 2023-06-20 | Uhl Windkraft Objekt 106 GmbH & Co. KG |
| WEA Bruhnsdorf | 5.70 MW | Nordex SE | planned | planned 2027 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| WEA 6 | 5.70 MW | Nordex SE | planned | planned 2028 | Windpark Schafstedt GmbH & Co. KG |
| WEA 1 - 92844 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-07-15 | Koogwind GmbH & Co. KG |
| WEA Karolinenkoog | 5.70 MW | Nordex Energy GmbH | in operation | 2023-07-27 | WEA Karolinenkoog GmbH & Co. KG |
| WEA 1 - RDJ | 5.70 MW | Nordex SE | planned | planned 2027 | Windpark RDJ GmbH & Co. KG |
| Windpark Wiemerstedt WEA1 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-02-06 | Windpark Wiemerstedt II GmbH & Co. KG |
| WP Mittelkoog WEA 3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Mittelkoog GmbH & Co. KG |
| WP Mittelkoog WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Mittelkoog GmbH & Co. KG |
| Conny N149 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | SchäHo Wind GmbH & Co. KG |
| Windpark Kanzlei WEA 10 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-10-15 | Windpark Kanzlei GmbH & Co. KG |
| Windpark Schlaa GmbH & Co. KG | 5.50 MW | ENERCON GmbH | in operation | 2023-11-06 | Windpark Schlaa |
| WEA 1 | 5.00 MW | ENERCON GmbH | in operation | 2023-02-24 | Windpark Krumstedter Viert GmbH & Co. KG |
| WEA 2 | 5.00 MW | ENERCON GmbH | in operation | 2023-07-05 | Windpark Krumstedter Viert GmbH & Co. KG |
| WEA 3 | 5.00 MW | ENERCON GmbH | in operation | 2023-02-26 | Windpark Krumstedter Viert GmbH & Co. KG |
| WEA 8 | 5.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2023-08-11 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA 9 | 5.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2023-07-27 | Nordermeldorf-Wind GmbH & Co. KG |
| WEA 6 | 4.80 MW | Nordex Energy GmbH | planned | planned 2028 | Repowering Windpark Ohlenbrook GmbH & Co. KG |
| TW SM WEA 1 | 4.80 MW | Nordex SE | in operation | 2023-06-19 | Trennewurth Südermarsch GmbH & Co. KG |
| WEA 3 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ERG Wind Brunsbüttel GmbH & Co. KG |
| WEA 2 - 96773 | 4.80 MW | Nordex Energy GmbH | in operation | 2026-09-16 | Repowering Windpark Ohlenbrook GmbH & Co. KG |
| WEA 4 | 4.80 MW | Nordex Energy GmbH | planned | planned 2028 | Repowering Windpark Ohlenbrook GmbH & Co. KG |
| TW WW WEA 1 | 4.80 MW | Nordex SE | in operation | 2023-06-14 | Trennewurth Warftwind GmbH & Co. KG |
| WEA 1 | 4.80 MW | Nordex Energy GmbH | planned | planned 2026 | ERG Wind Brunsbüttel GmbH & Co. KG |
| Hemme Repowering N133 | 4.80 MW | Nordex SE | in operation | 2023-06-15 | Uhl Windkraft Objekt 105 GmbH & Co. KG |
| WEA 1 - 91668 | 4.80 MW | Nordex Germany GmbH | in operation | 2023-09-20 | Koogwind GmbH & Co. KG |
| WKA 1 | 4.80 MW | Nordex Energy GmbH | in operation | 2023-10-23 | Windenergie Groven GmbH & Co. KG |
| Hemme Wind | 4.80 MW | Nordex Energy GmbH | in operation | 2023-09-20 | Hemme Wind GmbH & Co. KG |
| WEA 1 - Nordex | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | Hansen & Lamp Planungs-GbR |
| WEA 3 - 91864 | 4.80 MW | Nordex Germany GmbH | in operation | 2023-09-20 | Koogwind GmbH & Co. KG |
| WEA FIP | 4.80 MW | Nordex Germany GmbH | planned | planned 2029 | Looft-Schmidt Projekte Erneuerbarer Energien GmbH |
| WEA 4 - 91669 | 4.80 MW | Nordex Germany GmbH | in operation | 2023-09-20 | Koogwind GmbH & Co. KG |
| WEA 5 - 96772 | 4.80 MW | Nordex Energy GmbH | in operation | 2026-09-09 | Repowering Windpark Ohlenbrook GmbH & Co. KG |
| WEA 2 - 91667 | 4.80 MW | Nordex Germany GmbH | in operation | 2023-09-20 | Koogwind GmbH & Co. KG |
