Germany · renewables
Wind power in Dahme-Spreewald
321 wind turbines with 804.0 MW of gross capacity were in operation in Dahme-Spreewald (Brandenburg) as of 2026-11-05, with a further 59 units (390.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Dahme-Spreewald (Brandenburg), and how large are they, as of 2026-11-05?
- 321 wind turbines with 804.0 MW of gross capacity were in operation in Dahme-Spreewald (Brandenburg) as of 2026-11-05, with a further 59 units (390.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Dahme-Spreewald?
- 321 wind turbines with 804.0 MW of gross capacity were in operation in Dahme-Spreewald as of 2026-11-05, with a further 59 units (390.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Dahme-Spreewald in 2025?
- 11 wind turbines with 66.4 MW went into operation in Dahme-Spreewald in 2025; the strongest year of the last two decades was 2014 with 92.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Dahme-Spreewald?
- UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie operates 10 wind turbines with 68.0 MW in Dahme-Spreewald, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Dahme-Spreewald?
- Vestas Deutschland GmbH leads with 170 wind turbines and 524.0 MW in Dahme-Spreewald (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Dahme-Spreewald?
- The largest registered wind turbine in Dahme-Spreewald has 7.20 MW of gross capacity and is operated by Alterric Deutschland GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Dahme-Spreewald distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 389 | 1.21 GW | 320 | 59 |
How much wind power capacity was commissioned in Dahme-Spreewald each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 8 | 51.8 MW |
| 2025 | 11 | 66.4 MW |
| 2024 | 1 | 6.80 MW |
| 2023 | 7 | 44.0 MW |
| 2022 | 5 | 24.0 MW |
| 2021 | 3 | 10.5 MW |
| 2020 | 13 | 30.1 MW |
| 2019 | 1 | 2.05 MW |
| 2018 | 5 | 15.6 MW |
| 2017 | 3 | 9.45 MW |
| 2016 | 24 | 73.9 MW |
| 2015 | 20 | 46.3 MW |
| 2014 | 33 | 92.7 MW |
| 2013 | 2 | 6.10 MW |
| 2012 | 18 | 37.2 MW |
| 2011 | 10 | 20.3 MW |
| 2010 | 24 | 48.0 MW |
| 2009 | 20 | 40.0 MW |
| 2007 | 13 | 25.8 MW |
| 2006 | 20 | 35.0 MW |
How many wind turbines in Dahme-Spreewald are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 321 | 804.0 MW |
| planned | 59 | 390.1 MW |
| permanently decommissioned | 9 | 18.0 MW |
| temporarily shut down | 1 | 0.60 MW |
Which wind turbines are registered in Dahme-Spreewald?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Schenkendorf-Nord WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Schenkendorf-Nord WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Schönwalde VI (WEA 15) | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Rodelberg GmbH & Co. KG |
| WEA 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Seeberg GmbH & Co. KG |
| Schenkendorf-Nord WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Schenkendorf-Nord WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Waldow GmbH |
| WP Schönwalde VII (WEA 12) | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Rodelberg GmbH & Co. KG |
| Schenkendorf-Nord WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Schenkendorf-Nord WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA 08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| Schenkendorf-Nord WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA Groß Lubolz | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | NaturStromProjekte GmbH |
| WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| Schenkendorf-Nord WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA 09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Waldow GmbH |
| WEA Duben 12 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Duben 11 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Duben 09 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Duben 08 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Duben 07 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Duben 10 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Trebitz 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-12-07 | UGE Trebitz Eins GmbH & Co.KG Umweltgerechte Energie |
| WEA Trebitz 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Trebitz 2 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-12-04 | UGE Trebitz Eins GmbH & Co.KG Umweltgerechte Energie |
| WEA Mahlsdorf 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-02-26 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Schäcksdorf 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Schäcksdorf 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| Schönerlinde WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Schönerlinde GmbH & Co. KG |
