Germany · renewables
Wind power in Altenburger Land
64 wind turbines with 112.4 MW of gross capacity were in operation in Altenburger Land (Thüringen) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Altenburger Land (Thüringen), and how large are they, as of 2026-11-05?
- 64 wind turbines with 112.4 MW of gross capacity were in operation in Altenburger Land (Thüringen) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Altenburger Land?
- 64 wind turbines with 112.4 MW of gross capacity were in operation in Altenburger Land as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Altenburger Land in 2019?
- 4 wind turbines with 14.4 MW went into operation in Altenburger Land in 2019; the strongest year of the last two decades was 2016 with 18.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Altenburger Land?
- Wallenborn Windpark Waltersdorf I GmbH & Co. KG operates 12 wind turbines with 24.0 MW in Altenburger Land, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Altenburger Land?
- Vestas Deutschland GmbH leads with 24 wind turbines and 53.0 MW in Altenburger Land (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Altenburger Land?
- The largest registered wind turbine in Altenburger Land has 3.60 MW of gross capacity and is operated by CEE Windpark Mohlis GmbH & Co. KG, commissioned 2019-09-19 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Altenburger Land distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.01 MW | 1 | 0 |
| over 100 kW | 63 | 112.4 MW | 63 | 0 |
How much wind power capacity was commissioned in Altenburger Land each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2019 | 4 | 14.4 MW |
| 2017 | 2 | 3.41 MW |
| 2016 | 7 | 18.8 MW |
| 2015 | 1 | 3.00 MW |
| 2013 | 3 | 6.90 MW |
| 2012 | 2 | 4.60 MW |
| 2011 | 5 | 10.2 MW |
How many wind turbines in Altenburger Land are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 64 | 112.4 MW |
Which wind turbines are registered in Altenburger Land?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Mohlis WEA 04 neu | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-09-19 | CEE Windpark Mohlis GmbH & Co. KG |
| Mohlis WEA 01 neu | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-08-29 | CEE Windpark Mohlis GmbH & Co. KG |
| Mohlis WEA 02 neu | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-09-04 | CEE Windpark Mohlis GmbH & Co. KG |
| Mohlis WEA 05 neu | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-09-13 | CEE Windpark Mohlis GmbH & Co. KG |
| Thonhausen WEA6 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-10-25 | Steffen Stecher e.K. |
| VE-02-209014 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2016-01-29 | Investinvent 3. Windpark |
| Kraasa 9 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2016-02-22 | Lungta Windpark Kraasa GmbH & Co. KG |
| Kraasa 8 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2016-01-19 | Lungta Windpark Kraasa GmbH & Co. KG |
| VE-01-206089 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2015-02-24 | Investinvent 3. Windpark |
| WEA 4 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-21 | meridian Windpark Thonhausen GmbH & Co. KG |
| WEA 5 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-26 | meridian Windpark Thonhausen GmbH & Co. KG |
| WEA 6 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-09-15 | meridian Windpark Thonhausen GmbH & Co. KG |
| WEA 7 | 2.40 MW | Nordex Energy GmbH | in operation | 2016-12-22 | meridian Windpark Thonhausen GmbH & Co. KG |
| WEA 2 (824328) | 2.30 MW | ENERCON GmbH | in operation | 2012-08-09 | Zero Emission People Windrad Kraasa Süd GmbH & Co.KG |
| WEA 1 (824329) | 2.30 MW | ENERCON GmbH | in operation | 2012-08-09 | Windkraft Kraasa Nord UG (haftungsbeschränkt) & Co. KG |
| WEA 5 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-16 | InvestInvent 3. Windpark GmbH & Co. KG |
| Windpark Kraasa WEA 4, 825640 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-13 | Stadtwerke Augsburg Energie GmbH |
| Windpark Kraasa WEA 3, 825639 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-13 | Stadtwerke Augsburg Energie GmbH |
| WEA 6 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-11-24 | meridian Windpark Zschöpel GmbH & Co.KG |
| WEA10 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-11-24 | meridian Windpark Zschöpel GmbH & Co.KG |
| WEA 8 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-11-29 | meridian Windpark Zschöpel GmbH & Co.KG |
| WEA 9 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-12-01 | meridian Windpark Zschöpel GmbH & Co.KG |
| WEA 7 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2011-11-29 | meridian Windpark Zschöpel GmbH & Co.KG |
