Germany · renewables
Wind power in Trier-Saarburg
98 wind turbines with 247.6 MW of gross capacity were in operation in Trier-Saarburg (Rheinland-Pfalz) as of 2026-11-05, with a further 90 units (554.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Trier-Saarburg (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 98 wind turbines with 247.6 MW of gross capacity were in operation in Trier-Saarburg (Rheinland-Pfalz) as of 2026-11-05, with a further 90 units (554.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Trier-Saarburg?
- 98 wind turbines with 247.6 MW of gross capacity were in operation in Trier-Saarburg as of 2026-11-05, with a further 90 units (554.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Trier-Saarburg in 2025?
- 9 wind turbines with 49.4 MW went into operation in Trier-Saarburg in 2025; the strongest year of the last two decades was 2025 with 49.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Trier-Saarburg?
- JWP Jade Windpark GmbH&Co. 18. Betriebs KG operates 11 wind turbines with 64.6 MW in Trier-Saarburg, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Trier-Saarburg?
- ENERCON GmbH leads with 86 wind turbines and 324.9 MW in Trier-Saarburg (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Trier-Saarburg?
- The largest registered wind turbine in Trier-Saarburg has 7.00 MW of gross capacity and is operated by JWP Jade Windpark GmbH&Co. 18. Betriebs KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Trier-Saarburg distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 2 | 0 |
| over 100 kW | 210 | 840.5 MW | 96 | 90 |
How much wind power capacity was commissioned in Trier-Saarburg each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 9 | 49.4 MW |
| 2024 | 7 | 22.3 MW |
| 2023 | 8 | 32.4 MW |
| 2021 | 3 | 16.5 MW |
| 2020 | 5 | 16.1 MW |
| 2019 | 2 | 6.90 MW |
| 2018 | 1 | 2.30 MW |
| 2016 | 1 | 2.30 MW |
| 2014 | 3 | 6.90 MW |
| 2013 | 3 | 7.65 MW |
| 2012 | 7 | 14.8 MW |
| 2011 | 2 | 3.80 MW |
| 2010 | 9 | 14.4 MW |
| 2009 | 4 | 6.50 MW |
| 2007 | 4 | 8.00 MW |
| 2006 | 10 | 18.5 MW |
How many wind turbines in Trier-Saarburg are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 90 | 554.4 MW |
| in operation | 98 | 247.6 MW |
| permanently decommissioned | 23 | 36.9 MW |
| temporarily shut down | 1 | 1.50 MW |
Which wind turbines are registered in Trier-Saarburg?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA Her11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| WEA Her18 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| RFH5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| RMA6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RMA2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| WEA Her13 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| RFH6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| WEA Her16 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| WEA Her15 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| RFH2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| RMA5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| WEA Her17 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| WEA Her12 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| WEA Her14 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| RMA7 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RMA9 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RMA8 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RFH3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| WEA Her19 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| RMA3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RMA10 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| RFH1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| RFH7 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| RFH8 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| RFH4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WPF Windpark Franzenheim GmbH |
| WEA Her20 | 7.00 MW | Nordex Germany GmbH | planned | planned 2026 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| RMA4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | WEAG Windpark Mandern GmbH |
| Detzem WEA 05 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | JUWI GmbH |
| RKI-Neu1 | 6.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| RKI-Neu5 | 6.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| RKI1 | 6.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| RKI2 | 6.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| Detzem WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Gusterath WEA 1 Nordex | 6.80 MW | Nordex SE | planned | planned 2028 | CATH Windenergie GmbH & Co. KG |
