15 wind turbines with 45.9 MW of gross capacity were in operation in Pinneberg (Schleswig-Holstein) as of 2026-11-05, with a further 2 units (12.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Pinneberg (Schleswig-Holstein), and how large are they, as of 2026-11-05?
- 15 wind turbines with 45.9 MW of gross capacity were in operation in Pinneberg (Schleswig-Holstein) as of 2026-11-05, with a further 2 units (12.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Pinneberg?
- 15 wind turbines with 45.9 MW of gross capacity were in operation in Pinneberg as of 2026-11-05, with a further 2 units (12.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Pinneberg in 2025?
- 5 wind turbines with 22.8 MW went into operation in Pinneberg in 2025; the strongest year of the last two decades was 2025 with 22.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Pinneberg?
- Bürgerwindpark Uetersen GmbH & Co. KG operates 4 wind turbines with 22.8 MW in Pinneberg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Pinneberg?
- Nordex Energy GmbH leads with 8 wind turbines and 37.2 MW in Pinneberg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Pinneberg?
- The largest registered wind turbine in Pinneberg has 6.00 MW of gross capacity and is operated by ERG Windpark Bokel GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Pinneberg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.04 MW | 3 | 0 |
| over 100 kW | 24 | 71.7 MW | 12 | 2 |
How much wind power capacity was commissioned in Pinneberg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 5 | 22.8 MW |
| 2022 | 4 | 14.4 MW |
| 2017 | 1 | 0.01 MW |
| 2016 | 1 | 0.01 MW |
| 2011 | 4 | 8.70 MW |
How many wind turbines in Pinneberg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 15 | 45.9 MW |
| permanently decommissioned | 10 | 13.8 MW |
| planned | 2 | 12.0 MW |
Which wind turbines are registered in Pinneberg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Windpark Bokel WEA02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | ERG Windpark Bokel GmbH & Co. KG |
| Windpark Bokel WEA01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | ERG Windpark Bokel GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-08-13 | Bürgerwindpark Uetersen GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-08-13 | Bürgerwindpark Uetersen GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-08-13 | Bürgerwindpark Uetersen GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-08-19 | Bürgerwindpark Uetersen GmbH & Co. KG |
| WEA 1 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-27 | Windpark Raa-Besenbek GmbH & Co. KG |
| WEA 2 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-27 | Windpark Raa-Besenbek GmbH & Co. KG |
| WEA 3 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-27 | Windpark Raa-Besenbek GmbH & Co. KG |
| WEA 4 | 3.60 MW | Nordex Energy GmbH | in operation | 2022-10-27 | Windpark Raa-Besenbek GmbH & Co. KG |
| WEA 4 | 2.17 MW | Senvion Deutschland GmbH | in operation | 2011-11-09 | Windpark Raa-Besenbek Nord GmbH & Co. KG |
| WEA 1 | 2.17 MW | Senvion Deutschland GmbH | in operation | 2011-11-17 | Windpark Raa-Besenbek Nord GmbH & Co. KG |
| WEA 3 | 2.17 MW | Senvion Deutschland GmbH | in operation | 2011-11-16 | Windpark Raa-Besenbek Nord GmbH & Co. KG |
| WEA 2 | 2.17 MW | Senvion Deutschland GmbH | in operation | 2011-11-14 | Windpark Raa-Besenbek Nord GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2001-06-02 | private individual |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2001-06-02 | private individual |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 1999-09-01 | private individual |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | permanently decommissioned | 1999-09-01 | private individual |
| unit operated by a private individual | 1.30 MW | Bonus Energy A/S | permanently decommissioned | 2001-10-22 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-10-22 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-10-22 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-10-22 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-10-17 | private individual |
| unit operated by a private individual | 1.30 MW | AN Windenergie GmbH | permanently decommissioned | 2001-10-22 | private individual |
| unit operated by a private individual | 0.02 MW | – | in operation | 2025-07-21 | private individual |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2016-12-13 | private individual |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2017-04-28 | private individual |
Which organisations operate the most wind power capacity in Pinneberg?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerwindpark Uetersen GmbH & Co. KG | 4 | 22.8 MW |
| Windpark Raa-Besenbek GmbH & Co. KG | 4 | 14.4 MW |
| ERG Windpark Bokel GmbH & Co. KG | 2 | 12.0 MW |
| Windpark Raa-Besenbek Nord GmbH & Co. KG | 4 | 8.70 MW |
Which manufacturer accounts for the most wind power capacity in Pinneberg?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Energy GmbH | 8 | 37.2 MW |
| Vestas Deutschland GmbH | 2 | 12.0 MW |
| Senvion Deutschland GmbH | 4 | 8.70 MW |
| AN Windenergie GmbH | 5 | 6.50 MW |
| GE Renewable Germany GmbH | 2 | 3.00 MW |
| Tacke GmbH & Co. KG | 2 | 3.00 MW |
| Bonus Energy A/S | 1 | 1.30 MW |
| Sonstige | 2 | 0.02 MW |
Wind power in Schleswig-Holstein · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Pinneberg (Schleswig-Holstein), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.