| WEA Schäcksdorf 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Mahlsdorf 03 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-04 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Mahlsdorf 10 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-23 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Schäcksdorf 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Mahlsdorf 04 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-19 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Mahlsdorf 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-02-11 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Trebitz 4 | 6.80 MW | Nordex Energy GmbH | in operation | 2024-01-10 | UGE Trebitz Eins GmbH & Co.KG Umweltgerechte Energie |
| Schönerlinde WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Schönerlinde GmbH & Co. KG |
| WEA Trebitz 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Trebitz 3 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-12-05 | UGE Trebitz Eins GmbH & Co.KG Umweltgerechte Energie |
| Schönerlinde WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | EE Schönerlinde GmbH & Co. KG |
| WEA Mahlsdorf 09 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-12 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Mahlsdorf 08 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-03-26 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Mahlsdorf 06 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-18 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| Schönerlinde WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Schönerlinde GmbH & Co. KG |
| WEA Schäcksdorf 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Schäcksdorf 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Schäcksdorf 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Trebitz 1 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-12-06 | UGE Trebitz Eins GmbH & Co.KG Umweltgerechte Energie |
| WEA Schäcksdorf 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| Schönerlinde WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Schönerlinde GmbH & Co. KG |
| WEA Mahlsdorf 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-23 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Mahlsdorf 07 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-15 | UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA Schäcksdorf 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| WEA Schäcksdorf 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie |
| Schönerlinde WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EE Schönerlinde GmbH & Co. KG |
| Hellberge VI 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energiequelle GmbH |
| WEA 07 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-28 | Windpark Glücksberg 2 GmbH & Co. KG |
| WEA05_Waldow II_V255002_SP-65871 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-27 | NeXtWind Waldow II GmbH |
| WEA06_Waldow II_V255001_SP-65871 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2026-05-27 | NeXtWind Waldow II GmbH |
| Hellberge VI 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energiequelle GmbH |
| WEA Biebersdorf | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | WEB Windenergie Brandenburg GmbH |
| Hellberge VI 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energiequelle GmbH |
| WP Schönwalde V (WEA 16) | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Rodelberg GmbH & Co. KG |
| WEA 6 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| WEA04_Waldow II _V255003_SP-65871 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-05-27 | NeXtWind Waldow II GmbH |
| TN3-03 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA 4 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| WEA 2 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| TN1-03 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA 5 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| WEA 1 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| WEA 3 E175 EP5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dubener Platte GmbH & Co. KG |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-04-16 | Windpark Glücksberg GmbH & Co. KG |
| TN3-02 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| TN2-03 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| TN3-01 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| TN3-04 | 6.00 MW | eno energy systems GmbH | planned | planned 2027 | eno energy GmbH |
| WEA Kl.L.N 4-2 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-09-27 | UGE Klein Leine Nord Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA Kl.L.N 4-1 | 5.70 MW | Nordex Germany GmbH | in operation | 2022-09-27 | UGE Klein Leine Nord Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA 01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-03-14 | Windpark Trebitzberg GmbH & Co. KG |
| WEA 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-04-16 | NeXtWind Waldow GmbH |
| WEA 02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-03-29 | Windpark Trebitzberg GmbH & Co. KG |
| WEA 03 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-04-16 | NeXtWind Waldow GmbH |
