Germany · renewables
Wind power in Spree-Neiße
119 wind turbines with 367.8 MW of gross capacity were in operation in Spree-Neiße (Brandenburg) as of 2026-11-05, with a further 53 units (355.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Spree-Neiße (Brandenburg), and how large are they, as of 2026-11-05?
- 119 wind turbines with 367.8 MW of gross capacity were in operation in Spree-Neiße (Brandenburg) as of 2026-11-05, with a further 53 units (355.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Spree-Neiße?
- 119 wind turbines with 367.8 MW of gross capacity were in operation in Spree-Neiße as of 2026-11-05, with a further 53 units (355.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Spree-Neiße in 2025?
- 14 wind turbines with 81.4 MW went into operation in Spree-Neiße in 2025; the strongest year of the last two decades was 2025 with 81.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Spree-Neiße?
- LEWP Forst Briesnig 2 GmbH & Co. KG operates 17 wind turbines with 105.4 MW in Spree-Neiße, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Spree-Neiße?
- Vestas Deutschland GmbH leads with 109 wind turbines and 556.5 MW in Spree-Neiße (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Spree-Neiße?
- The largest registered wind turbine in Spree-Neiße has 7.20 MW of gross capacity and is operated by Jerischke III GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Spree-Neiße distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 1 | 0 |
| over 100 kW | 171 | 722.8 MW | 118 | 53 |
How much wind power capacity was commissioned in Spree-Neiße each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 11 | 68.2 MW |
| 2025 | 14 | 81.4 MW |
| 2022 | 3 | 17.6 MW |
| 2021 | 2 | 7.80 MW |
| 2019 | 7 | 24.8 MW |
| 2018 | 5 | 16.0 MW |
| 2017 | 1 | 3.45 MW |
| 2016 | 13 | 35.9 MW |
| 2015 | 1 | 0.01 MW |
| 2013 | 6 | 11.0 MW |
| 2010 | 4 | 8.00 MW |
| 2009 | 28 | 59.5 MW |
| 2008 | 1 | 1.50 MW |
| 2007 | 1 | 1.50 MW |
| 2006 | 8 | 16.0 MW |
How many wind turbines in Spree-Neiße are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 119 | 367.8 MW |
| planned | 53 | 355.0 MW |
| permanently decommissioned | 1 | 0.00 MW |
Which wind turbines are registered in Spree-Neiße?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Jerischke III WEA22 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Jerischke III GmbH |
| LBB 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| LBB 15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| LBB 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| Jerischke III WEA24 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Jerischke III GmbH |
| LBB 14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| LBB 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| LBB 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| LBB 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | PROKON Windpark Sembten III GmbH & Co. KG |
| WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | PROKON Windpark Sembten III GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| WP Forst-Briesnig 3 - WEA 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| Jerischke III WEA25 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Jerischke III GmbH |
| WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | PROKON Windpark Sembten III GmbH & Co. KG |
| Jerischke III WEA21 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Jerischke III GmbH |
| LBB 08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| LBB 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Lübbinchener Windkraft GmbH & Co. KG |
| Jerischke III WEA23 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Jerischke III GmbH |
| WP Forst-Briesnig 3 - WEA 14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | LEWP Forst Briesnig 3 GmbH & Co. KG |
| LEU_WEA03 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA08 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA05 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA02 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA01 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA04 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA07 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| LEU_WEA06 | 6.80 MW | – | planned | planned 2028 | Windpark Leuthen GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 17 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-22 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 12 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-20 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 10 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-01-23 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 04 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-12 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 06 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-03 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 05 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-02-23 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 02 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-07-03 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 