Germany · renewables
Wind power in Oder-Spree
193 wind turbines with 528.1 MW of gross capacity were in operation in Oder-Spree (Brandenburg) as of 2026-11-05, with a further 82 units (524.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Oder-Spree (Brandenburg), and how large are they, as of 2026-11-05?
- 193 wind turbines with 528.1 MW of gross capacity were in operation in Oder-Spree (Brandenburg) as of 2026-11-05, with a further 82 units (524.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Oder-Spree?
- 193 wind turbines with 528.1 MW of gross capacity were in operation in Oder-Spree as of 2026-11-05, with a further 82 units (524.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Oder-Spree in 2025?
- 11 wind turbines with 64.9 MW went into operation in Oder-Spree in 2025; the strongest year of the last two decades was 2021 with 130.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Oder-Spree?
- WKN Windpark Beerfelde GmbH & Co. KG operates 14 wind turbines with 97.6 MW in Oder-Spree, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Oder-Spree?
- Vestas Deutschland GmbH leads with 159 wind turbines and 635.3 MW in Oder-Spree (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Oder-Spree?
- The largest registered wind turbine in Oder-Spree has 7.20 MW of gross capacity and is operated by WKN Windpark Beerfelde GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Oder-Spree distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.00 MW | 0 | 0 |
| 30 to 100 kW | 3 | 0.11 MW | 3 | 0 |
| over 100 kW | 281 | 1.07 GW | 190 | 82 |
How much wind power capacity was commissioned in Oder-Spree each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 11 | 64.9 MW |
| 2023 | 10 | 49.7 MW |
| 2022 | 9 | 38.4 MW |
| 2021 | 33 | 130.2 MW |
| 2017 | 7 | 20.7 MW |
| 2016 | 10 | 34.5 MW |
| 2014 | 9 | 21.5 MW |
| 2012 | 6 | 12.0 MW |
| 2009 | 8 | 12.0 MW |
| 2008 | 3 | 6.00 MW |
| 2007 | 2 | 4.60 MW |
| 2006 | 8 | 16.0 MW |
How many wind turbines in Oder-Spree are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 193 | 528.1 MW |
| planned | 82 | 524.9 MW |
| permanently decommissioned | 11 | 15.2 MW |
Which wind turbines are registered in Oder-Spree?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Windpark Beerfelde WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| WP Grunow-Mixdorf_WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Merz WEA-M02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| Wind Berkenbrück-Dehmsee - WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Wind Berkenbrück-Dehmsee - WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Wind Berkenbrück-Dehmsee - WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Wind Berkenbrück-Dehmsee - WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| WP Merz WEA-M01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | PNE AG |
| WP Grunow-Mixdorf_WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Grunow-Mixdorf_WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Wind Berkenbrück-Dehmsee - WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| WP Grunow-Mixdorf_WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Wind Berkenbrück-Dehmsee - WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Wind Berkenbrück-Dehmsee - WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Windpark Beerfelde WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| BVIII - WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| WP Grunow-Mixdorf_WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Grunow-Mixdorf_WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Wind Berkenbrück-Dehmsee - WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| Wind Berkenbrück-Dehmsee - WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| BVIII - WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| Wind Berkenbrück-Dehmsee - WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | reVenton Windpark BB1 GmbH & Co. KG |
| WP Grunow-Mixdorf_WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Windpark Beerfelde WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 18 | 7.00 MW | – | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 16 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 20 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 11 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 12 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 17 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 13 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 19 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 15 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| Windpark Beerfelde WEA 14 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| WEA Görzig Süd Erweiterung 14 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Leißnitz WEA02 | 6.80 MW | Nordex SE | planned | planned 2029 | Leißnitz Projekt GmbH |
