33 wind turbines with 54.9 MW of gross capacity were in operation in Greiz (Thüringen) as of 2026-11-05, with a further 11 units (65.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Greiz (Thüringen), and how large are they, as of 2026-11-05?
- 33 wind turbines with 54.9 MW of gross capacity were in operation in Greiz (Thüringen) as of 2026-11-05, with a further 11 units (65.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Greiz?
- 33 wind turbines with 54.9 MW of gross capacity were in operation in Greiz as of 2026-11-05, with a further 11 units (65.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Greiz in 2024?
- 1 wind turbines with 0.02 MW went into operation in Greiz in 2024; the strongest year of the last two decades was 2022 with 15.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Greiz?
- RWE Renewables Zweite Beteiligungs GmbH operates 5 wind turbines with 26.7 MW in Greiz, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Greiz?
- Vestas Deutschland GmbH leads with 13 wind turbines and 40.5 MW in Greiz (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Greiz?
- The largest registered wind turbine in Greiz has 7.00 MW of gross capacity and is operated by wpd Windpark Chursdorf GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Greiz distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 8 | 0.09 MW | 8 | 0 |
| over 100 kW | 38 | 122.5 MW | 25 | 11 |
How much wind power capacity was commissioned in Greiz each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 0.00 MW |
| 2024 | 1 | 0.02 MW |
| 2022 | 5 | 15.6 MW |
| 2021 | 1 | 4.20 MW |
| 2019 | 3 | 3.47 MW |
| 2017 | 2 | 6.80 MW |
| 2016 | 1 | 3.30 MW |
| 2015 | 1 | 0.01 MW |
| 2014 | 3 | 9.39 MW |
| 2012 | 1 | 2.05 MW |
How many wind turbines in Greiz are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 11 | 65.7 MW |
| in operation | 33 | 54.9 MW |
| permanently decommissioned | 2 | 2.00 MW |
Which wind turbines are registered in Greiz?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Chursdorf GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Chursdorf GmbH & Co. KG |
| WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Chursdorf GmbH & Co. KG |
| WEA Großsaara 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | UGE Großsaara GmbH & Co. KG Umweltgerechte Energie |
| WEA 03 Windpark Allrichberg | 5.70 MW | Nordex SE | planned | planned 2027 | RWE Renewables Zweite Beteiligungs GmbH |
| Windpark Allrichberg WEA 04 | 5.70 MW | Nordex SE | planned | planned 2027 | RWE Renewables Zweite Beteiligungs GmbH |
| WEA 06 Windpark Allrichberg | 5.70 MW | Nordex SE | planned | planned 2027 | RWE Renewables Zweite Beteiligungs GmbH |
| AU16 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| AU15 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| Windpark Allrichberg WEA 05 | 4.80 MW | Nordex SE | planned | planned 2027 | RWE Renewables Zweite Beteiligungs GmbH |
| Windpark Allrichberg_WEA 02 | 4.80 MW | Nordex SE | planned | planned 2027 | RWE Renewables Zweite Beteiligungs GmbH |
| WEA 05 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-06-14 | meridian Windpark Großenstein III GmbH & Co.KG |
| WEA 8 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-10-21 | meridian Windpark Auma GmbH & Co.KG |
| WEA 06 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-06-14 | meridian Windpark Großenstein III GmbH & Co.KG |
| WEA 03 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-14 | meridian Windpark Beerwalde GmbH & Co.KG |
| WEA 04 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-14 | meridian Windpark Beerwalde GmbH & Co.KG |
| 227097 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-06-14 | VSB Windpark Pölzig Zwei |
| WEA 1 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-15 | meridian Windpark Großenstein GmbH & Co.KG |
| WEA 2 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-12-15 | meridian Windpark Großenstein GmbH & Co.KG |
| AU 08 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-12-22 | Windkraft Auma GmbH & Co. KG |