| WEA Holmlichtern - 88559 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-02-11 | Holmlichtern UG (haftungsbeschränkt) & Co. KG |
| WEA 1 - Norderwisch | 4.50 MW | Nordex SE | in operation | 2022-12-28 | Windpark Norderwisch GmbH & Co. KG |
| WEA 2 - Norderwisch | 4.50 MW | Nordex SE | in operation | 2022-12-29 | Windpark Norderwisch GmbH & Co. KG |
| Grünstrom 2 | 4.26 MW | ENERCON GmbH | in operation | 2024-11-22 | Windenergie Süderstrom |
| Deutsche WindXperts 1. | 4.26 MW | ENERCON GmbH | in operation | 2025-08-21 | Deutsche WindXperts 1. |
| Bürgerwind Südermarsch II WEA 2 | 4.20 MW | ENERCON GmbH | in operation | 2023-02-28 | Bürgerwind Südermarsch II GmbH & Co. KG |
| 4.4-Wind WEA 2 | 4.20 MW | ENERCON GmbH | in operation | 2023-10-27 | 4.4.-Wind GmbH & Co. KG |
| ET Marschland - 1160069 | 4.20 MW | ENERCON GmbH | in operation | 2022-07-22 | ET Marschland GmbH & Co. KG |
| WEA 3 - 1160234 | 4.20 MW | ENERCON GmbH | in operation | 2024-10-28 | Westerfleth GmbH & Co. KG |
| WEA 1 / Süderdeich | 4.20 MW | ENERCON GmbH | in operation | 2023-08-25 | Süderdeich Repowering GmbH & Co. KG |
| WEA Tiebensee | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-03-16 | Windpark Jarrenwisch GmbH & Co. 11. Windkraft KG |
| WEA 7 E-115 (S-Nr. 1160029) | 4.20 MW | ENERCON GmbH | in operation | 2022-03-10 | Bürgerwindpark Stelle-Wittenwurth GmbH & Co. KG |
| WEA 1 - 1160170 | 4.20 MW | ENERCON GmbH | in operation | 2023-06-12 | WEA Thöming GmbH & Co. KG |
| WEA Oesterwurth | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-01-19 | BWP Oesterwurth GmbH & Co. 1. Betriebs KG |
| WEA1 - E115 | 4.20 MW | ENERCON GmbH | in operation | 2024-11-08 | SB Wind Kannemoor GmbH & Co. KG |
| Flachswehl E115 | 4.20 MW | ENERCON GmbH | in operation | 2025-04-02 | Fahrengreth Windpark |
| AVK Wind | 4.20 MW | ENERCON GmbH | in operation | 2023-12-20 | AVK Wind GmbH & Co. KG |
| WEA Lieth | 4.20 MW | ENERCON GmbH | in operation | 2021-11-05 | Windenergie Lieth GmbH & Co. KG |
| WEA1-E115 | 4.20 MW | ENERCON GmbH | planned | planned 2027 | Fri-Wind GmbH & Co. KG |
| WEA3 HHU | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-09-06 | Windpark HHU Poolgesellschaft mbH |
| WEA 1 Repowering Siddeldeich | 4.20 MW | ENERCON GmbH | in operation | 2023-09-28 | Repowering Siddeldeich GmbH & Co. KG |
| Wahrtstrom 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| 4.4-Wind WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2023-12-11 | 4.4.-Wind GmbH & Co. KG |
| Karolinenkoog WEA 4 | 4.20 MW | ENERCON GmbH | in operation | 2023-11-17 | Meyer Energie GmbH & Co. KG |
| WKA Scheld | 4.20 MW | ENERCON GmbH | in operation | 2023-05-05 | WKA Scheld GmbH & Co. KG |
| WEA4 HHU | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-09-15 | Windpark HHU Poolgesellschaft mbH |
| WEA1 HHU | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-10-24 | Windpark HHU Poolgesellschaft mbH |
| WEA 1 - 1160232 | 4.20 MW | ENERCON GmbH | in operation | 2024-11-14 | Westerfleth GmbH & Co. KG |
| WEA 1 - E115 | 4.20 MW | ENERCON GmbH | in operation | 2023-08-01 | WEA Hochwöhrden UG (haftungsbeschränkt) & Co. KG |
| Wahrtstrom 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| Bürgerwind Südermarsch AVK | 4.20 MW | ENERCON GmbH | in operation | 2023-12-19 | Bürgerwind Südermarsch GmbH & Co. KG |
| Wahrtstrom 6 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| Wahrtstrom 4 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| 4.4-Wind WEA 4 | 4.20 MW | ENERCON GmbH | in operation | 2023-11-23 | 4.4.-Wind GmbH & Co. KG |
