Germany · renewables
Wind power in Saale-Holzland-Kreis
65 wind turbines with 140.1 MW of gross capacity were in operation in Saale-Holzland-Kreis (Thüringen) as of 2026-11-05, with a further 18 units (122.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Saale-Holzland-Kreis (Thüringen), and how large are they, as of 2026-11-05?
- 65 wind turbines with 140.1 MW of gross capacity were in operation in Saale-Holzland-Kreis (Thüringen) as of 2026-11-05, with a further 18 units (122.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Saale-Holzland-Kreis?
- 65 wind turbines with 140.1 MW of gross capacity were in operation in Saale-Holzland-Kreis as of 2026-11-05, with a further 18 units (122.1 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Saale-Holzland-Kreis in 2024?
- 4 wind turbines with 17.1 MW went into operation in Saale-Holzland-Kreis in 2024; the strongest year of the last two decades was 2013 with 31.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Saale-Holzland-Kreis?
- Windpark Wetzdorf Repowering GmbH & Co. KG operates 6 wind turbines with 40.8 MW in Saale-Holzland-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Saale-Holzland-Kreis?
- Nordex Energy GmbH leads with 22 wind turbines and 76.3 MW in Saale-Holzland-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Saale-Holzland-Kreis?
- The largest registered wind turbine in Saale-Holzland-Kreis has 7.20 MW of gross capacity and is operated by meridian Windpark Eineborn GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Saale-Holzland-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| 30 to 100 kW | 1 | 0.10 MW | 1 | 0 |
| over 100 kW | 89 | 272.8 MW | 63 | 18 |
How much wind power capacity was commissioned in Saale-Holzland-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 4 | 17.1 MW |
| 2023 | 3 | 20.4 MW |
| 2020 | 1 | 2.35 MW |
| 2017 | 2 | 7.17 MW |
| 2016 | 2 | 4.80 MW |
| 2015 | 1 | 2.50 MW |
| 2014 | 2 | 5.40 MW |
| 2013 | 13 | 31.8 MW |
| 2012 | 1 | 2.50 MW |
| 2011 | 2 | 4.10 MW |
| 2009 | 1 | 2.30 MW |
How many wind turbines in Saale-Holzland-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 65 | 140.1 MW |
| planned | 18 | 122.1 MW |
| permanently decommissioned | 8 | 10.7 MW |
Which wind turbines are registered in Saale-Holzland-Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | meridian Windpark Eineborn GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | meridian Windpark Eineborn GmbH & Co. KG |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | meridian Windpark Eineborn GmbH & Co. KG |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | meridian Windpark Eineborn GmbH & Co. KG |
| ABO Energy Windpark St. Gangloff WEA9 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ABO Energy WP St. Gangloff GmbH & Co. KG |
| ABO Energy Windpark St. Gangloff WEA2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy WP St. Gangloff GmbH & Co. KG |
| ABO Energy Windpark St. Gangloff WEA1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy WP St. Gangloff GmbH & Co. KG |
| ABO Energy Windpark St. Gangloff WEA5 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy WP St. Gangloff GmbH & Co. KG |
| ABO Energy Windpark St. Gangloff WEA6 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy WP St. Gangloff GmbH & Co. KG |
| WEA-6 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA Fpr. 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-09-19 | UGE Poppendorf GmbH & Co. KG Umweltgerechte Energie |
| WEA-2 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA Fpr. 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2023-09-19 | UGE Poppendorf GmbH & Co. KG Umweltgerechte Energie |
| WEA-5 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA-3 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA Fpr. 03 | 6.80 MW | Nordex Energy GmbH | in operation | 2023-10-09 | UGE Poppendorf GmbH & Co. KG Umweltgerechte Energie |
| WEA-4 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA-1 N175 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wetzdorf Repowering GmbH & Co. KG |
| WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | meridian Windpark Eineborn GmbH & Co. KG |
| WEA 1 (12) / Coppanz Repowering | 5.70 MW | Nordex SE | in operation | 2024-09-24 | GREE Coppanz GmbH & Co. KG |
| WEA 3 - 93310 (14) / Coppanz Repowering | 5.70 MW | Nordex SE | in operation | 2024-09-23 | Windfarm Weimar GmbH & Co. KG |
| WEA Mörsdorf 01 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Mörsdorf GmbH & Co. KG Umweltgerechte Energie |
