Germany · renewables
Wind power in Mainz-Bingen
62 wind turbines with 119.3 MW of gross capacity were in operation in Mainz-Bingen (Rheinland-Pfalz) as of 2026-11-05, with a further 41 units (260.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Mainz-Bingen (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 62 wind turbines with 119.3 MW of gross capacity were in operation in Mainz-Bingen (Rheinland-Pfalz) as of 2026-11-05, with a further 41 units (260.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Mainz-Bingen?
- 62 wind turbines with 119.3 MW of gross capacity were in operation in Mainz-Bingen as of 2026-11-05, with a further 41 units (260.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Mainz-Bingen in 2023?
- 1 wind turbines with 0.01 MW went into operation in Mainz-Bingen in 2023; the strongest year of the last two decades was 2014 with 29.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Mainz-Bingen?
- SelzEnergie Planung und Bau GmbH & Co. KG operates 21 wind turbines with 126.0 MW in Mainz-Bingen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Mainz-Bingen?
- ENERCON GmbH leads with 73 wind turbines and 223.7 MW in Mainz-Bingen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Mainz-Bingen?
- The largest registered wind turbine in Mainz-Bingen has 7.00 MW of gross capacity and is operated by PIONEXT 3 GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Mainz-Bingen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 2 | 0 |
| over 100 kW | 101 | 379.9 MW | 60 | 41 |
How much wind power capacity was commissioned in Mainz-Bingen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2023 | 1 | 0.01 MW |
| 2022 | 1 | 2.35 MW |
| 2017 | 3 | 7.70 MW |
| 2016 | 5 | 12.3 MW |
| 2015 | 3 | 2.40 MW |
| 2014 | 11 | 29.5 MW |
| 2013 | 5 | 14.6 MW |
| 2012 | 8 | 19.1 MW |
| 2011 | 4 | 9.20 MW |
| 2010 | 7 | 8.00 MW |
| 2007 | 1 | 0.80 MW |
| 2006 | 3 | 2.40 MW |
How many wind turbines in Mainz-Bingen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 41 | 260.6 MW |
| in operation | 62 | 119.3 MW |
Which wind turbines are registered in Mainz-Bingen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 02 Alsheimer Chaussee | 7.00 MW | Nordex SE | planned | planned 2026 | PIONEXT 3 GmbH & Co. KG |
| WEA DOL 9 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| WEA DOL 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| GUL 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| WEA DOL 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| GUL 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| WEA DOL 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| GUL 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| WEA DOL 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| GUL 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| WEA DOL 8 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| WEA DOL 7 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| GUL 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| GUL 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| GUL 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| GUL 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Guntersblum-Uelversheim GmbH & Co. KG |
| WEA DOL 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| WEA DOL 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Dolgesheim GmbH & Co. KG |
| MS 03 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WEA4 | 6.00 MW | – | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WS 05 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MS 04 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MS 06 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 06 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 07 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WEA3 | 6.00 MW | – | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WS 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WEA1 | 6.00 MW | – | planned | planned 2028 | Windpark Dienheim GmbH & Co. KG |
| WS 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MS 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 03 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MS 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WS 04 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 09 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WEA2 | 6.00 MW | – | planned | planned 2028 | Windpark Dienheim GmbH & Co. KG |