| Hemme Moorweg Repowering WEA 3 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-22 | Güldenzoph Windenergie GmbH & Co. KG |
| WEA3-E-115 | 4.20 MW | ENERCON GmbH | in operation | 2025-02-12 | Wind für Wasser GmbH |
| Hemme Moorweg Repowering WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2022-12-29 | Uhl Windkraft Objekt 102 GmbH & Co. KG |
| WEA 2 Süderdorf Enercon E138 | 4.20 MW | ENERCON GmbH | in operation | 2022-02-11 | Elnema Wind UG ( haftungsbeschränkt) & C0.KG |
| WEA 10 / 1160026 | 4.20 MW | ENERCON GmbH | in operation | 2022-12-29 | Windpark Neufeld Kattrepel GmbH & Co. KG |
| WEA4-E-115 | 4.20 MW | ENERCON GmbH | in operation | 2025-01-28 | Wind für Wasser GmbH |
| Hemme Moorweg Repowering WEA 2 | 4.20 MW | ENERCON GmbH | in operation | 2022-11-29 | Uhl Windkraft Objekt 103 GmbH & Co. KG |
| WEA2 HHU | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-09-06 | Windpark HHU Poolgesellschaft mbH |
| 1160006 - WEA 1 Nordwest | 4.20 MW | ENERCON GmbH | in operation | 2021-03-05 | Windpark Himmelreich GmbH & Co. KG |
| V-136 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwindpark Hemme GmbH & Co. KG |
| Trennewurth Deichenergie | 4.20 MW | ENERCON GmbH | in operation | 2023-11-22 | Deichenergie GmbH & Co. KG |
| WEA 12 | 4.20 MW | ENERCON GmbH | in operation | 2023-07-20 | Bürgerwindpark Wrohm-Osterrade |
| Neuenkirchen WEA 1160084 | 4.20 MW | ENERCON GmbH | in operation | 2022-05-31 | Lafrentz Windenergie GmbH & Co. KG |
| WEA 3 Süderdorf Enercon E138 | 4.20 MW | ENERCON GmbH | in operation | 2022-03-10 | Bürgerwindpark Süderdorf UG (haftungsbeschränkt) & Co.KG |
| WEA 9 / 1160025 | 4.20 MW | ENERCON GmbH | in operation | 2022-12-09 | Windpark Neufeld Kattrepel GmbH & Co. KG |
| Wahrtstrom 3 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| WEA 2 - 1160233 | 4.20 MW | ENERCON GmbH | in operation | 2024-10-28 | Westerfleth GmbH & Co. KG |
| Bürgerwind Südermarsch II WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2023-01-13 | Bürgerwind Südermarsch II GmbH & Co. KG |
| WEA Hemme II | 4.20 MW | ENERCON GmbH | in operation | 2023-04-06 | Windpark Hemme II GmbH & Co. KG |
| 1160007 - WEA 2 Nordost | 4.20 MW | ENERCON GmbH | in operation | 2021-06-10 | Windpark Himmelreich GmbH & Co. KG |
| DHB Wind | 4.20 MW | ENERCON GmbH | planned | planned 2028 | DHB Wind GmbH & Co. KG |
| 4.4-Wind WEA 3 | 4.20 MW | ENERCON GmbH | in operation | 2023-11-03 | 4.4.-Wind GmbH & Co. KG |
| Wahrtstrom 5 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WEA Wind-Energie-Anlagen GmbH |
| 1160008 - WEA 3 Süd | 4.20 MW | ENERCON GmbH | in operation | 2021-02-19 | Windpark Himmelreich GmbH & Co. KG |
| E-126 | 4.00 MW | ENERCON GmbH | in operation | 2021-04-21 | Windpark Schülper Feld GmbH & Co. Betriebs KG |
| Nordwind Trennewurth - WEA 1250373 | 4.00 MW | ENERCON GmbH | in operation | 2022-04-28 | Nordwind Trennewurth GmbH & Co. KG |
| WEA Neuenkirchen - 1250365 | 4.00 MW | ENERCON GmbH | in operation | 2021-10-22 | Bürgerwindpark Neuenkirchen UG (haftungsbeschränkt) & Co. KG |
| WEA Böddinghusen | 4.00 MW | ENERCON GmbH | in operation | 2021-08-27 | BöddiWind GmbH & Co. KG |
| Energiewende 1 | 4.00 MW | ENERCON GmbH | in operation | 2021-09-28 | Weinhold Windenergie |
| WEA Süderdorf - 247057 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2023-08-02 | Bürgerwindpark Eider GmbH & Co. KG |
| Looft-Schmidt GmbH & Co. 2. Betriebs KG | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-13 | Looft-Schmidt GmbH & Co. 2.Betriebs KG |
