Germany · renewables
Wind power in Teltow-Fläming
420 wind turbines with 906.0 MW of gross capacity were in operation in Teltow-Fläming (Brandenburg) as of 2026-11-05, with a further 96 units (549.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Teltow-Fläming (Brandenburg), and how large are they, as of 2026-11-05?
- 420 wind turbines with 906.0 MW of gross capacity were in operation in Teltow-Fläming (Brandenburg) as of 2026-11-05, with a further 96 units (549.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Teltow-Fläming?
- 420 wind turbines with 906.0 MW of gross capacity were in operation in Teltow-Fläming as of 2026-11-05, with a further 96 units (549.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Teltow-Fläming in 2025?
- 12 wind turbines with 71.5 MW went into operation in Teltow-Fläming in 2025; the strongest year of the last two decades was 2016 with 113.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Teltow-Fläming?
- RWE Wind Onshore & PV Deutschland GmbH operates 35 wind turbines with 77.8 MW in Teltow-Fläming, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Teltow-Fläming?
- ENERCON GmbH leads with 203 wind turbines and 400.6 MW in Teltow-Fläming (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Teltow-Fläming?
- The largest registered wind turbine in Teltow-Fläming has 7.20 MW of gross capacity and is operated by VSB Windpark Kerzendorf GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Teltow-Fläming distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 1 | 1 |
| over 100 kW | 516 | 1.46 GW | 419 | 95 |
How much wind power capacity was commissioned in Teltow-Fläming each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 4.26 MW |
| 2025 | 12 | 71.5 MW |
| 2024 | 3 | 10.9 MW |
| 2023 | 4 | 22.8 MW |
| 2022 | 6 | 19.4 MW |
| 2021 | 2 | 5.90 MW |
| 2020 | 1 | 2.30 MW |
| 2019 | 8 | 28.2 MW |
| 2018 | 4 | 10.7 MW |
| 2017 | 32 | 90.0 MW |
| 2016 | 44 | 113.2 MW |
| 2015 | 10 | 26.3 MW |
| 2014 | 3 | 7.05 MW |
| 2013 | 14 | 35.4 MW |
| 2012 | 10 | 21.2 MW |
| 2011 | 6 | 12.0 MW |
| 2010 | 3 | 6.90 MW |
| 2009 | 50 | 100.0 MW |
| 2008 | 3 | 6.00 MW |
| 2007 | 20 | 40.0 MW |
| 2006 | 39 | 78.0 MW |
How many wind turbines in Teltow-Fläming are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 420 | 906.0 MW |
| planned | 96 | 549.0 MW |
| permanently decommissioned | 2 | 1.30 MW |
Which wind turbines are registered in Teltow-Fläming?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA KEE 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | VSB Windpark Kerzendorf GmbH & Co. KG |
| WEA KEE 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | VSB Windpark Kerzendorf GmbH & Co. KG |
| WEA KEE 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | VSB Windpark Kerzendorf GmbH & Co. KG |
| WEA KEE 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | VSB Windpark Kerzendorf GmbH & Co. KG |
| WEA 07 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 7 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 7 GmbH & Co. KG |
| WP Zül 1 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 1 GmbH & Co. KG |
| WEA 03 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 02 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 10 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 10 GmbH & Co. KG |
| WP Ludwigsfelde Ortsteile - WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Energiequelle GmbH |
| WP Zül 4 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 4 GmbH & Co. KG |
| WEA 01 - Malterhausen Repowering 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 9 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 9 GmbH & Co. KG |
| WEA 06 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 5 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 5 GmbH & Co. KG |
| WP Zül 8 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 8 GmbH & Co. KG |
| WEA 05 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 2 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 2 GmbH & Co. KG |
| WP Zül 6 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 6 GmbH & Co. KG |
| WP Zül 12 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 12 GmbH & Co. KG |
| WP Zül 3 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 3 GmbH & Co. KG |
| WEA 04 - Malterhausen Repowering 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Zül 11 | 7.00 MW | – | planned | planned 2029 | WP Zülichendorf 11 GmbH & Co. KG |