| WP Heinersdorf Ost II WEA 5 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA Görzig 03 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-09-25 | UGE Radinkendorf GmbH & Co. KG Umweltgerechte Energie |
| WP Heinersdorf Ost II WEA 4 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA Görzig Süd Erweiterung 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Leißnitz WEA01 | 6.80 MW | Nordex SE | planned | planned 2029 | Leißnitz Projekt GmbH |
| WEA Görzig Süd Erweiterung 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Görzig Süd Erweiterung 12 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Görzig Süd Erweiterung 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WP Heinersdorf Ost II WEA 6 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA Görzig 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-10-07 | UGE Radinkendorf GmbH & Co. KG Umweltgerechte Energie |
| WEA Görzig 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-09-24 | UGE Radinkendorf GmbH & Co. KG Umweltgerechte Energie |
| WEA Görzig Süd Erweiterung 13 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Grunow-Dammendorf 03 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 01 | 6.20 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | UPWIND GmbH & Co. KG |
| Diehlo West WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 266 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA7 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | NOTUS energy Plan GmbH & Co. KG |
| ABO Energy WP Spreeau 3 WEA 11 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Energy WP Spreeau 3 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA6 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| Windpark Beerfelde WEA 7 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | WKN Windpark Beerfelde GmbH & Co. KG |
| ABO Energy WP Spreeau 2 WEA 9 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Energy WP Spreeau 2 GmbH & Co. KG |
| ABO Energy WP Spreeau 3 WEA 8 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Energy WP Spreeau 3 GmbH & Co. KG |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-12-18 | Windpark Blanke Hölle 2 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA4 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA8 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| Diehlo West WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 266 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| ABO Wind WP Schierenberg WEA5 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | ABO Wind Windpark 10 GmbH & Co. KG |
| WKA4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | GBB Windpark Madlitz GmbH & Co. KG |
| WKA5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | GBB Windpark Madlitz GmbH & Co. KG |
| WKA3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | GBB Windpark Madlitz GmbH & Co. KG |
| WKA1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | GBB Windpark Madlitz GmbH & Co. KG |
| WKA2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | GBB Windpark Madlitz GmbH & Co. KG |
| WEA 01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-06-08 | Windpark Blanke Hölle 1 GmbH & Co. KG |
| Heinersdorf Ost WEA 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| Windpark Odervorland WEA 11 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-08 | MLK Windpark Schornsteinfeger Berge Nr. 71 GmbH & Co. KG |
| Windpark Sieversdorfer Heide WEA 8 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-08 | MLK Windpark Sieversdorfer Heide Nr. 58 GmbH & Co. KG |
| ABO Energy WP Hasenberg WEA 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | ABO Energy WP Hasenberg GmbH & Co. KG |
| Heinersdorf Ost WEA 3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| Windpark Odervorland WEA 10 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-05 | MLK Windpark Schornsteinfeger Berge Nr. 71 GmbH & Co. KG |
| Heinersdorf Ost WEA 2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-06-18 | Windpark Blanke Hölle 1 GmbH & Co. KG |
| Windpark Am Hirschberg WEA 5 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-15 | MLK Windpark Am Hirschberg Nr. 67 GmbH & Co. KG |
| Windpark Am Hirschberg WEA 6 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-07 | MLK Windpark Am Hirschberg Nr. 67 GmbH & Co. KG |
| Windpark Sieversdorfer Heide WEA 09 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-08 | MLK Windpark Sieversdorfer Heide Nr. 58 GmbH & Co. KG |
