Germany · renewables
Wind power in Görlitz
126 wind turbines with 210.1 MW of gross capacity were in operation in Görlitz (Sachsen) as of 2026-11-05, with a further 38 units (254.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Görlitz (Sachsen), and how large are they, as of 2026-11-05?
- 126 wind turbines with 210.1 MW of gross capacity were in operation in Görlitz (Sachsen) as of 2026-11-05, with a further 38 units (254.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Görlitz?
- 126 wind turbines with 210.1 MW of gross capacity were in operation in Görlitz as of 2026-11-05, with a further 38 units (254.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Görlitz in 2024?
- 3 wind turbines with 12.6 MW went into operation in Görlitz in 2024; the strongest year of the last two decades was 2006 with 28.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Görlitz?
- BOREAS Energie GmbH operates 17 wind turbines with 70.0 MW in Görlitz, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Görlitz?
- Vestas Deutschland GmbH leads with 51 wind turbines and 286.1 MW in Görlitz (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Görlitz?
- The largest registered wind turbine in Görlitz has 7.20 MW of gross capacity and is operated by NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Görlitz distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.04 MW | 4 | 0 |
| over 100 kW | 164 | 470.3 MW | 122 | 38 |
How much wind power capacity was commissioned in Görlitz each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 3 | 12.6 MW |
| 2020 | 1 | 2.35 MW |
| 2019 | 1 | 0.00 MW |
| 2018 | 1 | 3.45 MW |
| 2017 | 2 | 6.60 MW |
| 2015 | 1 | 0.00 MW |
| 2014 | 1 | 3.05 MW |
| 2013 | 2 | 0.03 MW |
| 2011 | 4 | 8.30 MW |
| 2010 | 9 | 18.0 MW |
| 2009 | 7 | 14.0 MW |
| 2008 | 2 | 6.00 MW |
| 2006 | 14 | 28.4 MW |
How many wind turbines in Görlitz are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 38 | 254.3 MW |
| in operation | 126 | 210.1 MW |
| permanently decommissioned | 3 | 4.10 MW |
| temporarily shut down | 1 | 1.80 MW |
Which wind turbines are registered in Görlitz?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Charlottenhof Repowering WEA L16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| Charlottenhof Repowering WEA L11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| Charlottenhof Repowering WEA L17 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| WEAII/10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | enercity Windpark Schleife GmbH & Co. KG |
| DIT04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| Windpark Oderwitz OW 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiequelle GmbH |
| WEAII/17 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| DIT07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| WEAII/16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| WEAII/15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| Windpark Oderwitz OW 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiequelle GmbH |
| Charlottenhof Repowering WEA L15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| WEAII/18 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| OL12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Leuba GmbH & Co. KG |
| Windpark Oderwitz OW 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiequelle GmbH |
| Charlottenhof Repowering WEA L13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| WEAII/11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| WEAII/19 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| WEAII/14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| Charlottenhof Repowering WEA L12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| Charlottenhof Repowering WEA L14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| WEAII/13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Schleife GmbH & Co. KG |
| DIT08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| Charlottenhof Repowering WEA L18 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG |
| OL 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Leuba GmbH & Co. KG |
| WEA OL10 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Leuba GmbH & Co. KG |
| OL 14 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Leuba GmbH & Co. KG |
| DIT06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| DIT05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| SF 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Rohne GmbH & Co. KG |
| SF 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Rohne GmbH & Co. KG |
| OS06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| SF 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Rohne GmbH & Co. KG |
| OS05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| SF 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | enercity Windpark Rohne GmbH & Co. KG |
| OS07 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| SL15 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | BOREAS Energie GmbH |
| WP Mittelherwigsdorf - 1381110 | 4.20 MW | ENERCON GmbH | in operation | 2024-08-14 | Windpark GmbH & Co. Mittelherwigsdorf II KG |
| WP Mittelherwigsdorf - 1381109 | 4.20 MW | ENERCON GmbH | in operation | 2024-08-14 | Windpark GmbH & Co. Mittelherwigsdorf II KG |
| WP Mittelherwigsdorf - WEA 11-1381016 | 4.20 MW | ENERCON GmbH | in operation | 2024-07-17 | Windpark Eckartsberg GmbH & Co. KG |
| RB 12 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2018-01-25 | Windkraft Kirchheilingen III GmbH & Co. KG |
| SL 11 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-28 | Windkraft Sohland II GmbH & Co. KG |
| SL 10 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-12-21 | Windkraft Sohland II GmbH & Co. KG |
| WEA Melaune | 3.05 MW | ENERCON GmbH | in operation | 2014-10-20 | Windkraft Melaune |
| Dittelsdorf1.2-F | 3.00 MW | Vestas Deutschland GmbH | in operation | 2008-03-17 | Windkraft Reichenbach I GmbH & Co. KG |
| Dittelsdorf2.2-F | 3.00 MW | Vestas Deutschland GmbH | in operation | 2008-03-14 | Windkraft Reichenbach I GmbH & Co. KG |
| 921786 | 2.35 MW | ENERCON GmbH | in operation | 2020-06-30 | NWE Niederschlesische Windenergie GmbH & Co. Windkraftanlagenpark am Galgenpark KG |
| STW-2.3 - S2300949 | 2.30 MW | Bonus Energy A/S | in operation | 2006-04-25 | NxW Zodel GmbH |
| STW-2.3 - S2300948 | 2.30 MW | Bonus Energy A/S | in operation | 2006-04-20 | NxW Zodel GmbH |
| STW-2.3 - S2300950 | 2.30 MW | Bonus Energy A/S | in operation | 2006-04-28 | NxW Zodel GmbH |
| RB14.1 | 2.30 MW | ENERCON GmbH | planned | planned 2027 | BOREAS Energie GmbH |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2011-09-12 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-07-21 | private individual |
| 781247 | 2.00 MW | ENERCON GmbH | in operation | 2009-05-27 | Green Energy Volker und Christel Noller GbR |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | in operation | 2006-12-29 | private individual |
| SL 09 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-29 | Windkraft Sohland GmbH & Co. KG |
| 781254 | 2.00 MW | ENERCON GmbH | in operation | 2011-02-04 | WINDPOOL Charlottenhof GmbH & Co.KG |
| WEA Görlitz IV - ST07/781250 - FH250 | 2.00 MW | ENERCON GmbH | in operation | 2011-03-17 | Windkraft Fichtenhöhe GmbH & Co. KG |
| WEA Reichenbach IX | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-12-31 | Windkraft Reichenbach II GmbH & Co. KG |
| OST07 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-14 | Erzeugergemeinschaft Dittersbach GbR |
| Omikron_1 | 2.00 MW | ENERCON GmbH | in operation | 2006-09-22 | HerBe Alsterwind GmbH & Co Omikron KG |
| Ditt WEA 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-23 | Grünwerke GmbH |
| OST06 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-21 | Erzeugergemeinschaft Dittersbach GbR |
| Herrnhut WEA1 | 2.00 MW | REpower Systems SE | in operation | 2004-09-02 | Steffen Stecher e.K. |
| 781252 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-30 | Windpark Neiße GmbH & Co. KG |
| WEA Görlitz V - ST08/781251 - FH251 | 2.00 MW | ENERCON GmbH | in operation | 2011-03-02 | Windkraft Fichtenhöhe GmbH & Co. KG |
