Germany · renewables
Wind power in Uckermark
659 wind turbines with 1.75 GW of gross capacity were in operation in Uckermark (Brandenburg) as of 2026-11-05, with a further 194 units (1.25 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Uckermark (Brandenburg), and how large are they, as of 2026-11-05?
- 659 wind turbines with 1.75 GW of gross capacity were in operation in Uckermark (Brandenburg) as of 2026-11-05, with a further 194 units (1.25 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Uckermark?
- 659 wind turbines with 1.75 GW of gross capacity were in operation in Uckermark as of 2026-11-05, with a further 194 units (1.25 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Uckermark in 2025?
- 21 wind turbines with 114.2 MW went into operation in Uckermark in 2025; the strongest year of the last two decades was 2017 with 171.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Uckermark?
- ENERTRAG SE operates 52 wind turbines with 360.6 MW in Uckermark, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Uckermark?
- Vestas Deutschland GmbH leads with 281 wind turbines and 1.31 GW in Uckermark (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Uckermark?
- The largest registered wind turbine in Uckermark has 7.58 MW of gross capacity and is operated by ENERTRAG Windfeld Neuenfeld W0 GmbH & Co. KG, commissioned 2012-03-30 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Uckermark distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.00 MW | 2 | 0 |
| over 100 kW | 949 | 3.08 GW | 657 | 194 |
How much wind power capacity was commissioned in Uckermark each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 4 | 25.2 MW |
| 2025 | 21 | 114.2 MW |
| 2024 | 15 | 77.2 MW |
| 2023 | 21 | 115.7 MW |
| 2022 | 15 | 71.9 MW |
| 2021 | 28 | 122.7 MW |
| 2020 | 22 | 80.3 MW |
| 2019 | 11 | 40.8 MW |
| 2018 | 31 | 111.0 MW |
| 2017 | 52 | 171.2 MW |
| 2016 | 17 | 49.1 MW |
| 2015 | 32 | 82.8 MW |
| 2014 | 14 | 36.0 MW |
| 2013 | 4 | 9.15 MW |
| 2012 | 14 | 43.5 MW |
| 2011 | 22 | 49.4 MW |
| 2010 | 23 | 41.1 MW |
| 2009 | 61 | 128.7 MW |
| 2008 | 14 | 27.0 MW |
| 2007 | 14 | 27.0 MW |
| 2006 | 21 | 39.0 MW |
How many wind turbines in Uckermark are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 659 | 1.75 GW |
| planned | 194 | 1.25 GW |
| permanently decommissioned | 98 | 82.2 MW |
Which wind turbines are registered in Uckermark?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| W0 Westweg 0 | 7.58 MW | ENERCON GmbH | in operation | 2012-03-30 | ENERTRAG Windfeld Neuenfeld W0 GmbH & Co. KG |
| NS3 Neuer See 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| HH3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Groeben-Jeinsen GbR |
| K8 Klarer See 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| P2 Plattenweg 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| K1 Kottstertbruch 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| V4 Vierrutenbruch 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| R1 Rehberge 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| SS2 Schwedenschanze 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| G3 Göritzer Weg 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA Schönermark | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG |
| R5 Rehberge 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| K6 Klarer See 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| O5 Oder-Neisse-Radweg 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | ENERTRAG SE |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| UH2 Uhlhorn 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| HH2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Groeben-Jeinsen GbR |
| DR A1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Bietikow GbR |
| NS4 Neuer See 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| DR M2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Bietikow GbR |
| MM6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WKA Windpark Bietikow 2 GmbH & Co. KG |
| V3 Vierrutenbruch 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| R2 Rehberge 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| K2 Kottstertbruch 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| SS1 Schwedenschanze 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| NS6 Neuer See 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| K4 Klarer See 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| UH3 Uhlhorn 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| K7 Klarer See 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| AW4 Am Weinberg 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| BERT11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| HH1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Groeben-Jeinsen GbR |
| unit operated by a private individual | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | private individual |
| S1 Schilderberg 1 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-18 | WKA Windpark Bietikow 2 GmbH & Co. KG |