| Odervorland Erweiterung WEA 07 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-15 | Ventus Bürgerstrom Brandenburg Nr. 88 GmbH & Co. KG |
| ABO Energy WP Hasenberg WEA 2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | ABO Energy WP Hasenberg GmbH & Co. KG |
| WEA01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Green Wind Energy GmbH |
| 1603362 - WEA 07 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-24 | enercity Windpark Beeskow GmbH & Co. KG |
| 1603367 - WEA 12 | 5.56 MW | ENERCON GmbH | in operation | 2025-07-08 | enercity Windpark Beeskow GmbH & Co. KG |
| WEA08 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | enercity Windpark Beeskow II GmbH & Co. KG |
| 1603364 - WEA 11 | 5.56 MW | ENERCON GmbH | in operation | 2025-07-11 | enercity Windpark Beeskow GmbH & Co. KG |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Groß Rietz KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Groß Rietz KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Groß Rietz KG |
| WKA13 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-03 | WP Beeskow Hufenfeld VCS GmbH & Co. KG |
| 1603363 - WEA 09 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-13 | enercity Windpark Beeskow GmbH & Co. KG |
| 1603360 - WEA 03 | 5.56 MW | ENERCON GmbH | in operation | 2025-06-27 | enercity Windpark Beeskow GmbH & Co. KG |
| WKA10 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-06 | WP Beeskow Hufenfeld GWI GmbH & Co. KG |
| 1603361 - WEA 06 | 5.56 MW | ENERCON GmbH | in operation | 2025-03-18 | enercity Windpark Beeskow GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark GmbH & Co. Groß Rietz KG |
| WEA 3 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-07-06 | Energiepark Jacobsdorf WP Jaco GmbH & Co. KG |
| WEA 4 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-08-26 | Energiepark Jacobsdorf WP Jaco GmbH & Co. KG |
| Trianel Windpark Görzig WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-06-22 | Trianel Windpark Görzig GmbH & Co. KG |
| WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-07-27 | Energiepark Jacobsdorf WP Jaco GmbH & Co. KG |
| WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-08-26 | Energiepark Jacobsdorf WP Jaco GmbH & Co. KG |
| Trianel Windpark Görzig WEA 3 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-12-19 | Trianel Windpark Görzig GmbH & Co. KG |
| Trianel Windpark Görzig WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-12-19 | Trianel Windpark Görzig GmbH & Co. KG |
| Spreeau 05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-24 | Trianel Windpark Spreeau GmbH & Co. KG |
| Windmüllerei Biegen I | 4.20 MW | – | in operation | 2022-02-23 | Windmüllerei Biegen I GmbH & Co. KG |
| WEA Biegener Hellen | 4.20 MW | ENERCON GmbH | planned | planned 2027 | MLK Windpark Biegener Hellen Nr. 68 GmbH & Co. KG |
| Spreeau 06 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-10-27 | Trianel Windpark Spreeau GmbH & Co. KG |
| Spreeau 03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-09-01 | Trianel Windpark Spreeau GmbH & Co. KG |
| Spreeau 04 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-10 | Trianel Windpark Spreeau GmbH & Co. KG |
| Windmüllerei Biegen IV | 4.20 MW | ENERCON GmbH | in operation | 2022-01-19 | Windmüllerei Biegen IV GmbH & Co. KG |
| Windmüllerei Biegen II | 4.20 MW | – | in operation | 2022-03-11 | Windmüllerei Biegen II GmbH & Co. KG |
| Spreeau 02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-09-28 | Trianel Windpark Spreeau GmbH & Co. KG |
| Spreeau 10 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-11-03 | Trianel Windpark Spreeau GmbH & Co. KG |
| Windmüllerei Biegen VII | 4.20 MW | ENERCON GmbH | in operation | 2022-05-16 | Windmüllerei Biegen VII GmbH & Co. KG |
| Windmüllerei Biegen VI | 4.20 MW | ENERCON GmbH | in operation | 2022-02-11 | Windmüllerei Biegen VI GmbH & Co. KG |
| Windmüllerei Biegen III | 4.20 MW | – | in operation | 2022-04-22 | Windmüllerei Biegen III GmbH & Co. KG |
| Windmüllerei Biegen V | 4.20 MW | ENERCON GmbH | in operation | 2022-01-06 | Windmüllerei Biegen V GmbH & Co. KG |
| Spreeau 01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-10-08 | Trianel Windpark Spreeau GmbH & Co. KG |
| Spreeau 07 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-07-28 | Trianel Windpark Spreeau GmbH & Co. KG |
| WEA 05 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-08-31 | Windpark Weinberg GmbH & Co. KG |
| WEA 02 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-16 | Windpark Weinberg GmbH & Co. KG |
| WEA 01 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-23 | Windpark Weinberg GmbH & Co. KG |