| Detzem WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Detzem WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Detzem WEA 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Detzem WEA 07 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Detzem WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Detzem WEA 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Mehring II WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| RHF5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WEAG Future Energies AG |
| Mehring II WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| Mehring II WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| Mehring II WEA07 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JUWI GmbH |
| Mehring II WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| Mehring II WEA 06 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| Mehring II WEA 05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 279 GmbH & Co. KG |
| WEA 14 Nossem E-175 mit 162 m NH | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Hochwald GmbH & Co. KG |
| WP Helenenberg Rep. WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2025 | PNE Windpark Helenenberg Repowering I GmbH & Co.KG |
| WEA 12 Heselbüsch E-175 mit 162 m NH | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Hochwald GmbH & Co. KG |
| WEA 00 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| WEA 01 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| ABO Wind WP Zerfer Schneeberg WEA 03 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-06-26 | IVD WP Schneeberg GmbH & Co. KG |
| ABO Wind WP Zerfer Schneeberg WEA 02 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-06-26 | IVD WP Schneeberg GmbH & Co. KG |
| ABO Wind WP Zerfer Schneeberg WEA 05 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-06-26 | IVD WP Schneeberg GmbH & Co. KG |
| WEA 02 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| WEA 06 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| ABO Wind WP Zerfer Schneeberg WEA 01 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-06-26 | IVD WP Schneeberg GmbH & Co. KG |
| WEA 04 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| WEA 07 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| ABO Wind WP Zerfer Schneeberg WEA 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-07-01 | IVD WP Schneeberg GmbH & Co. KG |
| WEA 05 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | FerdiWind GmbH & Co. KG |
| HKS 01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW Windkraftprojekte GmbH |
| RKI2F | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | EW Windpark Saargau GmbH |
| HKS 02 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW Windkraftprojekte GmbH |
| HKS 03 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | EnBW Windkraftprojekte GmbH |
| R05 | 5.56 MW | – | planned | planned 2027 | Alterric Windpark GmbH & Co. Windrose KG |
| Reinsfeld-Grimburg RFD 09 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| Reinsfeld-Grimburg RFD 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| R06 | 5.56 MW | – | planned | planned 2027 | Windpark Mehringer Höhe GmbH & Co. KG |
| RMA13 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEAG Future Energies AG |
| RMA1B | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEAG Future Energies AG |
| Reinsfeld-Grimburg RFD 08 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| R03 | 5.56 MW | – | planned | planned 2027 | Windpark Mehringer Höhe GmbH & Co. KG |
| Reinsfeld-Grimburg RFD 05 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| Reinsfeld-Grimburg RFD 12 | 5.56 MW | – | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA 13 Maarheld E-160 mit 166 m NH | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Läusberg GmbH & Co. KG |
| R02 | 5.56 MW | – | planned | planned 2026 | Windpark Mehringer Höhe GmbH & Co. KG |
| WEA 11 Kollert E-160 mit 166 m NH | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Läusberg GmbH & Co. KG |
| R01 | 5.56 MW | – | planned | planned 2026 | Windpark Mehringer Höhe GmbH & Co. KG |
| Reinsfeld-Grimburg GBG 03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| Reinsfeld-Grimburg RFD 06 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| WEA 5 E-160 EP5 E3 166 m NH SN 1603383 | 5.56 MW | ENERCON GmbH | in operation | 2025-05-10 | Invest-Wind Regenerative Energieanlagen GmbH & Co. KG Ruwertal-Hochwald |
| WEA H1 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-16 | Öko Eifelwind GmbH & Co. KG |
| WEA 6 E-160 mit 166 m NH SN 1603384 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-25 | Bürgerwind Läusberg GmbH & Co. KG |
| R07 | 5.56 MW | – | planned | planned 2027 | Windpark Mehringer Höhe GmbH & Co. KG |