| WKN WEA II | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-01 | WKN Windkraft Nord GmbH & Co. Windenergiefonds Westküste KG |
| WKN WEW I | 3.45 MW | Sonstige | in operation | 2017-12-08 | WKN Windkraft Nord GmbH & Co. Windenergiefonds Westküste KG |
| BWP Norderwöhrden III | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-22 | Norderwöhrden Poolgesellschaft mbH |
| WKN Windpark Wöhrden V KG | 3.45 MW | Sonstige | in operation | 2017-11-16 | WKN Windkraft Nord GmbH & Co. Windpark Wöhrden V KG |
| WEA Norderwöhrden LE | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-08 | Norderwöhrden Poolgesellschaft mbH |
| WEA Wischmann | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-01 | Windpark Wischmann GmbH & Co. KG |
| WEA Norderwöhrden OHG | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-01 | Norderwöhrden Poolgesellschaft mbH |
| WEA Petersen und Rolfs | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-22 | Norderwöhrden Poolgesellschaft mbH |
| WEA 4 / V 203772 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-06-05 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| WEA 3 / V 203771 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-06-05 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| GeRo Wind I | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-19 | GeRo Jochims Windkraft UG (haftungsbeschränkt) & Co. KG |
| Jochims Windkraft II | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-27 | Norderwöhrden Poolgesellschaft mbH |
| WKN Norderwöhrden IV KG | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-22 | Norderwöhrden Poolgesellschaft mbH |
| unit operated by a private individual | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2026 | private individual |
| WEA 2 / V 203770 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-06-12 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| BWP Norderwöhrden I | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-09 | Norderwöhrden Poolgesellschaft mbH |
| WEA 1 / V 203769 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-06-06 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| De Leh Repowering | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2026 | De Leh Repowering GmbH & Co. KG |
| WEA 5 / V 203773 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-06-13 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| WKN WEW III | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-09 | Norderwöhrden Poolgesellschaft mbH |
| GeRo Wind II | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-20 | GeRo Jochims Windkraft UG (haftungsbeschränkt) & Co. KG |
| Jochims Windkraft I | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-22 | Jochims Windkraft UG (haftungsbeschränkt) & Co. KG |
| BWP Norderwöhrden II | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-17 | Norderwöhrden Poolgesellschaft mbH |
| WEA Looft-Bröcker | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-20 | Looft und Bröcker GmbH & Co. KG |
| BWP Norderwöhrden IV | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-11 | Norderwöhrden Poolgesellschaft mbH |
| WEA Kiebitzweg | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-08 | Norderwöhrden Poolgesellschaft mbH |
| WKN Norderwöhrden IV KG | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-20 | Norderwöhrden Poolgesellschaft mbH |
| BWP Norderwöhrden V | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-12-15 | Norderwöhrden Poolgesellschaft mbH |
| WKN Norderwöhrden III KG | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-11-08 | Norderwöhrden Poolgesellschaft mbH |