| WEA 08 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-30 | Windpark Weinberg GmbH & Co. KG |
| WEA 10 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-21 | Windpark Weinberg GmbH & Co. KG |
| WEA 14 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-17 | Windpark Spitzberg GmbH & Co. KG |
| WEA 07 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-09-29 | Windpark Weinberg GmbH & Co. KG |
| WEA 03 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-08-30 | Windpark Weinberg GmbH & Co. KG |
| WEA 11 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-10-13 | Windpark Weinberg GmbH & Co. KG |
| WEA 09 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-08-27 | Windpark Spitzberg GmbH & Co. KG |
| WEA 15 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-08-31 | Windpark Spitzberg GmbH & Co. KG |
| WEA 06 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2021-08-31 | Windpark Spitzberg GmbH & Co. KG |
| V 236764-05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-06-29 | Windpark Biegen GmbH & Co. KG |
| W2/WEA 4 WP Palmnicken | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2028 | MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG |
| V 236760-01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-08-10 | Windpark Biegen GmbH & Co. KG |
| W1/WEA 3 WP Palmnicken | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2028 | MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG |
| V 236763-04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-08-19 | Windpark Biegen GmbH & Co. KG |
| V213250 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-15 | MLK Windpark Briesen Nr. 59 GmbH & Co. KG |
| V211586 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-08 | MLK Windpark Treplin Nr. 60 GmbH & Co. KG |
| V213248 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-28 | MLK Windpark Briesen Nr. 59 GmbH & Co. KG |
| V 212509 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-02-23 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| W3/WEA 5 WP Palmnicken | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2026 | MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG |
| V 212502 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-23 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 236761-02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-08-25 | Windpark Biegen GmbH & Co. KG |
| V204872 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-12-29 | MLK Windpark Lichtenberg Nr. 55 GmbH & Co. KG |
| V 236766-07 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-06-29 | Windpark Biegen GmbH & Co. KG |
| V 236765-06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-07-16 | Windpark Biegen GmbH & Co. KG |
| V213249 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-13 | MLK Windpark Briesen Nr. 59 GmbH & Co. KG |
| V 212507 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-02-21 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 212510 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-02-27 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 212503 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-02-20 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V211583 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-05-25 | MLK Windpark Briesen Nr. 59 GmbH & Co. KG |
| V 212505 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-02-01 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 212506 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-11-22 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 212504 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-01-20 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V 212508 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-30 | Ventus Regenerative Energien GmbH & Co. Windstrom Jacobsdorf KG |
| V211585 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-07 | MLK Windpark Treplin Nr. 60 GmbH & Co. KG |
| V204873 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2014-12-30 | MLK Windpark Lichtenberg Nr. 55 GmbH & Co. KG |
| V211584 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-06-03 | MLK Windpark Treplin Nr. 60 GmbH & Co. KG |
| V 236762-03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-07-29 | Windpark Biegen GmbH & Co. KG |
| WEA 1 2300_1766_01 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2007-11-26 | WP Odervorland Nr. 44 GmbH & Co. KG |
| Windmüllerei Jacobsdorf | 2.30 MW | ENERCON GmbH | in operation | 2014-10-08 | Windmüllerei Jacobsdorf GmbH & Co. KG |
| Windmüllerei Jacobsdorf | 2.30 MW | ENERCON GmbH | in operation | 2014-10-08 | Windmüllerei Jacobsdorf GmbH & Co. KG |
| WEA 2 2300_1767_02 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2007-11-26 | WP Odervorland Nr. 44 GmbH & Co. KG |