| WP Ludwigsfelde Ortsteile - WEA 2 | 7.00 MW | – | planned | planned 2028 | Energiequelle GmbH |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| DAN2b-9 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| WEA Waltersdorf 7 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-10-21 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| DAN2a-4 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| DAN2b-2 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| DAN2b-3 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| WEA Siethen 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Siethen Eins GmbH & Co. KG Umweltgereche Energie |
| DAN2b-1 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| DAN2b-5 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| DAN2b-6 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| WEA Waltersdorf 06 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-10-22 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| DAN2a-7 | 6.80 MW | Nordex SE | planned | planned 2028 | Swisspower Renewables GmbH |
| WEA Waltersdorf 08 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-10-21 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Siethen 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Siethen Eins GmbH & Co. KG Umweltgereche Energie |
| Hohenseefeld E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | QE Portfolio 1 GmbH & Co. KG |
| Tertian 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | B&W Projekt GmbH & Co. KG |
| Tertian 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | B&W Projekt GmbH & Co. KG |
| Tertian 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | B&W Projekt GmbH & Co. KG |
| Tertian 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | B&W Projekt GmbH & Co. KG |
| WEA HD 1 | 5.90 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Dahme II GmbH & Co. KG |
| WEA Illmersdorf 09 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Illmersdorf 18 | 5.70 MW | Nordex Germany GmbH | in operation | 2023-10-05 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Illmersdorf 05 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Buckow-WEA-8 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | wpd Windpark Buckow GmbH & Co. KG |
| WEA Illmersdorf 15 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 3 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-17 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| Buckow-WEA-1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Dahme-Buckow 2 GmbH & Co.KG |
| WEA 6 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-22 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| WEA 7 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-23 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| WEA 5 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-17 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| Buckow-WEA-2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Dahme-Buckow 2 GmbH & Co.KG |
| WEA Illmersdorf 04 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Illmersdorf 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Illmersdorf 14 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Ihlow 20 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-22 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Illmersdorf 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Ihlow 16 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-22 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Illmersdorf 12 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Buckow-WEA-6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | wpd Windpark Buckow GmbH & Co. KG |
| Buckow-WEA-7 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Dahme - Buckow 3 GmbH & Co. KG |
| WEA Illmersdorf 13 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Ihlow 1 | 5.70 MW | Nordex Germany GmbH | in operation | 2023-10-28 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 1 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-10 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| WEA 4 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-22 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| WEA Illmersdorf 08 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 2 Windpark Mühlberg | 5.70 MW | Nordex Energy GmbH | in operation | 2025-07-10 | e-wikom Windpark Mühlberg GmbH & Co. KG |