| WEA2 - 301334 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-05-31 | Marschenwind Horst GmbH & Co. KG |
| WEA 1 301171 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2016-12-09 | Bürgerwindpark Strübbel Beteiligungs |
| WEA 4 301172 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2016-12-08 | Bürgerwindpark Strübbel Beteiligungs |
| WEA 2 301169 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2016-11-14 | Bürgerwindpark Strübbel Beteiligungs |
| WEA_DohrnFa_Friedrichskoog | 3.40 MW | Senvion Deutschland GmbH | in operation | 2011-09-07 | Dohrn Falkenhagen GmbH & Co KG |
| WEA 3 301170 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2016-11-28 | Bürgerwindpark Strübbel Beteiligungs |
| WEA3 - 300636 | 3.37 MW | REpower Systems SE | in operation | 2014-12-10 | Kronprinzenkoog LEP Bürgerwindpark GmbH & Co. KG |
| P.S.Repowering GmbH & Co.KG | 3.37 MW | REpower Systems SE | in operation | 2011-08-11 | P.S.Repowering GmbH & Co.KG |
| WEA1 - FNO21 - 301119 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-12-20 | Acolus Friedrichskoog III OHG |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-12-13 | Bürgerwindpark Hemme GmbH & Co. KG |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-11-29 | Bürgerwindpark Hemme GmbH & Co. KG |
| R-300011_WEA 1 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2011-08-05 | KMW Windpark Dingen GmbH & Co. KG |
| WEA1 - 300092 | 3.37 MW | REpower Systems SE | in operation | 2012-03-14 | Bürgerwind Barlt West GmbH & Co. KG |
| WEA 2 - AVK7 - 301394 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2017-08-28 | Hafenwind Nordost Friedrichskoog GmbH & Co. KG |
| WEA 4 / 300840 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-10-23 | Ohlener Wind UG (haftungsbeschränkt) & Co. KG |
| WEA2 - 300150 | 3.37 MW | REpower Systems SE | in operation | 2012-05-18 | Gemeindewerke St. Michel-Energie GmbH |
| WEA300015, Dingen | 3.37 MW | Senvion Deutschland GmbH | in operation | 2011-07-21 | Bürgermühle Dingen GmbH & Co.KG |
| WEA4 - 300635 | 3.37 MW | REpower Systems SE | in operation | 2014-12-09 | Kronprinzenkoog LEP Bürgerwindpark GmbH & Co. KG |
| Dingen2 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2011-08-17 | Dohrn&Boie Gmbh&COKG |
| WEA 4 / 300360 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-03-28 | DG Windconsult GmbH & Co. Windkraft Diekshörn KG |
| WEA2 - 301107 | 3.37 MW | REpower Systems SE | in operation | 2016-11-24 | LEP Repowering Kp-Koog GmbH & Co. KG |
| WEA4 - 300148 | 3.37 MW | REpower Systems SE | in operation | 2012-05-10 | Gemeindewerke St. Michel-Energie GmbH |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-12-31 | Bürgerwindpark Hemme GmbH & Co. KG |
| WEA5 - 300728 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-02-17 | Bürgerwindpark Hedwigenkoog GmbH & Co. KG |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2014-03-06 | Bürgerwindpark Hemme GmbH & Co. KG |
| WEA2 - 300093 | 3.37 MW | REpower Systems SE | in operation | 2012-04-24 | Barlt West Wind GmbH & Co. KG |
| WEA 1 - FNO20 - 301202 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-12-23 | Hafenwind Nordost Friedrichskoog GmbH & Co. KG |
| WEA 1 - FNO27 - 301204 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-12-30 | Hafenwind Doseweg Friedrichskoog GmbH & Co. KG |
| WEA08 - 300587 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2014-11-11 | Bürgerwind Südergeest GmbH & Co. KG |
| WEA07 - 300588 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2014-11-14 | Bürgerwind Südergeest GmbH & Co. KG |