| R4 Rehberge 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| G7 Göritzer Weg 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| R3 Rehberge 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| DR M3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Bietikow GbR |
| G2 Göritzer Weg 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| DR M5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Bietikow GbR |
| WP Damitzow - WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Damitzow GmbH & Co. KG |
| SS3 Schwedenschanze 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| AW3 Am Weinberg 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| G6 Göritzer Weg 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| G4 Göritzer Weg 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| SS6 Schwedenschanze 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| V1 Vierrutenbruch 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| G1 Göritzer Weg 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| O7 Oder-Neisse-Radweg 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| K5 Kottstertbruch 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| HeiDo 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | TEUT Energieprojekte GmbH |
| R6 Rehberge 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| V2 Vierrutenbruch 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| BERT10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| SS4 Schwedenschanze 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| G5 Göritzer Weg 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| O8 Oder-Neisse-Radweg 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| NS2 Neuer See 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| DR M1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Bietikow GbR |
| SS5 Schwedenschanze 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| K4 Kottstertbruch 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| BERT09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| K3 Klarer See 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | ENERTRAG SE |
| NS1 Neuer See 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| SMP6 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 15 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 14 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP7 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 17 | 7.00 MW | Nordtank Energy Group | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| MÜR7 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | Windkraft Neukünkendorf GmbH & Co. KG |
| SMP 13 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Agrowind GmbH & Co. KG |
| SMP 12 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 5 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 16 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| SMP 3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark SMP Schönermark-Passow GmbH & Co. KG |
| WKA HL 1 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| Dobberzin Repowering | 6.80 MW | Nordex Energy GmbH | in operation | 2025-09-23 | Phase 5 GmbH & Co. Windkraft I KG |
| WEA Kröchlendorff 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WEA Kröchlendorff 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WEA Kröchlendorff 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| Windpark Kröchlendorff KD D | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WEA 16 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NOTUS energy Wind GmbH & Co. KG |
| WEA 20 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NOTUS energy Wind GmbH & Co. KG |
| WP Battin WEA 01 | 6.80 MW | Nordex SE | planned | planned 2028 | wpd Windpark Battin GmbH & Co. KG |
| WKA HL 5 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WEA Kröchlendorff 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WEA 2 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA 17 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NOTUS energy Wind GmbH & Co. KG |
| WP Battin WEA 02 | 6.80 MW | Nordex SE | planned | planned 2028 | wpd Windpark Battin GmbH & Co. KG |
| WEA 9 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA 6 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WKA HL 4 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WEA 7 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA 19 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NOTUS energy Wind GmbH & Co. KG |
| Windpark Kröchlendorff KD 1 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WKA HL 2 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WEA S2 / 94736 | 6.80 MW | Nordex Energy GmbH | in operation | 2025-04-01 | GREE Gollmark Repowering GmbH & Co. KG |
| WEA 4 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA 1 / Klinkow | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA 18 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NOTUS energy Wind GmbH & Co. KG |
| Windpark Kröchlendorff KD 3 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WP Battin WEA 04 | 6.80 MW | Nordex SE | planned | planned 2028 | wpd Windpark Battin GmbH & Co. KG |
| WEA Kröchlendorff 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WKA HL 3 | 6.80 MW | Nordex SE | planned | planned 2028 | REW Regenerative Energien Wichmannsdorf GmbH |