| WEA 03 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-03-29 | Windpark Trebitzberg GmbH & Co. KG |
| WEA Kl.L.N 4-3 | 4.50 MW | Nordex SE | in operation | 2022-09-27 | UGE Klein Leine Nord Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA Kl.L.N 4-4 | 4.50 MW | Nordex SE | in operation | 2022-09-27 | UGE Klein Leine Nord Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA 2 251600 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2025-04-11 | MLK Windpark Radensdorf Nr. 97 GmbH & Co. KG |
| WEA 1 251601 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2025-04-11 | MLK Windpark Radensdorf Nr. 97 GmbH & Co. KG |
| WEA Freiwalde 5 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2020-07-23 | Windpark Brottewitz GmbH & Co. KG |
| Schenkendorf-Nord WEA 5 | 4.20 MW | – | planned | planned 2027 | Alterric Deutschland GmbH |
| Barbassee | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-12-22 | EE Barbassee ApS & Co. KG |
| WP Hellberge V WEA KR1 1380605 | 3.50 MW | ENERCON GmbH | in operation | 2021-12-21 | Raschemann & Kahlbaum GmbH & Co. KG |
| WP Hellberge V WEA 1 1380603 | 3.50 MW | ENERCON GmbH | in operation | 2021-12-16 | Windpark Hellberge V GmbH & Co. KG |
| WEA TN1-04 | 3.50 MW | eno energy systems GmbH | planned | planned 2026 | eno energy GmbH |
| WP Hellberge V WEA 2 1380604 | 3.50 MW | ENERCON GmbH | in operation | 2021-12-15 | Windpark Hellberge V GmbH & Co. KG |
| WEA 212314 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-21 | Windpark Klein Leine Nord GmbH & Co. KG |
| WEA 212316 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-21 | Windpark Klein Leine Nord GmbH & Co. KG |
| WEA Schochodde | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-09-29 | WEA Schochodde V126 ApS & Co. KG c/o BDO AG Wirtschaftsprüfungsgesellschaft |
| WEA 212315 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-09-21 | Windpark Klein Leine Nord GmbH & Co. KG |
| WEA 14 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-12-13 | Windpark Ziegelberg GmbH & Co. KG |
| 205000 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Eins GmbH & Co. KG Umweltgerechte Energie |
| Uckley 12 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-21 | Trianel Windpark Uckley GmbH & Co. KG |
| Windpark Siegadel WEA 05 / 19 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-03-27 | FP Lux Wind GmbH & Co. Siegadel KG |
| 205010 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Eins GmbH & Co. KG Umweltgerechte Energie |
| 205003 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-14 | UGE Siegadel Drei GmbH & Co. KG Umweltgerechte Energie |
| Windpark Siegadel WEA 03 / 17 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-03-31 | FP Lux Wind GmbH & Co. Siegadel KG |
| Uckley 06 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-20 | Trianel Windpark Uckley GmbH & Co. KG |
| Windpark Siegadel WEA 01 / 15 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-04-01 | FP Lux Wind GmbH & Co. Siegadel KG |
| Uckley 05 | 3.30 MW | Nordex SE | in operation | 2016-09-19 | Trianel Windpark Uckley GmbH & Co. KG |
| 204998 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-18 | UGE Siegadel Drei GmbH & Co. KG Umweltgerechte Energie |
| 205009 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Eins GmbH & Co. KG Umweltgerechte Energie |
| Uckley 04 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-19 | Trianel Windpark Uckley GmbH & Co. KG |
| Uckley 08 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-23 | Trianel Windpark Uckley GmbH & Co. KG |
| 204999 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-17 | UGE Siegadel Drei GmbH & Co. KG Umweltgerechte Energie |
| Uckley 03 | 3.30 MW | Nordex SE | in operation | 2016-09-19 | Trianel Windpark Uckley GmbH & Co. KG |
| 205008 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Vier GmbH & Co. KG Umweltgerechte Energie |
| 205005 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-10 | UGE Siegadel Drei GmbH & Co. KG Umweltgerechte Energie |
| 205001 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Vier GmbH & Co. KG Umweltgerechte Energie |
| 205011 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Vier GmbH & Co. KG Umweltgerechte Energie |
| Uckley 02 | 3.30 MW | Nordex SE | in operation | 2016-09-19 | Trianel Windpark Uckley GmbH & Co. KG |
| Uckley 07 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-21 | Trianel Windpark Uckley GmbH & Co. KG |
| Uckley 13 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-28 | Trianel Windpark Uckley GmbH & Co. KG |
| 205007 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-07 | UGE Siegadel Vier GmbH & Co. KG Umweltgerechte Energie |
| Windpark Siegadel WEA 02 / 16 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-03-27 | FP Lux Wind GmbH & Co. Siegadel KG |
| Uckley 11 | 3.30 MW | Nordex Energy GmbH | in operation | 2016-09-28 | Trianel Windpark Uckley GmbH & Co. KG |
| 205002 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-03 | UGE Siegadel Drei GmbH & Co. KG Umweltgerechte Energie |
