Germany · renewables
Wind power in Unstrut-Hainich-Kreis
105 wind turbines with 227.3 MW of gross capacity were in operation in Unstrut-Hainich-Kreis (Thüringen) as of 2026-11-05, with a further 63 units (387.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Unstrut-Hainich-Kreis (Thüringen), and how large are they, as of 2026-11-05?
- 105 wind turbines with 227.3 MW of gross capacity were in operation in Unstrut-Hainich-Kreis (Thüringen) as of 2026-11-05, with a further 63 units (387.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Unstrut-Hainich-Kreis?
- 105 wind turbines with 227.3 MW of gross capacity were in operation in Unstrut-Hainich-Kreis as of 2026-11-05, with a further 63 units (387.2 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Unstrut-Hainich-Kreis in 2022?
- 3 wind turbines with 15.4 MW went into operation in Unstrut-Hainich-Kreis in 2022; the strongest year of the last two decades was 2014 with 44.3 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Unstrut-Hainich-Kreis?
- BOREAS Energie GmbH operates 32 wind turbines with 177.6 MW in Unstrut-Hainich-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Unstrut-Hainich-Kreis?
- Vestas Deutschland GmbH leads with 111 wind turbines and 489.7 MW in Unstrut-Hainich-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Unstrut-Hainich-Kreis?
- The largest registered wind turbine in Unstrut-Hainich-Kreis has 7.20 MW of gross capacity and is operated by BOREAS Energie GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Unstrut-Hainich-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.03 MW | 3 | 0 |
| over 100 kW | 183 | 641.1 MW | 102 | 63 |
How much wind power capacity was commissioned in Unstrut-Hainich-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2022 | 3 | 15.4 MW |
| 2021 | 4 | 16.8 MW |
| 2020 | 2 | 4.20 MW |
| 2019 | 1 | 4.20 MW |
| 2018 | 1 | 3.45 MW |
| 2017 | 1 | 3.30 MW |
| 2016 | 1 | 3.30 MW |
| 2015 | 6 | 17.6 MW |
| 2014 | 16 | 44.3 MW |
| 2013 | 4 | 5.10 MW |
| 2012 | 3 | 5.08 MW |
| 2011 | 6 | 12.0 MW |
| 2010 | 12 | 24.0 MW |
| 2009 | 3 | 6.00 MW |
| 2006 | 10 | 20.0 MW |
How many wind turbines in Unstrut-Hainich-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 63 | 387.2 MW |
| in operation | 105 | 227.3 MW |
| permanently decommissioned | 19 | 26.6 MW |
Which wind turbines are registered in Unstrut-Hainich-Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| AS30 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| HL21 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| WL16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| HL23 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| HL22 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| HL20 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| AS28 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| AS31 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| AS29 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| WEA Nägelstedt 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark EKM Nägelstedt GmbH & Co. KG |
| WEA Nägelstedt 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark EKM Nägelstedt GmbH & Co. KG |
| WEA Nägelstedt 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark EKM Nägelstedt GmbH & Co. KG |
| WEA Nägelstedt 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark EKM Nägelstedt GmbH & Co. KG |
| WEA Nägelstedt 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Windpark EKM Nägelstedt GmbH & Co. KG |
| WEA Nägelstedt 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark EKM Nägelstedt Zwei GmbH & Co. KG |
| WEA Nägelstedt 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| BH24 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Tornow T05 GmbH & Co. KG |
| BH25 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Tornow T05 GmbH & Co. KG |
| BH19 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Tornow T05 GmbH & Co. KG |
| BH26 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Tornow T05 GmbH & Co. KG |
| BH07.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| BH05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH14 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| GV32.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2025 | Windkraft Großvargula III GmbH & Co. KG |
| GV23.2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2025 | Windkraft Großvargula III GmbH & Co. KG |
| BH11 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| BH03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH17 | 6.00 MW | – | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| BH15 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| WEA 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| BH21.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| BH12 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| BH13 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| BH08 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| GV 25.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Großvargula III GmbH & Co. KG |
| GV 31.2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Großvargula III GmbH & Co. KG |