15 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-13 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 11 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-10-28 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 13 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-10-30 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 09 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-19 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 01 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-07-14 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 08 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-24 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 07 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-19 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 16 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-04-21 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WP Forst-Briesnig II - WEA 14 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-27 | LEWP Forst Briesnig 2 GmbH & Co. KG |
| WEA Auras 02 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-01-14 | Windpark Auras Süd GmbH & Co.KG |
| WEA Auras 03 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-02-07 | Windpark Auras Süd GmbH & Co.KG |
| Windpark Bahren West WEA14 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-01-28 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West II WEA03 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA20 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West WEA04 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-20 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West II WEA16 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West WEA08 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-26 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West II WEA13 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West WEA01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-24 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West II WEA15 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA09 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA05 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West WEA18 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-04 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West WEA10 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-28 | Erste Windpark Jerischke GmbH & Co. KG |
| WEA Auras 04 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2022-02-10 | Windpark Auras Süd GmbH & Co.KG |
| Windpark Bahren West WEA12 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-04 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West II WEA19 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA11 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA07 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West II WEA17 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Jerischke II GmbH |
| Windpark Bahren West WEA06 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-27 | Erste Windpark Jerischke GmbH & Co. KG |
| Windpark Bahren West WEA02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-02-10 | Erste Windpark Jerischke GmbH & Co. KG |
| WEA Dubje 1 | 4.80 MW | Nordex SE | planned | planned 2027 | EE Dubje ApS & Co. KG |
| WEA Dubje 2 | 4.80 MW | Nordex SE | planned | planned 2027 | EE Dubje ApS & Co. KG |
| WEA Schorbus 1 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-11-08 | Windpark Auras Süd GmbH & Co.KG |
| V-228994 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-07-23 | PROKON Windpark Sembten II GmbH & Co. KG |
| V-228996 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-06-28 | PROKON Windpark Sembten II GmbH & Co. KG |
| V-228995 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-07-11 | PROKON Windpark Sembten II GmbH & Co. KG |
| V-228993 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-07-30 | PROKON Windpark Sembten II GmbH & Co. KG |
| Windpark Tornitz | 3.60 MW | Nordex Energy GmbH | in operation | 2021-04-14 | Windpark Tornitz GmbH & Co. KG |
| WEA01 - 229545 - JNE010 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-22 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| WEA02_211899 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-29 | Windpark Schenkendöbern Eins GmbH & Co. KG |
| WEA03_214166 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-01-12 | Windpark Schenkendöbern Eins GmbH & Co. KG |
| WEA04 - 229547 - JNE013 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-05 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| WEA04_214167 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-29 | Windpark Schenkendöbern Eins GmbH & Co. KG |
| SOB WEA01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-22 | EWI Schorbus GmbH & Co. KG |
| WEA01_211898 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-30 | Windpark Schenkendöbern Eins GmbH & Co. KG |
| WEA02 - 229546 - JNE011 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-19 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| FBR03_301626 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-14 | LHI SolarWind WP Forst Briesnig 2459 GmbH &Co. KG |