| 17704 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-04 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17701 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-05 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17707 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-11 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17706 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-11 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17699 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-12 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17702 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-04 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17697 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-07 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17696 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-06 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17703 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-14 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17700 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-10 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17698 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-07 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| 17705 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-10 | Wallenborn Windpark Waltersdorf I GmbH & Co. KG |
| Rositz WEA 9 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-04-01 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 6 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-02-28 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 3 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-02-13 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 2 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-06 | EnBW Windkraftprojekte GmbH |
| WEA 2 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2004-07-29 | provent Windpark Ponitz GmbH & Co.KG |
| Rositz WEA 8 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-27 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 7 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-06 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 4 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-20 | EnBW Windkraftprojekte GmbH |
| Rositz WEA 1 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-06 | EnBW Windkraftprojekte GmbH |
| WEA 1 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2004-07-29 | provent Windpark Ponitz GmbH & Co.KG |
| WEA 1 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2004-12-29 | provent Windpark Mehna GmbH & Co. KG |
| Rositz WEA 5 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-03-27 | EnBW Windkraftprojekte GmbH |
| Windkraft | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1996-10-21 | PR Windkraft GmbH |
| Windmühle WKA | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-10-01 | WKA Göpfersdorf Fritzsche GbR |
| unit operated by a private individual | 0.60 MW | Bonus Energy A/S | in operation | 1996-10-22 | private individual |
| unit operated by a private individual | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1996-10-22 | private individual |
| Windkraftanlage Hartha | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1996-01-27 | PR Windkraft GmbH |
| Windkraftanlage Lumpzig | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1995-02-02 | PR Windkraft GmbH |
| WKA Heukewalde | 0.60 MW | Vestas Deutschland GmbH | in operation | 1995-10-04 | Agrargenossenschaft Thonhausen eG |
| AN Bonus 600 Nitzschka | 0.60 MW | Bonus Energy A/S | in operation | 1996-10-22 | PR Windkraft GmbH |
| WKA Hartha | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1996-02-06 | BWW Gesellschaft für umweltschonende Energie mbH |
| V44 Goepfersdorf | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-10-08 | Zweite Zukunftsenergien Seeth GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1996-10-22 | private individual |
| unit operated by a private individual | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-10-07 | private individual |
| WEA Meuselwitz Guss | 0.60 MW | ENERCON GmbH | in operation | 2004-04-21 | Giga Energy - Meuselwitz Guss Windkraftanlagen GbR |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1995-06-01 | private individual |
| E-40_Pontewitz | 0.50 MW | ENERCON GmbH | in operation | 1997-03-14 | Fischer Windkraft GbR |
| unit operated by a private individual | 0.25 MW | NEG Micon Deutschland GmbH | in operation | 1993-11-11 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2017-03-30 | private individual |
Which organisations operate the most wind power capacity in Altenburger Land?
| Operator | Units | Capacity |
|---|---|---|
| Wallenborn Windpark Waltersdorf I GmbH & Co. KG | 12 | 24.0 MW |
| CEE Windpark Mohlis GmbH & Co. KG | 4 | 14.4 MW |
| EnBW Windkraftprojekte GmbH | 9 | 13.5 MW |
| meridian Windpark Zschöpel GmbH & Co.KG | 5 | 10.2 MW |
| meridian Windpark Thonhausen GmbH & Co. KG | 4 | 9.60 MW |
| Lungta Windpark Kraasa GmbH & Co. KG | 2 | 6.15 MW |
| Investinvent 3. Windpark | 2 | 6.08 MW |
| Stadtwerke Augsburg Energie GmbH | 2 | 4.60 MW |
| Steffen Stecher e.K. | 1 | 3.40 MW |
| provent Windpark Ponitz GmbH & Co.KG | 2 | 3.00 MW |
Which manufacturer accounts for the most wind power capacity in Altenburger Land?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 24 | 53.0 MW |
| Senvion Deutschland GmbH | 9 | 18.1 MW |
| Südwind Borsig Energy GmbH | 9 | 13.5 MW |
| ENERCON GmbH | 8 | 13.1 MW |
| Nordex Energy GmbH | 4 | 9.60 MW |
| NEG Micon Deutschland GmbH | 4 | 2.05 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 3 | 1.80 MW |
| Bonus Energy A/S | 2 | 1.20 MW |
| BRAUN Windturbinen GmbH | 1 | 0.01 MW |
Wind power in Thüringen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Altenburger Land (Thüringen), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.