Battery storage in Bremen

9,888 storage units with 66.2 MW of gross capacity were in operation in Bremen as of 2026-11-05, with a further 222 units (67.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — by district, size class, year and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/storage/bremen

Questions this page answers

How much battery storage capacity does Bremen have, and which districts have the most, as of 2026-11-05?
9,888 storage units with 66.2 MW of gross capacity were in operation in Bremen as of 2026-11-05, with a further 222 units (67.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — by district, size class, year and operator, from the Marktstammdatenregister.
How many storage units are in operation in Bremen?
9,888 storage units with 66.2 MW of gross capacity were in operation in Bremen as of 2026-11-05, with a further 222 units (67.4 MW) registered as planned; the count includes every registered unit down to home batteries (Bundesnetzagentur, Marktstammdatenregister).
How much battery storage capacity was commissioned in Bremen in 2025?
2,568 storage units with 11.5 MW went into operation in Bremen in 2025; the strongest year of the last two decades was 2019 with 18.3 MW (Bundesnetzagentur, Marktstammdatenregister).
What share of Bremen's storage units are larger than 100 kW?
12 of 10,160 registered storage units in Bremen (0.1 percent) exceed 100 kW, but they hold 85.8 MW of the 133.8 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most battery storage capacity in Bremen?
Green Hedge Infra GmbH operates 1 storage units over 100 kW with 60.0 MW in Bremen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which technology has the most battery storage capacity in Bremen?
Lithium-Batterie leads with 12 storage units and 85.8 MW in Bremen (Bundesnetzagentur, Marktstammdatenregister).
Which district in Bremen has the most battery storage capacity?
Bremen has the most battery storage capacity in operation in Bremen with 56.8 MW in 8,014 storage units, ahead of Bremerhaven with 9.39 MW (Bundesnetzagentur, Marktstammdatenregister).

How much battery storage capacity is in operation and planned in each district of Bremen?

AreaUnits in operationCapacity in operationPlanned unitsPlanned capacityAll registered units
Bremen8,01456.8 MW16166.9 MW8,214
Bremerhaven1,8729.39 MW610.55 MW1,944
Wesermarsch20.01 MW00.00 MW2

How are the storage units in Bremen distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW10,12846.9 MW9,868210
30 to 100 kW201.08 MW146
over 100 kW1285.8 MW66

How much battery storage capacity was commissioned in Bremen each year?

Commissioning yearUnitsCapacity added
20262,56411.0 MW
20252,56811.5 MW
20242,56814.2 MW
20231,3237.20 MW
20224192.01 MW
20211730.88 MW
20201500.74 MW
20195318.3 MW
2018310.14 MW
2017220.11 MW
2016230.11 MW
2015120.07 MW
2014130.07 MW
201370.03 MW
201260.04 MW
201010.00 MW
200910.01 MW

How many storage units in Bremen are in operation, planned or decommissioned?

StatusUnitsCapacity
planned22267.4 MW
in operation9,88866.2 MW
permanently decommissioned460.11 MW
temporarily shut down40.01 MW

Which are the largest storage units in Bremen?

UnitDistrictCapacityUsable capacityStatusCommissionedOperator
Batteriespeicher BremenBremen60.0 MW120.0 MWhplannedplanned 2028Green Hedge Infra GmbH
HybridregelkraftwerkBremen18.0 MW14.2 MWhin operation2019-03-11swb Erzeugung AG & Co. KG
SpeicherBremen2.56 MW4.5 MWhplannedplanned 2026Cor Energie
Oslebshausen - SpeicherBremen2.51 MW4.0 MWhplannedplanned 2026Alterric Deutschland GmbH
BESS Becks, BremenBremen1.31 MW1.6 MWhin operation2024-03-01EDF Distributed Solutions Deutschland GmbH
BREMEN_PC1Bremen0.64 MW1.0 MWhin operation2024-10-07AUDI
2023-02_BESS_One Box,HBBremen0.18 MW360 kWhplannedplanned 20261. PES Solarprojekt GmbH & Co. KG
Kd.-Nr.: 00099Bremen0.16 MW160 kWhin operation2024-06-21AES GmbH
Speicher PV Anlage Enno Roggemann GmbH & Co.KGBremen0.12 MW576 kWhin operation2023-08-17Enno Roggemann GmbH & Co. KG
PV Anlage Homebox BremenBremen0.12 MW225 kWhin operation2026-04-24Homebox Germany
Speicher Schulz SoMa 2Bremen0.11 MW215 kWhplannedplanned 2026SCHULZ Systemtechnik GmbH
Speicher Schulz SoMaBremen0.11 MW215 kWhplannedplanned 2026SCHULZ Systemtechnik GmbH

Which organisations operate the most battery storage capacity in Bremen?

OperatorUnitsCapacity
Green Hedge Infra GmbH160.0 MW
swb Erzeugung AG & Co. KG118.0 MW
Cor Energie12.56 MW
Alterric Deutschland GmbH12.51 MW
EDF Distributed Solutions Deutschland GmbH11.31 MW
AUDI10.64 MW
SCHULZ Systemtechnik GmbH20.22 MW
1. PES Solarprojekt GmbH & Co. KG10.18 MW
AES GmbH10.16 MW
Enno Roggemann GmbH & Co. KG10.12 MW

Which technology accounts for the most battery storage capacity in Bremen?

TechnologyUnitsCapacity
Lithium-Batterie1285.8 MW

Battery storage in all German states · All energy sources

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How much battery storage capacity does Bremen have, and which districts have the most, as can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.