| WEA Kröchlendorff 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WEA Kröchlendorff 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WEA 8 / Klinkow | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA Kröchlendorff 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie |
| WP Battin WEA 03 | 6.80 MW | Nordex SE | planned | planned 2028 | wpd Windpark Battin GmbH & Co. KG |
| WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Damitzow GmbH & Co. KG |
| WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Damitzow GmbH & Co. KG |
| WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Damitzow GmbH & Co. KG |
| WEA 05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Damitzow GmbH & Co. KG |
| WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Damitzow GmbH & Co. KG |
| S11 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| S08 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| WEA07-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP Crussow GWI RO GmbH & Co. KG |
| WEA04-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| F3 Flaggenpfuhl 3 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-11-28 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| WEA Baumgarten West | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | MLK Windfeld Baumgarten West Nr. 107 GmbH & Co. KG |
| F8 Fuchsberg 8 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-04-20 | ENERTRAG Windfeld Uckermark XIV GmbH & Co. KG |
| S07 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| F5 Flaggenpfuhl 5 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-28 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| S10 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| WEA08-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| WEA05-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | WB Energy 16 GmbH & Co. KG |
| WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP Crussow VCS GmbH & Co. KG |
| WEA 01 | 6.00 MW | eno energy systems GmbH | planned | planned 2028 | eno energy GmbH |
| BD07 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| F6 Flaggenpfuhl 6 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-29 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| WEA S02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | WP Neukünkendorf II GmbH & Co. KG |
| WEA 02 | 6.00 MW | eno energy systems GmbH | planned | planned 2028 | eno energy GmbH |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | MBBF Windparkplanung GmbH & Co. KG |
| F8 Flaggenpfuhl 8 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-29 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| WEA01-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| V243424 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-02-27 | MLK Windfeld Wollenthin Nr. 79 GmbH & Co. KG |
| WEA06-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | WB Energy 16 GmbH & Co. KG |
| WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP Crussow GWI GmbH & Co. KG |
| F1 Flaggenpfuhl 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-12-16 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| WEA 2 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| S09 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| F2 Flaggenpfuhl 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-12-16 | ENERTRAG Windfeld Kleisthöhe Flaggenpfuhl GmbH & Co. KG |
| Am Weinberg | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-05-18 | Ventus Bürgerstrom Basedow Nr. 66 GmbH & Co. KG |
| WEA03-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| WEA S01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | WP Neukünkendorf Repowering GWI GmbH & Co. KG |
| F9 Fuchsberg 9 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-04-20 | ENERTRAG Windfeld Uckermark XIV GmbH & Co. KG |
| Windfeld Pinnow Frauenhagen WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-30 | MLK Windfeld Pinnow Nr. 74 GmbH & Co. KG |
| F7 Fuchsberg 7 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-04-20 | ENERTRAG Windfeld Uckermark XIV GmbH & Co. KG |
| Windfeld Pinnow Frauenhagen WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-30 | MLK Windfeld Pinnow Nr. 74 GmbH & Co. KG |
| F7 Flaggenpfuhl 7 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-30 | ENERTRAG Windfeld Kleisthöhe F7 GmbH & Co. KG |
| BD06.3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| WEA 1 Stegemannshof | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-02-05 | MLK Windfeld Stegemannshof Nr. 81 GmbH & Co. KG |
| WEA02-Rep | 6.00 MW | ENERCON GmbH | planned | planned 2029 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH |
| WEA Baumgarten | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-01-16 | Ventus Bürgerstrom Baumgarten Nr. 82 GmbH & Co. KG |
| W9 Wallmow 9 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | Bürgerenergie Wallmower Hasenbrücke UG (haftungsbeschränkt) & Co. KG |
| WEA 1 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| MAL2 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-17 | Windpark Pinnow IV GmbH & Co. KG |