| WEA Ihlow 19 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-01-30 | UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie |
| Buckow-WEA-4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Dahme - Buckow 3 GmbH & Co. KG |
| Buckow-WEA-5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark Dahme - Buckow 3 GmbH & Co. KG |
| Buckow-WEA-3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Dahme-Buckow 2 GmbH & Co.KG |
| V 251168-06 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-10-10 | Windpark Schlenzer Fläming GmbH & Co. KG |
| V 251169-07 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-10-10 | Windpark Schlenzer Fläming GmbH & Co. KG |
| r01 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r09 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r06 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r07 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r12 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r03 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r10 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r04 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r11 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r05 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r08 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| r02 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Alterric Windpark Rosenthal GmbH |
| WP Ludwigsfelde Ortsteile - WEA 5 | 4.80 MW | – | planned | planned 2028 | Energiequelle GmbH |
| WP Ludwigsfelde Ortsteile - WEA 4 | 4.80 MW | – | planned | planned 2028 | Energiequelle GmbH |
| WP Ludwigsfelde Ortsteile - WEA 3 | 4.80 MW | – | planned | planned 2028 | Energiequelle GmbH |
| Danna II | 4.26 MW | ENERCON GmbH | in operation | 2026-09-14 | WEA Danna II GmbH & Co. KG |
| WEA 05 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Hohenseefeld 1 GmbH & Co. KG |
| WEA 06 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | NOTUS energy Opera GmbH & Co.KG |
| WEA 4 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| WEA 04 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | NOTUS energy Opera GmbH & Co.KG |
| WEA 3 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| WEA Ludwigsfelde 1381168 | 4.20 MW | ENERCON GmbH | in operation | 2024-12-09 | e.distherm Energielösungen GmbH |
| WP Schönefeld WEA 02 | 4.20 MW | ENERCON GmbH | in operation | 2019-12-18 | Windpark Schönefeld GmbH & CO. KG |
| WEA 5 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| WEA 1 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| WEA 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| WP Schönefeld WEA 03 | 4.20 MW | ENERCON GmbH | in operation | 2019-12-16 | Windpark Schönefeld GmbH & CO. KG |
| WEA 03 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Hohenseefeld 1 GmbH & Co. KG |
| WEA 02 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Hohenseefeld 1 GmbH & Co. KG |
| WEA HD 2 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Dahme II GmbH & Co. KG |
| WP Schönefeld WEA 04 | 4.20 MW | ENERCON GmbH | in operation | 2019-12-12 | Windpark Schönefeld GmbH & CO. KG |
| WEA 6 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Hohenseefeld 3 GmbH & Co. KG |
| V 234659-05 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-02-18 | Windpark Schlenzer Fläming GmbH & Co. KG |
| Malterhausen WEA V214164 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-01-10 | UGE Malterhausen GmbH & Co. KG Umweltgerechte Energie |
| WEA 5 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-01-25 | BEE Groß Ziescht Eins GmbH & Co.KG |
| WEA 6 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2015-12-30 | BEE Groß Ziescht Eins GmbH & Co.KG |
| WEA 8 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2015-12-30 | BEE Groß Ziescht Eins GmbH & Co.KG |
| SLZ WEA04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-10-27 | EWI Schlenzer GmbH & Co. KG |
| WEA 4 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-05-11 | BEE Groß Ziescht Eins GmbH & Co.KG |
| Markendorf WEA V209646 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2015-12-15 | UGE Markendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| SLZ WEA03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-10-27 | EWI Schlenzer GmbH & Co. KG |