| R-300016_WEA 6 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2011-07-15 | KMW Windpark Dingen GmbH & Co. KG |
| WEA2 - 300076 | 3.37 MW | REpower Systems SE | in operation | 2012-03-05 | Deichwind GmbH & Co. KG |
| WEA 3/300363 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-04-26 | Krey Warnecke Kattrepel Windkraft GmbH & Co KG |
| R-300017_WEA 7 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2011-07-11 | KMW Windpark Dingen GmbH & Co. KG |
| WEA 2 - FNO26 - 301205 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2017-01-26 | Hafenwind Doseweg Friedrichskoog GmbH & Co. KG |
| Thießen Alternativenergie II 3.4 XM | 3.37 MW | REpower Systems SE | in operation | 2014-03-28 | Thießen GmbH & Co. Alternativenergie KG |
| WEA1 - 300819 | 3.37 MW | REpower Systems SE | in operation | 2015-05-27 | LEP Erneuerbare Energie GmbH & Co. KG |
| WEA 6 / 300344 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-03-21 | GREE Kattrepel GmbH & Co. KG |
| WEA 301026, Dingen | 3.37 MW | Senvion Deutschland GmbH | in operation | 2016-03-31 | Dingener Südwind GmbH & Co. KG |
| WEA 2 / 300361 | 3.37 MW | REpower Systems SE | in operation | 2013-04-11 | KuW Vermögensverwaltung GmbH |
| WEA3 - 300078 | 3.37 MW | REpower Systems SE | in operation | 2012-03-21 | Deichwind GmbH & Co. KG |
| WEA 5 / 300358 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-03-20 | Kattrepel Wind GmbH & Co. KG |
| WM Repowering GmbH & Co.KG | 3.37 MW | REpower Systems SE | in operation | 2011-07-22 | WM Repowering |
| WEA4 - 300149 | 3.37 MW | REpower Systems SE | in operation | 2012-04-04 | Windkraft Barlt West GmbH & Co. KG |
| WEA 1 / 300362 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-04-23 | Windkraft Hinrichsen UG & Co. KG |
| WEA1 - 300077 | 3.37 MW | REpower Systems SE | in operation | 2012-02-29 | Deichwind GmbH & Co. KG |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2014-02-10 | Bürgerwindpark Hemme GmbH & Co. KG |
| WEA 1 / 300843 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-10-15 | Bürgerwindpark Kattrepel GmbH & Co. KG |
| WEA 3 / 300842 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-10-03 | Auenbütteler Windkraft GmbH & Co. KG |
| WEA3 - 300095 | 3.37 MW | REpower Systems SE | in operation | 2012-03-16 | Landwind Barlt West GmbH & Co. KG |
| WEA 2 / 300839 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-10-08 | Ohlen Energy UG (haftungsbeschränkt) & Co. KG |
| 3.4 M104 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-12-21 | Bürgerwindpark Hemme GmbH & Co. KG |
| Oeverwisch WEA205048 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-09-12 | Bürgerwindpark Norderwöhrden UG (haftungsbeschränkt) & Co. KG |
| WEA 1 - V209019 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-11-27 | Peter Schrum Wind und Solar GmbH & Co.KG |
| WEA2 - 84690 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-22 | Helser Fleet Wind UG (haftungsbeschränkt) & Co. KG |
| WEA4 - 84692 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-26 | SK Energy II GmbH & Co. KG |
| WEA7 – 84687 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-30 | SK Energy II GmbH & Co. KG |
| WEA1 - 84689 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-13 | Bürgerwind Brunsbüttel GmbH & Co. KG |
| WEA 6 / V 207212 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-06-09 | Bürgerwindpark Albersdorf GmbH & Co. KG |
