7,385 storage units with 56.4 MW of gross capacity were in operation in Neckar-Odenwald-Kreis (Baden-Württemberg) as of 2026-11-05, with a further 37 units (2.89 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many storage units are registered in Neckar-Odenwald-Kreis (Baden-Württemberg), and how large are they, as of 2026-11-05?
- 7,385 storage units with 56.4 MW of gross capacity were in operation in Neckar-Odenwald-Kreis (Baden-Württemberg) as of 2026-11-05, with a further 37 units (2.89 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit over 100 kW with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many storage units are in operation in Neckar-Odenwald-Kreis?
- 7,385 storage units with 56.4 MW of gross capacity were in operation in Neckar-Odenwald-Kreis as of 2026-11-05, with a further 37 units (2.89 MW) registered as planned; the count includes every registered unit down to home batteries (Bundesnetzagentur, Marktstammdatenregister).
- How much battery storage capacity was commissioned in Neckar-Odenwald-Kreis in 2025?
- 1,507 storage units with 8.31 MW went into operation in Neckar-Odenwald-Kreis in 2025; the strongest year of the last two decades was 2023 with 13.3 MW (Bundesnetzagentur, Marktstammdatenregister).
- What share of Neckar-Odenwald-Kreis's storage units are larger than 100 kW?
- 12 of 7,454 registered storage units in Neckar-Odenwald-Kreis (0.2 percent) exceed 100 kW, but they hold 16.9 MW of the 59.4 MW total capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most battery storage capacity in Neckar-Odenwald-Kreis?
- EnBW Solar GmbH operates 1 storage units over 100 kW with 4.60 MW in Neckar-Odenwald-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which technology has the most battery storage capacity in Neckar-Odenwald-Kreis?
- Lithium-Batterie leads with 12 storage units and 16.9 MW in Neckar-Odenwald-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest storage unit in Neckar-Odenwald-Kreis?
- The largest registered storage unit in Neckar-Odenwald-Kreis has 4.60 MW of gross capacity and is operated by EnBW Solar GmbH, commissioned 2026-03-24 (Bundesnetzagentur, Marktstammdatenregister).
How are the storage units in Neckar-Odenwald-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 7,432 | 42.0 MW | 7,365 | 35 |
| 30 to 100 kW | 10 | 0.47 MW | 10 | 0 |
| over 100 kW | 12 | 16.9 MW | 10 | 2 |
How much battery storage capacity was commissioned in Neckar-Odenwald-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1,530 | 19.4 MW |
| 2025 | 1,507 | 8.31 MW |
| 2024 | 1,378 | 8.60 MW |
| 2023 | 1,550 | 13.3 MW |
| 2022 | 640 | 3.25 MW |
| 2021 | 410 | 1.80 MW |
| 2020 | 185 | 0.84 MW |
| 2019 | 95 | 0.45 MW |
| 2018 | 46 | 0.19 MW |
| 2017 | 29 | 0.12 MW |
| 2016 | 22 | 0.10 MW |
| 2015 | 5 | 0.02 MW |
| 2014 | 7 | 0.03 MW |
| 2013 | 8 | 0.03 MW |
| 2012 | 3 | 0.01 MW |
| 2011 | 1 | 0.02 MW |
| 2009 | 1 | 0.07 MW |
How many storage units in Neckar-Odenwald-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 7,385 | 56.4 MW |
| planned | 37 | 2.89 MW |
| permanently decommissioned | 32 | 0.10 MW |
Which storage units over 100 kW are registered in Neckar-Odenwald-Kreis?
| Unit | Capacity | Usable capacity | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Solarpark Adelsheim Speicher | 4.60 MW | 6.7 MWh | in operation | 2026-03-24 | EnBW Solar GmbH |
| Schweinberg - BESS | 4.06 MW | 8.1 MWh | in operation | 2026-03-17 | Energiebauern GmbH & Co. Kraftwerke KG |
| Solarpark Seckach BESS | 3.70 MW | 3.7 MWh | in operation | 2023-03-22 | MVV Windenergie GmbH |
| Speicher Seckach V - P26-042 | 2.50 MW | 5.0 MWh | planned | planned 2028 | Anumar Solarpark Seckach V GmbH & Co. KG |
| Speicher Adelsheim - P21-096 - 1.000 kW Inn23-2/043 | 1.00 MW | 2.0 MWh | in operation | 2026-03-30 | Anumar Solarpark Adelsheim GmbH & Co. KG |
| sungrow Batterie | 0.38 MW | 771 kWh | in operation | 2026-10-08 | Wohnfitz GmbH |
| PV Popp Battery | 0.12 MW | 261 kWh | planned | planned 2026 | Poppstar GmbH |
| Gewerbespeicher 1 - Adolf-Seeber-Str. 2 | 0.11 MW | 215 kWh | in operation | 2026-09-15 | Leiblein |
| Gewerbespeicher 1 - Adolf-Seeber-Str. 4 | 0.11 MW | 215 kWh | in operation | 2026-09-15 | Leiblein |
| SP-Anlage 01-2026 | 0.11 MW | 253 kWh | in operation | 2026-01-30 | Krematorium am Limes GmbH |
| Gewerbespeicher 2 - Adolf-Seeber-Str. 4 | 0.11 MW | 215 kWh | in operation | 2026-09-15 | Leiblein |
| Gewerbespeicher 2 - Adolf-Seeber-Straße 2 | 0.11 MW | 215 kWh | in operation | 2026-09-15 | Leiblein |
Which organisations operate the most battery storage capacity in Neckar-Odenwald-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| EnBW Solar GmbH | 1 | 4.60 MW |
| Energiebauern GmbH & Co. Kraftwerke KG | 1 | 4.06 MW |
| MVV Windenergie GmbH | 1 | 3.70 MW |
| Anumar Solarpark Seckach V GmbH & Co. KG | 1 | 2.50 MW |
| Anumar Solarpark Adelsheim GmbH & Co. KG | 1 | 1.00 MW |
| Leiblein | 4 | 0.44 MW |
| Wohnfitz GmbH | 1 | 0.38 MW |
| Poppstar GmbH | 1 | 0.12 MW |
| Krematorium am Limes GmbH | 1 | 0.11 MW |
Which technology accounts for the most battery storage capacity in Neckar-Odenwald-Kreis?
| Technology | Units | Capacity |
|---|---|---|
| Lithium-Batterie | 12 | 16.9 MW |
Battery storage in Baden-Württemberg · Battery storage in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists, operators and grid operators cover units over 100 kW gross capacity; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many storage units are registered in Neckar-Odenwald-Kreis (Baden-Württemberg), and ho can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.