| WEA30 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-26 | Berliner Stadtwerke GmbH |
| Malterhausen WEA V214165 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-28 | UGE Malterhausen GmbH & Co. KG Umweltgerechte Energie |
| GZ8 | 3.30 MW | Vestas Deutschland GmbH | planned | planned 2026 | K & M Wind KG |
| 211312; V-112; WEA 2; 3,3 MW | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-16 | Märkische Windkraft 109 GmbH & Co. KG |
| LüdII-01 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-05-12 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| GZ5 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-04 | K & M Wind KG |
| GZ1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-29 | K & M Wind KG |
| 211313; V-112; WEA 3; 3,3 MW | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-07 | Märkische Windkraft 109 GmbH & Co. KG |
| GZ3 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-11 | K & M Wind KG |
| 211314; V-112; WEA 4; 3,3 MW | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-06-16 | Märkische Windkraft 111 GmbH & Co. KG |
| GZ4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-27 | K & M Wind KG |
| GZ14 | 3.30 MW | Vestas Deutschland GmbH | planned | planned 2026 | K & M Wind KG |
| LüdII-02 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-05-20 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| GZ16 | 3.30 MW | Vestas Deutschland GmbH | planned | planned 2026 | K & M Wind KG |
| V 216972-04 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-06-30 | Windpark Schlenzer Fläming GmbH & Co. KG |
| V 216971-03 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-07-21 | Windpark Schlenzer Fläming GmbH & Co. KG |
| GZ7 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-26 | K & M Wind KG |
| WP Wahlsdorf SO10 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-03-18 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| WP Wahlsdorf SO11 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-03-29 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| WP Wahlsdorf SO1 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-02-04 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| WP Wahlsdorf SO7 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-02-03 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| WP Wahlsdorf SO5 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-04-08 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| WP Wahlsdorf SO8 | 3.23 MW | GE Renewable Germany GmbH | in operation | 2022-03-26 | PNE Wind Park Wahlsdorf GmbH & Co.KG |
| SNE 01 | 3.23 MW | GE Wind Energy GmbH | in operation | 2019-06-18 | PNE WIND Park Schlenzer GmbH & Co.KG |
| SNE 03 | 3.23 MW | GE Wind Energy GmbH | in operation | 2019-06-18 | PNE WIND Park Schlenzer GmbH & Co.KG |
| Pro Eko WEA 2 | 3.05 MW | ENERCON GmbH | in operation | 2014-04-25 | pro eko GmbH & Co. KG |
| 1011544 | 3.05 MW | ENERCON GmbH | in operation | 2019-12-20 | Windpark Altes Lager II GmbH & Co. KG |
| 1011543 | 3.05 MW | ENERCON GmbH | in operation | 2019-12-20 | Windpark Altes Lager II GmbH & Co. KG |
| 1011542 | 3.05 MW | ENERCON GmbH | in operation | 2019-12-20 | Windpark Altes Lager II GmbH & Co. KG |
| 201138 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-05 | BEE Danna Zwei GmbH & Co. KG |
| Danna WEA 03 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-27 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| 201132 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-06 | BEE Danna Zwei GmbH & Co. KG |
| Danna WEA 01 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| 201131 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-06 | BEE Danna Zwei GmbH & Co. KG |
| E 1150700-11 | 3.00 MW | ENERCON GmbH | in operation | 2017-08-30 | Windpark Werbig IV GmbH & Co. KG, |
| 201133 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-06 | BEE Danna Zwei GmbH & Co. KG |
| Danna WEA 05 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-22 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| 201139 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-06 | BEE Danna Zwei GmbH & Co. KG |
| E 1150701-12 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-15 | Windpark Werbig IV GmbH & Co. KG, |
| Danna WEA 04 | 3.00 MW | ENERCON GmbH | in operation | 2017-11-29 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| Danna WEA 02 | 3.00 MW | ENERCON GmbH | in operation | 2017-11-16 | HSW Windpark Niedergörsdorf GmbH & Co. KG |