| BH18 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| GV 26.2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Großvargula III GmbH & Co. KG |
| GV 30.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Großvargula III GmbH & Co. KG |
| BH01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH23 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| GV24.1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2025 | Windkraft Großvargula III GmbH & Co. KG |
| BH10 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH16 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| BH22 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windkraft Bothenheilingen GmbH & Co. KG |
| WEA 06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| WEA 05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Forstberg GmbH & Co. KG |
| GV 32 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV33.2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2025 | Windkraft Großvargula III GmbH & Co. KG |
| GV 28 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV 33 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV 23 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV 27 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV27.1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV28.1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| GV 24 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| TL 09 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2022-09-19 | Windkraft Kirchheilingen VIII GmbH & Co. KG |
| KH 63 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2022-09-19 | Windkraft Kirchheilingen VIII GmbH & Co. KG |
| BH06 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| KH 59 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-19 | Windkraft Kirchheilingen VII GmbH & Co. KG |
| KA 07 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2019-11-14 | Windkraft Keula GmbH & Co. KG |
| BG 09 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-08-09 | Windkraft Kirchheilingen VII GmbH & Co. KG |
| HL17 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-02-11 | Windkraft Herbsleben VII GmbH & Co. KG |
| HL19 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-02-11 | Windkraft Herbsleben VII GmbH & Co. KG |
| KH 60 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-08-18 | Windkraft Kirchheilingen VIII GmbH & Co. KG |
| HL18 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2020-12-23 | GSW Windpark Herbsleben GmbH & Co. KG |
| GV 29.2 | 3.45 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| KH 58 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-04-11 | Windfeld Thüringer Becken KH 56.1 GmbH & Co. KG |
| KH 46.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2015-12-02 | Windkraft Kirchheilingen III GmbH & Co. KG |
| HL 11 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-29 | GSW Windpark Herbsleben GmbH & Co. KG |
| KH 56.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-09-16 | Windfeld Thüringer Becken KH 56.1 GmbH & Co. KG |
| HS 04 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-12-05 | Windkraft Hornsömmern GmbH & Co. KG |
| V204991 (KH 53) | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-09-06 | EKM-StromVerbund |
| WEA Kirchheilingen KH52 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-01-10 | envia THERM GmbH |
| KL 13 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-06-26 | Windfeld Kutzleben II GmbH & Co. KG |
| WEA Kirchheilingen KH51 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2012-12-30 | envia THERM GmbH |
| HS 01 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-12-05 | Windkraft Hornsömmern GmbH & Co. KG |
| HS 02 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-12-05 | Windkraft Hornsömmern GmbH & Co. KG |
| HL 08 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-08-25 | Windkraft Herbsleben V GmbH & Co. KG |
| KL 12 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-06-26 | Windfeld Kutzleben II GmbH & Co. KG |
| V202433 (KH 50) | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-09-05 | EKM-StromVerbund |
| HS 03 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-12-05 | Windkraft Hornsömmern GmbH & Co. KG |
| WEA Kirchheilingen KH55 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-05-15 | envia THERM GmbH |
| KL 14 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-06-24 | Windfeld Kutzleben II GmbH & Co. KG |
| KL 11 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2015-06-22 | Windfeld Kutzleben II GmbH & Co. KG |
| HL 09 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-04-10 | GSW Windmühle Herbsleben 09 GmbH & Co. KG |
| KH 49 | 2.40 MW | Nordex SE | in operation | 2014-11-28 | Windkraft Kirchheilingen IV GmbH & Co. KG |
| KH 47 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-12-08 | Windkraft Kirchheilingen IV GmbH & Co. KG |
| BG 08.1 | 2.40 MW | Nordex SE | in operation | 2014-12-15 | Windkraft Kirchheilingen IV GmbH & Co. KG |
| KH 48 | 2.40 MW | Nordex SE | in operation | 2014-12-08 | Windkraft Kirchheilingen IV GmbH & Co. KG |
| BG 04.1 | 2.40 MW | Nordex SE | in operation | 2014-12-23 | Windkraft Kirchheilingen IV GmbH & Co. KG |
| 784091 | 2.30 MW | ENERCON GmbH | in operation | 2014-03-12 | HM Green Line GmbH |