| WEA 2 - 93309 (13) / Coppanz Repowering | 5.70 MW | Nordex SE | in operation | 2024-09-23 | Windfarm Weimar GmbH & Co. KG |
| WEA Nr. 2b | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Energieproduktion Frauenprießnitz GmbH & Co. KG |
| WEA 1 / 1410001 | 4.20 MW | ENERCON GmbH | in operation | 2017-02-06 | GREE Coppanz GmbH & Co. KG |
| WEA 6 | 3.00 MW | Nordex SE | in operation | 2014-06-20 | meridian Windpark Rauschwitz III GmbH & Co.KG |
| WEA 13 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2017-10-20 | meridian Windpark Lindau II GmbH & Co.KG |
| WEA 9 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-08-29 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 10 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-08-12 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 6 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-08-02 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 5 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-07-29 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 7 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-08-21 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 8 | 2.50 MW | Nordex Energy GmbH | in operation | 2013-08-30 | meridian Windpark Lindau GmbH & Co.KG |
| WEA 11 | 2.50 MW | Nordex Energy GmbH | in operation | 2015-03-27 | meridian Windpark Lindau II GmbH & Co.KG |
| WEA 10 | 2.50 MW | Nordex SE | in operation | 2012-12-15 | meridian Windpark Bucha GmbH & Co.KG |
| WEA 34-8 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-28 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 27-1 | 2.40 MW | Nordex Energy GmbH | in operation | 2014-01-28 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 28-2 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-21 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 36-10 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-28 | meridian Windpark Wetzdorf II GmbH & Co. KG |
| WEA 33-7 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-07 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 31-5 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-27 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 32-6 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-11-22 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA30-4 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-18 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 35-9 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-06-24 | meridian Windpark Wetzdorf II GmbH & Co. KG |
| WEA 29-3 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-11 | meridian Windpark Wetzdorf GmbH & Co.KG |
| WEA 1 (Repowering) | 2.35 MW | ENERCON GmbH | in operation | 2020-09-15 | NaturStromQuelle Thüringen GmbH & Co. KG |
| E70 782680 | 2.30 MW | ENERCON GmbH | in operation | 2009-11-09 | Ulrich Heineck UHNS e.K. |
| WEA 4 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-03-21 | meridian Windpark Rauschwitz II GmbH & Co.KG |
| WEA 5 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-03-23 | meridian Windpark Rauschwitz II GmbH & Co.KG |
| unit operated by a private individual | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-12-18 | private individual |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-07-10 | private individual |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-08-29 | private individual |
| WEA 02 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-02-27 | provent Windpark Rauschwitz GmbH & Co.KG |
| WEA Weimar 06 (70129) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-07-17 | Windfarm Weimar GmbH & Co. KG |
| WEA 07-70358 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-17 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 09-70341 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-18 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 12-70387 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-18 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WP Rauschwitz | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-02-12 | MRS Windpark Betriebsgesellschaft mbH & Co. KG |
| WEA 04-70298 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-02 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 06-70335 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-09 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA Lindau | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-11-25 | MBBF Windpark GmbH & Co. V. Betriebs KG |