| Windpark Havelland Projekt I GmbH & Co. KG HAV WEA 2 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-01-07 | Windpark Havelland Projekt I GmbH & Co. KG |
| Windpark Havelland Projekt I GmbH & Co. KG HAV WEA 1 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-01-07 | Windpark Havelland Projekt I GmbH & Co. KG |
| 13-28140159 (E32206) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-01-21 | Windpark Dahme-Wahlsdorf 3 GmbH & Co. KG |
| GE 28150210-12 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-05-13 | Windpark Zagelsdorf GmbH & Co. KG |
| Windpark Zagelsdorf WEA 06 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-05-13 | FP Lux Wind GmbH & Co. Zagelsdorf KG |
| WEA 5 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-15 | Windpark Dahme-Zagelsdorf 4 GmbH & Co. KG |
| GE 28150208-08 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-05-13 | Windpark Zagelsdorf GmbH & Co. KG |
| WEA 2 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-03 | Windpark Dahme-Zagelsdorf 4 GmbH & Co. KG |
| Wahlsdorf WKA 3 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-12-12 | HSW Windpark Wahlsdorf GmbH & Co. KG |
| S012 (Serien-Nr. 28140160) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-01-26 | Windpark Dahme - Wahlsdorf 2 GmbH & Co. KG |
| S014 (Serien-Nr. 28140158) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-02-05 | Windpark Dahme - Wahlsdorf 2 GmbH & Co. KG |
| S04 (Serien-Nr. 28140162) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-02-06 | Windpark Dahme - Wahlsdorf 2 GmbH & Co. KG |
| Windpark Zagelsdorf WEA 10 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-16 | FP Lux Wind GmbH & Co. Zagelsdorf KG |
| GE 25163682-01 | 2.53 MW | GE Wind Energy GmbH | in operation | 2017-03-18 | Windpark Dahme-Zagelsdorf 4 GmbH & Co. KG |
| Windpark Zagelsdorf WEA 11 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-07 | FP Lux Wind GmbH & Co. Zagelsdorf KG |
| 09-28140161 (E32289) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-02-13 | Windpark Dahme-Wahlsdorf 3 GmbH & Co. KG |
| Wahlsdorf WKA 2 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-12-22 | HSW Windpark Wahlsdorf GmbH & Co. KG |
| Windpark Zagelsdorf WEA 13 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-16 | FP Lux Wind GmbH & Co. Zagelsdorf KG |
| GE 28150209-09 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-03 | Windpark Zagelsdorf GmbH & Co. KG |
| 15-28140157 (E32182) | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-01-14 | Windpark Dahme-Wahlsdorf 3 GmbH & Co. KG |
| Windpark Zagelsdorf WEA 07 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-05-13 | FP Lux Wind GmbH & Co. Zagelsdorf KG |
| WEA 4 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-16 | Windpark Dahme-Zagelsdorf 4 GmbH & Co. KG |
| Wahlsdorf WKA 6 | 2.53 MW | GE Wind Energy GmbH | in operation | 2015-12-10 | HSW Windpark Wahlsdorf GmbH & Co. KG |
| WEA 3 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-06-16 | Windpark Dahme-Zagelsdorf 4 GmbH & Co. KG |
| WEA_03_NX85014 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-27 | Windpark Fläming 1 GmbH & Co. KG |
| WEA_04_NX85010 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-11-23 | Windpark Fläming 1 GmbH & Co. KG |
| WEA 13 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-09-25 | e-wikom Windpark Fläming 2 GmbH & Co. KG |
| WEA_07_NX85011 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-11-16 | Windpark Fläming 1 GmbH & Co. KG |
| WEA 14 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-09-29 | e-wikom Windpark Fläming 2 GmbH & Co. KG |
| WEA 09 | 2.40 MW | Nordex Energy GmbH | in operation | 2018-03-28 | e-wikom Windpark Fläming 3 GmbH & Co. KG |
| WEA_01_NX85015 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-04 | Windpark Fläming 1 GmbH & Co. KG |
| WEA_06_NX85012 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-12-07 | Windpark Fläming 1 GmbH & Co. KG |
| WEA 08 | 2.40 MW | Nordex Energy GmbH | in operation | 2018-03-28 | e-wikom Windpark Fläming 3 GmbH & Co. KG |
| WEA 10 | 2.40 MW | Nordex Energy GmbH | in operation | 2018-03-28 | e-wikom Windpark Fläming 3 GmbH & Co. KG |
| WEA_05_NX85013 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-01-04 | Windpark Fläming 1 GmbH & Co. KG |
