Germany · renewables
Wind power in Barnim
164 wind turbines with 418.9 MW of gross capacity were in operation in Barnim (Brandenburg) as of 2026-11-05, with a further 75 units (474.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Barnim (Brandenburg), and how large are they, as of 2026-11-05?
- 164 wind turbines with 418.9 MW of gross capacity were in operation in Barnim (Brandenburg) as of 2026-11-05, with a further 75 units (474.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Barnim?
- 164 wind turbines with 418.9 MW of gross capacity were in operation in Barnim as of 2026-11-05, with a further 75 units (474.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Barnim in 2025?
- 3 wind turbines with 11.0 MW went into operation in Barnim in 2025; the strongest year of the last two decades was 2022 with 68.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Barnim?
- TEUT Energieprojekte GmbH operates 16 wind turbines with 105.2 MW in Barnim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Barnim?
- Vestas Deutschland GmbH leads with 118 wind turbines and 528.6 MW in Barnim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Barnim?
- The largest registered wind turbine in Barnim has 7.20 MW of gross capacity and is operated by ENERTRAG SE, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Barnim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 5 | 0.01 MW | 2 | 2 |
| over 100 kW | 249 | 920.0 MW | 162 | 73 |
How much wind power capacity was commissioned in Barnim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 11.0 MW |
| 2025 | 3 | 11.0 MW |
| 2024 | 2 | 6.80 MW |
| 2023 | 1 | 6.80 MW |
| 2022 | 15 | 68.1 MW |
| 2021 | 5 | 17.2 MW |
| 2020 | 7 | 24.1 MW |
| 2019 | 1 | 3.60 MW |
| 2018 | 20 | 66.2 MW |
| 2017 | 3 | 9.90 MW |
| 2016 | 2 | 5.85 MW |
| 2015 | 2 | 3.17 MW |
| 2014 | 8 | 18.9 MW |
| 2013 | 18 | 54.3 MW |
| 2012 | 6 | 14.8 MW |
| 2011 | 1 | 2.05 MW |
| 2010 | 2 | 4.00 MW |
| 2009 | 3 | 6.05 MW |
| 2008 | 1 | 2.00 MW |
| 2006 | 1 | 0.80 MW |
How many wind turbines in Barnim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 75 | 474.6 MW |
| in operation | 164 | 418.9 MW |
| permanently decommissioned | 15 | 26.5 MW |
Which wind turbines are registered in Barnim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| PF7 Pfingstberg 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WP Börnicke - WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| PF5 Pfingstberg 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| PF2 Pfingstberg 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| SN 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| SÖF 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | TEUT Energieprojekte GmbH |
| WP Börnicke - WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| WP Börnicke - WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| WPA II - WR14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Albertshof GmbH &Co. KG |
| WEA14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP GWI Weesow II GmbH & Co. KG |
| PF9 Pfingstberg 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| PF4 Pfingstberg 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| BP2 Beiersdorfer Pfuhl 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WP Börnicke - WEA 09 | 7.20 MW | – | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| BP1 Beiersdorfer Pfuhl 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| PF6 Pfingstberg 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| Tempelfelde II - WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| WP Börnicke - WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| PF3 Pfingstberg 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP GWI Weesow II GmbH & Co. KG |
| PF1 Pfingstberg 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| Tempelfelde II - WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| WPA II - WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Albertshof GmbH &Co. KG |
| SÖF2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| PF8 Pfingstberg 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WP Börnicke - WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| SN 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| SÖF3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| WEA 13 Blumberg III | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PROKON Windpark Blumberg II GmbH & Co. KG |
| WP Börnicke - WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WPB Windpark Börnicke GmbH & Co. KG |
| Tempelfelde II - WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | NOTUS energy Opera GmbH & Co.KG |
| WEA10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP GWI Weesow I GmbH & Co. KG |