| OST09 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-28 | Erzeugergemeinschaft Dittersbach GbR |
| 701066 | 2.00 MW | ENERCON GmbH | in operation | 2005-07-20 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| WEA1 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-05 | Netzverwaltung Kemnitz GbR |
| Omega_1 | 2.00 MW | ENERCON GmbH | in operation | 2009-05-28 | HerBe Alsterwind GmbH & Co Omega KG |
| Herrnhut WEA2 | 2.00 MW | REpower Systems SE | in operation | 2004-09-04 | Steffen Stecher e.K. |
| WEA Reichenbach X | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-01-28 | Windkraft Reichenbach II GmbH & Co. KG |
| WEA Reichenbach XI | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-01-14 | Windkraft Reichenbach II GmbH & Co. KG |
| WEA2 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-02 | Netzverwaltung Kemnitz GbR |
| 781246 | 2.00 MW | ENERCON GmbH | in operation | 2009-05-19 | Green Energy Volker und Christel Noller GbR |
| SL 07 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-29 | Windkraft Sohland GmbH & Co. KG |
| 781245 | 2.00 MW | ENERCON GmbH | in operation | 2009-06-11 | Green Energy Volker und Christel Noller GbR |
| 781249 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-21 | Windpark Neiße GmbH & Co. KG |
| 701068 | 2.00 MW | ENERCON GmbH | in operation | 2005-07-21 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| Ditt WEA 3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-28 | Grünwerke GmbH |
| Ditt WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-23 | Grünwerke GmbH |
| 781061 | 2.00 MW | ENERCON GmbH | in operation | 2006-12-30 | Vindpark DE ApS |
| Herrnhut WEA4 | 2.00 MW | REpower Systems SE | in operation | 2005-11-11 | Steffen Stecher e.K. |
| SL 08 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-30 | Windkraft Sohland GmbH & Co. KG |
| Windpark Kunnersdorf | 2.00 MW | ENERCON GmbH | in operation | 2010-12-22 | Windpark Kunnersdorf GmbH & Co. KG |
| OST05 | 2.00 MW | ENERCON GmbH | in operation | 2006-11-28 | Erzeugergemeinschaft Dittersbach GbR |
| Herrnhut WEA3 | 2.00 MW | REpower Systems SE | in operation | 2005-11-15 | Steffen Stecher e.K. |
| 781253 | 2.00 MW | ENERCON GmbH | in operation | 2010-12-30 | Windpark Neiße GmbH & Co. KG |
| 701062 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-30 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| 70026 | 1.80 MW | ENERCON GmbH | in operation | 2002-08-12 | NWE Niederschlesische Windenergie GmbH & Co. Repowering Ludwigsdorf III KG |
| 701575 WEA 4 | 1.80 MW | ENERCON GmbH | in operation | 2004-03-04 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| BERN01 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| 701580 WEA 3 | 1.80 MW | ENERCON GmbH | in operation | 2004-06-04 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 701579 WEA 10 | 1.80 MW | ENERCON GmbH | in operation | 2004-06-04 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| BERN03 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| 70028 | 1.80 MW | ENERCON GmbH | in operation | 2002-08-07 | NWE Niederschlesische Windenergie GmbH & Co. Repowering Ludwigsdorf III KG |
| BERN06 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| 70025 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-16 | NWE Niederschlesische Windenergie GmbH & Co. Repowering Ludwigsdorf III KG |
| 701061 | 1.80 MW | ENERCON GmbH | in operation | 2002-12-20 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| 701577 WEA 2 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-12 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 701572 WEA 6 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-16 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 701578 WEA 5 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-12 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 701063 | 1.80 MW | ENERCON GmbH | temporarily shut down | 2003-04-24 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| BERN02 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| BERN05 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| 701576 WEA 8 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-04 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 70027 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-12 | NWE Niederschlesische Windenergie GmbH & Co. Repowering Ludwigsdorf III KG |
