64 wind turbines with 155.6 MW of gross capacity were in operation in Herzogtum Lauenburg (Schleswig-Holstein) as of 2026-11-05, with a further 16 units (83.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Herzogtum Lauenburg (Schleswig-Holstein), and how large are they, as of 2026-11-05?
- 64 wind turbines with 155.6 MW of gross capacity were in operation in Herzogtum Lauenburg (Schleswig-Holstein) as of 2026-11-05, with a further 16 units (83.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Herzogtum Lauenburg?
- 64 wind turbines with 155.6 MW of gross capacity were in operation in Herzogtum Lauenburg as of 2026-11-05, with a further 16 units (83.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Herzogtum Lauenburg in 2025?
- 7 wind turbines with 38.1 MW went into operation in Herzogtum Lauenburg in 2025; the strongest year of the last two decades was 2025 with 38.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Herzogtum Lauenburg?
- NeXtWind Lütau II GmbH & Co. KG operates 7 wind turbines with 39.9 MW in Herzogtum Lauenburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Herzogtum Lauenburg?
- Nordex Germany GmbH leads with 19 wind turbines and 104.7 MW in Herzogtum Lauenburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Herzogtum Lauenburg?
- The largest registered wind turbine in Herzogtum Lauenburg has 5.70 MW of gross capacity and is operated by Windpark Witzeeze-Wangelau GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Herzogtum Lauenburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 2 | 0 |
| over 100 kW | 92 | 255.8 MW | 62 | 16 |
How much wind power capacity was commissioned in Herzogtum Lauenburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 5 | 28.5 MW |
| 2025 | 7 | 38.1 MW |
| 2023 | 2 | 11.4 MW |
| 2018 | 1 | 0.01 MW |
| 2017 | 2 | 4.70 MW |
| 2016 | 3 | 4.70 MW |
| 2015 | 3 | 8.50 MW |
| 2014 | 11 | 29.8 MW |
How many wind turbines in Herzogtum Lauenburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 64 | 155.6 MW |
| planned | 16 | 83.6 MW |
| permanently decommissioned | 14 | 16.6 MW |
Which wind turbines are registered in Herzogtum Lauenburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Witzeeze-Wangelau WEA9 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Witzeeze-Wangelau GmbH & Co. KG |
| WP Hamwarde WEA 2 - 92624 | 5.70 MW | Nordex Germany GmbH | in operation | 2023-12-21 | WKN Windkraft Nord GmbH & Co. Windpark Hamwarde KG |
| G30_001 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| Witzeeze-Wangelau WEA7 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Witzeeze-Wangelau GmbH & Co. KG |
| Witzeeze-Wangelau WEA8 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Witzeeze-Wangelau GmbH & Co. KG |
| WP Hamwarde WEA 1 - 92625 | 5.70 MW | Nordex Germany GmbH | in operation | 2023-12-21 | WKN Windkraft Nord GmbH & Co. Windpark Hamwarde KG |
| WP Bälau-Mannhagen N-149 WEA5 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-05 | 41. naturwind Windpark GmbH & Co.KG |
| WP Bälau-Mannhagen N-149 WEA3 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-17 | 21. naturwind Windpark GmbH & Co KG |
| WP Lütau WKA 5 (95493) | 5.70 MW | Nordex Germany GmbH | in operation | 2025-06-04 | NeXtWind Lütau GmbH & Co.KG |
| WP Bälau-Mannhagen N-149 WEA4 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-16 | GPE Windpark Bälau GmbH & Co. KG |
| G30_005 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| WP Lütau WKA 1 (95143) | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-20 | NeXtWind Lütau GmbH & Co.KG |
| WP Lütau WKA 2 (95144) | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-20 | NeXtWind Lütau GmbH & Co.KG |
| WP Bälau-Mannhagen N-149 WEA2 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-17 | GPE Windpark Bälau GmbH & Co. KG |
| WP Bälau-Mannhagen N-149 WEA1 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-16 | GPE Windpark Bälau GmbH & Co. KG |
| WP Lütau WKA 4 (95146) | 5.70 MW | Nordex Germany GmbH | in operation | 2025-06-04 | NeXtWind Lütau GmbH & Co.KG |
| WP Lütau WKA 3 (95145) | 5.70 MW | Nordex Germany GmbH | in operation | 2025-05-27 | NeXtWind Lütau GmbH & Co.KG |
| G30_004 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| G30_003 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| G30_002 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| G30_006 | 5.70 MW | Nordex SE | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| G30_007 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | NeXtWind Lütau II GmbH & Co. KG |
| WKA 1 - 94926 | 4.80 MW | Nordex Germany GmbH | in operation | 2025-06-12 | Windpark Bliestorf GmbH & Co. KG |
| Witzeeze-Wangelau WEA11 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Witzeeze-Wangelau GmbH & Co. KG |
| Witzeeze-Wangelau WEA10 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Witzeeze-Wangelau GmbH & Co. KG |
| WKA 2 - 94927 | 4.80 MW | Nordex Germany GmbH | in operation | 2025-06-23 | Windpark Bliestorf GmbH & Co. KG |
| WKA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Breitenfelde Süd GmbH & Co. KG |
| WKA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Breitenfelde Süd GmbH & Co. KG |
| WKA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Breitenfelde Süd GmbH & Co. KG |
| WKA 4 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Breitenfelde Süd GmbH & Co. KG |
| 208433 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-08-26 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 204560 | 3.08 MW | Sonstige | in operation | 2014-08-29 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 204558 | 3.08 MW | Sonstige | in operation | 2014-08-22 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 204562 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-08-27 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 208434 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-09-08 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 204561 | 3.08 MW | Sonstige | in operation | 2014-08-25 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| 204559 | 3.08 MW | Sonstige | in operation | 2014-08-21 | MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG |
| NX 83462-03 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-09 | Windpark Wangelau GmbH & Co. KG |
| NX 83464-05 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-11 | Windpark Wangelau GmbH & Co. KG |
| NX 83460-02 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-06 | Windpark Wangelau GmbH & Co. KG |
| NX 83461-01 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-05 | Windpark Wangelau GmbH & Co. KG |