| WEA 05-70278 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-01 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-08-23 | private individual |
| WEA Weimar 08 (70131) | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-07-10 | Windfarm Weimar GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-08-29 | private individual |
| WEA 10-70382 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-20 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 13-70381 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-18 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 08-70336 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-20 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-07-17 | private individual |
| WEA 03-70362 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-11 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 11-70364 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-15 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 02-70363 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-12 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2002-08-06 | private individual |
| WEA 14-70365 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-17 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| WEA 01-70366 MD77 | 1.50 MW | REpower Systems SE | in operation | 2003-12-21 | Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH |
| Frauenprießnitz WEA 17712 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | Weikmann Immotec GmbH & Co. KG |
| Frauenprießnitz WEA 7 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | NaturEnergy GmbH & Co. KGaA |
| V67564 (WEA 9) | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | QE Frauenprießnitz GmbH |
| V67565 (WEA 11) | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | QE Frauenprießnitz GmbH |
| V67563 (WEA 12) | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | QE Frauenprießnitz GmbH |
| V67566 (WEA 8) | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | QE Frauenprießnitz GmbH |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2001-06-15 | private individual |
| Fri 91 | 0.85 MW | Frisia Windkraftanlagen Service GmbH | in operation | 2001-07-18 | NaturEnergy GmbH & Co. KGaA |
| unit operated by a private individual | 0.85 MW | Frisia Windkraftanlagen Service GmbH | permanently decommissioned | 2001-06-15 | private individual |
| Fri93 | 0.85 MW | Frisia Windkraftanlagen Service GmbH | in operation | 2001-06-15 | NaturEnergy GmbH & Co. KGaA |
| WEA 1 | 0.75 MW | NEG Micon Deutschland GmbH | in operation | 2001-06-15 | Welzenbach Windpark oHG |
| WEA 2 | 0.75 MW | NEG Micon Deutschland GmbH | in operation | 2001-06-15 | Welzenbach Windpark oHG |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-04-27 | private individual |
| M700 Frauenprießnitz WEA | 0.23 MW | NEG Micon Deutschland GmbH | in operation | 1995-11-10 | Rasmus GmbH |
| Fu 01 Her | 0.10 MW | Fuhrländer AG | in operation | 1996-10-29 | Hermsdorf - Wind GbR |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-04-30 | private individual |
Which organisations operate the most wind power capacity in Saale-Holzland-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Wetzdorf Repowering GmbH & Co. KG | 6 | 40.8 MW |
| meridian Windpark Eineborn GmbH & Co. KG | 5 | 35.0 MW |
| ABO Energy WP St. Gangloff GmbH & Co. KG | 5 | 35.0 MW |
| Windpark Wetzdorf GmbH & Co. KG c/o Das Grüne Emissionshaus GmbH | 14 | 21.0 MW |
| UGE Poppendorf GmbH & Co. KG Umweltgerechte Energie | 3 | 20.4 MW |
| meridian Windpark Wetzdorf GmbH & Co.KG | 8 | 19.2 MW |
| meridian Windpark Lindau GmbH & Co.KG | 6 | 15.0 MW |
| Windfarm Weimar GmbH & Co. KG | 4 | 14.4 MW |
| GREE Coppanz GmbH & Co. KG | 2 | 9.90 MW |
| UGE Mörsdorf GmbH & Co. KG Umweltgerechte Energie | 1 | 5.70 MW |
Which manufacturer accounts for the most wind power capacity in Saale-Holzland-Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Energy GmbH | 22 | 76.3 MW |
| Nordex Germany GmbH | 10 | 67.1 MW |
| Vestas Deutschland GmbH | 6 | 35.6 MW |
| Nordex SE | 5 | 22.6 MW |
| REpower Systems SE | 14 | 21.0 MW |
| Senvion Deutschland GmbH | 11 | 19.1 MW |
| ENERCON GmbH | 4 | 14.4 MW |
| NEG Micon Deutschland GmbH | 9 | 7.33 MW |
| Frisia Windkraftanlagen Service GmbH | 4 | 3.40 MW |
| Südwind Borsig Energy GmbH | 2 | 3.00 MW |
Wind power in Thüringen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Saale-Holzland-Kreis (Thüringen), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.