| WEA_02_NX85009 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-11-09 | Windpark Fläming 1 GmbH & Co. KG |
| WEA 15 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-10-26 | e-wikom Windpark Fläming 2 GmbH & Co. KG |
| WEA 12 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-09-06 | e-wikom Windpark Fläming 2 GmbH & Co. KG |
| Trebbin 921067 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-11 | Windpark Trebbin GmbH & Co. KG |
| Trebbin 921065 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-19 | Windpark Trebbin GmbH & Co. KG |
| Trebbin 921066 | 2.35 MW | ENERCON GmbH | in operation | 2017-03-31 | Windpark Trebbin GmbH & Co. KG |
| E 920782-08 | 2.35 MW | ENERCON GmbH | in operation | 2017-07-28 | Windpark Werbig II GmbH & Co. KG |
| E 920780-10 | 2.35 MW | ENERCON GmbH | in operation | 2016-02-19 | Windpark Werbig II GmbH & Co. KG |
| E 920779-05 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-18 | Windpark Werbig II GmbH & Co. KG |
| E 920781-04 | 2.35 MW | ENERCON GmbH | in operation | 2016-02-17 | Windpark Werbig II GmbH & Co. KG |
| E 920784-03 | 2.35 MW | ENERCON GmbH | in operation | 2017-07-26 | Windpark Werbig II GmbH & Co. KG |
| E 920778-07 | 2.35 MW | ENERCON GmbH | in operation | 2016-01-27 | Windpark Werbig II GmbH & Co. KG |
| Trebbin 921068 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-21 | Windpark Trebbin GmbH & Co. KG |
| E 822022-02 | 2.30 MW | – | in operation | 2010-05-31 | QE Portfolio 1 GmbH & Co. KG |
| WEA 6, Seriennummer 824542 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-05 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| E 822021-01 | 2.30 MW | ENERCON GmbH | in operation | 2010-06-11 | QE Portfolio 1 GmbH & Co. KG |
| 824547 | 2.30 MW | ENERCON GmbH | in operation | 2013-03-22 | Windpark GmbH & Co. Jänickendorf KG |
| WEA 7, Seriennummer 824551 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-21 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| 826572 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-13 | Windpark GmbH & Co. Heidehof III KG |
| 826573 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-17 | Windpark GmbH & Co. Heidehof III KG |
| 826574 | 2.30 MW | ENERCON GmbH | in operation | 2016-07-27 | Windpark GmbH & Co. Heidehof III KG |
| 824545 | 2.30 MW | ENERCON GmbH | in operation | 2013-03-08 | Windpark GmbH & Co. Jänickendorf KG |
| WEA 5, Seriennummer 824541 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-19 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| WEA 2, Seriennummer 824538 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| 826570 | 2.30 MW | ENERCON GmbH | in operation | 2016-07-19 | Windpark GmbH & Co. Heidehof III KG |
| 826571 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-26 | Windpark GmbH & Co. Heidehof III KG |
| WP Werbig IV | 2.30 MW | ENERCON GmbH | in operation | 2016-12-20 | Werbig 4 GmbH & Co. KG |
| 824550 | 2.30 MW | ENERCON GmbH | in operation | 2013-02-11 | Windpark GmbH & Co. Jänickendorf KG |
| Wind Werbig VI | 2.30 MW | ENERCON GmbH | in operation | 2020-01-20 | Werbig 4 GmbH & Co. KG |
| WEA 3, Seriennummer 824539 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-28 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| 824546 | 2.30 MW | ENERCON GmbH | in operation | 2013-03-08 | Windpark GmbH & Co. Jänickendorf KG |
| 824544 | 2.30 MW | ENERCON GmbH | in operation | 2013-04-09 | Windpark GmbH & Co. Jänickendorf KG |
| 824543 | 2.30 MW | ENERCON GmbH | in operation | 2013-03-26 | Windpark GmbH & Co. Jänickendorf KG |
| 824549 | 2.30 MW | ENERCON GmbH | in operation | 2013-02-20 | Windpark GmbH & Co. Jänickendorf KG |
| 824548 | 2.30 MW | ENERCON GmbH | in operation | 2013-02-26 | Windpark GmbH & Co. Jänickendorf KG |
| WEA 4, Seriennummer 824540 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-21 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| E 822451-01 | 2.30 MW | ENERCON GmbH | in operation | 2010-08-09 | QE Portfolio 1 GmbH & Co. KG |
| WEA 1, Seriennummer 824537 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-21 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| 826569 | 2.30 MW | ENERCON GmbH | in operation | 2016-07-15 | Windpark GmbH & Co. Heidehof III KG |
| WEA 8, Seriennummer 824552 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-17 | LHI GII1 WP Heidehof 2034 GmbH & Co. KG |