| 701573 WEA 7 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-16 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| 701064 | 1.80 MW | ENERCON GmbH | in operation | 2003-05-09 | Alterric Windpark GmbH & Co. Mittelherwigsdorf KG |
| 701574 WEA 1 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-17 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| BERN04 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-16 | Windpark Bernstadt GmbH & Co. KG |
| 701571 WEA 9 | 1.80 MW | ENERCON GmbH | in operation | 2003-12-12 | ENOVA Windpark Ludwigsdorf GmbH & Co. KG |
| RB 02 | 1.50 MW | ENERCON GmbH | in operation | 1999-09-21 | Windkraft Reichenbach I GmbH & Co. KG |
| RB 03 | 1.50 MW | ENERCON GmbH | in operation | 1999-09-15 | Windkraft Reichenbach I GmbH & Co. KG |
| SL 02 | 1.50 MW | REpower Systems SE | in operation | 2001-10-12 | Windkraft Sohland II GmbH & Co. KG |
| WEA 2 | 1.50 MW | GE Renewable Germany GmbH | in operation | 2003-03-05 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| WEA 8 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-02-26 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| ME03 | 1.50 MW | GE Renewable Germany GmbH | in operation | 1999-12-20 | BOREAS Energie GmbH |
| ME 08 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2001-08-09 | BOREAS Energie GmbH |
| RB 08 | 1.50 MW | Fuhrländer AG | in operation | 2006-12-22 | Windkraft Kirchheilingen III GmbH & Co. KG |
| 66380 | 1.50 MW | ENERCON GmbH | in operation | 2000-02-10 | NWE Niederschlesische Windenergie GmbH & Co. Windkraftanlagenpark am Galgenpark KG |
| WEA 4 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-02-12 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| WEA 5 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-03-18 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| WEA 1 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-03-11 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| WEA 3 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-03-06 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| 66385 | 1.50 MW | ENERCON GmbH | in operation | 2000-02-17 | NWE Niederschlesische Windenergie GmbH & Co. Windkraftanlagenpark am Galgenpark KG |
| SL 01 | 1.50 MW | REpower Systems SE | in operation | 2002-04-03 | Windkraft Sohland II GmbH & Co. KG |
| ME06 | 1.50 MW | GE Wind Energy GmbH | in operation | 2000-08-10 | BOREAS Energie GmbH |
| RB 04 | 1.50 MW | eno energy GmbH | in operation | 1999-09-14 | Windkraft Reichenbach I GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | ENERCON GmbH | permanently decommissioned | 2000-02-22 | private individual |
| SL 05 | 1.50 MW | REpower Systems SE | in operation | 2001-09-29 | Windkraft Sohland II GmbH & Co. KG |
| 66381 | 1.50 MW | ENERCON GmbH | in operation | 2000-02-16 | NWE Niederschlesische Windenergie GmbH & Co. Windkraftanlagenpark am Galgenpark KG |
| SL 03 | 1.50 MW | REpower Systems SE | in operation | 2001-10-10 | Windkraft Sohland II GmbH & Co. KG |
| RB 01 | 1.50 MW | ENERCON GmbH | in operation | 1999-09-24 | Windkraft Reichenbach I GmbH & Co. KG |
| 66078 | 1.50 MW | ENERCON GmbH | in operation | 1998-08-01 | Vindpark DE ApS |
| ME 02 | 1.50 MW | GE Renewable Germany GmbH | in operation | 2000-03-23 | BOREAS Energie GmbH |
| ME 07 | 1.50 MW | REpower Systems SE | in operation | 2001-07-10 | BOREAS Energie GmbH |
| 66079 | 1.50 MW | ENERCON GmbH | in operation | 1998-08-01 | Vindpark DE ApS |
| WEA 6 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-02-13 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| ME05 | 1.50 MW | GE Wind Energy GmbH | in operation | 2000-08-15 | BOREAS Energie GmbH |