| WEA 12 Blumberg III | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | PROKON Windpark Blumberg II GmbH & Co. KG |
| GSB 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| GSB 7 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| WTS1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2026 | TEUT Energieprojekte GmbH |
| GSB 5 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| GSB 3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| GSB 4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| GSB 6 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| WEA Tempelfelde 04 | 7.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Tempelfelde 01 | 7.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA Tempelfelde 03 | 7.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WTS2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | TEUT Energieprojekte GmbH |
| WEA Tempelfelde 02 | 7.00 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| GSB 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| BRTZ1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| LINrep8n | 6.80 MW | Nordex SE | in operation | 2025-12-18 | Phase 5 UG (haftungsbeschränkt) & Co. Lindenberg 3 KG |
| DANrep | 6.80 MW | Nordex Energy GmbH | in operation | 2023-10-10 | Phase 5 GmbH & Co. Danewitz KG |
| LINrep7 | 6.80 MW | Nordex Energy GmbH | in operation | 2024-07-23 | Phase 5 GmbH & Co. Lindenberg KG |
| LINrep9 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-06-02 | Windkraft Lindenberg 9 GmbH & Co. KG |
| BRTZ2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| SN 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | C4 Schönfeld GmbH & Co. KG |
| WR 12 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| TR 12 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| TR 11 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| WR 11 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-07-08 | MLK Windfeld Blumberg Nr. 65 GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2022-06-30 | MLK Windfeld Blumberg Nr. 65 GmbH & Co. KG |
| WILL01 | 5.70 MW | Nordex SE | in operation | 2022-02-16 | Phase 5 GmbH & Co. Windkraft IV KG |
| WEA 3 / 89790 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-11-29 | Windpark Klobbicke GmbH & Co. KG |
| WEA 4 / 89787 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-12-23 | Windpark Klobbicke GmbH & Co. KG |
| WEA 01 / 89788 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-11-30 | Windpark Klobbicke GmbH & Co. KG |
| WEA 02 / 89789 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-11-29 | Windpark Klobbicke GmbH & Co. KG |
| WEA Krummensee | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG |
| WEA 05 Blumberg II | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | PROKON Windpark Blumberg II GmbH & Co. KG |
| WEA 2 Lichterfelde | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Regenerative Energiewandlung Grimme GmbH & Co. KG |
| WEA 1 Lichterfelde | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Regenerative Energiewandlung Grimme GmbH & Co. KG |
| WEA Seefeld | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | MLK Projektentwicklungs GmbH & Co. KG |
| WEA 3 Lichterfelde | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | Regenerative Energiewandlung Grimme GmbH & Co. KG |
| WP Mittelbarnim, WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 8 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| WP Mittelbarnim, WEA 9 | 4.26 MW | ENERCON GmbH | planned | planned 2029 | Barnimer Energiebeteiligungsgesellschaft mbH |
| SEN-400112 | 4.20 MW | Senvion Deutschland GmbH | in operation | 2018-12-30 | PROKON Windpark Blumberg GmbH & Co.KG |
| WEA 3 | 4.20 MW | ENERCON GmbH | planned | planned 2027 | VS Ventor WEA3 Energiegenossenschaft eG |
| WP Krummensee IV WEA 1381164 | 4.20 MW | ENERCON GmbH | in operation | 2025-04-17 | Krummensee IV GmbH & Co. KG |
| WP Krummensee III WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2026-07-02 | Krummensee III WEA 1 GmbH & Co. KG |
| WEA 2 Lichterfelde | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Alterric Deutschland GmbH |
| WEA 2 | 4.00 MW | ENERCON GmbH | in operation | 2020-09-09 | VS Ventor Energiegenossenschaft eG |
| WEA 1 | 4.00 MW | ENERCON GmbH | in operation | 2020-05-15 | VS Ventor Energiegenossenschaft eG |
| V-240995 (WEA 4) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-09-02 | PROKON Windpark Blumberg GmbH & Co.KG |
| T3000 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-07-30 | Phase 5 GmbH & Co. Tempelfelde II KG |
| V-240996 (WEA 8) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-08-31 | PROKON Windpark Blumberg GmbH & Co.KG |
| WTF | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2029 | TEUT Energieprojekte GmbH |
| V-240993 (WEA 2) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-09-08 | PROKON Windpark Blumberg GmbH & Co.KG |