| VE-08-22956 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-24 | GD Wind Dritte GmbH & Co. KG |
| V 47857 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-08 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| Beeskow-Neuendorf 13505 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-20 | enercity Windpark Portfolio GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-04-29 | private individual |
| V 47854 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-20 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| V 47858 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-04-15 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-04-01 | private individual |
| VE-06-22964 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-22 | GD Wind Dritte GmbH & Co. KG |
| V 47855 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-08 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| WEA 12 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-31 | GD Wind Dritte GmbH & Co. KG |
| V 47853 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-16 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| Beeskow-Hufenfeld 13508 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-04-04 | enercity Windpark Portfolio GmbH & Co. KG |
| WEA 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-05-28 | MLK Windpark Sieversdorf Nr. 51 GmbH & Co. KG |
| V200832 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-06-21 | BKW Pillgram GmbH & Co. KG |
| V 47856 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-07 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| VE-01-22963 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-29 | GD Wind Dritte GmbH & Co. KG |
| WEA 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-05-26 | MLK Windpark Sieversdorf Nr. 51 GmbH & Co. KG |
| V30938 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-05-26 | VRE Odervorland Windkraft GmbH & Co. KG |
| V 22960 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-29 | GD Wind Dritte GmbH & Co. KG |
| VE-07-22959 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-22 | GD Wind Dritte GmbH & Co. KG |
| Beeskow-Neuendorf 13503 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-16 | enercity Windpark Portfolio GmbH & Co. KG |
| VE-05-22962 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-29 | GD Wind Dritte GmbH & Co. KG |
| V204874 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-12-18 | MLK Windpark Petershagen Nr. 56 GmbH & Co. KG |
| VE-10-22958 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-30 | GD Wind Dritte GmbH & Co. KG |
| Beeskow-Neuendorf 13497 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-29 | enercity Windpark Portfolio GmbH & Co. KG |
| V202884 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-04-24 | MLK Windpark Pillgram Nr. 52 GmbH & Co. KG |
| 25021 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-21 | Biegen 2 I/S |
| Beeskow-Neuendorf 13501 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-11 | enercity Windpark Portfolio GmbH & Co. KG |
| Beeskow-Neuendorf 13496 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-26 | enercity Windpark Portfolio GmbH & Co. KG |
| Beeskow-Hufenfeld 13512 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-04-22 | enercity Windpark Portfolio GmbH & Co. KG |
| VE-09-22955 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-20 | GD Wind Dritte GmbH & Co. KG |
| VE-03-22957 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-30 | GD Wind Dritte GmbH & Co. KG |
| Beeskow-Hufenfeld 13507 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-04-01 | enercity Windpark Portfolio GmbH & Co. KG |
| WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-12-27 | GD Wind Dritte GmbH & Co. KG |
| Beeskow-Neuendorf 13504 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-19 | enercity Windpark Portfolio GmbH & Co. KG |
| V13515 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-01 | Windpark Altsow ApS & Co. KG |
| 25024 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-15 | Biegen 3 I/S |
| Beeskow-Neuendorf 13499 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-05 | enercity Windpark Portfolio GmbH & Co. KG |
| Beeskow-Neuendorf 13498 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-03 | enercity Windpark Portfolio GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-04-16 | private individual |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-04-14 | private individual |
| Beeskow-Hufenfeld 13509 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-04-10 | enercity Windpark Portfolio GmbH & Co. KG |