| Windpark Siegadel WEA 04 / 18 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-04-01 | FP Lux Wind GmbH & Co. Siegadel KG |
| 205006 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-24 | UGE Siegadel Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 13 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-05 | CP Wind Einundvierzigste GmbH & Co. KG |
| 205004 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2014-11-06 | UGE Siegadel Vier GmbH & Co. KG Umweltgerechte Energie |
| WEA A2 | 3.15 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2018-12-13 | EWI Niewitz GmbH & Co. KG |
| 1010424 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-20 | Windpark Hellberge III GmbH & Co. KG |
| 1010425 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-16 | Windpark Hellberge III GmbH & Co. KG |
| 1151051 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-28 | Windpark GmbH & Co. Damsdorf KG |
| 1150709 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-28 | Achtruten GmbH |
| 1151053 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-14 | Windpark GmbH & Co. Damsdorf KG |
| 1150647 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | Achtruten GmbH |
| 1151052 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-20 | Windpark GmbH & Co. Damsdorf KG |
| WEA09_28150115 | 2.78 MW | GE Wind Energy GmbH | in operation | 2015-11-28 | Windpark Karche Zwei GmbH & Co. KG |
| VF07_27161345 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2016-12-15 | Windpark Duben Süd GmbH & Co. KG |
| VF01_27161339 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-11-11 | Windpark Duben Süd GmbH & Co. KG |
| UKA1 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2015-12-08 | UGE Karche Eins GmbH & Co. KG Umweltgerechte Energie |
| VF08_27161346 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-12-08 | Windpark Duben Süd GmbH & Co. KG |
| VF02_27161340 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-11-24 | Windpark Duben Süd GmbH & Co. KG |
| VF04_27161342 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-19 | Windpark Duben Süd GmbH & Co. KG |
| VF06_27161344 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-29 | Windpark Duben Süd GmbH & Co. KG |
| VF05_27161343 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2016-11-29 | Windpark Duben Süd GmbH & Co. KG |
| VF10_27161348 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2016-09-22 | Windpark Duben Süd GmbH & Co. KG |
| VF11_27161349 | 2.78 MW | GE Renewable Germany GmbH | in operation | 2016-09-21 | Windpark Duben Süd GmbH & Co. KG |
| VF03_27161341 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-10-29 | Windpark Duben Süd GmbH & Co. KG |
| UKA5 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-28 | UGE Karche Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA08_28150114 | 2.78 MW | GE Wind Energy GmbH | in operation | 2015-12-02 | Windpark Karche Zwei GmbH & Co. KG |
| UKA 4 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-30 | UGE Karche Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA07_28150107 | 2.78 MW | GE Wind Energy GmbH | in operation | 2015-11-27 | Windpark Karche Zwei GmbH & Co. KG |
| UKA3 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2015-12-03 | UGE Karche Eins GmbH & Co. KG Umweltgerechte Energie |
| VF09_27161347 | 2.78 MW | GE Wind Energy GmbH | in operation | 2016-09-27 | Windpark Duben Süd GmbH & Co. KG |
| UKA2 | 2.78 MW | General Electric Deutschland Holding GmbH | in operation | 2015-11-30 | UGE Karche Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA06_28150113 | 2.78 MW | GE Wind Energy GmbH | in operation | 2015-11-27 | Windpark Karche Zwei GmbH & Co. KG |
| WEA10-83153 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-07-28 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA08-83160 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-07-22 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA09-83156 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-18 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA13-83150 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-06-05 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA22-83163 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-08-29 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA17-83154 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-07-30 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA18-83148 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-06-13 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA14-83162 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-22 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA20-83164 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-08-21 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA21-83161 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-10 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA05-83149 