| WEA 1 Lichterfelde | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | Alterric Windpark Lichterfelde GmbH & Co. KG |
| V-240994 (WEA 3) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-08-31 | PROKON Windpark Blumberg GmbH & Co.KG |
| Tempelfelde - WEA 1 - 221787 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-08 | Windpark Tempelfelde 2 GmbH & Co. KG |
| WEA 12 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-19 | Hanse Windkraft GmbH |
| WEA09 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-02-01 | Windpark Albertshof GmbH &Co. KG |
| Tempelfelde - WEA 3 - 221789 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-31 | Windpark Tempelfelde 2 GmbH & Co. KG |
| WEA03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-12-15 | Windpark Albertshof GmbH &Co. KG |
| WEA08 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-12-22 | Windpark Albertshof GmbH &Co. KG |
| WEA06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-02-15 | Windpark Albertshof GmbH &Co. KG |
| Tempelfelde - WEA 5 - 221790 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-20 | Windpark Tempelfelde 2 GmbH & Co. KG |
| TF01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-29 | Phase 5 GmbH & Co. Tempelfelde KG |
| WEA 11 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-22 | Hanse Windkraft GmbH |
| WEA02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-12-22 | Windpark Albertshof GmbH &Co. KG |
| WEA01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-12-17 | Windpark Albertshof GmbH &Co. KG |
| Tempelfelde - WEA 2 - 221788 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-20 | Windpark Tempelfelde 2 GmbH & Co. KG |
| WEA 13 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-08 | Hanse Windkraft GmbH |
| TF 02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-11 | Windkraft Tempelfelde II GmbH & Co. KG |
| WEA 10 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-22 | Hanse Windkraft GmbH |
| WEA 09 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-27 | Hanse Windkraft GmbH |
| Tempelfelde - WEA 6 - 221791 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-22 | Windpark Tempelfelde 2 GmbH & Co. KG |
| TT01 | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2026 | TEUT Energieprojekte GmbH |
| WEA04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-01-12 | Windpark Albertshof GmbH &Co. KG |
| TF 03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-03-28 | Windkraft Tempelfelde II GmbH & Co. KG |
| V213895 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2016-12-09 | Windpark Tempelfelde III GmbH & Co. KG |
| WEA10 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-02-01 | Windpark Albertshof GmbH &Co. KG |
| 219028 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-05-31 | Windpark Willmersdorf GmbH & Co. KG |
| WEA 07 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-20 | Hanse Windkraft GmbH |
| WEA05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2021-02-25 | Windpark Albertshof GmbH &Co. KG |
| 219027 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-05-31 | Windpark Willmersdorf GmbH & Co. KG |
| unit operated by a private individual | 3.37 MW | REpower Systems SE | permanently decommissioned | 2012-05-30 | private individual |
| LIN4 | 3.37 MW | REpower Systems SE | in operation | 2012-05-24 | Phase 5 UG (haftungsbeschränkt) & Co. Lindenberg 3 KG |
| V242235 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2022-07-22 | MBBF Windpark GmbH & Co. 27. Betriebs KG |
| V242236 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2022-07-21 | MBBF Windpark GmbH & Co. 27. Betriebs KG |
| WKA 7 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2022-07-21 | MBBF Windpark Birkholz GmbH & Co. Betriebs KG |
| WKA 4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2022-07-22 | MBBF Windpark Birkholz GmbH & Co. Betriebs KG |
| LIN6 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-15 | Phase 5 GmbH & Co. Lindenberg 6 KG |
| V201624 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-08-23 | Windpark TEWI GmbH & Co. KG |
| V201631 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-26 | Windpark TEWI GmbH & Co. KG |
| 201741 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-30 | Willmersdorf Repowering GmbH & Co. KG |
| V201626 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-22 | Windpark TEWI GmbH & Co. KG |
| V201744 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-16 | Windpark Willmersdorf II GmbH & Co. KG |
| V201743 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-23 | Windpark Willmersdorf II GmbH & Co. KG |
| V-204887 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-07-30 | Onshore Wind 2012 Birkholz GmbH & Co. KG |
