10,319 storage units with 64.2 MW of gross capacity were in operation in Rostock (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 208 units (470.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many storage units are registered in Rostock (Mecklenburg-Vorpommern), and how large are they, as of 2026-11-05?
- 10,319 storage units with 64.2 MW of gross capacity were in operation in Rostock (Mecklenburg-Vorpommern) as of 2026-11-05, with a further 208 units (470.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many storage units are in operation in Rostock?
- 10,319 storage units with 64.2 MW of gross capacity were in operation in Rostock as of 2026-11-05, with a further 208 units (470.1 MW) registered as planned; the count includes every registered unit down to home batteries (Bundesnetzagentur, Marktstammdatenregister).
- How much battery storage capacity was commissioned in Rostock in 2025?
- 2,028 storage units with 11.0 MW went into operation in Rostock in 2025; the strongest year of the last two decades was 2023 with 14.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Rostock's storage units are larger than 100 kW?
- 27 of 10,587 registered storage units in Rostock (0.3 percent) exceed 100 kW, but they hold 475.6 MW of the 534.6 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most battery storage capacity in Rostock?
- East Energy PV Wiendorf GmbH & Co.KG operates 1 storage units over 100 kW with 210.0 MW in Rostock, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which technology has the most battery storage capacity in Rostock?
- Lithium-Batterie leads with 23 storage units and 456.8 MW in Rostock (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest storage unit in Rostock?
- The largest registered storage unit in Rostock has 210.0 MW of gross capacity and is operated by East Energy PV Wiendorf GmbH & Co.KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the storage units in Rostock distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 10,539 | 57.9 MW | 10,289 | 190 |
| 30 to 100 kW | 21 | 1.14 MW | 20 | 1 |
| over 100 kW | 27 | 475.6 MW | 10 | 17 |
How much battery storage capacity was commissioned in Rostock each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2,101 | 10.7 MW |
| 2025 | 2,028 | 11.0 MW |
| 2024 | 2,187 | 13.3 MW |
| 2023 | 2,432 | 14.8 MW |
| 2022 | 847 | 10.1 MW |
| 2021 | 342 | 2.09 MW |
| 2020 | 187 | 0.89 MW |
| 2019 | 101 | 0.75 MW |
| 2018 | 47 | 0.28 MW |
| 2017 | 43 | 0.23 MW |
| 2016 | 32 | 0.13 MW |
| 2015 | 12 | 0.05 MW |
| 2014 | 12 | 0.07 MW |
| 2013 | 5 | 0.02 MW |
| 2009 | 1 | 0.00 MW |
How many storage units in Rostock are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 208 | 470.1 MW |
| in operation | 10,319 | 64.2 MW |
| permanently decommissioned | 54 | 0.16 MW |
| temporarily shut down | 6 | 0.02 MW |
Which storage units over 100 kW are registered in Rostock?
| Unit | Capacity | Usable capacity | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| BESS_Sabel | 210.0 MW | 1,000.0 MWh | planned | planned 2027 | East Energy PV Wiendorf GmbH & Co.KG |
| BESS_Bentwisch | 150.0 MW | 300.0 MWh | planned | planned 2027 | East Energy PV Rostock GmbH & Co.KG |
| BESS Sandhagen | 25.2 MW | 50.1 MWh | planned | planned 2027 | East Energy PV Detershagen GmbH & Co. KG |
| BESS_Werle | 25.0 MW | 50.0 MWh | planned | planned 2027 | East Energy PV Werle GmbH & Co. KG |