| Kirchheilingen 54 | 2.30 MW | ENERCON GmbH | in operation | 2014-02-21 | GSW Windmühle Kirchheilingen 54 GmbH & Co. KG |
| KL 06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-27 | Windkraft Kutzleben III GmbH & Co. KG |
| BG 06 | 2.00 MW | ENERCON GmbH | in operation | 2013-07-31 | GSW Windmühlen Fonds 2003 GmbH & Co. KG |
| KL 09 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-15 | Windkraft Kutzleben III GmbH & Co. KG |
| GV 17 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-26 | Windpark UH II GmbH & Co. KG |
| KH 16 | 2.00 MW | ENERCON GmbH | in operation | 2010-11-16 | Windkraft Kirchheilingen III GmbH & Co. KG |
| KH 17 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-30 | Windkraft Kirchheilingen III GmbH & Co. KG |
| KL 08 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-10-05 | Windkraft Kutzleben III GmbH & Co. KG |
| TL 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-02-04 | Windkraft Kirchheilingen III GmbH & Co. KG |
| 782881 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | Windpark Wiegleben II GmbH & Co. KG |
| 782882 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | Windpark Wiegleben II GmbH & Co. KG |
| KH 18 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-01-20 | Windkraft Kirchheilingen III GmbH & Co. KG |
| KH 32 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-02-02 | Windkraft Kirchheilingen III GmbH & Co. KG |
| KL 10 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-09 | Windkraft Kutzleben III GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | in operation | 2005-01-21 | private individual |
| HL06 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-03-05 | BOREAS Energie GmbH |
| KL 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-27 | Windkraft Kutzleben III GmbH & Co. KG |
| WEA GV 01 -35169 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-03-03 | Leuchtturm Großvargula GmbH& Co.KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-12-29 | private individual |
| KL 05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-27 | Windkraft Kutzleben III GmbH & Co. KG |
| 35031 - GV 21 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-02-17 | Windpark UH ApS & Co. KG |
| AS 01 | 2.00 MW | ENERCON GmbH | in operation | 2012-10-02 | GSW Windmühle Aschera 01 GmbH & Co. KG |
| HL 10.1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2015-12-22 | Windkraft Herbsleben VI GmbH & Co. KG |
| E-822273 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | ET Energy Hochheim 1 GmbH & Co. KG |
| KL 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-18 | Windkraft Kutzleben III GmbH & Co. KG |
| HL 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-02-11 | Windkraft Herbsleben IV GmbH & Co. KG |
| KH 19 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-12-27 | Windkraft Kirchheilingen III GmbH & Co. KG |
| KH 26 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-01-24 | Windkraft Kirchheilingen III GmbH & Co. KG |
| E-822275 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | ET Energy Hochheim 1 GmbH & Co. KG |
| KH 30 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-02-17 | Windkraft Kirchheilingen III GmbH & Co. KG |
| GV 19 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-25 | Windpark UH II GmbH & Co. KG |
| KL 03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-07-13 | Windkraft Kutzleben III GmbH & Co. KG |
| 782880 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | Windpark Wiegleben II GmbH & Co. KG |
| KL 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-03 | Windkraft Kutzleben III GmbH & Co. KG |
| E-822274 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-31 | ET Energy Hochheim 1 GmbH & Co. KG |
| WEA GV 01 -35168 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-26 | Leuchtturm Großvargula GmbH& Co.KG |
| KL 04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-08-08 | Windkraft Kutzleben III GmbH & Co. KG |
| 35879 - GV 20 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-02-16 | Windpark UH ApS & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | in operation | 2003-10-05 | private individual |
| 702149 | 1.80 MW | ENERCON GmbH | in operation | 2004-10-30 | GERES EnergieSysteme GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | in operation | 2003-10-15 | private individual |
| 701276 | 1.80 MW | ENERCON GmbH | in operation | 2003-09-22 | GERES EnergieSysteme GmbH |
| 701277 | 1.80 MW | ENERCON GmbH | in operation | 2003-09-22 | GERES EnergieSysteme GmbH |
| 70249 | 1.50 MW | ENERCON GmbH | in operation | 2001-12-14 | Alterric Windpark GmbH & Co. Wiegleben KG |
| KH 14 | 1.50 MW | REpower Systems SE | in operation | 2003-12-30 | BOREAS Energie GmbH |
| unit operated by a private individual | 1.50 MW | Fuhrländer AG | permanently decommissioned | 2003-12-16 | private individual |
| Großvargula 11 | 1.50 MW | REpower Systems SE | permanently decommissioned | 2001-11-07 | Windpark Großvargula GmbH & Co. KG |
| Großvargula 09 | 1.50 MW | REpower Systems SE | in operation | 2002-04-17 | Windpark Großvargula GmbH & Co. KG |
| 70245 | 1.50 MW | ENERCON GmbH | in operation | 2001-12-12 | Alterric Windpark GmbH & Co. Wiegleben KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-06-13 | private individual |
