Wind power in Nordhausen

29 wind turbines with 76.2 MW of gross capacity were in operation in Nordhausen (Thüringen) as of 2026-11-05, with a further 10 units (56.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/thueringen/nordhausen

Questions this page answers

How many wind turbines are registered in Nordhausen (Thüringen), and how large are they, as of 2026-11-05?
29 wind turbines with 76.2 MW of gross capacity were in operation in Nordhausen (Thüringen) as of 2026-11-05, with a further 10 units (56.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Nordhausen?
29 wind turbines with 76.2 MW of gross capacity were in operation in Nordhausen as of 2026-11-05, with a further 10 units (56.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Nordhausen in 2025?
1 wind turbines with 0.00 MW went into operation in Nordhausen in 2025; the strongest year of the last two decades was 2017 with 35.1 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Nordhausen?
Energiequelle GmbH operates 4 wind turbines with 27.2 MW in Nordhausen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Nordhausen?
ENERCON GmbH leads with 22 wind turbines and 54.3 MW in Nordhausen (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Nordhausen?
The largest registered wind turbine in Nordhausen has 6.80 MW of gross capacity and is operated by Energiequelle GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Nordhausen distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW20.00 MW11
over 100 kW42139.7 MW289

How much wind power capacity was commissioned in Nordhausen each year?

Commissioning yearUnitsCapacity added
202510.00 MW
202013.50 MW
201914.50 MW
2018515.0 MW
20171235.1 MW
201626.00 MW
201424.60 MW
201012.00 MW
200612.00 MW

How many wind turbines in Nordhausen are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation2976.2 MW
planned1056.0 MW
permanently decommissioned57.50 MW

Which wind turbines are registered in Nordhausen?