| Reinsfeld-Grimburg GBG 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| R04 | 5.56 MW | – | planned | planned 2027 | Alterric Windpark GmbH & Co. Windrose KG |
| Reinsfeld-Grimburg RFD 11 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | EnBW OnshoreInvest GmbH & Co. KG |
| RMA12 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEAG Future Energies AG |
| PEL3E - GE | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-10-14 | WEAG Windkraft Konz GmbH & Co. KG |
| PEL1B - GE | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-11-19 | WEAG Windkraft Konz GmbH & Co. KG |
| PEL4B | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-28 | WEAG Windkraft Berndroth GmbH |
| PEL2D - GE | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-09-24 | WEAG Windkraft Konz GmbH & Co. KG |
| RKI-Neu4 | 4.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| RKI-Neu8 | 4.80 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| WEA 4 E-138 EP3 E3 160 m NH SN 1390070 | 4.26 MW | ENERCON GmbH | in operation | 2025-06-26 | ZWEITE Invest-Wind Waldrach GmbH & Co. KG |
| RA05 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Ralingen Planungsgesellschaft mbH |
| Bescheid Süd WEA 02 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-11-16 | Windpark Bescheid-Süd GmbH & Co. KG |
| 1160201 | 4.20 MW | ENERCON GmbH | in operation | 2024-08-16 | GERES EnergieSysteme V GmbH |
| Bescheid Süd WEA 04 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-11-22 | Windpark Bescheid-Süd GmbH & Co. KG |
| Bescheid Süd WEA 01 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-11-20 | Windpark Bescheid-Süd GmbH & Co. KG |
| WEA Her10 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-04-13 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| 1160198 | 4.20 MW | ENERCON GmbH | in operation | 2024-06-28 | GERES EnergieSysteme V GmbH |
| WEA Her08 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-03-31 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| 1160200 | 4.20 MW | ENERCON GmbH | in operation | 2024-08-06 | GERES EnergieSysteme V GmbH |
| 1160199 | 4.20 MW | ENERCON GmbH | in operation | 2024-07-26 | GERES EnergieSysteme V GmbH |
| Bescheid Süd WEA 03 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-11-16 | Windpark Bescheid-Süd GmbH & Co. KG |
| WEA Her07 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2023-03-31 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| RKI1F | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | EW Windpark Saargau GmbH |
| RKI-Neu3 | 3.60 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| RKI-Neu7 | 3.60 MW | Nordex SE | planned | planned 2028 | EW Windpark Saargau GmbH |
| WEA Her09 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2023-04-20 | JWP Jade Windpark GmbH&Co. 18. Betriebs KG |
| HER04 - 229021 - JNE021 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-03-11 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| HER03 -229019 - JNE020 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-01-28 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| HER01 - 231679 - JNE018 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-03-27 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| HER06 - 229017 - JNE023 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-20 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| HER05 -229018 - JNE022 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-12-30 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| HER02 - 229020 - JNE019 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-02-11 | JWP Jade Windpark GmbH & Co. 20. Betriebs KG |
| 1010101 | 3.05 MW | ENERCON GmbH | in operation | 2013-11-29 | Windstrom Trierweiler GmbH & Co. KG |
| NET Planung Vensys Gusterath | 2.50 MW | VENSYS Energy AG | in operation | 2012-12-12 | NET Planungs GmbH & Co.KG |
| Erweiterung Trierweiler West | 2.30 MW | ENERCON GmbH | in operation | 2020-06-12 | Windstrom Trierweiler GmbH & Co. KG |
| WEA 6 (823592) | 2.30 MW | ENERCON GmbH | in operation | 2012-11-17 | Öko Eifelwind GmbH & Co. KG |
| WEA 9 E-82 Waldrach | 2.30 MW | ENERCON GmbH | in operation | 2012-04-02 | ZWEITE Invest-Wind Waldrach GmbH & Co. KG |
| E825198 - OE3C | 2.30 MW | ENERCON GmbH | in operation | 2013-09-25 | WEAG Windpark Dreikopf GmbH & Co. KG |
| Mehring 822958 | 2.30 MW | ENERCON GmbH | in operation | 2011-03-31 | juwi Beteiligungs GmbH & Co. Naturpower 10 KG |
| E-825927 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-18 | Windpark Trierweiler GmbH & Co.KG |
| E825058 - LA9B | 2.30 MW | ENERCON GmbH | in operation | 2013-02-04 | WEAG Windpark Dreikopf GmbH & Co. KG |
| E827057 - OE5 | 2.30 MW | ENERCON GmbH | in operation | 2018-03-29 | WEAG Windpark Dreikopf GmbH & Co. KG |
| E-825926 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-18 | Windpark Trierweiler GmbH & Co.KG |