| WP Frauenhagen FRHrep1 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-12-05 | Windpark Frauenhagen GmbH & Co. KG |
| WP Frauenhagen FRHrep2 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-10-24 | e.disnatur Erneuerbare Energien GmbH |
| WP Frauenhagen FRHrep3 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-10-24 | e.disnatur Erneuerbare Energien GmbH |
| WEA 5 / Klinkow | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Denker & Wulf AG |
| WEA S1 / 94737 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-04-22 | GREE Gollmark Repowering GmbH & Co. KG |
| WP Frauenhagen FRHrep4 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-10-10 | e.disnatur Erneuerbare Energien GmbH |
| WEA Augustenhof | 5.70 MW | Nordex Germany GmbH | in operation | 2025-02-20 | MLK Windfeld Augustenhof Nr. 92 GmbH & Co. KG |
| WEA G2 / 91859 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-14 | GREE Gollmark Repowering GmbH & Co. KG |
| WEA G4 / 92823 | 5.70 MW | Nordex Energy GmbH | in operation | 2021-03-05 | GREE Güstow GmbH & Co. KG |
| MAL3 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-17 | Selig-Teut GmbH & Co. Windkraft Schönermark KG |
| G9 / 90393 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-02-28 | GREE Güstow GmbH & Co. KG |
| MAL6 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-11-04 | Agrowind GmbH & Co. KG |
| NKD3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windkraft Neukünkendorf 2 GmbH & Co. KG |
| WEA G5 / 91461 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-01-27 | GREE Güstow GmbH & Co. KG |
| NKD6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windkraft Neukünkendorf GmbH & Co. KG |
| G6 / 90391 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-03-10 | GREE Güstow GmbH & Co. KG |
| WEA G1 / 91858 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-04-01 | GREE Gollmark Repowering GmbH & Co. KG |
| MAL5 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-20 | Phase 5 GmbH & Co. Windkraft V KG |
| G1 / 90395 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-03-10 | GREE Güstow GmbH & Co. KG |
| NKD1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windkraft Neukünkendorf 2 GmbH & Co. KG |
| MAL7 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-18 | Phase 5 GmbH & Co. Windkraft VI KG |
| MLK Wp Horst WEA 4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | MLK Windfeld Horst Nr. 86 GmbH & Co. KG |
| NKD4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windkraft Neukünkendorf 2 GmbH & Co. KG |
| G11 / 90392 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-01-24 | GREE Güstow GmbH & Co. KG |
| NKD5 | 5.70 MW | Nordex SE | planned | planned 2027 | Windkraft Neukünkendorf GmbH & Co. KG |
| NKD2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | Windkraft Neukünkendorf 2 GmbH & Co. KG |
| Sarma EE2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | EE Sarma GmbH & Co. KG |
| KW3-W9 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-05-05 | Kerkow Welsow WEA 9 GmbH |
| MAL4 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-17 | Windpark Pinnow III GmbH & Co. KG |
| MÜR8 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | Windkraft Neukünkendorf GmbH & Co. KG |
| G10 / 90394 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-02-20 | GREE Güstow GmbH & Co. KG |
| Repowering UB 33 WEA 2 | 5.70 MW | Nordex SE | planned | planned 2026 | Enel Green Power UB33 GmbH & Co. KG |
| Repowering UB 33 WEA 1 | 5.70 MW | Nordex SE | planned | planned 2026 | Enel Green Power UB33 GmbH & Co. KG |
| G2 / 90396 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-03-13 | GREE Güstow GmbH & Co. KG |
| KW3-W8 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-05-05 | Windpark Kerkow-Welsow GmbH & Co. KG |
| MAL1 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-10-27 | Phase 5 GmbH & Co. Windkraft VII KG |
| WEA01-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA 04 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-03-26 | Windpark Beesenberg 15 GmbH & Co. KG |
| WEA12-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA07-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Wilsickow KG |
| GRAM 03 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-10-07 | GSW Windmühle Hohengüstow GmbH & Co. KG |
| BERT 04 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-01-20 | Windkraft Bertikow GmbH & Co. KG |
| WEA 02 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Milow 4 GmbH & Co. KG |
| BERT 01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-01-19 | Windkraft Bertikow GmbH & Co. KG |
| BAN WB-07 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-01-31 | WB Energy 11 GmbH & Co. KG |
| WB BAN 01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windbauer GmbH |
| BERT 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-01-20 | Windkraft Bertikow GmbH & Co. KG |
| WEA 05 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-01-30 | Hanse Windkraft GmbH |
| WEA 01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Milow 4 GmbH & Co. KG |