| MN 04 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| WS 03 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 08 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| MN 05 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SelzEnergie Planung und Bau GmbH & Co. KG |
| E-1010693 | 3.05 MW | ENERCON GmbH | in operation | 2014-09-23 | Szielasko/Wahl Energie Nieder-Olm eGbR |
| EMH02-1010694 | 3.05 MW | ENERCON GmbH | in operation | 2014-09-26 | WS Energie GmbH & Co. KG |
| K11 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-30 | Gemeinschaftswindpark Kandrich GmbH & Co. KG |
| 1010377 | 3.05 MW | ENERCON GmbH | in operation | 2013-11-21 | Windpark Eimsheim-Wintersheim GmbH & Co. KG |
| WP Ludwigshöhe WEA 03 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-17 | Green Energy Volker und Christel Noller GbR |
| WP Ludwigshöhe WEA 04 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-14 | MH Wind Ludwigshöhe GmbH & Co. KG |
| 1010376 | 3.05 MW | ENERCON GmbH | in operation | 2013-10-16 | Windpark Eimsheim-Wintersheim GmbH & Co. KG |
| Windrad Badenheim | 3.05 MW | ENERCON GmbH | in operation | 2016-06-29 | Zero Emission People Windpark Badenheim GmbH & Co. KG |
| Waldalgesheim 1010129 | 3.05 MW | ENERCON GmbH | in operation | 2012-10-26 | Windpark Rheinhessen I GmbH & Co. KG |
| K09 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-30 | Gemeinschaftswindpark Kandrich GmbH & Co. KG |
| WP Ludwigshöhe WEA 05 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-25 | Stahl Windenergie WEA 155 GmbH & Co. KG |
| 1010378 | 3.05 MW | ENERCON GmbH | in operation | 2013-11-29 | Windpark Eimsheim-Wintersheim GmbH & Co. KG |
| K12 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-07 | Gemeinschaftswindpark Kandrich GmbH & Co. KG |
| 1010375 | 3.05 MW | ENERCON GmbH | in operation | 2013-09-29 | Windpark Eimsheim-Wintersheim GmbH & Co. KG |
| E-1150640 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-28 | Windpark Klein-Winternheim II |
| Waldalgesheim 07 | 2.53 MW | GE Wind Energy GmbH | in operation | 2014-11-21 | Trianel Windpark Zellertal GmbH & Co. KG |
| Waldalgesheim 08 | 2.53 MW | GE Wind Energy GmbH | in operation | 2014-11-14 | Trianel Windpark Zellertal GmbH & Co. KG |
| G03 | 2.35 MW | ENERCON GmbH | in operation | 2017-03-24 | GEDEA- Ingelheim GmbH & Co. Bürger- Windpark Waldalgesheim KG |
| KWH01 | 2.35 MW | ENERCON GmbH | in operation | 2022-04-01 | Energiepark Klein-Winternheim eGbR |
| Aufwind WEA Wintersheim | 2.35 MW | ENERCON GmbH | in operation | 2013-12-23 | Aufwind Ges. f. Windkraft mbH & Co KG. WEA Wintersheim |
| G01 | 2.35 MW | ENERCON GmbH | in operation | 2016-12-29 | GEDEA- Ingelheim GmbH & Co. Bürger- Windpark Waldalgesheim KG |
| G02 | 2.35 MW | ENERCON GmbH | in operation | 2017-03-31 | GEDEA- Ingelheim GmbH & Co. Bürger- Windpark Waldalgesheim KG |
| 824598 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-09 | EWR Neue Energien GmbH |
| 824604 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-14 | EWR Neue Energien GmbH |
| Waldalgesheim 822382 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-18 | Windpark Rheinhessen I GmbH & Co. KG |
| Waldalgesheim 822381 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-27 | Windpark Rheinhessen I GmbH & Co. KG |
| Waldalgesheim 822384 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-18 | Windpark Rheinhessen I GmbH & Co. KG |
| Waldalgesheim 822383 | 2.30 MW | ENERCON GmbH | in operation | 2011-05-26 | Windpark Rheinhessen I GmbH & Co. KG |
| WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-08 | InvestInvent 14. Windpark GmbH &Co.KG |
| WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-13 | InvestInvent 14. Windpark GmbH &Co.KG |
| 824600 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-08 | EWR Neue Energien GmbH |
| 824599 | 2.30 MW | ENERCON GmbH | in operation | 2012-10-26 | EWR Neue Energien GmbH |
| 824601 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-16 | EWR Neue Energien GmbH |
| WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-21 | InvestInvent 14. Windpark GmbH &Co.KG |