| FBR05_301628 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-11 | LHI SolarWind WP Forst Briesnig 2459 GmbH &Co. KG |
| FBR04_301627 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-11 | LHI SolarWind WP Forst Briesnig 2459 GmbH &Co. KG |
| FBR01_301624 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-12 | LHI SolarWind WP Forst Briesnig 2459 GmbH &Co. KG |
| FBR02_301625 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-11 | LHI SolarWind WP Forst Briesnig 2459 GmbH &Co. KG |
| WEA 03 - 201911 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-30 | UGE Proschim GmbH & Co. KG Umweltgerechte Energie |
| WEA 02 - 201910 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-27 | UGE Proschim GmbH & Co. KG Umweltgerechte Energie |
| NxW Spremberg GmbH & Co. KG FL-547 | 2.50 MW | Fuhrländer AG | in operation | 2009-02-27 | NxW Spremberg GmbH & Co. KG |
| WEA03 - FWTD033 - JNE012 | 2.50 MW | FWT energy GmbH | in operation | 2016-12-22 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| NxW Spremberg GmbH & Co. KG FL-543 | 2.50 MW | Fuhrländer AG | in operation | 2009-01-27 | NxW Spremberg GmbH & Co. KG |
| WEA06 - FWTD029 - JNE015 | 2.50 MW | FWT energy GmbH | in operation | 2016-06-29 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| WEA07 - FWTD030 - JNE016 | 2.50 MW | FWT energy GmbH | in operation | 2016-06-30 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| NxW Spremberg GmbH & Co. KG FL-542 | 2.50 MW | Fuhrländer AG | in operation | 2009-02-20 | NxW Spremberg GmbH & Co. KG |
| NxW Spremberg GmbH & Co. KG FL-541 | 2.50 MW | Fuhrländer AG | in operation | 2009-02-25 | NxW Spremberg GmbH & Co. KG |
| NxW Spremberg GmbH & Co. KG FL-545 | 2.50 MW | Fuhrländer AG | in operation | 2009-04-28 | NxW Spremberg GmbH & Co. KG |
| NxW Spremberg GmbH & Co. KG FL-544 | 2.50 MW | Fuhrländer AG | in operation | 2009-04-29 | NxW Spremberg GmbH & Co. KG |
| NxW Spremberg GmbH & Co. KG FL-549 | 2.50 MW | Fuhrländer AG | in operation | 2009-01-19 | NxW Spremberg GmbH & Co. KG |
| WEA05 - FWTD032 - JNE014 | 2.50 MW | FWT energy GmbH | in operation | 2016-09-30 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| WEA08 - FWTD031 - JNE017 | 2.50 MW | FWT energy GmbH | in operation | 2016-08-31 | JWP Jade Windpark GmbH&Co. 27.Betriebs KG |
| NxW Spremberg GmbH & Co. KG FL 546 | 2.50 MW | Fuhrländer AG | in operation | 2009-04-08 | NxW Spremberg GmbH & Co. KG |
| NxW Spremberg GmbH & Co. KG FL-540 | 2.50 MW | Fuhrländer AG | in operation | 2009-02-10 | NxW Spremberg GmbH & Co. KG |
| WEK Kolkwitz - WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-22 | envia Mitteldeutsche Energiepartner GmbH |
| WEK Kolkwitz - WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-29 | envia Mitteldeutsche Energiepartner GmbH |
| WEK Kolkwitz - WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-09 | envia Mitteldeutsche Energiepartner GmbH |
| WEK Kolkwitz - WEA 6 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-01 | envia Mitteldeutsche Energiepartner GmbH |
| V25698 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-18 | EWF Eins Neun GmbH & Co. KG |
| WEA 04 - 201955 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-10-10 | UGE Proschim GmbH & Co. KG Umweltgerechte Energie |
| WP Domsdorf WEA 5 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-11 | CEE Windpark Domsdorf GmbH & Co. KG |
| WEA10-V30763 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-30 | Windpark Greifenhain GmbH & Co. KG |
| V25695 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-07 | EWF Eins Sieben GmbH & Co. KG |
| V-30755 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-03-02 | MELEG Grundstücksgesellschaft mbH & Co. KG |
| WEA01-V30762 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-01-18 | Windpark Greifenhain GmbH & Co. KG |
| WP Domsdorf WEA 1 | 2.00 MW | ENERCON GmbH | in operation | 2009-11-04 | CEE Windpark Domsdorf GmbH & Co. KG |
| WEA03-V30761 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-31 | Windpark Greifenhain GmbH & Co. KG |
| WP Domsdorf WEA 3 | 2.00 MW | ENERCON GmbH | in operation | 2009-11-25 | CEE Windpark Domsdorf GmbH & Co. KG |
| WP Domsdorf WEA 6 | 2.00 MW | ENERCON GmbH | in operation | 2009-11-17 | CEE Windpark Domsdorf GmbH & Co. KG |
| WEA07-V30756 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-28 | Windpark Greifenhain GmbH & Co. KG |
| WEA06-V30759 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-23 | Windpark Greifenhain GmbH & Co. KG |
| WEA04-V30758 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-30 | Windpark Greifenhain GmbH & Co. KG |
| WEA09-V30764 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-29 | Windpark Greifenhain GmbH & Co. KG |
| WEA05-V30760 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-21 | Windpark Greifenhain GmbH & Co. KG |
| 24984 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-17 | Windpark Auras III UG (haftungsbeschränkt) & Co. KG |
| V-22948 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-03 | MELEG Grundstücksgesellschaft mbH & Co. KG |
| WP Domsdorf WEA 7 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-03 | CEE Windpark Domsdorf GmbH & Co. KG |