| Beeskow-Neuendorf 13500 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-09 | enercity Windpark Portfolio GmbH & Co. KG |
| 25022 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-15 | Vindpark DE ApS |
| VE-11-22967 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-04-13 | GD Wind Dritte GmbH & Co. KG |
| WEA 13 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-31 | GD Wind Dritte GmbH & Co. KG |
| Beeskow-Hufenfeld 13506 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-03-26 | enercity Windpark Portfolio GmbH & Co. KG |
| V 200041 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-11-08 | MLK Windpark Jacobsdorf Nr. 54 GmbH & Co. KG |
| 25025 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-15 | Vindpark DE ApS |
| V204875 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-12-15 | MLK Windpark Petershagen Nr. 56 GmbH & Co. KG |
| Beeskow-Neuendorf 13502 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-13 | enercity Windpark Portfolio GmbH & Co. KG |
| 25023 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-21 | Biegen 5 I/S |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-04-01 | private individual |
| Beeskow-Hufenfeld 13513 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-04-24 | enercity Windpark Portfolio GmbH & Co. KG |
| BF 04 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-26 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| R-70117 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-06 | PROKON Regenerative Energien eG |
| R-70-252 | 1.50 MW | REpower Systems SE | in operation | 2003-11-19 | PROKON Regenerative Energien eG |
| R-70100 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-04 | PROKON Regenerative Energien eG |
| 701238 | 1.50 MW | ENERCON GmbH | in operation | 2003-05-21 | Groß Rietzer Windparkbetriebsgesellschaf mbH |
| R-70-214 | 1.50 MW | REpower Systems SE | in operation | 2003-09-03 | PROKON Regenerative Energien eG |
| R-70113 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-20 | PROKON Regenerative Energien eG |
| R-70116 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-25 | PROKON Regenerative Energien eG |
| R-70115 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-26 | PROKON Regenerative Energien eG |
| BF 06 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-24 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| R-70136 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-24 | PROKON Regenerative Energien eG |
| WEA Schenkendöbern 5 | 1.50 MW | Fuhrländer AG | in operation | 2009-11-23 | Windfarm Idesheim GmbH & Co. KG |
| R-70127 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70133 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-04 | PROKON Regenerative Energien eG |
| R-70-256 | 1.50 MW | REpower Systems SE | in operation | 2003-11-07 | PROKON Regenerative Energien eG |
| BF 07 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-25 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| BF 01 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-24 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| WEA Schenkendöbern 2 | 1.50 MW | Fuhrländer AG | in operation | 2009-11-23 | Windfarm Idesheim GmbH & Co. KG |
| R-70-254 | 1.50 MW | REpower Systems SE | in operation | 2003-09-11 | PROKON Regenerative Energien eG |
| WEA Schenkendöbern 8 | 1.50 MW | Fuhrländer AG | in operation | 2009-11-24 | Windfarm Idesheim GmbH & Co. KG |
| R-70128 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70114 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-06 | PROKON Regenerative Energien eG |
| BF 03 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-03-21 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| WEA Schenkendöbern 10 | 1.50 MW | Fuhrländer AG | in operation | 2009-03-04 | Windfarm Idesheim GmbH & Co. KG |
| R-70132 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-04 | PROKON Regenerative Energien eG |
| BF 05 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-24 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| R-70089 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70126 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70137 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-10-25 | PROKON Regenerative Energien eG |
| WEA Schenkendöbern 4 | 1.50 MW | Fuhrländer AG | in operation | 2009-03-11 | Windfarm Idesheim GmbH & Co. KG |
| WEA Schenkendöbern 6 | 1.50 MW | Fuhrländer AG | in operation | 2009-03-26 | Windfarm Idesheim GmbH & Co. KG |
| R-70138 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-10-08 | PROKON Regenerative Energien eG |
| BF 02 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-04-24 | Energiekontor Umwelt GmbH & Co. WP BF KG |