| WP Werbig VII | 2.30 MW | ENERCON GmbH | in operation | 2021-08-17 | Werbig 4 GmbH & Co. KG |
| 826567 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-04 | Windpark GmbH & Co. Heidehof III KG |
| 826568 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-01 | Windpark GmbH & Co. Heidehof III KG |
| WEA Zossen 701841 | 2.00 MW | ENERCON GmbH | in operation | 2004-06-23 | Energiequelle GmbH & Co. Windenergieanlage Zossen KG |
| 78844 | 2.00 MW | ENERCON GmbH | in operation | 2006-10-26 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| 78824 | 2.00 MW | ENERCON GmbH | in operation | 2007-03-02 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| EWF Zwei Drei KG | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-22 | EWF Zwei Drei GmbH&Co.KG |
| 78849 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-07 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| 78847 | 2.00 MW | ENERCON GmbH | in operation | 2006-10-27 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| Christinendorf_III WEA 3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-28 | EnBW Onshore Portfolio GmbH |
| 78846 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-01 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| WP Werbig III - 82088 | 2.00 MW | ENERCON GmbH | in operation | 2007-11-30 | Windpark Niederer Fläming GmbH & Co. KG |
| AN 2000-284-04 | 2.00 MW | AN Windenergie GmbH | in operation | 2002-12-28 | Windpark Hohenseefeld GmbH & Co. KG Renditefonds |
| Zossen WEA 16442 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-08-26 | WP Zossen GmbH & Co. KG |
| 16859 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-09-01 | Öko-Depot GmbH & Co. KG |
| E 82564-05 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-31 | Windpark Waltersdorf GmbH & Co. KG Renditefonds |
| 78441 | 2.00 MW | ENERCON GmbH | in operation | 2006-04-21 | Windpark GmbH & Co. Feldheim KG |
| WEA Werbig 14-82091 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-31 | Windfarm Weimar GmbH & Co. KG |
| WEA Werbig 15-82092 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-30 | Windfarm Weimar GmbH & Co. KG |
| V 206151-04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2015-01-09 | Windpark Hohenseefeld II GmbH & Co. KG |
| Hohenseefeld - 35420 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-11-06 | KE Windpark Hohenseefeld GmbH & Co. KG |
| 78843 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-03 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| Danna V31917 (3) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-13 | Swisspower Renewables Windparks Brandenburg GmbH |
| E 78071-06 | 2.00 MW | ENERCON GmbH | in operation | 2005-12-12 | Windpark Jüterbog GmbH & Co. KG Renditefonds |
| 78820 | 2.00 MW | ENERCON GmbH | in operation | 2007-03-29 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| WEA Wergzahna 821071 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-23 | Windpark Wergzahna GmbH & Co. KG |
| 78442 | 2.00 MW | ENERCON GmbH | in operation | 2006-04-21 | Windpark GmbH & Co. Feldheim KG |
| Windpark Kaseldorf GmbH & Co. KG | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-24 | Windpark Kaseldorf GmbH & Co. KG |
| 78440 | 2.00 MW | ENERCON GmbH | in operation | 2006-05-03 | Windpark GmbH & Co. Feldheim KG |
| 78841 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-14 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| 78836 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-17 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| WP Werbig III - 82086 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-22 | Windpark Niederer Fläming GmbH & Co. KG |
| 821404 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-05 | Windpark Altes Lager GmbH & Co. KG |
| 78443 | 2.00 MW | ENERCON GmbH | in operation | 2006-05-04 | Windpark GmbH & Co. Feldheim KG |
| 78840 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-20 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| Windpark Kaseldorf GmbH & Co. KG | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-21 | Windpark Kaseldorf GmbH & Co. KG |
| 78833 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-30 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| E 78069-04 | 2.00 MW | ENERCON GmbH | in operation | 2005-12-02 | Windpark Jüterbog GmbH & Co. KG Renditefonds |