| Spoitgendorf I Speicher | 7.50 MW | 15.0 MWh | planned | planned 2027 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| BESS Dummerstorf Energiewende 3 | 6.67 MW | 13.3 MWh | planned | planned 2026 | Energiewende Projekt 3 GmbH & Co. KG |
| BESS Dummerstorf Energiewende 2 | 6.67 MW | 13.3 MWh | planned | planned 2026 | Energiewende Projekt 3 GmbH & Co. KG |
| Spoitgendorf II Speicher | 6.50 MW | 13.0 MWh | planned | planned 2027 | mea Energieagentur Mecklenburg-Vorpommern GmbH |
| PVA Lalendorf BESS Grau | 6.20 MW | 14.7 MWh | planned | planned 2026 | Vogelsang BESS GmbH & Co. KG |
| PVA Lalendorf BESS InnoAus | 5.80 MW | 15.3 MWh | planned | planned 2026 | Vogelsang PV GmbH & Co. KG |
| BS Glasewitz | 5.50 MW | 11.0 MWh | planned | planned 2026 | NOTUS energy Plan GmbH & Co. KG |
| APEX 4-MWh-Batteriespeicher SMA | 4.00 MW | 4.0 MWh | in operation | 2022-06-25 | APEX Energy GmbH |
| BESS Dummerstorf Energiewende 4 | 3.33 MW | 6.7 MWh | planned | planned 2026 | Energiewende Projekt 3 GmbH & Co. KG |
| Laage 3MW Speicher | 3.00 MW | 6.0 MWh | planned | planned 2026 | Enertek Anlagenbau GmbH |
| Beselin I | 3.00 MW | 17.5 MWh | planned | planned 2026 | Enertek Anlagenbau GmbH |
| BESS Dummerstorf Energiewende | 2.08 MW | 4.2 MWh | planned | planned 2025 | Energiewende Projekt 3 GmbH & Co. KG |
| HMM-2022-005-1 Langhagen-Speicher | 1.50 MW | 2.6 MWh | planned | planned 2024 | WI Energy Verwaltungs GmbH |
| APEX 2-MWh-Batteriespeicher MR | 1.12 MW | 1.9 MWh | in operation | 2022-06-20 | APEX Energy GmbH |
| ESS Krakow am See | 0.80 MW | 1.6 MWh | planned | planned 2026 | Innosun GmbH |
| APEX 1-MWh-Batteriespeicher WBS500 | 0.50 MW | 925 kWh | in operation | 2022-05-03 | APEX Energy GmbH |
| KBN Battery Heiligenhagen | 0.30 MW | 300 kWh | in operation | 2024-02-08 | KBN Sustainable Technology Group GmbH |
| PV Speicher Erbsenkamp 1 | 0.22 MW | 430 kWh | in operation | 2025-12-19 | V&B Verwaltungs- & Beteilungsgesellschaft mbH |
| Malzfabrik Rostock | 0.20 MW | 240 kWh | in operation | 2019-09-05 | EDF Distributed Solutions Deutschland GmbH |
| Speicher | 0.14 MW | 387 kWh | in operation | 2025-06-10 | ROMA KG |
| Batterie-Speicher PV | 0.13 MW | 160 kWh | in operation | 2025-11-05 | tfc tools for Composite GmbH |
| unit operated by a private individual | 0.11 MW | 215 kWh | in operation | 2026-06-22 | private individual |
| WAZ - Betriebshof Bützow | 0.10 MW | 144 kWh | in operation | 2026-02-20 | Eurawasser Nord GmbH |
Which organisations operate the most battery storage capacity in Rostock?
| Operator | Units | Capacity |
|---|---|---|
| East Energy PV Wiendorf GmbH & Co.KG | 1 | 210.0 MW |
| East Energy PV Rostock GmbH & Co.KG | 1 | 150.0 MW |
| East Energy PV Detershagen GmbH & Co. KG | 1 | 25.2 MW |
| East Energy PV Werle GmbH & Co. KG | 1 | 25.0 MW |
| Energiewende Projekt 3 GmbH & Co. KG | 4 | 18.8 MW |
| mea Energieagentur Mecklenburg-Vorpommern GmbH | 2 | 14.0 MW |
| Vogelsang BESS GmbH & Co. KG | 1 | 6.20 MW |
| Enertek Anlagenbau GmbH | 2 | 6.00 MW |
| Vogelsang PV GmbH & Co. KG | 1 | 5.80 MW |
| APEX Energy GmbH | 3 | 5.62 MW |
Which technology accounts for the most battery storage capacity in Rostock?
| Technology | Units | Capacity |
|---|---|---|
| Lithium-Batterie | 23 | 456.8 MW |
Battery storage in Mecklenburg-Vorpommern · Battery storage in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many storage units are registered in Rostock (Mecklenburg-Vorpommern), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.