| NX 83465-06 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-13 | Windpark Wangelau GmbH & Co. KG |
| A161366902083 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-17 | Windenergie Wangelau GmbH&Co.KG |
| Breitenfelde I WKA 5 | 2.35 MW | ENERCON GmbH | in operation | 2016-02-05 | HSW Windpark Breitenfelde GmbH & Co. KG |
| E 921272 - WEA 04 | 2.35 MW | ENERCON GmbH | in operation | 2017-11-02 | HSW Windpark Breitenfelde GmbH & Co. KG |
| E 921271 - WEA 01 | 2.35 MW | ENERCON GmbH | in operation | 2017-09-29 | HSW Windpark Breitenfelde GmbH & Co. KG |
| Breitenfelde I WKA 2 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-29 | HSW Windpark Breitenfelde GmbH & Co. KG |
| Breitenfelde I WKA 3 | 2.35 MW | ENERCON GmbH | in operation | 2016-01-26 | HSW Windpark Breitenfelde GmbH & Co. KG |
| AN1,3MW #3, 1300-707-03 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| AN1,3MW #2, 1300-730-02 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| LAB WEA 01 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-05-28 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 04 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-05-21 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 03 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-05-21 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 13 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-23 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 08 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-05 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 14 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-06-05 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 06 | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2003-06-05 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 02 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-05-21 | Elbewindparkprojekt GmbH & Co. KG |
| AN1,3MW #4, 1300-682-04 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| LAB WEA 10 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-05 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 12 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-23 | Elbewindparkprojekt GmbH & Co. KG |
| AN1,3MW #1, 1300-725-01 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| LAB WEA 11 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-19 | Elbewindparkprojekt GmbH & Co. KG |
| AN1,3MW #6, 1300-700-06 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| LAB WEA 07 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-05-28 | Elbewindparkprojekt GmbH & Co. KG |
| LAB WEA 09 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-19 | Elbewindparkprojekt GmbH & Co. KG |
| AN1,3MW #5, 1300-681-05 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-07-10 | Woltersdorf Netz GbR |
| LAB WEA 05 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-06-19 | Elbewindparkprojekt GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 11. German Wind KG | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-11-25 | ENOVA Windpark Schiphorst GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 11. German Wind KG | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-11-25 | ENOVA Windpark Schiphorst GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 11. German Wind KG | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-11-25 | ENOVA Windpark Schiphorst GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 11. German Wind KG | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-11-25 | ENOVA Windpark Schiphorst GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-01 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-11 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-11 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-02 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-17 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-05-28 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-02 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-21 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-02 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-01 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-06 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-01 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-07-08 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-23 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-11 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| EREM European Renewable Energy Management GmbH & Co. 5. German Wind KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-16 | ENOVA Windpark Panten-Bälau GmbH & Co. KG |
| E40/44 Rothenhausen | 0.60 MW | ENERCON GmbH | in operation | 2003-06-11 | Gut Rothenhausen Energie GbR |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1994-11-09 | private individual |
| unit operated by a private individual | 0.50 MW | – | in operation | 1997-02-18 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1994-12-30 | private individual |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2018-04-25 | private individual |
| unit operated by a private individual | 0.00 MW | LWS systems GmbH & Co. KG. | in operation | 2016-05-25 | private individual |
Which organisations operate the most wind power capacity in Herzogtum Lauenburg?
| Operator | Units | Capacity |
|---|---|---|
| NeXtWind Lütau II GmbH & Co. KG | 7 | 39.9 MW |
| NeXtWind Lütau GmbH & Co.KG | 5 | 28.5 MW |
| Windpark Witzeeze-Wangelau GmbH & Co. KG | 5 | 26.7 MW |
| MOSELA ZWEITE Mobiliengesellschaft mbH & Co. KG | 7 | 21.5 MW |
| Elbewindparkprojekt GmbH & Co. KG | 14 | 18.2 MW |
| GPE Windpark Bälau GmbH & Co. KG | 3 | 17.1 MW |
| Windpark Breitenfelde Süd GmbH & Co. KG | 4 | 17.0 MW |
| ENOVA Windpark Panten-Bälau GmbH & Co. KG | 16 | 14.4 MW |
| Windpark Wangelau GmbH & Co. KG | 5 | 12.0 MW |
| HSW Windpark Breitenfelde GmbH & Co. KG | 5 | 11.8 MW |
Which manufacturer accounts for the most wind power capacity in Herzogtum Lauenburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 19 | 104.7 MW |
| Nordex SE | 6 | 34.2 MW |
| ENERCON GmbH | 12 | 30.4 MW |
| Nordex Energy GmbH | 7 | 20.1 MW |
| NEG Micon Deutschland GmbH | 20 | 18.4 MW |
| Siemens Wind Power GmbH & Co. KG | 13 | 16.9 MW |
| Sonstige | 5 | 12.3 MW |
| Vestas Deutschland GmbH | 3 | 9.22 MW |
| AN Windenergie GmbH | 6 | 7.80 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 1 | 1.30 MW |
Wind power in Schleswig-Holstein · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Herzogtum Lauenburg (Schleswig-Holstein), and how can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.