| 78825 | 2.00 MW | ENERCON GmbH | in operation | 2007-03-01 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| V 32999-06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-04-21 | SWM 50 MW Windpark Portfolio GmbH & Co. KG |
| V 32996-04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-04-27 | SWM 50 MW Windpark Portfolio GmbH & Co. KG |
| AN 2000-318-07 | 2.00 MW | AN Windenergie GmbH | in operation | 2002-12-11 | Windpark Hohenseefeld GmbH & Co. KG Renditefonds |
| unit operated by a private individual | 2.00 MW | AN Windenergie GmbH | in operation | 2001-12-20 | private individual |
| Hohenseefeld - 35419 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-11-06 | KE Windpark Hohenseefeld GmbH & Co. KG |
| 821396 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-24 | Windpark Altes Lager GmbH & Co. KG |
| Christinendorf 31409 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-13 | enercity Windpark Portfolio GmbH & Co. KG |
| 821405 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-09 | Windpark Altes Lager GmbH & Co. KG |
| WP Werbig II - 2000-231-01 | 2.00 MW | AN Windenergie GmbH | in operation | 2001-12-20 | Windpark Niederer Fläming GmbH & Co. KG |
| E 78073-08 | 2.00 MW | ENERCON GmbH | in operation | 2005-12-14 | Windpark Jüterbog GmbH & Co. KG Renditefonds |
| Danna V31294 (8) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-16 | Swisspower Renewables Windparks Brandenburg GmbH |
| 821390 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-04 | Windpark Altes Lager GmbH & Co. KG |
| 821392 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-31 | Windpark Altes Lager GmbH & Co. KG |
| E 78070-05 | 2.00 MW | ENERCON GmbH | in operation | 2005-12-02 | Windpark Jüterbog GmbH & Co. KG Renditefonds |
| Danna V31916 (5) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-16 | Swisspower Renewables Windparks Brandenburg GmbH |
| WEA 134 VE-02-43219 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-28 | Windkraft Lüdersdorf GmbH & Co. OHG |
| 821402 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-03 | Windpark Altes Lager GmbH & Co. KG |
| WEA Wergzahna 821072 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-15 | Windpark Wergzahna GmbH & Co. KG |
| Christinendorf 31410 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-09 | enercity Windpark Portfolio GmbH & Co. KG |
| 78834 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-24 | Windpark Jänickendorfer Heide GmbH & Co. KG |
| WP Werbig III - 82089 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-11 | Windpark Niederer Fläming GmbH & Co. KG |
| Christinendorf 31408 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-13 | enercity Windpark Portfolio GmbH & Co. KG |
| Hohenseefeld - 35421 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-11-06 | KE Windpark Hohenseefeld GmbH & Co. KG |
| Christinendorf 31407 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-07 | enercity Windpark Portfolio GmbH & Co. KG |
| E 82563-04 | 2.00 MW | ENERCON GmbH | in operation | 2008-01-24 | Windpark Waltersdorf GmbH & Co. KG Renditefonds |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Teltow-Fläming?
| Operator | Units | Capacity |
|---|---|---|
| RWE Wind Onshore & PV Deutschland GmbH | 35 | 77.8 MW |
| Windpark Dahme GmbH & Co. KG | 51 | 76.5 MW |
| Alterric Windpark Rosenthal GmbH | 12 | 66.0 MW |
| Windpark Jänickendorfer Heide GmbH & Co. KG | 31 | 62.0 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 10 | 57.0 MW |
| Swisspower Renewables GmbH | 8 | 54.4 MW |
| UGE Ihlow Eins GmbH & Co. KG Umweltgerechte Energie | 8 | 48.9 MW |
| e-wikom Windpark Mühlberg GmbH & Co. KG | 7 | 39.9 MW |
| Windpark Altes Lager GmbH & Co. KG | 18 | 36.0 MW |
| Swisspower Renewables Windparks Brandenburg GmbH | 18 | 32.0 MW |
Which manufacturer accounts for the most wind power capacity in Teltow-Fläming?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 203 | 400.6 MW |
| Vestas Deutschland GmbH | 98 | 291.0 MW |
| Nordex Germany GmbH | 37 | 229.0 MW |
| Nordex Energy GmbH | 24 | 91.9 MW |
| NEG Micon Deutschland GmbH | 59 | 88.5 MW |
| GE Renewable Germany GmbH | 18 | 85.4 MW |
| GE Wind Energy GmbH | 26 | 67.7 MW |
| Nordex SE | 8 | 54.4 MW |
| AN Windenergie GmbH | 17 | 29.6 MW |
| VENSYS Energy AG | 3 | 5.55 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Teltow-Fläming (Brandenburg), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.