| WEA 7 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2003-02-26 | GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft |
| ME04 | 1.50 MW | GE Wind Energy GmbH | in operation | 1999-12-20 | BOREAS Energie GmbH |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | in operation | 2000-05-31 | private individual |
| WEA 5 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1997-02-14 | Wagenblast-Technik GmbH |
| WKA2 Ebersdorf | 0.60 MW | ENERCON GmbH | in operation | 2004-10-22 | Hellmuth Matthes KG |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | in operation | 2000-06-20 | private individual |
| WP Weißkeißel | 0.60 MW | DeWind GmbH | in operation | 2000-06-20 | Energiepark Weißkeißel GmbH & Co. KG |
| WEA 6 | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-12-17 | Wagenblast-Technik GmbH |
| OS 04 | 0.60 MW | ENERCON GmbH | in operation | 2005-12-10 | Windkraft Schanzberg 4 GmbH & Co.KG |
| GE78991502 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-09-15 | Wagenblast-Technik GmbH |
| GE78991500 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-09-15 | Wagenblast-Technik GmbH |
| GE78991503 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-09-15 | Wagenblast-Technik GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2004-06-24 | private individual |
| LB 01 | 0.60 MW | – | in operation | 2000-09-15 | Windmühle Lauba GmbH & Co. KG |
| WKA1 Ebersdorf | 0.60 MW | ENERCON GmbH | in operation | 2003-12-19 | Hellmuth Matthes KG |
| GE78991501 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-09-15 | Wagenblast-Technik GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1995-07-05 | private individual |
| OS 01 | 0.50 MW | ENERCON GmbH | in operation | 1998-03-10 | Windkraft Schanzberg 4 GmbH & Co.KG |
| 41072 | 0.50 MW | ENERCON GmbH | in operation | 1997-12-01 | Vindpark DE ApS |
| 41073 | 0.50 MW | ENERCON GmbH | in operation | 1997-12-01 | Vindpark DE ApS |
| OS 03 | 0.50 MW | ENERCON GmbH | in operation | 2002-07-02 | Windkraft Schanzberg 4 GmbH & Co.KG |
| 40637 | 0.50 MW | ENERCON GmbH | in operation | 1996-09-16 | Betreibergemeinschaft Windenergieanlagen B. Kratzsch & A. Zahlten GbR |
| OS 02 | 0.50 MW | ENERCON GmbH | in operation | 1998-03-17 | Windkraft Schanzberg 4 GmbH & Co.KG |
| unit operated by a private individual | 0.25 MW | NEG Micon Deutschland GmbH | in operation | 1994-03-11 | private individual |
| Hummer 30 | 0.03 MW | – | in operation | 2013-01-21 | Autotreff Hille Gmbh |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2015-12-04 | private individual |
| unit operated by a private individual | 0.00 MW | Heyde Windtechnik GmbH | in operation | 2013-04-17 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2019-03-14 | private individual |
Which organisations operate the most wind power capacity in Görlitz?
| Operator | Units | Capacity |
|---|---|---|
| BOREAS Energie GmbH | 17 | 70.0 MW |
| enercity Windpark Schleife GmbH & Co. KG | 9 | 64.8 MW |
| NWE Niederschlesische Windenergie & Co. Repowering Ludwigsdorf II KG | 8 | 57.6 MW |
| Windpark Leuba GmbH & Co. KG | 4 | 26.8 MW |
| enercity Windpark Rohne GmbH & Co. KG | 4 | 24.0 MW |
| Energiequelle GmbH | 3 | 21.6 MW |
| ENOVA Windpark Ludwigsdorf GmbH & Co. KG | 10 | 18.0 MW |
| Windkraft Sohland II GmbH & Co. KG | 6 | 12.6 MW |
| GLS Windpark Zodel GmbH & Co. KG Betriebsgesellschaft | 8 | 12.0 MW |
| Windkraft Reichenbach I GmbH & Co. KG | 6 | 12.0 MW |
Which manufacturer accounts for the most wind power capacity in Görlitz?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 51 | 286.1 MW |
| ENERCON GmbH | 75 | 132.2 MW |
| REpower Systems SE | 9 | 15.5 MW |
| General Electric Deutschland Holding GmbH | 7 | 10.5 MW |
| Bonus Energy A/S | 3 | 6.90 MW |
| GE Renewable Germany GmbH | 3 | 4.50 MW |
| GE Wind Energy GmbH | 3 | 4.50 MW |
| Tacke GmbH & Co. KG | 5 | 3.00 MW |
| Fuhrländer AG | 1 | 1.50 MW |
| eno energy GmbH | 1 | 1.50 MW |
Wind power in Sachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Görlitz (Sachsen), and how large are they, as of can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.