| WEA05-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA09-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| GRAM 04 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-09-26 | GSW Windpark Gramzow GmbH & Co. KG |
| WEA 3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Bietikow GmbH & Co. KG |
| WEA03-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Wilsickow KG |
| WEA10-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA 01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-03-08 | Windpark Beesenberg 14 GmbH & Co. KG |
| WB BAN 08 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windbauer GmbH |
| WEA02-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | TANDEM Investitions- und Beteiligungsgesellschaft für ökologische Projekte mbH & Co. Wilsickow KG |
| BERT 03 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-01-16 | Windkraft Bertikow GmbH & Co. KG |
| GRAM 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-09-30 | GSW Windpark Gramzow GmbH & Co. KG |
| WEA06-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA04-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA08-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WB BAN 04 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windbauer GmbH |
| WEA11-Rep | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | wpd Windpark Wilsickow REP II GmbH & Co. KG |
| WEA 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-03-06 | Windpark Mühlenbach GmbH & Co. KG |
| WEA MM5 | 5.56 MW | ENERCON GmbH | in operation | 2023-03-20 | WP Bertikow GmbH & Co. KG |
| L9 Luckow-Petershagen 9 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | ENERTRAG SE |
| E8 Eickstedter Weg 8 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-09-17 | Bürgerwind Falkenwalde UG (haftungsbeschränkt) & Co. KG |
| E7 Eickstedter Weg 7 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-09-07 | Bürgerwind Falkenwalde UG (haftungsbeschränkt) & Co. KG |
| GE-551912259-WEA01 | 5.50 MW | GE Renewable Germany GmbH | in operation | 2023-01-27 | Norddeutsche Energie WP Grünow GmbH & Co KG |
| P1 Prähnsee 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-08-11 | Bürgerwind Koppelsee GmbH & Co. KG |
| L8 Luckow-Petershagen 8 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA 2 / 552203437 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-12-14 | Milower Windkraft GmbH & Co. KG |
| WEA 3 / 552203436 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-12-12 | Milower Windkraft GmbH & Co. KG |
| WEA 1 / 552203435 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-12-21 | Milower Windkraft GmbH & Co. KG |
| R5 Rötpfuhlweg 5 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | ENERTRAG SE |
| K1 Koppelsee 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-07-14 | Bürgerwind Koppelsee GmbH & Co. KG |
| P2 Pfarracker 2 | 5.30 MW | GE Wind Energy GmbH | planned | planned 2026 | ENERTRAG SE |
| P4 Pfarracker 4 | 5.30 MW | GE Wind Energy GmbH | planned | planned 2026 | ENERTRAG SE |
| P3 Pfarracker 3 | 5.30 MW | GE Wind Energy GmbH | planned | planned 2026 | ENERTRAG SE |
| MLK WP Horst WEA 1 | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | MLK Windfeld Horst Nr. 86 GmbH & Co. KG |
| Sarma EE3 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | EE Sarma GmbH & Co. KG |
| Sarma EE1 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | EE Sarma GmbH & Co. KG |
| MÜR9 | 4.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windkraft Neukünkendorf GmbH & Co. KG |
| WEA G8 / 87652 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-09-14 | GREE Güstow GmbH & Co. KG |
| WEA G7 / 87651 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-06-04 | GREE Güstow GmbH & Co. KG |
| 1470006 | 4.30 MW | Lagerwey GmbH | in operation | 2020-12-05 | Windenergie Falkenwalde GmbH & Co. KG |
| K9 Koppelsee 9 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-06 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| K2 Koppelsee 2 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-27 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| K3 Koppelsee 3 | 4.26 MW | ENERCON GmbH | in operation | 2025-05-15 | WKA Windpark Bietikow 2 GmbH & Co. KG |
| B4 Bollenberg 4 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-27 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| K7 Koppelsee 7 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-20 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| K5 Koppelsee 5 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-06 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| K8 Koppelsee 8 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-27 | ENERTRAG Windfeld Mattheshöhe II GmbH & Co. KG |
| W 7 | 4.20 MW | ENERCON GmbH | in operation | 2021-11-17 | WKA 223 GmbH |
| T7 Tornow 7 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENERTRAG SE |
| WEA L-04 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-27 | WB Energy 13 GmbH & Co. KG |
| V-234688 WEA 02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-05-25 | Windpark Bietikow GmbH & Co. KG |
| WKA MM3 | 4.20 MW | ENERCON GmbH | in operation | 2021-06-29 | Windpark Mattheshöhe GmbH & Co. KG |