| 824603 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-13 | EWR Neue Energien GmbH |
| 824602 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-02 | EWR Neue Energien GmbH |
| Klein-Winternheim 821991 | 2.00 MW | ENERCON GmbH | in operation | 2010-01-22 | Mainzer Erneuerbare Energien GmbH |
| Klein-Winternheim 821992 | 2.00 MW | ENERCON GmbH | in operation | 2010-03-11 | Mainzer Erneuerbare Energien GmbH |
| WEA Guntersblum 70718 | 1.80 MW | ENERCON GmbH | in operation | 2002-07-18 | QE EiDoHi Projekt GmbH |
| GE 15532273-02 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-12-28 | ENOVA Windpark Value-Portfolio I GmbH & Co. KG |
| GE 15532272-01 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-12-29 | ENOVA Windpark Value-Portfolio I GmbH & Co. KG |
| WEA Guntersblum 58109 | 1.00 MW | ENERCON GmbH | in operation | 2002-12-27 | QE EiDoHi Projekt GmbH |
| Aufwind WEA Selzer Berg 1 | 1.00 MW | Nordex Energy GmbH | in operation | 1998-12-29 | Aufwind Ges. f. Windkraft mbH & Co KG. WEA Selzer Berg 1 |
| WEA Guntersblum 58110 | 1.00 MW | ENERCON GmbH | in operation | 2002-12-20 | QE EiDoHi Projekt GmbH |
| WEA Guntersblum 58107 | 1.00 MW | ENERCON GmbH | in operation | 2002-12-31 | QE EiDoHi Projekt GmbH |
| WEA Guntersblum 58108 | 1.00 MW | ENERCON GmbH | in operation | 2002-12-24 | QE EiDoHi Projekt GmbH |
| 531686 | 0.80 MW | ENERCON GmbH | in operation | 2015-12-30 | Windpark GmbH & Co. Gensingen KG |
| WKA Königsstuhl | 0.80 MW | ENERCON GmbH | in operation | 2010-10-15 | THH GbR erneuerbare Energien |
| Windpark Köngernheim 53988 | 0.80 MW | ENERCON GmbH | in operation | 2010-08-04 | Windpark Köngernheim UG & Co KG |
| 531684 | 0.80 MW | ENERCON GmbH | in operation | 2015-12-24 | Windpark GmbH & Co. Gensingen KG |
| WP Königsstuhl WEA 02 | 0.80 MW | ENERCON GmbH | in operation | 2010-10-19 | Stahl und Söhne eGbR |
| E48784-01 | 0.80 MW | ENERCON GmbH | in operation | 2006-09-19 | Roes Forst GmbH & Co. KG |
| Selzen II oberhalb | 0.80 MW | ENERCON GmbH | in operation | 2006-09-29 | Sabine Graalfs und Christine Gelhausen GbR |
| E-53450 | 0.80 MW | ENERCON GmbH | in operation | 2007-07-23 | Szielasko/Wahl Energie Nieder-Olm eGbR |
| Selzen I Mitte | 0.80 MW | ENERCON GmbH | in operation | 2006-09-27 | Sabine Graalfs und Christine Gelhausen GbR |
| WP Königsstuhl WEA 01 | 0.80 MW | ENERCON GmbH | in operation | 2010-10-17 | GbR WEA 111 Königstuhl |
| Windpark Köngernheim 53989 | 0.80 MW | ENERCON GmbH | in operation | 2010-07-21 | Windpark Köngernheim UG & Co KG |
| 531685 | 0.80 MW | ENERCON GmbH | in operation | 2015-12-24 | Windpark GmbH & Co. Gensingen KG |
| Aufwind WEA Selzer Berg 2 | 0.60 MW | Nordex Energy GmbH | in operation | 2000-07-27 | Aufwind Ges. f. Windkraft mbH & Co KG. WEA Selzer Berg 2 |
| WEA Nieder-Olm 44308 | 0.60 MW | ENERCON GmbH | in operation | 2000-07-25 | Keilhofer Energieerzeugung GmbH |
| Windbaum 10,8 KW/peak | 0.01 MW | Sonstige | in operation | 2023-06-29 | Roland Simmet und Janka Heller GbR |
| Windkraftanlage | 0.00 MW | Sonstige | in operation | 2014-10-30 | Rheinhessische Energie- und Wasserversorgungs-GmbH |
Which organisations operate the most wind power capacity in Mainz-Bingen?
| Operator | Units | Capacity |
|---|---|---|
| SelzEnergie Planung und Bau GmbH & Co. KG | 21 | 126.0 MW |
| Windpark Dolgesheim GmbH & Co. KG | 9 | 61.2 MW |
| Windpark Guntersblum-Uelversheim GmbH & Co. KG | 8 | 54.4 MW |
| EWR Neue Energien GmbH | 7 | 16.1 MW |
| Windpark Rheinhessen I GmbH & Co. KG | 5 | 12.2 MW |
| Windpark Eimsheim-Wintersheim GmbH & Co. KG | 4 | 12.2 MW |
| Windpark Dienheim GmbH & Co. KG | 2 | 12.0 MW |
| Gemeinschaftswindpark Kandrich GmbH & Co. KG | 3 | 9.15 MW |
| GEDEA- Ingelheim GmbH & Co. Bürger- Windpark Waldalgesheim KG | 3 | 7.05 MW |
| PIONEXT 3 GmbH & Co. KG | 1 | 7.00 MW |
Which manufacturer accounts for the most wind power capacity in Mainz-Bingen?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 73 | 223.7 MW |
| Nordex Germany GmbH | 16 | 108.8 MW |
| Nordex Energy GmbH | 3 | 8.40 MW |
| GE Wind Energy GmbH | 4 | 8.06 MW |
| Nordex SE | 1 | 7.00 MW |
| Sonstige | 2 | 0.01 MW |
Wind power in Rheinland-Pfalz · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Mainz-Bingen (Rheinland-Pfalz), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.