FACTANKER · measured, cited, anchored official records connected

Germany · renewables

Wind power in Hildburghausen

7 wind turbines with 14.5 MW of gross capacity were in operation in Hildburghausen (Thüringen) as of 2026-11-05, with a further 4 units (21.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/thueringen/hildburghausen

Questions this page answers

How many wind turbines are registered in Hildburghausen (Thüringen), and how large are they, as of 2026-11-05?
7 wind turbines with 14.5 MW of gross capacity were in operation in Hildburghausen (Thüringen) as of 2026-11-05, with a further 4 units (21.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Hildburghausen?
7 wind turbines with 14.5 MW of gross capacity were in operation in Hildburghausen as of 2026-11-05, with a further 4 units (21.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Hildburghausen in 2024?
1 wind turbines with 0.00 MW went into operation in Hildburghausen in 2024; the strongest year of the last two decades was 2019 with 13.9 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Hildburghausen?
JWP Jade Windpark GmbH & Co. 24. Betriebs KG operates 3 wind turbines with 21.0 MW in Hildburghausen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Hildburghausen?
Nordex SE leads with 3 wind turbines and 21.0 MW in Hildburghausen (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Hildburghausen?
The largest registered wind turbine in Hildburghausen has 7.00 MW of gross capacity and is operated by JWP Jade Windpark GmbH & Co. 24. Betriebs KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Hildburghausen distributed by size class?

Size classUnitsCapacityIn operationPlanned
up to 30 kW30.01 MW21
over 100 kW835.5 MW53

How much wind power capacity was commissioned in Hildburghausen each year?

Commissioning yearUnitsCapacity added
202410.00 MW
2019413.9 MW
201310.00 MW

How many wind turbines in Hildburghausen are in operation, planned or decommissioned?

StatusUnitsCapacity
planned421.0 MW
in operation714.5 MW

Which wind turbines are registered in Hildburghausen?

UnitCapacityManufacturerStatusCommissionedOperator
WEA 27.00 MWNordex SEplannedplanned 2027JWP Jade Windpark GmbH & Co. 24. Betriebs KG
WEA 17.00 MWNordex SEplannedplanned 2027JWP Jade Windpark GmbH & Co. 24. Betriebs KG
WEA 37.00 MWNordex SEplannedplanned 2027JWP Jade Windpark GmbH & Co. 24. Betriebs KG
V229949 - WEA33.60 MWVestas Deutschland GmbHin operation2019-12-20Bürgerenergie Windpark auf der Galgenhöh GmbH& Co. KG
V229948 - WEA23.45 MWVestas Deutschland GmbHin operation2019-12-20Bürgerenergie Windpark auf der Galgenhöh GmbH& Co. KG
V229947 - WEA13.45 MWVestas Deutschland GmbHin operation2019-12-20Bürgerenergie Windpark auf der Galgenhöh GmbH& Co. KG
V229950 - WEA43.45 MWVestas Deutschland GmbHin operation2019-12-20Bürgerenergie Windpark auf der Galgenhöh GmbH& Co. KG
WKA Pfersdorf0.50 MWENERCON GmbHin operation1999-04-09WKA Schweiger Pfersdorf GbR
unit operated by a private individual0.00 MW–in operation2013-08-22private individual
unit operated by a private individual0.00 MWSkyWind GmbHplannedplanned 2024private individual
unit operated by a private individual0.00 MWSkyWind GmbHin operation2024-11-18private individual

Which organisations operate the most wind power capacity in Hildburghausen?

OperatorUnitsCapacity
JWP Jade Windpark GmbH & Co. 24. Betriebs KG321.0 MW
Bürgerenergie Windpark auf der Galgenhöh GmbH& Co. KG413.9 MW
WKA Schweiger Pfersdorf GbR10.50 MW

Which manufacturer accounts for the most wind power capacity in Hildburghausen?

ManufacturerUnitsCapacity
Nordex SE321.0 MW
Vestas Deutschland GmbH413.9 MW
ENERCON GmbH10.50 MW
SkyWind GmbH20.00 MW

Wind power in Thüringen · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Hildburghausen (Thüringen), and how large are the can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.