| 824534 | 2.30 MW | ENERCON GmbH | in operation | 2012-10-31 | Windstrom Trierweiler GmbH & Co. KG |
| WEA 10 E-82 Waldrach | 2.30 MW | ENERCON GmbH | in operation | 2012-02-03 | ZWEITE Invest-Wind Waldrach GmbH & Co. KG |
| 824533 | 2.30 MW | ENERCON GmbH | in operation | 2012-10-10 | Windstrom Trierweiler GmbH & Co. KG |
| E824913 - KIRZ2 | 2.30 MW | ENERCON GmbH | in operation | 2014-03-21 | WFS Windkraft für Speyer GmbH & Co. KG |
| E826821 - OE4C | 2.30 MW | ENERCON GmbH | in operation | 2016-11-23 | WEAG Windpark Dreikopf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2004-12-30 | private individual |
| WEA 90021 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2007-06-12 | Windpark Kirf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-02-11 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2009-04-29 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-09-12 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-04-11 | private individual |
| WEA 8 E-82 Waldrach | 2.00 MW | ENERCON GmbH | in operation | 2010-08-19 | ZWEITE Invest-Wind Waldrach GmbH & Co. KG |
| WEA 90027 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2007-05-31 | Windpark Kirf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-08-25 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-06-22 | private individual |
| Eisenach_II WEA 25 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-25 | EnBW Onshore Portfolio GmbH |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-06-17 | private individual |
| WEA 1 (82080) | 2.00 MW | ENERCON GmbH | in operation | 2006-12-07 | Öko Eifelwind GmbH & Co. KG |
| Eisenach_II WEA 24 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-17 | EnBW Onshore Portfolio GmbH |
| WEA 90032 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2007-06-06 | Windpark Kirf GmbH & Co. KG |
| 78104 | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-09-26 | Alterric Windpark GmbH & Co. Windrose KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-08-17 | private individual |
| Mehring 702246 | 2.00 MW | ENERCON GmbH | in operation | 2005-07-07 | juwi Beteiligungs GmbH & Co. Naturpower 10 KG |
| E822335 - WAL1C | 2.00 MW | ENERCON GmbH | in operation | 2010-08-27 | Windstrom Waldrach GmbH |
| WEA 90052 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2007-06-02 | Windpark Kirf GmbH & Co. KG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-07-11 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-08-11 | private individual |
| Eisenach_II WEA 20 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-29 | EnBW Onshore Portfolio GmbH |
| Eisenach_II WEA 21 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-06-26 | EnBW Onshore Portfolio GmbH |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2006-08-31 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2004-12-24 | private individual |
| NX70466 - KIRZ1 | 1.50 MW | Nordex SE | in operation | 2009-02-06 | WEAG Windpark Saargau GmbH & Co. KG |
| GE15541924 - KIR1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-12-22 | Windkraft Kirf Weiersbach GmbH & Co. KG |
| Windkraftwerk Reinsfeld 1 | 1.50 MW | VENSYS Energy AG | in operation | 2009-12-29 | SWT Windpark Reinsfeld GmbH & Co. KG |
| Windkraftwerk Reinsfeld 2 | 1.50 MW | VENSYS Energy AG | in operation | 2009-12-30 | SWT Windpark Reinsfeld GmbH & Co. KG |
| NX70079 - LA8 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2001-12-30 | Eco-Mobilität GmbH & Co. KG |
| NX70391 - KIR4 | 1.50 MW | Nordex SE | in operation | 2006-12-13 | WFS Windkraft für Speyer GmbH & Co. KG |
| NX70080 - LA3 | 1.50 MW | Nordex SE | in operation | 2002-02-07 | Eco-Mobilität GmbH & Co. KG |
| WP VII WEA 5 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-10-16 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 4 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-10-17 | SachsenFonds Windpark VII GmbH & Co. KG |
| NX70366 - KIR2 | 1.50 MW | Nordex SE | in operation | 2006-02-25 | WEAG Power GmbH & Co. KG |
| WP VII WEA 2 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-10-22 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 6 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-09-25 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 7 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-09-25 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 1 | 1.50 MW | Nordex Energy GmbH | temporarily shut down | 2002-10-15 | SachsenFonds Windpark VII GmbH & Co. KG |
| NX70390 - KIR3 | 1.50 MW | Nordex SE | in operation | 2006-12-13 | WFS Windkraft für Speyer GmbH & Co. KG |
