Germany · renewables
Wind power in Germersheim
29 wind turbines with 86.8 MW of gross capacity were in operation in Germersheim (Rheinland-Pfalz) as of 2026-11-05, with a further 2 units (11.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Germersheim (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 29 wind turbines with 86.8 MW of gross capacity were in operation in Germersheim (Rheinland-Pfalz) as of 2026-11-05, with a further 2 units (11.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Germersheim?
- 29 wind turbines with 86.8 MW of gross capacity were in operation in Germersheim as of 2026-11-05, with a further 2 units (11.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Germersheim in 2025?
- 1 wind turbines with 5.60 MW went into operation in Germersheim in 2025; the strongest year of the last two decades was 2017 with 28.2 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Germersheim?
- EnBW WindInvest GmbH & Co. KG operates 6 wind turbines with 19.8 MW in Germersheim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Germersheim?
- Vestas Deutschland GmbH leads with 11 wind turbines and 46.2 MW in Germersheim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Germersheim?
- The largest registered wind turbine in Germersheim has 6.20 MW of gross capacity and is operated by JUWI GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Germersheim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| over 100 kW | 35 | 104.6 MW | 29 | 2 |
How much wind power capacity was commissioned in Germersheim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 12.0 MW |
| 2025 | 1 | 5.60 MW |
| 2019 | 4 | 13.8 MW |
| 2018 | 4 | 13.2 MW |
| 2017 | 9 | 28.2 MW |
| 2009 | 1 | 2.00 MW |
| 2006 | 3 | 4.50 MW |
How many wind turbines in Germersheim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 29 | 86.8 MW |
| planned | 2 | 11.8 MW |
| permanently decommissioned | 4 | 6.00 MW |
Which wind turbines are registered in Germersheim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA Schwegenheim 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| Minfeld R - WEA 01 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-10 | MVV Windenergie GmbH |
| Minfeld R - WEA 02 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-10 | MVV Windenergie GmbH |
| Windpark Gollenberg II WEA 03 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-05-22 | Windpark Gollenberg II GmbH & Co. KG |
| HZE1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SW Windenergie Hatzenbühl GmbH & Co. KG |
| Schwegenheim 2 WEA 03 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-06-27 | LHI GII2 WP Schwegenheim 2411 GmbH & Co. KG |
| Schwegenheim 2 WEA 04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-06-24 | LHI GII2 WP Schwegenheim 2411 GmbH & Co. KG |
| Schwegenheim 2 WEA 01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-06-27 | LHI GII2 WP Schwegenheim 2411 GmbH & Co. KG |
| Schwegenheim 2 WEA 02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-07-02 | LHI GII2 WP Schwegenheim 2411 GmbH & Co. KG |
| Freckenfeld WEA 6 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-21 | EnBW WindInvest GmbH & Co. KG |
| Freckenfeld WEA 2 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-15 | EnBW WindInvest GmbH & Co. KG |
| Freckenfeld WEA 1 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-02-13 | EnBW WindInvest GmbH & Co. KG |
| WP Gollenberg WEA 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-01-19 | CEE Windpark Gollenberg GmbH & Co. KG |
| Freckenfeld WEA 5 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-08 | EnBW WindInvest GmbH & Co. KG |
| WP Gollenberg WEA 4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-01-24 | CEE Windpark Gollenberg GmbH & Co. KG |
| Freckenfeld WEA 3 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-28 | EnBW WindInvest GmbH & Co. KG |
| Freckenfeld WEA 4 | 3.30 MW | Nordex Energy GmbH | in operation | 2018-03-22 | EnBW WindInvest GmbH & Co. KG |
| E1150590 - HZ1 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | SW Windkraft Speyer Hatzenbühl GmbH & Co. KG |
| E1150594 - HZ5 | 3.00 MW | ENERCON GmbH | in operation | 2017-01-26 | SW Windkraft Speyer Hatzenbühl GmbH & Co. KG |
| E1150592 - HZ3 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-30 | SW Windkraft Speyer Hatzenbühl GmbH & Co. KG |
| E1150593 - HZ4 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-17 | SW Windkraft Speyer Hatzenbühl GmbH & Co. KG |
| E1150591 - HZ2 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-27 | SW Windkraft Speyer Hatzenbühl GmbH & Co. KG |
| Windpark Minfeld Anlage 5 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-12 | pfalzwind GmbH |
| FL 344-03 | 1.50 MW | Fuhrländer AG | in operation | 2006-01-31 | Statkraft Windenergie GmbH & Co. KG |
| Windpark Herxheimweyher Rülzheim Anlage 5 | 1.50 MW | Fuhrländer AG | in operation | 2005-10-12 | pfalzwind GmbH |
| Windpark Herxheimweyher Rülzheim Anlage 6 | 1.50 MW | Fuhrländer AG | in operation | 2006-02-17 | pfalzwind GmbH |
| Windpark Bellheim Anlage 3 | 1.50 MW | GE Renewable Germany GmbH | in operation | 2004-01-14 | pfalzwind GmbH |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2004-09-22 | private individual |
| Windpark Bellheim Anlage 1 | 1.50 MW | GE Renewable Germany GmbH | in operation | 2003-12-17 | pfalzwind GmbH |
| FL 342-01 | 1.50 MW | Fuhrländer AG | in operation | 2006-01-17 | Statkraft Windenergie GmbH & Co. KG |
| FL 343-02 | 1.50 MW | Fuhrländer AG | in operation | 2005-12-23 | Statkraft Windenergie GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2004-09-14 | private individual |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2004-09-22 | private individual |
| Windpark Bellheim Anlage 2 | 1.50 MW | GE Renewable Germany GmbH | in operation | 2003-12-21 | pfalzwind GmbH |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | permanently decommissioned | 2004-09-15 | private individual |
Which organisations operate the most wind power capacity in Germersheim?
| Operator | Units | Capacity |
|---|---|---|
| EnBW WindInvest GmbH & Co. KG | 6 | 19.8 MW |
| SW Windkraft Speyer Hatzenbühl GmbH & Co. KG | 5 | 15.0 MW |
| LHI GII2 WP Schwegenheim 2411 GmbH & Co. KG | 4 | 13.8 MW |
| MVV Windenergie GmbH | 2 | 12.0 MW |
| pfalzwind GmbH | 6 | 9.50 MW |
| CEE Windpark Gollenberg GmbH & Co. KG | 2 | 6.60 MW |
| JUWI GmbH | 1 | 6.20 MW |
| Windpark Gollenberg II GmbH & Co. KG | 1 | 5.60 MW |
| SW Windenergie Hatzenbühl GmbH & Co. KG | 1 | 5.56 MW |
| Statkraft Windenergie GmbH & Co. KG | 3 | 4.50 MW |
Which manufacturer accounts for the most wind power capacity in Germersheim?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 11 | 46.2 MW |
| ENERCON GmbH | 6 | 20.6 MW |
| Nordex Energy GmbH | 6 | 19.8 MW |
| GE Renewable Germany GmbH | 7 | 10.5 MW |
| Fuhrländer AG | 5 | 7.50 MW |
Wind power in Rheinland-Pfalz · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Germersheim (Rheinland-Pfalz), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.