| WEA Heyses Hof | 4.20 MW | ENERCON GmbH | in operation | 2023-05-17 | Ventus Bürgerstrom Heyses Hof Nr. 87 GmbH & Co. KG |
| S1 Streitberge 1 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-27 | Windkraft Gut Blankenburg UG (haftungsbeschränkt) & Co. KG |
| WEA L-02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-27 | WB Energy 10 GmbH & Co. KG |
| WKA MÖ MM1 | 4.20 MW | ENERCON GmbH | in operation | 2021-07-28 | WKA Windpark Bietikow GmbH & Co. KG |
| WEA Basedow | 4.20 MW | ENERCON GmbH | in operation | 2020-12-08 | Ventus Bürgerstrom Basedow Nr. 66 GmbH & Co. KG |
| E 115 Wind Güstow | 4.20 MW | ENERCON GmbH | planned | planned 2026 | MLK Windfeld Horst Nr. 86 GmbH & Co. KG |
| V243425 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-12-14 | MLK Windfeld Wollenthin Nr. 79 GmbH & Co. KG |
| WKA MM4 | 4.20 MW | ENERCON GmbH | in operation | 2021-06-28 | Windpark Mattheshöhe GmbH & Co. KG |
| unit operated by a private individual | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | private individual |
| WEA 06 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2019-10-09 | Hanse Windkraft GmbH |
| Falkenhagen MLK R2 | 4.20 MW | ENERCON GmbH | planned | planned 2026 | Torsten Affeldt Wind Wilhelmshof GmbH & Co. KG |
| WKA MM2 | 4.20 MW | ENERCON GmbH | in operation | 2021-06-07 | Windpark Mattheshöhe GmbH & Co. KG |
| WEA L-03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-09-17 | WB Energy Lübbenow GmbH & Co. KG |
| Falkenhagen MLK R3 | 4.20 MW | ENERCON GmbH | planned | planned 2026 | Fleigele GmbH & Co. KG |
| W 6 | 4.20 MW | ENERCON GmbH | in operation | 2021-04-22 | Phase 5 GmbH & Co. Kerkow-Welsow KG |
| WEA Falkenwalde | 4.20 MW | ENERCON GmbH | in operation | 2022-06-17 | WEA Eickstedt GmbH & Co. KG |
| WEA 03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2019-09-26 | Hanse Windkraft GmbH |
| V-234687 WEA 01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-05-31 | Windpark Bietikow GmbH & Co. KG |
| S2 Streitberge 2 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-08 | Windkraft Gut Blankenburg UG (haftungsbeschränkt) & Co. KG |
| Falkenhagen MLK R1 | 4.20 MW | ENERCON GmbH | planned | planned 2026 | Fleigele GmbH & Co. KG |
| eno126013 - WEA5 | 4.00 MW | eno energy GmbH | in operation | 2018-04-27 | Norddeutsche Energie WP Schönermark GmbH & Co. KG |
| eno126019 | 4.00 MW | eno energy GmbH | in operation | 2018-12-19 | Norddeutsche Energie WP Tornow GmbH & Co. KG |
| WEA F1 / 1250208 | 4.00 MW | ENERCON GmbH | in operation | 2020-06-26 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
| eno126010 - WEA3 | 4.00 MW | eno energy GmbH | in operation | 2017-12-22 | Norddeutsche Energie WP Schönermark GmbH & Co. KG |
| eno114022 | 4.00 MW | eno energy GmbH | in operation | 2018-11-19 | Norddeutsche Energie WP Tornow GmbH & Co. KG |
| WEA F5 / 1250213 | 4.00 MW | ENERCON GmbH | in operation | 2020-11-30 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
| eno126018 | 4.00 MW | eno energy GmbH | in operation | 2018-12-06 | Norddeutsche Energie WP Tornow GmbH & Co. KG |
| eno126011 - WEA1 | 4.00 MW | eno energy GmbH | in operation | 2017-12-22 | Norddeutsche Energie WP Schönermark GmbH & Co. KG |
| WEA F4 / 1250211 | 4.00 MW | ENERCON GmbH | in operation | 2020-09-22 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
| eno126012 - WEA2 | 4.00 MW | eno energy GmbH | in operation | 2018-03-29 | Norddeutsche Energie WP Schönermark GmbH & Co. KG |
| WEA B1 / 1250212 | 4.00 MW | ENERCON GmbH | in operation | 2020-11-12 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
| eno126014 - WEA4 | 4.00 MW | eno energy GmbH | in operation | 2018-06-22 | Norddeutsche Energie WP Schönermark GmbH & Co. KG |
| WEA F3 / 1250210 | 4.00 MW | ENERCON GmbH | in operation | 2020-06-18 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
| WEA F2 / 1250209 | 4.00 MW | ENERCON GmbH | in operation | 2020-09-18 | Windpark Falkenhagen Wilhelmshof GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Uckermark?
| Operator | Units | Capacity |
|---|---|---|
| ENERTRAG SE | 52 | 360.6 MW |
| BOREAS Energie GmbH | 30 | 93.7 MW |
| Windpark SMP Schönermark-Passow GmbH & Co. KG | 12 | 84.0 MW |
| GREE Güstow GmbH & Co. KG | 11 | 55.2 MW |
| REW Regenerative Energien Wichmannsdorf GmbH | 8 | 54.4 MW |
| UGE Kröchlendorff Ost GmbH & Co. KG Umweltgerechte Energie | 8 | 54.4 MW |
| Denker & Wulf AG | 8 | 53.3 MW |
| wpd Windpark Wilsickow REP II GmbH & Co. KG | 9 | 50.4 MW |
| MBBF Windparkplanung GmbH & Co. KG | 7 | 48.0 MW |
| Hanse Windkraft GmbH | 13 | 44.8 MW |
Which manufacturer accounts for the most wind power capacity in Uckermark?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 281 | 1.31 GW |
| ENERCON GmbH | 219 | 495.1 MW |
| Nordex Energy GmbH | 64 | 307.6 MW |
| GE Wind Energy GmbH | 91 | 266.7 MW |
| Nordex Germany GmbH | 31 | 193.3 MW |
| Senvion Deutschland GmbH | 48 | 119.9 MW |
| Nordex SE | 15 | 98.7 MW |
| General Electric Deutschland Holding GmbH | 37 | 60.5 MW |
| REpower Systems SE | 26 | 45.2 MW |
| eno energy GmbH | 9 | 35.5 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Uckermark (Brandenburg), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.