| V201634 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-10 | Windpark TEWI GmbH & Co. KG |
| 201740 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-25 | Willmersdorf Repowering GmbH & Co. KG |
| V201627 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-30 | Windpark TEWI GmbH & Co. KG |
| V201628 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-29 | Windpark TEWI GmbH & Co. KG |
| V201630 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-31 | Windpark TEWI GmbH & Co. KG |
| V201632 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-08-16 | Windpark TEWI GmbH & Co. KG |
| V201745 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-19 | Windpark Willmersdorf II GmbH & Co. KG |
| V201629 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-07-18 | Windpark TEWI GmbH & Co. KG |
| V201625 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-08-23 | Windpark TEWI GmbH & Co. KG |
| 201742 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-19 | Willmersdorf Repowering GmbH & Co. KG |
| V201633 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-02 | Windpark TEWI GmbH & Co. KG |
| Windkraftanlage Klosterfelde I | 3.05 MW | ENERCON GmbH | in operation | 2014-12-30 | ENGIE Windpark Klosterfelde GmbH & Co. KG |
| WEA Börnicke | 3.00 MW | ENERCON GmbH | in operation | 2017-09-28 | Windenergie Börnicke GmbH & Co.KG |
| 1151101 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-20 | Windenergie Werneuchen-Seefeld GmbH & Co. KG |
| 1151099 | 3.00 MW | ENERCON GmbH | in operation | 2018-08-31 | WES Windenergie Seefeld GmbH & Co. KG |
| 1151100 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-11 | WES Windenergie Seefeld GmbH & Co. KG |
| NX 85138-01 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-12-29 | Windenergie Management GmbH & Co. Ladeburg KG |
| K1 Klosterfelde 1 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-11 | ENERTRAG Windfeld Klosterfelde K1 GmbH & Co. KG |
| Klosterfelde E92 | 2.35 MW | ENERCON GmbH | in operation | 2018-12-19 | P & A Windkraft GbR |
| Enercon E82 Nr 825792 | 2.30 MW | ENERCON GmbH | in operation | 2014-05-12 | Infrastrukturgesellschaft Windpark Parstein GmbH & Co KG |
| Ladeburg LDB | 2.30 MW | ENERCON GmbH | in operation | 2020-10-06 | Phase 5 GmbH & Co. Windkraft III KG |
| KF II | 2.30 MW | ENERCON GmbH | in operation | 2014-09-05 | GSW Windmühle Klosterfelde GmbH & Co. KG |
| WEA 01 - eno 920033 | 2.20 MW | eno energy GmbH | in operation | 2014-12-30 | Windpark Kohlenberge GmbH & Co. KG |
| unit operated by a private individual | 2.05 MW | REpower Systems SE | permanently decommissioned | 2011-12-30 | private individual |
| unit operated by a private individual | 2.05 MW | REpower Systems SE | permanently decommissioned | 2009-10-16 | private individual |
| unit operated by a private individual | 2.05 MW | REpower Systems SE | permanently decommissioned | 2012-01-16 | private individual |
| V 35256 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-09-30 | ENOVA Windpark Birkholz GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-12-19 | private individual |
| V-29660 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-02-04 | Wind Partner 41 Aps & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-01 | private individual |
| V18397 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-12-19 | Windkraft Willmersdorf GbR |
| eno920007 | 2.00 MW | eno energy GmbH | in operation | 2012-11-26 | Berliner Wasserbetriebe |
| WEA 205057 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-09-25 | Märkische Windkraft 108 GmbH & Co. KG |
| Lichterfelde 18388 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-12-15 | Hanse Windkraft GmbH |
| WEA 205053 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-09-22 | Märkische Windkraft 88 GmbH & Co. KG |
| V18398 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2003-12-19 | Windkraft Willmersdorf GbR |
| 32402 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-28 | Wind Partner 45 ApS & Co. KG |
| eno920008 | 2.00 MW | eno energy GmbH | in operation | 2012-11-29 | Berliner Wasserbetriebe |
| V201618 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-07-30 | Windpark TEWI GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2005-02-01 | private individual |
| eno920009 | 2.00 MW | eno energy GmbH | in operation | 2012-12-07 | Berliner Wasserbetriebe |
| V 37091 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-30 | ENOVA Windpark Birkholz GmbH & Co. KG |
| WEA 205055 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2014-09-26 | Märkische Windkraft 88 GmbH & Co. KG |
| WP Krummensee III | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-10-26 | WEA Krummensee III UG (haftungsbeschränkt) & Co. KG |
| WP Klosterfelde WEA 70706 | 1.80 MW | ENERCON GmbH | in operation | 2002-06-25 | Windpark Klosterfelde |
