Battery storage in Berchtesgadener Land

3,940 storage units with 24.8 MW of gross capacity were in operation in Berchtesgadener Land (Bayern) as of 2026-11-05, with a further 13 units (0.10 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/storage/bayern/berchtesgadener-land

Questions this page answers

How many storage units are registered in Berchtesgadener Land (Bayern), and how large are they, as of 2026-11-05?
3,940 storage units with 24.8 MW of gross capacity were in operation in Berchtesgadener Land (Bayern) as of 2026-11-05, with a further 13 units (0.10 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many storage units are in operation in Berchtesgadener Land?
3,940 storage units with 24.8 MW of gross capacity were in operation in Berchtesgadener Land as of 2026-11-05, with a further 13 units (0.10 MW) registered as planned; the count includes every registered unit down to home batteries (Bundesnetzagentur, Marktstammdatenregister).
How much battery storage capacity was commissioned in Berchtesgadener Land in 2025?
741 storage units with 4.92 MW went into operation in Berchtesgadener Land in 2025; the strongest year of the last two decades was 2023 with 4.99 MW (Bundesnetzagentur, Marktstammdatenregister).
What share of Berchtesgadener Land's storage units are larger than 100 kW?
1 of 3,976 registered storage units in Berchtesgadener Land (0.0 percent) exceed 100 kW, but they hold 0.11 MW of the 25.0 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
Which technology has the most battery storage capacity in Berchtesgadener Land?
Lithium-Batterie leads with 1 storage units and 0.11 MW in Berchtesgadener Land (Bundesnetzagentur, Marktstammdatenregister).
What is the largest storage unit in Berchtesgadener Land?
The largest registered storage unit in Berchtesgadener Land has 0.11 MW of gross capacity, commissioned 2026-01-15 (Bundesnetzagentur, Marktstammdatenregister).

How are the storage units in Berchtesgadener Land distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW3,96024.2 MW3,92413
30 to 100 kW150.68 MW150
over 100 kW10.11 MW10

How much battery storage capacity was commissioned in Berchtesgadener Land each year?

Commissioning yearUnitsCapacity added
20267025.15 MW
20257414.92 MW
20247454.90 MW
20237744.99 MW
20223411.86 MW
20212371.16 MW
20201600.70 MW
2019750.28 MW
2018420.23 MW
2017490.22 MW
2016380.18 MW
2015300.14 MW
2014170.07 MW
201360.03 MW
201220.01 MW
201110.00 MW
200910.01 MW

How many storage units in Berchtesgadener Land are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation3,94024.8 MW
planned130.10 MW
permanently decommissioned230.10 MW

Which storage units over 100 kW are registered in Berchtesgadener Land?

UnitCapacityUsable capacityStatusCommissionedOperator
unit operated by a private individual0.11 MW225 kWhin operation2026-01-15private individual

Which organisations operate the most battery storage capacity in Berchtesgadener Land?

OperatorUnitsCapacity

Which technology accounts for the most battery storage capacity in Berchtesgadener Land?

TechnologyUnitsCapacity
Lithium-Batterie10.11 MW

Battery storage in Bayern · Battery storage in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many storage units are registered in Berchtesgadener Land (Bayern), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.