| WEA1 - 205262 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-04 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA6 - 207274 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-12-23 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA1 - 205257 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-10-24 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA6 - 205267 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-12-04 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA3 - 205259 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-10-10 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA5 - 205261 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-10-02 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA 1 - V209310 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-12-17 | Repowering Lieth Verwaltungs UG |
| WEA4 - 205265 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-11 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA6 - 84686 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-28 | Sunny Wind GmbH & Co. KG |
| WEA3 - 205264 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-04 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA8 - 205269 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-30 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA5 - 207273 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-01-28 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA 1 V112 | 3.30 MW | Sonstige | in operation | 2015-12-01 | Bürgerwindpark Stelle-Wittenwurth GmbH & Co. KG |
| WEA5 - 84685 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-06-29 | Behmhusen Wind GmbH & Co. Stromerzeugung KG |
| WEA2 - 207268 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-12-23 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA 6 V112 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-06-05 | Bürgerwindpark Stelle-Wittenwurth GmbH & Co. KG |
| WEA5 - 205266 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-20 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA7 - 205268 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-27 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA3 - 207271 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-01-22 | Bürgerwindpark Eider GmbH & Co. KG |
| WEA 2 V112 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-05-21 | Bürgerwindpark Stelle-Wittenwurth GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Dithmarschen?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerwindpark Eider GmbH & Co. KG | 22 | 72.9 MW |
| Nordermeldorf-Wind GmbH & Co. KG | 9 | 56.2 MW |
| WP Dingen GmbH & Co. KG | 8 | 56.0 MW |
| Norderwöhrden Poolgesellschaft mbH | 14 | 48.3 MW |
| Bürgerwindpark Neuenkirchen UG (haftungsbeschränkt) & Co. KG | 14 | 45.0 MW |
| Bürgerwindpark Wrohm-Osterrade | 12 | 38.0 MW |
| Looft-Schmidt Projekte Erneuerbarer Energien GmbH | 7 | 37.7 MW |
| Repowering Wöhrden Poolgesellschaft | 6 | 37.2 MW |
| Doseweg GmbH & Co. KG | 5 | 35.0 MW |
| Bürgerwindpark Hemme GmbH & Co. KG | 12 | 34.4 MW |
Which manufacturer accounts for the most wind power capacity in Dithmarschen?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 505 | 1.25 GW |
| Vestas Deutschland GmbH | 239 | 675.1 MW |
| Senvion Deutschland GmbH | 86 | 255.2 MW |
| Nordex Germany GmbH | 35 | 222.7 MW |
| Nordex Energy GmbH | 34 | 160.7 MW |
| REpower Systems SE | 43 | 109.8 MW |
| Nordex SE | 20 | 107.9 MW |
| Sonstige | 50 | 34.8 MW |
| Siemens Wind Power GmbH & Co. KG | 5 | 33.0 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 4 | 23.2 MW |
Wind power in Schleswig-Holstein · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Dithmarschen (Schleswig-Holstein), and how large can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.