| WP Klosterfelde WEA 70708 | 1.80 MW | ENERCON GmbH | in operation | 2002-06-25 | Windpark Klosterfelde |
| Windpark Stolzenhagen WEA 701552 | 1.80 MW | ENERCON GmbH | in operation | 2003-11-01 | Windkraft Stolzenhagen |
| Windpark Stolzenhagen WEA 701551 | 1.80 MW | ENERCON GmbH | in operation | 2003-11-01 | Windkraft Stolzenhagen |
| WP Klosterfelde WEA 70707 | 1.80 MW | ENERCON GmbH | in operation | 2002-06-26 | Windpark Klosterfelde |
| WP Klosterfelde WEA 70709 | 1.80 MW | ENERCON GmbH | in operation | 2002-06-25 | Windpark Klosterfelde |
| WEA Breydin 01 | 1.50 MW | REpower Systems SE | in operation | 2004-12-30 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA SLD 70178 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-18 | Infrastruktur Schönerlinde Kiepsch & Bosse GbR |
| WP Krummensee | 1.50 MW | Enron Wind GmbH | in operation | 2002-10-30 | Windkraft Beteiligungsgesellschaft mbH & Co. Windpark Krummensee KG |
| WEA 1 / 70002 | 1.50 MW | REpower Systems SE | in operation | 2000-08-11 | Momentum Energy Germany GmbH & Co.KG |
| WEA Heckelberg 03 | 1.50 MW | REpower Systems SE | in operation | 2005-07-19 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WP Schönerlinde 70182 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-12-18 | Infrastruktur Schönerlinde Kiepsch & Bosse GbR |
| WEA Breydin 02 | 1.50 MW | REpower Systems SE | in operation | 2004-12-21 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA Breydin 04 | 1.50 MW | REpower Systems SE | in operation | 2004-12-31 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WP Krummensee | 1.50 MW | Enron Wind GmbH | in operation | 2002-10-30 | Windkraft Beteiligungsgesellschaft mbH & Co. Windpark Krummensee KG |
| WEA 15561340 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-04-27 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561334 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-03-02 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA Breydin 08 | 1.50 MW | REpower Systems SE | in operation | 2004-12-27 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2003-01-01 | private individual |
| WEA 15561331 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561339 | 1.50 MW | Sonstige | in operation | 2004-04-28 | HelveticWind Lüdersdorf Parstein GmbH |
| WP Krummsee-Süd | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-12-19 | Windpark Krummensee-Süd GmbH & Co. KG |
| WP Ladeburg WEA 02 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-17 | WKA Ladeburg eGbR |
| WEA Breydin 09 | 1.50 MW | REpower Systems SE | in operation | 2004-12-29 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA D (15561358) | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-22 | MBBF Windpark Birkholz GmbH & Co. Betriebs KG |
| WEA Breydin 03 | 1.50 MW | REpower Systems SE | in operation | 2004-12-28 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA 2 / 70258 | 1.50 MW | REpower Systems SE | in operation | 2003-07-09 | KuW Vermögensverwaltung GmbH |
| WEA 15561343 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-10-28 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561335 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561341 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-11-02 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561337 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-04-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA Heckelberg 04 | 1.50 MW | REpower Systems SE | in operation | 2005-07-29 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA Breydin 10 | 1.50 MW | REpower Systems SE | in operation | 2004-12-30 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA 15561345 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA Breydin 06 | 1.50 MW | REpower Systems SE | in operation | 2004-12-23 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WP Krummsee-Süd | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-12-01 | Windpark Krummensee-Süd GmbH & Co. KG |
| WEA 15561342 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-10-28 | HelveticWind Lüdersdorf Parstein GmbH |
| WP Krummensee | 1.50 MW | Enron Wind GmbH | in operation | 2002-11-06 | Windkraft Beteiligungsgesellschaft mbH & Co. Windpark Krummensee KG |
| WEA 15561336 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-17 | private individual |
| WKA Ladeburg I 1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-18 | BGB-Gesellschaft WKA Schonach-Holzeck |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-19 | private individual |
| WEA 15561333 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA 15561344 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WP Krummsee-Süd | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-12-01 | Windpark Krummensee-Süd GmbH & Co. KG |