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-07-01 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA01-83157 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-24 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA16-83159 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-06-25 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA06-83151 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-05-28 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA04-83152 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-07-18 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA02-83155 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-15 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA19-83158 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-10 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| WEA07-83165 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-09-15 | Iqony Windpark Ullersdorf GmbH & Co. KG |
| 921576 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-13 | Windpark GmbH & Co. Duben KG |
| 921578 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-15 | Windpark GmbH & Co. Duben KG |
| 921571 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-14 | Windpark GmbH & Co. Duben KG |
| 921575 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-12 | Windpark GmbH & Co. Duben KG |
| 921722 | 2.35 MW | ENERCON GmbH | in operation | 2020-07-10 | Windpark GmbH & Co. Duben KG |
| 921577 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-13 | Windpark GmbH & Co. Duben KG |
| 921572 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-14 | Windpark GmbH & Co. Duben KG |
| 921574 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-19 | Windpark GmbH & Co. Duben KG |
| 921724 | 2.35 MW | ENERCON GmbH | in operation | 2020-08-12 | Windpark GmbH & Co. Duben KG |
| 921725 | 2.35 MW | ENERCON GmbH | in operation | 2020-07-15 | Windpark GmbH & Co. Duben KG |
| 921573 | 2.35 MW | ENERCON GmbH | in operation | 2020-02-13 | Windpark GmbH & Co. Duben KG |
| 824918 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-31 | Achtruten GmbH |
| 824917 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-28 | Achtruten GmbH |
| Hellberge WEA E823702 | 2.30 MW | ENERCON GmbH | in operation | 2012-03-02 | Chorus CleanTech GmbH & Co. Windpark Hellberge KG |
| Hellberge WEA E823704 | 2.30 MW | ENERCON GmbH | in operation | 2012-03-16 | Chorus CleanTech GmbH & Co. Windpark Hellberge KG |
| Hellberge WEA E823703 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-30 | Chorus CleanTech GmbH & Co. Windpark Hellberge KG |
| 781488 | 2.30 MW | ENERCON GmbH | in operation | 2007-06-05 | Achtruten GmbH |
| EE Sieben Fünf GmbH & Co. KG | 2.05 MW | Senvion Deutschland GmbH | in operation | 2019-06-14 | Windenergieanlage Jetsch GmbH & Co. KG |
| 17652 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-12-18 | NxW Waldow GmbH |
| V 23071-04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-11-30 | Statkraft Windenergie GmbH & Co. KG |
| WEA 44072 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-23 | Windpark Biebersdorf GmbH & Co. KG |
| 16896 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-11 | NxW Waldow GmbH |
| V 30712 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-28 | Windpark Briesensee GmbH |
| WEA 35190 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-22 | BKW Energie Deutschland GmbH |
| V 30718 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-03 | Windpark Briesensee GmbH |
| AN 2000-371-02 | 2.00 MW | Sonstige | in operation | 2006-12-29 | QE Portfolio 1 GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-14 | private individual |
| V 37177 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-26 | Windpark Märkische Heide GmbH |
| V37423 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-05-27 | Windpark Nowa Niwa GmbH |
| WEA 35187 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-22 | BKW Energie Deutschland GmbH |
| 17650 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-28 | NxW Waldow GmbH |
| WEA 08 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-11-29 | Windpark Schönwalde GmbH & Co. KG |
| VE-09-20121 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-31 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-11 | private individual |
| WEA 35185 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-28 | BKW Energie Deutschland GmbH |
| WEA 35189 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-30 | BKW Energie Deutschland GmbH |
| WEA 44070 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-01-04 | Windpark Biebersdorf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-18 | private individual |
| V 41275 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-20 | Windpark Märkische Heide GmbH |
| V 30719 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-03 | Windpark Briesensee GmbH |
| V30711 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-20 | Windpark Briesensee GmbH |