| 300593 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2014-09-08 | Windpark Pölzig GmbH & Co. KG |
| 300592 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2014-09-23 | Windpark Pölzig GmbH & Co. KG |
| Windkraftanlage | 3.05 MW | ENERCON GmbH | in operation | 2014-06-01 | Avel GmbH& Co.KG |
| WEA 183 OR Drei Bröckau | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-04-20 | OR Energy Drei GmbH & Co. KG |
| GE1550077 | 1.50 MW | GE Wind Energy GmbH | in operation | 1999-09-17 | HT Aiwanger GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | ENERCON GmbH | permanently decommissioned | 1998-06-18 | private individual |
| WEA Forstwolfersdorf | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-04-09 | Rasmus GmbH |
| V65470 Forstwolfersdorf | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-11-20 | TiLeTo Ecostrom GmbH |
| V65478 Forstwolfersdorf | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-11-20 | TiLeTo Ecostrom GmbH |
| ADM Windkraft GmbH & Co. Pölzig KG | 0.85 MW | Vestas Deutschland GmbH | in operation | 2003-10-09 | ZOPF Windfang GmbH |
| WKA Korbußen | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-10-26 | ZOPF Windfang GmbH |
| Windrad Korbußen | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-04-27 | ET im Brahm Wind GbR |
| WKA Berga 2 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-08-01 | MA-WI Windkraft Beteiligungs GmbH |
| unit operated by a private individual | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-03-13 | private individual |
| AU01 | 0.50 MW | ENERCON GmbH | in operation | 1995-12-28 | BOREAS Energie GmbH |
| WKA Berga 1 | 0.50 MW | Vestas Deutschland GmbH | in operation | 1997-10-12 | Agrargenossenschaft Elstertal Markersdorf eG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1997-12-01 | private individual |
| AU 02 | 0.50 MW | ENERCON GmbH | in operation | 1995-12-31 | BOREAS Energie GmbH |
| unit operated by a private individual | 0.03 MW | Sonstige | in operation | 2002-12-19 | private individual |
| Windrad | 0.02 MW | Sonstige | in operation | 2024-03-15 | Schmidt Elektrotechnik e. K. Inhaber Ralph Schmidt |
| unit operated by a private individual | 0.01 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2015-01-29 | private individual |
| unit operated by a private individual | 0.01 MW | Uni Wind GmbH | in operation | 2019-11-28 | private individual |
| unit operated by a private individual | 0.01 MW | Uni Wind GmbH | in operation | 2019-11-28 | private individual |
| Windrad Tischendorf | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2022-10-19 | Sebastian Leucht |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 1996-02-01 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2026-09-01 | private individual |
Which organisations operate the most wind power capacity in Greiz?
| Operator | Units | Capacity |
|---|---|---|
| RWE Renewables Zweite Beteiligungs GmbH | 5 | 26.7 MW |
| wpd Windpark Chursdorf GmbH & Co. KG | 3 | 21.0 MW |
| BOREAS Energie GmbH | 4 | 12.2 MW |
| meridian Windpark Großenstein III GmbH & Co.KG | 2 | 8.40 MW |
| meridian Windpark Beerwalde GmbH & Co.KG | 2 | 7.20 MW |
| UGE Großsaara GmbH & Co. KG Umweltgerechte Energie | 1 | 6.80 MW |
| meridian Windpark Großenstein GmbH & Co.KG | 2 | 6.80 MW |
| Windpark Pölzig GmbH & Co. KG | 2 | 6.34 MW |
| meridian Windpark Auma GmbH & Co.KG | 1 | 4.20 MW |
| VSB Windpark Pölzig Zwei | 1 | 3.45 MW |
Which manufacturer accounts for the most wind power capacity in Greiz?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 13 | 40.5 MW |
| Nordex SE | 5 | 26.7 MW |
| Nordex Germany GmbH | 3 | 21.0 MW |
| Senvion Deutschland GmbH | 5 | 15.2 MW |
| Nordex Energy GmbH | 1 | 6.80 MW |
| ENERCON GmbH | 5 | 6.05 MW |
| NEG Micon Deutschland GmbH | 4 | 3.20 MW |
| GE Wind Energy GmbH | 2 | 3.00 MW |
| Sonstige | 4 | 0.05 MW |
| Uni Wind GmbH | 2 | 0.02 MW |
Wind power in Thüringen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Greiz (Thüringen), and how large are they, as of can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.