| WP Krummensee | 1.50 MW | Enron Wind GmbH | in operation | 2002-11-07 | Windkraft Beteiligungsgesellschaft mbH & Co. Windpark Krummensee KG |
| WEA 15561338 | 1.50 MW | Sonstige | in operation | 2004-03-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WEA Breydin 07 | 1.50 MW | REpower Systems SE | in operation | 2004-12-23 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| WEA Heckelberg 02 | 1.50 MW | REpower Systems SE | in operation | 2005-07-18 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2004-12-30 | private individual |
| WEA 15561332 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-01 | HelveticWind Lüdersdorf Parstein GmbH |
| WP Krummensee | 1.50 MW | Enron Wind GmbH | in operation | 2002-11-05 | Windkraft Beteiligungsgesellschaft mbH & Co. Windpark Krummensee KG |
| WP Krummsee-Süd | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2004-12-01 | Windpark Krummensee-Süd GmbH & Co. KG |
| WEA Heckelberg 01 | 1.50 MW | REpower Systems SE | in operation | 2005-07-21 | Windpark Heckelberg-Breydin GmbH & Co. K Bereich FRF / Heckelberg-Breydin |
| Lucy | 1.50 MW | Nordex Energy GmbH | in operation | 2003-10-01 | Hanse Windkraft GmbH |
| WP Thaerfelde 1357 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-05 | e.disnatur Erneuerbare Energien GmbH |
| WP Thaerfelde 1356 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-05 | e.disnatur Erneuerbare Energien GmbH |
| WP Thaerfelde 1358 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-12-05 | e.disnatur Erneuerbare Energien GmbH |
| unit operated by a private individual | 1.00 MW | Fuhrländer AG | permanently decommissioned | 1999-07-01 | private individual |
| WEA Lichterfelde | 1.00 MW | Fuhrländer AG | in operation | 2001-01-30 | GFW Energy e.K. Inh. Jürgen Fuhrländer |
| NX-9913 | 1.00 MW | Nordex Energy GmbH | in operation | 2001-03-01 | Kloss & Porm Mühle Wandlitz GbR |
| NEG Micon 900/ 52 Lichterfelde | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2003-07-30 | Erste Fritz Ader Wind & Umwelt- technologie Beratung und Vertriebs GmbH & Co. KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2006-10-09 | private individual |
| Krummensee I | 0.75 MW | NEG Micon Deutschland GmbH | in operation | 2000-11-16 | AEROGIE Ingenieurbüro für Windenergienutzung |
| Windkraft Trappenhof | 0.60 MW | Südwind Borsig Energy GmbH | in operation | 1998-04-07 | Windkraft Trappenhof GbR |
| Windkraftanlage Ladeburg WEA 2, 442388 | 0.60 MW | ENERCON GmbH | in operation | 2004-12-20 | Hanle und Essig GbR, Hölter Berg |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1994-12-08 | private individual |
| Spreewind Ladeburg | 0.60 MW | ENERCON GmbH | in operation | 2002-12-12 | Windprojekt Barnim - Ladeburg Eins GmbH & Co. KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1999-12-23 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1999-12-22 | private individual |
| Parstein I | 0.50 MW | Vestas Deutschland GmbH | in operation | 1994-04-14 | AEROGIE Ingenieurbüro für Windenergienutzung |
| unit operated by a private individual | 0.00 MW | Heyde Windtechnik GmbH | in operation | 2015-09-30 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-08-26 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2026 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2024 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | permanently decommissioned | 2025-04-03 | private individual |
Which organisations operate the most wind power capacity in Barnim?
| Operator | Units | Capacity |
|---|---|---|
| TEUT Energieprojekte GmbH | 16 | 105.2 MW |
| ENERTRAG SE | 11 | 79.2 MW |
| WPB Windpark Börnicke GmbH & Co. KG | 7 | 50.4 MW |
| Barnimer Energiebeteiligungsgesellschaft mbH | 9 | 48.7 MW |
| Windpark Albertshof GmbH &Co. KG | 11 | 45.5 MW |
| WTW Windpark Tempelfelde-Willmersdorf IV GmbH & Co. KG | 6 | 39.2 MW |
| Windpark TEWI GmbH & Co. KG | 12 | 35.8 MW |
| UKA Umweltgerechte Kraftanlagen GmbH & Co. KG | 4 | 28.0 MW |
| Hanse Windkraft GmbH | 8 | 24.2 MW |
| Windpark Klobbicke GmbH & Co. KG | 4 | 22.8 MW |
Which manufacturer accounts for the most wind power capacity in Barnim?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 118 | 528.6 MW |
| ENERCON GmbH | 35 | 109.8 MW |
| Nordex Energy GmbH | 21 | 102.7 MW |
| REpower Systems SE | 22 | 38.4 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 4 | 28.0 MW |
| Nordex Germany GmbH | 4 | 27.4 MW |
| GE Wind Energy GmbH | 18 | 27.0 MW |
| Nordex SE | 2 | 12.5 MW |
| eno energy GmbH | 4 | 8.20 MW |
| NEG Micon Deutschland GmbH | 6 | 7.65 MW |
Wind power in Brandenburg · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Barnim (Brandenburg), and how large are they, as can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.