| unit operated by a private individual | 1.50 MW | Jacobs Energie GmbH | permanently decommissioned | 2000-12-28 | private individual |
| Großvargula 13 | 1.50 MW | REpower Systems SE | in operation | 2001-11-14 | Windpark Großvargula GmbH & Co. KG |
| BG 02 | 1.50 MW | REpower Systems SE | in operation | 2003-12-12 | GSW Windmühlen Fonds 2003 GmbH & Co. KG |
| 70246 | 1.50 MW | ENERCON GmbH | in operation | 2001-12-11 | Alterric Windpark GmbH & Co. Wiegleben KG |
| Großvargula 07 | 1.50 MW | REpower Systems SE | in operation | 2001-12-28 | Windpark Großvargula GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-06-18 | private individual |
| Großvargula 16 | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-06-26 | Windpark Großvargula GmbH & Co. KG |
| 70250 | 1.50 MW | ENERCON GmbH | in operation | 2001-12-14 | Alterric Windpark GmbH & Co. Wiegleben KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-05-15 | private individual |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-05-24 | private individual |
| 70248 | 1.50 MW | ENERCON GmbH | in operation | 2001-12-11 | Alterric Windpark GmbH & Co. Wiegleben KG |
| 70247 | 1.50 MW | ENERCON GmbH | in operation | 2001-11-30 | Alterric Windpark GmbH & Co. Wiegleben KG |
| ADIB | 1.50 MW | ENERCON GmbH | in operation | 2001-09-25 | ALG Aschara Landwirtschaftsgesellschaft mbH |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-05-07 | private individual |
| Großvargula 14 | 1.50 MW | REpower Systems SE | in operation | 2002-04-24 | Windpark Großvargula GmbH & Co. KG |
| HL 03 | 1.50 MW | REpower Systems SE | in operation | 2002-06-20 | BOREAS Energie GmbH |
| Großvargula 04 | 1.50 MW | REpower Systems SE | permanently decommissioned | 2001-12-18 | Windpark Großvargula GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-05-16 | private individual |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2001-10-31 | private individual |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-07-18 | private individual |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-04-23 | private individual |
| Großvargula 05 | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-02-21 | Windpark Großvargula GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2002-07-16 | private individual |
| Großvargula 12 | 1.50 MW | REpower Systems SE | in operation | 2002-05-08 | Windpark Großvargula GmbH & Co. KG |
| KH05 | 1.30 MW | Nordex Energy GmbH | in operation | 1999-10-20 | BOREAS Energie GmbH |
| WEA-Nr. 44186 Hüpstedt | 0.60 MW | ENERCON GmbH | in operation | 2000-07-06 | Arcos D green energy GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 1995-10-11 | private individual |
| 442344 | 0.60 MW | ENERCON GmbH | in operation | 2004-11-30 | HM Green Line GmbH |
| WEA-Nr. 44188 Rodeberg | 0.60 MW | ENERCON GmbH | in operation | 2000-07-06 | Arcos D green energy GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-03-08 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-03-08 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-03-08 | private individual |
| WEA-Nr. 44187 Rodeberg | 0.60 MW | ENERCON GmbH | in operation | 2000-07-06 | Arcos D green energy GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-12-30 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-02-04 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-02-12 | private individual |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | in operation | 2013-11-19 | private individual |
| unit operated by a private individual | 0.01 MW | windradshop | in operation | 2013-01-17 | private individual |
| Windrad | 0.00 MW | Sonstige | in operation | 2012-08-22 | Lackiererei Menge GmbH & Co.KG |
| unit operated by a private individual | 0.00 MW | Sonstige | permanently decommissioned | 2020-12-12 | private individual |
Which organisations operate the most wind power capacity in Unstrut-Hainich-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| BOREAS Energie GmbH | 32 | 177.6 MW |
| Windkraft Bothenheilingen GmbH & Co. KG | 10 | 60.0 MW |
| Windkraft Großvargula III GmbH & Co. KG | 8 | 47.6 MW |
| Windpark Forstberg GmbH & Co. KG | 6 | 36.0 MW |
| Windpark EKM Nägelstedt GmbH & Co. KG | 5 | 34.0 MW |
| Windkraft Tornow T05 GmbH & Co. KG | 4 | 24.8 MW |
| Windkraft Kutzleben III GmbH & Co. KG | 10 | 20.0 MW |
| Windkraft Kirchheilingen III GmbH & Co. KG | 9 | 19.3 MW |
| Windkraft Kirchheilingen VIII GmbH & Co. KG | 3 | 15.4 MW |
| Windpark Großvargula GmbH & Co. KG | 9 | 13.5 MW |
Which manufacturer accounts for the most wind power capacity in Unstrut-Hainich-Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 111 | 489.7 MW |
| ENERCON GmbH | 34 | 48.5 MW |
| Nordex Germany GmbH | 7 | 47.6 MW |
| REpower Systems SE | 22 | 33.0 MW |
| Nordex SE | 4 | 9.60 MW |
| Nordex Energy GmbH | 2 | 3.70 MW |
| Jacobs Energie GmbH | 1 | 1.50 MW |
| Fuhrländer AG | 1 | 1.50 MW |
| PSW-Energiesysteme GmbH | 1 | 0.01 MW |
| windradshop | 1 | 0.01 MW |
Wind power in Thüringen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Unstrut-Hainich-Kreis (Thüringen), and how large can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.