| 701239 | 1.50 MW | ENERCON GmbH | in operation | 2003-06-16 | Groß Rietzer Windparkbetriebsgesellschaf mbH |
| R-70-259 | 1.50 MW | REpower Systems SE | in operation | 2003-11-12 | PROKON Regenerative Energien eG |
| WEA Schenkendöbern 7 | 1.50 MW | Fuhrländer AG | in operation | 2009-03-10 | Windfarm Idesheim GmbH & Co. KG |
| R-70097 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-13 | PROKON Regenerative Energien eG |
| R-70118 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-11-15 | PROKON Regenerative Energien eG |
| R-70125 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70-250 | 1.50 MW | REpower Systems SE | in operation | 2003-11-14 | PROKON Regenerative Energien eG |
| R-70122 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70-255 | 1.50 MW | REpower Systems SE | in operation | 2003-11-12 | PROKON Regenerative Energien eG |
| R-70124 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70-218 | 1.50 MW | REpower Systems SE | in operation | 2003-08-28 | PROKON Regenerative Energien eG |
| R-70112 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-12 | PROKON Regenerative Energien eG |
| R-70-219 | 1.50 MW | REpower Systems SE | in operation | 2003-09-15 | PROKON Regenerative Energien eG |
| WEA Schenkendöbern 9 | 1.50 MW | Fuhrländer AG | in operation | 2009-03-06 | Windfarm Idesheim GmbH & Co. KG |
| R-70123 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-09-05 | PROKON Regenerative Energien eG |
| R-70-253 | 1.50 MW | REpower Systems SE | in operation | 2003-11-14 | PROKON Regenerative Energien eG |
| WEA Tempelberg | 1.30 MW | AN Windenergie GmbH | in operation | 2002-10-14 | Albertsen, Clasen, Gerster, Klawitter Surendorf WEA Tempelberg GbR |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2003-11-27 | private individual |
| WEA 03 - 441838 | 0.60 MW | ENERCON GmbH | in operation | 2003-11-27 | Märkische Windkraft 101 GmbH & Co. KG |
| V44 Fürstenwalde | 0.60 MW | Vestas Deutschland GmbH | in operation | 1996-10-02 | Windconsult Tomaschäfsky & Co. OHG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2003-11-27 | private individual |
| E44299 Jacobsdorf | 0.60 MW | ENERCON GmbH | in operation | 2000-09-02 | SR Wind GmbH & Co. KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-12-14 | private individual |
| Windkraftanlage | 0.50 MW | ENERCON GmbH | in operation | 1999-12-01 | Leißnitz Bestand GmbH |
| Windmüllerei Heinersdorf | 0.50 MW | ENERCON GmbH | in operation | 1997-03-24 | EXPEC Wind REpower 1 GmbH & Co. KG |
| V 9439 | 0.50 MW | Vestas Deutschland GmbH | in operation | 1996-05-09 | EXPEC Wind REpower 1 GmbH & Co. KG |
| WKA Tauche | 0.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Agrargenossenschaft Tauche eG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-12-03 | private individual |
| LOS 3 | 0.04 MW | Südwind Borsig Energy GmbH | in operation | 1994-03-22 | Ökologisches Kulturzentrum Kesselberg e.V. |
| LOS2 | 0.04 MW | Südwind Borsig Energy GmbH | in operation | 1992-01-01 | Ökologisches Kulturzentrum Kesselberg e.V. |
| LOS 1 | 0.04 MW | Sonstige | in operation | 1992-01-01 | Ökologisches Kulturzentrum Kesselberg e.V. |
| unit operated by a private individual | 0.00 MW | Sonstige | permanently decommissioned | 2023-07-21 | private individual |
| unit operated by a private individual | 0.00 MW | FuSystems SkyWind GmbH | permanently decommissioned | 2017-01-16 | private individual |
Which organisations operate the most wind power capacity in Oder-Spree?
| Operator | Units | Capacity |
|---|---|---|
| WKN Windpark Beerfelde GmbH & Co. KG | 14 | 97.6 MW |
| reVenton Windpark BB1 GmbH & Co. KG | 10 | 72.0 MW |
| Alterric Deutschland GmbH | 7 | 50.4 MW |
| PROKON Regenerative Energien eG | 32 | 48.0 MW |
| ABO Wind Windpark 10 GmbH & Co. KG | 8 | 48.0 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 7 | 47.4 MW |
| EnBW OnshoreInvest GmbH & Co. KG | 6 | 37.2 MW |
| Trianel Windpark Spreeau GmbH & Co. KG | 8 | 33.6 MW |
| enercity Windpark Beeskow GmbH & Co. KG | 6 | 33.4 MW |
| enercity Windpark Portfolio GmbH & Co. KG | 16 | 32.0 MW |
Which manufacturer accounts for the most wind power capacity in Oder-Spree?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 159 | 635.3 MW |
| ENERCON GmbH | 40 | 168.8 MW |
| Nordex Germany GmbH | 14 | 89.7 MW |
| Nordex Energy GmbH | 10 | 51.9 MW |
| Senvion Deutschland GmbH | 22 | 33.0 MW |
| REpower Systems SE | 10 | 15.0 MW |
| Nordex SE | 2 | 13.6 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 2 | 12.8 MW |
| Fuhrländer AG | 8 | 12.0 MW |
| GE Wind Energy GmbH | 7 | 10.5 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Oder-Spree (Brandenburg), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.