UnitCapacityManufacturerStatusCommissionedOperator
WP Werther West - WEA 116.80 MWNordex SEplannedplanned 2027Energiequelle GmbH
WP Werther West - WEA 136.80 MWNordex SEplannedplanned 2027Energiequelle GmbH
WEA B6.80 MWNordex Germany GmbHplannedplanned 2026Windpark Wipperdorf GmbH & Co. KG
WP Werther West - WEA 126.80 MWNordex SEplannedplanned 2027Energiequelle GmbH
WEA D6.80 MWNordex Germany GmbHplannedplanned 2026Windpark Wipperdorf GmbH & Co. KG
WP Werther West - WEA 186.80 MW–plannedplanned 2027Energiequelle GmbH
WEA E6.80 MWNordex Germany GmbHplannedplanned 2026Windpark Wipperdorf GmbH & Co. KG
WEA 44.50 MWNordex Energy GmbHin operation2019-09-03VSB Windpark Pustleben
Nentzelsrode R24.20 MWENERCON GmbHplannedplanned 2025Windpark GmbH & Co. Repowering Nentzelsrode KG
Nentzelsrode R14.20 MWENERCON GmbHplannedplanned 2026Alterric Deutschland GmbH
eno1260074.00 MWeno energy GmbHin operation2017-12-22Norddeutsche Energie WP Wipperdorf GmbH & Co. KG
eno1260084.00 MWeno energy GmbHin operation2017-12-22Norddeutsche Energie WP Wipperdorf GmbH & Co. KG
eno1260094.00 MWeno energy GmbHin operation2017-12-22Norddeutsche Energie WP Wipperdorf GmbH & Co. KG
13800653.50 MWENERCON GmbHin operation2020-02-14Windpark GmbH & Co. Nentzelsrode KG
3014223.37 MWSenvion Deutschland GmbHin operation2017-12-08M.P. Strom GmbH & Co. KG
11507033.00 MWENERCON GmbHin operation2018-06-13Windpark GmbH & Co. Nentzelsrode KG
WEA Uthleben II 11505603.00 MWENERCON GmbHin operation2017-03-30Windpark Uthleben II GmbH & Co. KG
11507043.00 MWENERCON GmbHin operation2018-06-05Windpark GmbH & Co. Nentzelsrode KG
WEA 23.00 MWENERCON GmbHin operation2016-11-04Windpark Uthleben Gmbh & Co. KG
11507053.00 MWENERCON GmbHin operation2018-05-30Windpark GmbH & Co. Nentzelsrode KG
WEA 13.00 MWENERCON GmbHin operation2016-12-23Windpark Uthleben Gmbh & Co. KG
11507023.00 MWENERCON GmbHin operation2018-06-06Windpark GmbH & Co. Nentzelsrode KG
11507063.00 MWENERCON GmbHin operation2018-06-27Windpark GmbH & Co. Nentzelsrode KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-05-04Wind Wipperdorf GmbH & Co. KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-03-08Wind Wipperdorf GmbH & Co. KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-04-19Wind Wipperdorf GmbH & Co. KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-03-23Wind Wipperdorf GmbH & Co. KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-02-28Wind Wipperdorf GmbH & Co. KG
Wind Wipperdorf GmbH & Co. KG2.40 MWNordex Energy GmbHin operation2017-04-06Wind Wipperdorf GmbH & Co. KG
E 825790-022.30 MWENERCON GmbHin operation2014-08-08Windpark Nentzelsrode GmbH & Co. KG
8257912.30 MWENERCON GmbHin operation2017-02-27Windpark GmbH & Co. Nentzelsrode KG
E 825789-012.30 MWENERCON GmbHin operation2014-08-05Windpark Nentzelsrode GmbH & Co. KG
8228472.00 MWENERCON GmbHin operation2010-11-23M.P. Strom GmbH & Co. KG
WEA 42.00 MWSenvion Deutschland GmbHin operation2006-09-08Provent Windpark Hörningen GmbH & Co.KG
660691.50 MWENERCON GmbHpermanently decommissioned1998-06-03Alterric Windpark GmbH & Co. Nordhausen KG
unit operated by a private individual1.50 MWENERCON GmbHpermanently decommissioned1999-01-13private individual
unit operated by a private individual1.50 MWENERCON GmbHpermanently decommissioned1999-01-06private individual
702571.50 MWSenvion Deutschland GmbHin operation2003-04-24Momentum Energy Germany GmbH & Co.KG
660711.50 MWENERCON GmbHpermanently decommissioned1998-09-22Alterric Windpark GmbH & Co. Nordhausen KG
660701.50 MWENERCON GmbHpermanently decommissioned1998-09-16Alterric Windpark GmbH & Co. Nordhausen KG
Wind Hörningen I1.00 MWENERCON GmbHin operation2001-04-03Elektrizitätswerke Müller oHG
Wind Hörningen II1.00 MWENERCON GmbHin operation2001-04-03Elektrizitätswerke Müller oHG
unit operated by a private individual0.00 MWREpower Systems SEin operation2025-05-05private individual
unit operated by a private individual0.00 MWSkyWind GmbHplannedplanned 2025private individual

Which organisations operate the most wind power capacity in Nordhausen?

OperatorUnitsCapacity
Energiequelle GmbH427.2 MW
Windpark GmbH & Co. Nentzelsrode KG720.8 MW
Windpark Wipperdorf GmbH & Co. KG320.4 MW
Wind Wipperdorf GmbH & Co. KG614.4 MW
Norddeutsche Energie WP Wipperdorf GmbH & Co. KG312.0 MW
Windpark Uthleben Gmbh & Co. KG26.00 MW
M.P. Strom GmbH & Co. KG25.37 MW
Windpark Nentzelsrode GmbH & Co. KG24.60 MW
VSB Windpark Pustleben14.50 MW
Alterric Windpark GmbH & Co. Nordhausen KG34.50 MW

Which manufacturer accounts for the most wind power capacity in Nordhausen?

ManufacturerUnitsCapacity
ENERCON GmbH2254.3 MW
Nordex SE320.4 MW
Nordex Germany GmbH320.4 MW
Nordex Energy GmbH718.9 MW
eno energy GmbH312.0 MW
Senvion Deutschland GmbH36.87 MW
REpower Systems SE10.00 MW
SkyWind GmbH10.00 MW

Wind power in Thüringen · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Nordhausen (Thüringen), and how large are they, a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.