| WEA 1 (Seriennummer 200356) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-12-21 | LHI GII2 WP Niederlehme 2288 GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-10 | private individual |
| V 30715 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-28 | Windpark Briesensee GmbH |
| WEA 8 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-02-07 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| WEA 40009 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-09 | BKW Energie Deutschland GmbH |
| WEA 35194 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-20 | BKW Energie Deutschland GmbH |
| WEA 44073 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-31 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 37329 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-18 | EE Sieben Null GmbH & co. KG |
| WEA 44027 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-04-20 | Windpark Biebersdorf GmbH & Co. KG |
| V37424 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-01 | Windpark Nowa Niwa GmbH |
| WEA 09 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-11-21 | Windpark Schönwalde GmbH & Co. KG |
| WEA 44074 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-01-27 | Windpark Biebersdorf GmbH & Co. KG |
| V 30713 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-28 | Windpark Briesensee GmbH |
| WEA 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-17 | Windpark Schönwalde GmbH & Co. KG |
| VE-05-20112 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-18 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| WEA 35191 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-29 | BKW Energie Deutschland GmbH |
| V44010 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-07 | Windpark Nowa Niwa GmbH |
| WEA 44011 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-02-07 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-04 | Windpark Schönwalde GmbH & Co. KG |
| V 37178 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-19 | Windpark Märkische Heide GmbH |
| V 30717 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-28 | Windpark Briesensee GmbH |
| WEA 37421 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-14 | BKW Energie Deutschland GmbH |
| VE-02-20114 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-22 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| WEA 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-21 | Windpark Schönwalde GmbH & Co. KG |
| WEA 44065 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-27 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 40008 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-09 | BKW Energie Deutschland GmbH |
| WEA 03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-05 | Windpark Schönwalde GmbH & Co. KG |
| AN 2000-349-01 | 2.00 MW | Sonstige | in operation | 2006-12-29 | QE Portfolio 1 GmbH & Co. KG |
| WEA 35193 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-20 | BKW Energie Deutschland GmbH |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-27 | private individual |
| V 23075-03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-11-30 | Statkraft Windenergie GmbH & Co. KG |
| V37172 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-17 | Windpark Märkische Heide GmbH |
| WEA 37419 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-14 | BKW Energie Deutschland GmbH |
| WEA 44067 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-30 | Windpark Biebersdorf GmbH & Co. KG |
| V 23074-01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-07 | Statkraft Windenergie GmbH & Co. KG |
| WEA 44286 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-03-30 | Windpark Biebersdorf GmbH & Co. KG |
| VE-07-20119 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-29 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| V 30709 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-20 | Windpark Briesensee GmbH |
| WEA 44069 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-29 | Windpark Biebersdorf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-26 | private individual |
| 17651 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-27 | NxW Waldow GmbH |
| WEB Briesensee - WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-12-21 | Windenergie Briesensee GmbH |
| V37176 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-21 | Windpark Märkische Heide GmbH |
| WEA 6 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-23 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| WEA 44077 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-01-11 | Windpark Biebersdorf GmbH & Co. KG |
| V23798 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-24 | Schäcksdorf 2.6 ApS & Co. KG |
| WEB Briesensee - WEA 3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-12-21 | Windenergie Briesensee GmbH |
| 16906 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-03-18 | Windpark Glücksberg GmbH & Co. KG |