| WP VII WEA 3 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-10-16 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 8 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-09-26 | SachsenFonds Windpark VII GmbH & Co. KG |
| WP VII WEA 9 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-09-24 | SachsenFonds Windpark VII GmbH & Co. KG |
| 70528/18 | 1.50 MW | Nordex Energy GmbH | in operation | 2002-06-03 | PNE Power Generation GmbH |
| Windkraftwerk Reinsfeld 3 | 1.50 MW | VENSYS Energy AG | in operation | 2011-03-25 | SWT Windpark Reinsfeld GmbH & Co. KG |
| 1246/05 | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2000-10-19 | PNE Power Generation GmbH |
| WP Gusterath | 1.30 MW | Nordex Energy GmbH | in operation | 2000-12-28 | Eco-Mobilität GmbH & Co. KG |
| 1248/04 | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2000-10-19 | PNE Power Generation GmbH |
| NX1243 - LA6 | 1.30 MW | Nordex SE | in operation | 2000-07-15 | Eco-Mobilität GmbH & Co. KG |
| NX1163 - LA5 | 1.30 MW | Nordex SE | in operation | 1999-12-16 | Eco-Mobilität GmbH & Co. KG |
| NX1166 - LA4 | 1.30 MW | Nordex Energy GmbH | in operation | 1999-12-16 | Eco-Mobilität GmbH & Co. KG |
| 1244/01 | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2000-10-19 | PNE Power Generation GmbH |
| NX1167 - LA1 | 1.30 MW | Nordex SE | in operation | 1999-12-16 | Eco-Mobilität GmbH & Co. KG |
| NX1168 - LA2 | 1.30 MW | Nordex SE | in operation | 1999-12-16 | Eco-Mobilität GmbH & Co. KG |
| 1245/02 | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2000-10-11 | PNE Power Generation GmbH |
| 1247/03 | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2000-10-12 | PNE Power Generation GmbH |
| ENERCON E58 | 1.00 MW | ENERCON GmbH | in operation | 2002-12-19 | INVEST-WIND Regenerativ-Energie Anlagen GmbH & Co. KG |
| E531426 - KIRZ3 | 0.80 MW | ENERCON GmbH | in operation | 2012-12-20 | WFS Windkraft für Speyer GmbH & Co. KG |
| E531184 - OE1B | 0.80 MW | ENERCON GmbH | in operation | 2010-11-24 | Gimbweiler Windkraft GmbH & Co. KG |
| E531186 - OE6C | 0.80 MW | ENERCON GmbH | in operation | 2010-11-12 | Gimbweiler Windkraft GmbH & Co. KG |
| E531185 - OE2 | 0.80 MW | ENERCON GmbH | in operation | 2010-11-12 | Gimbweiler Windkraft GmbH & Co. KG |
| Kessler GUS | 0.66 MW | Vestas Deutschland GmbH | in operation | 2000-08-24 | CATH Windenergie GmbH & Co. KG |
| Gusterath 1 KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 1999-09-01 | Vernet GmbH & Co. Gusterath 1 KG |
| WEA Gusterath | 0.66 MW | Vestas Deutschland GmbH | in operation | 1999-09-01 | CATH Windenergie GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-10-18 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-10-14 | private individual |
| WKA 3 | 0.60 MW | ENERCON GmbH | in operation | 2002-10-01 | Invest-Wind Regenerative Energieanlagen GmbH & Co. KG Ruwertal-Hochwald |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-08-01 | private individual |
| WKA 1 | 0.60 MW | ENERCON GmbH | in operation | 2002-10-04 | Invest-Wind Regenerative Energieanlagen GmbH & Co. KG Ruwertal-Hochwald |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-10-17 | private individual |
| WKA 2 | 0.60 MW | ENERCON GmbH | in operation | 2002-10-02 | Invest-Wind Regenerative Energieanlagen GmbH & Co. KG Ruwertal-Hochwald |
| unit operated by a private individual | 0.27 MW | Südwind Borsig Energy GmbH | in operation | 1995-04-21 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2024-10-28 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-08-20 | private individual |
Which organisations operate the most wind power capacity in Trier-Saarburg?
| Operator | Units | Capacity |
|---|---|---|
| JWP Jade Windpark GmbH&Co. 18. Betriebs KG | 11 | 64.6 MW |
| WEAG Windpark Mandern GmbH | 9 | 63.0 MW |
| JUWI GmbH | 9 | 60.6 MW |
| WPF Windpark Franzenheim GmbH | 8 | 56.0 MW |
| EW Windpark Saargau GmbH | 10 | 53.2 MW |
| EnBW OnshoreInvest GmbH & Co. KG | 9 | 50.0 MW |
| FerdiWind GmbH & Co. KG | 8 | 45.6 MW |
| JWP Jade Windpark GmbH & Co. 20. Betriebs KG | 9 | 41.7 MW |
| juwi Wind Germany 279 GmbH & Co. KG | 6 | 37.2 MW |
| IVD WP Schneeberg GmbH & Co. KG | 5 | 28.5 MW |
Which manufacturer accounts for the most wind power capacity in Trier-Saarburg?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 86 | 324.9 MW |
| Vestas Deutschland GmbH | 35 | 144.7 MW |
| Nordex Germany GmbH | 18 | 123.3 MW |
| Nordex Energy GmbH | 30 | 99.3 MW |
| Nordex SE | 18 | 63.5 MW |
| GE Wind Energy GmbH | 5 | 23.5 MW |
| Senvion Deutschland GmbH | 4 | 8.00 MW |
| VENSYS Energy AG | 4 | 7.00 MW |
| Südwind Borsig Energy GmbH | 2 | 1.77 MW |
| BRAUN Windturbinen GmbH | 1 | 0.01 MW |
Wind power in Rheinland-Pfalz · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Trier-Saarburg (Rheinland-Pfalz), and how large a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.