| WP Domsdorf WEA 8 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-17 | CEE Windpark Domsdorf GmbH & Co. KG |
| WEA02-V30757 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-30 | Windpark Greifenhain GmbH & Co. KG |
| WP Domsdorf WEA 4 | 2.00 MW | ENERCON GmbH | in operation | 2009-11-12 | CEE Windpark Domsdorf GmbH & Co. KG |
| 25700 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-08 | EWF Zwei Null GmbH & Co.KG |
| V25697 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-06 | EWF Eins Sechs GmbH & Co. KG |
| 23065 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-26 | Windpark Auras IV UG (haftungsbeschränkt) & Co. KG |
| WP Domsdorf WEA 2 | 2.00 MW | ENERCON GmbH | in operation | 2009-11-05 | CEE Windpark Domsdorf GmbH & Co. KG |
| V25699 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-12 | EWF Eins Acht GmbH & Co. KG |
| WW 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-04 | Windkraft Watowainz GmbH & Co. KG |
| WK Prom 6 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-11-26 | PROM 5 GmbH & Co. KG |
| WEA08-V30765 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-08-17 | Windpark Greifenhain GmbH & Co. KG |
| V25696 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-05 | EWF Eins Fünf GmbH & Co. KG |
| Drehnow NM70843 (7)* | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-02-17 | Swisspower Renewables Windparks Brandenburg GmbH |
| Pflanzenberg WEA2 70682 | 1.50 MW | REpower Systems SE | in operation | 2008-01-24 | Windkraft Brummel GmbH & Co KG |
| Drehnow NM70848 (5) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-02-24 | Swisspower Renewables Windparks Brandenburg GmbH |
| Drehnow NM70844 (9) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-02-11 | Swisspower Renewables Windparks Brandenburg GmbH |
| Drehnow NM70847 (3) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-02-16 | Swisspower Renewables Windparks Brandenburg GmbH |
| WEA Turnow 1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2009-01-24 | Windfarm Weimar GmbH & Co. KG |
| Drehnow NM70845 (1) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-03-01 | Swisspower Renewables Windparks Brandenburg GmbH |
| Pflanzenberg WEA1 70681 | 1.50 MW | REpower Systems SE | in operation | 2007-12-30 | Windkraft Brummel GmbH & Co KG |
| WEA Turnow 2 | 1.50 MW | GE Wind Energy GmbH | in operation | 2009-01-19 | Windfarm Weimar GmbH & Co. KG |
| Drehnow NM70849 (6) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-03-02 | Swisspower Renewables Windparks Brandenburg GmbH |
| Drehnow NM70846 (8) | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-02-25 | Swisspower Renewables Windparks Brandenburg GmbH |
| WK Prom 5 | 0.80 MW | ENERCON GmbH | in operation | 2013-07-16 | PROM 5 GmbH & Co. KG |
| WEA Proschim 3 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-05-07 | NeXtWind Windpark Beteiligung X GmbH & Co. KG |
| WEA Proschim 1 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-05-07 | NeXtWind Windpark Beteiligung X GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-12-20 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-12-20 | private individual |
| WEA Proschim 4 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-05-07 | NeXtWind Windpark Beteiligung X GmbH & Co. KG |
| WEA Proschim 2 | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1997-05-07 | NeXtWind Windpark Beteiligung X GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-12-20 | private individual |
| BB 01 | 0.50 MW | ENERCON GmbH | in operation | 1994-04-14 | Jörg Kuntzsch und Jörg Müller GbR Windkraftanlagen |
| Gewerbehof | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2015-04-27 | Landwirtschaftliches Lohnunternehmen Cornelia Burtchen |
| unit operated by a private individual | 0.00 MW | Honeywell Windtronics | permanently decommissioned | 2013-12-06 | private individual |
Which organisations operate the most wind power capacity in Spree-Neiße?
| Operator | Units | Capacity |
|---|---|---|
| LEWP Forst Briesnig 2 GmbH & Co. KG | 17 | 105.4 MW |
| LEWP Forst Briesnig 3 GmbH & Co. KG | 14 | 100.8 MW |
| Lübbinchener Windkraft GmbH & Co. KG | 9 | 64.8 MW |
| Jerischke II GmbH | 11 | 61.6 MW |
| Windpark Leuthen GmbH & Co. KG | 8 | 54.4 MW |
| Erste Windpark Jerischke GmbH & Co. KG | 9 | 50.4 MW |
| Jerischke III GmbH | 5 | 36.0 MW |
| JWP Jade Windpark GmbH&Co. 27.Betriebs KG | 8 | 22.9 MW |
| NxW Spremberg GmbH & Co. KG | 9 | 22.5 MW |
| Windpark Auras Süd GmbH & Co.KG | 4 | 21.8 MW |
Which manufacturer accounts for the most wind power capacity in Spree-Neiße?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 109 | 556.5 MW |
| Fuhrländer AG | 9 | 22.5 MW |
| ENERCON GmbH | 13 | 19.1 MW |
| Senvion Deutschland GmbH | 5 | 16.0 MW |
| Nordex Energy GmbH | 5 | 13.2 MW |
| FWT energy GmbH | 5 | 12.5 MW |
| NEG Micon Deutschland GmbH | 7 | 10.5 MW |
| Nordex SE | 2 | 9.60 MW |
| GE Wind Energy GmbH | 2 | 3.00 MW |
| REpower Systems SE | 2 | 3.00 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Spree-Neiße (Brandenburg), and how large are they can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.