| WEA 44066 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-27 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 44076 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-01-17 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 23801 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-24 | EWF Zwei Vier GmbH & Co. KG |
| V41273 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-02 | Windpark Märkische Heide GmbH |
| WEA 35188 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-22 | BKW Energie Deutschland GmbH |
| WEA 35184 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-15 | BKW Energie Deutschland GmbH |
| WEA 35183 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-29 | BKW Energie Deutschland GmbH |
| WEA 2 (Seriennummer 200357) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-12-21 | LHI GII2 WP Niederlehme 2288 GmbH & Co. KG |
| VE-01-20115 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-18 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| WEA 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-07 | Windpark Schönwalde GmbH & Co. KG |
| WEA 40011 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-06 | BKW Energie Deutschland GmbH |
| WEA 11 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-11-26 | Windpark Schönwalde GmbH & Co. KG |
| WEA 06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-11 | Windpark Schönwalde GmbH & Co. KG |
| V37179 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-23 | Windpark Märkische Heide GmbH |
| 16897 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-02-06 | NxW Waldow GmbH |
| V37174 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-21 | Windpark Märkische Heide GmbH |
| V37175 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-30 | Windpark Märkische Heide GmbH |
| WEA 35192 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-16 | BKW Energie Deutschland GmbH |
| WEA 05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-12-14 | Windpark Schönwalde GmbH & Co. KG |
| V 30710 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-22 | Windpark Briesensee GmbH |
| WEA 40010 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-14 | BKW Energie Deutschland GmbH |
| V 41274 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-13 | Windpark Märkische Heide GmbH |
| V37173 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-23 | Windpark Märkische Heide GmbH |
| V 30716 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-29 | Windpark Briesensee GmbH |
| WEB Briesensee - WEA 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-12-27 | Windenergie Briesensee GmbH |
| WEA 35186 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-30 | BKW Energie Deutschland GmbH |
| WEA 4 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-12-28 | Windpark Trebitz Siebte Windkraftanlage GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-21 | private individual |
| WEA 37420 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-09 | BKW Energie Deutschland GmbH |
| WEA 23799 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-22 | EWF Zwei Fünf GmbH & Co. KG |
| WEA 37422 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-09 | BKW Energie Deutschland GmbH |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-02-21 | private individual |
| WEA 44071 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-02-17 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 44068 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-30 | Windpark Biebersdorf GmbH & Co. KG |
| WEA 44075 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-02-08 | Windpark Biebersdorf GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Dahme-Spreewald?
| Operator | Units | Capacity |
|---|---|---|
| UGE Schäcksdorf Drei GmbH & Co. KG Umweltgereche Energie | 10 | 68.0 MW |
| UGE Schenkendorf Eins GmbH & Co. KG Umweltgerechte Energie | 10 | 68.0 MW |
| Windpark Dubener Platte GmbH & Co. KG | 25 | 64.5 MW |
| Alterric Deutschland GmbH | 9 | 61.8 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 8 | 55.6 MW |
| Iqony Windpark Ullersdorf GmbH & Co. KG | 18 | 43.2 MW |
| EE Schönerlinde GmbH & Co. KG | 6 | 40.8 MW |
| BKW Energie Deutschland GmbH | 20 | 40.0 MW |
| eno energy GmbH | 7 | 39.5 MW |
| SK Wind GmbH & Co. KG | 21 | 37.8 MW |
Which manufacturer accounts for the most wind power capacity in Dahme-Spreewald?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 170 | 524.0 MW |
| Nordex Germany GmbH | 33 | 223.3 MW |
| ENERCON GmbH | 83 | 208.2 MW |
| Nordex Energy GmbH | 27 | 78.8 MW |
| GE Wind Energy GmbH | 22 | 47.1 MW |
| eno energy systems GmbH | 7 | 39.5 MW |
| REpower Systems SE | 19 | 28.5 MW |
| Nordex SE | 5 | 18.9 MW |
| General Electric Deutschland Holding GmbH | 5 | 13.9 MW |
| GE Renewable Germany GmbH | 4 | 11.1 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Dahme-Spreewald (Brandenburg), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.