Germany · renewables
Wind power in Cochem-Zell
89 wind turbines with 190.3 MW of gross capacity were in operation in Cochem-Zell (Rheinland-Pfalz) as of 2026-11-05, with a further 1 units (7.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Cochem-Zell (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 89 wind turbines with 190.3 MW of gross capacity were in operation in Cochem-Zell (Rheinland-Pfalz) as of 2026-11-05, with a further 1 units (7.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Cochem-Zell?
- 89 wind turbines with 190.3 MW of gross capacity were in operation in Cochem-Zell as of 2026-11-05, with a further 1 units (7.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Cochem-Zell in 2025?
- 3 wind turbines with 12.9 MW went into operation in Cochem-Zell in 2025; the strongest year of the last two decades was 2009 with 29.9 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Cochem-Zell?
- enercity Windpark Beuren GmbH operates 7 wind turbines with 24.1 MW in Cochem-Zell, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Cochem-Zell?
- Vestas Deutschland GmbH leads with 28 wind turbines and 84.5 MW in Cochem-Zell (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Cochem-Zell?
- The largest registered wind turbine in Cochem-Zell has 7.00 MW of gross capacity and is operated by wpd Windpark Zettingen GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Cochem-Zell distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| over 100 kW | 92 | 198.3 MW | 89 | 1 |
How much wind power capacity was commissioned in Cochem-Zell each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 4.20 MW |
| 2025 | 3 | 12.9 MW |
| 2024 | 7 | 24.1 MW |
| 2023 | 1 | 5.60 MW |
| 2022 | 1 | 4.20 MW |
| 2020 | 5 | 16.5 MW |
| 2017 | 1 | 2.40 MW |
| 2016 | 6 | 17.5 MW |
| 2015 | 1 | 2.30 MW |
| 2014 | 1 | 2.30 MW |
| 2013 | 3 | 3.60 MW |
| 2012 | 2 | 4.00 MW |
| 2011 | 5 | 10.0 MW |
| 2010 | 6 | 10.4 MW |
| 2009 | 16 | 29.9 MW |
| 2008 | 1 | 2.00 MW |
| 2006 | 14 | 21.6 MW |
How many wind turbines in Cochem-Zell are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 89 | 190.3 MW |
| planned | 1 | 7.00 MW |
| permanently decommissioned | 2 | 1.00 MW |
Which wind turbines are registered in Cochem-Zell?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | wpd Windpark Zettingen GmbH & Co. KG |
| ABO Wind WP Dünfus WEA 1 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-10-19 | Windpark Dünfus GmbH & Co. KG |
| WP Kail_WEA 1 | 4.50 MW | Nordex SE | in operation | 2025-09-30 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Kail WEA 02 | 4.50 MW | Nordex SE | in operation | 2025-09-30 | RWE Wind Onshore & PV Deutschland GmbH |
| Trianel Windpark Treis WEA 4 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2022-11-02 | Trianel Windpark Treis GmbH & Co. KG |
| Trianel Windpark Treis WEA 5 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2026-06-30 | TAP Windpark Treis II GmbH & Co. KG |
| WP Kail WEA 03 | 3.90 MW | Nordex SE | in operation | 2025-10-06 | RWE Wind Onshore & PV Deutschland GmbH |
| 248240 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-30 | enercity Windpark Beuren GmbH |
| 248242 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-29 | enercity Windpark Beuren GmbH |
| 248244 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-26 | enercity Windpark Beuren GmbH |
| 248239 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-26 | enercity Windpark Beuren GmbH |
| 248245 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-26 | enercity Windpark Beuren GmbH |
| 248241 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-29 | enercity Windpark Beuren GmbH |
| 248243 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-25 | enercity Windpark Beuren GmbH |
| Lieger Wald WEA 4 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2020-06-10 | InvestInvent 26. Windpark GmbH & Co. KG |
| Lieger Wald WEA 2 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2020-06-10 | InvestInvent 26. Windpark GmbH & Co. KG |
| WEA03 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-29 | Windpark Kaifenheim GmbH & Co. KG |
| Lieger Wald WEA 1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2020-06-10 | InvestInvent 26. Windpark GmbH & Co. KG |
| Lieger Wald WEA 5 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2020-05-22 | InvestInvent 26. Windpark GmbH & Co. KG |
| WEA02 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-17 | Windpark Kaifenheim GmbH & Co. KG |
| Lieger Wald WEA 3 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2020-06-10 | InvestInvent 26. Windpark GmbH & Co. KG |
| WEA01 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2016-03-14 | Windpark Kaifenheim GmbH & Co. KG |
| WEA03_28161273 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-11-04 | GGEW WP Kalenborn GmbH & Co. KG |
| WEA02_28161274 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-11-16 | GGEW WP Kalenborn GmbH & Co. KG |
| WEA01_28161275 | 2.53 MW | GE Wind Energy GmbH | in operation | 2016-11-22 | GGEW WP Kalenborn GmbH & Co. KG |
| Zettingen - WEA03 | 2.50 MW | Nordex Energy GmbH | in operation | 2009-12-17 | Ingka Deutschland Windfarms GmbH |
| Zettingen - WEA04 | 2.50 MW | Nordex Energy GmbH | in operation | 2009-12-15 | Ingka Deutschland Windfarms GmbH |
| Zettingen - WEA02 | 2.50 MW | Nordex Energy GmbH | in operation | 2009-12-08 | Ingka Deutschland Windfarms GmbH |
| Zettingen - WEA07 | 2.50 MW | Nordex Energy GmbH | in operation | 2010-06-25 | Ingka Deutschland Windfarms GmbH |
| Zettingen - WEA06 | 2.50 MW | Nordex Energy GmbH | in operation | 2009-12-14 | Ingka Deutschland Windfarms GmbH |
| Zettingen - WEA01 | 2.50 MW | Nordex Energy GmbH | in operation | 2009-12-17 | Ingka Deutschland Windfarms GmbH |
| Anlage 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-04-22 | InvestInvent 25.Windpark GmbH & Co.KG |
| NX 8326-01 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-10-08 | Windpark Gamlen ApS & Co. KG |
| Windkraftanlage Illerich E70 | 2.30 MW | ENERCON GmbH | in operation | 2010-12-15 | BBG Illerich Windkraftanlagen GmbH & Co.KG |
| Windrad Gamlen | 2.30 MW | ENERCON GmbH | in operation | 2015-07-27 | Windrad Gamlen UG & Co. KG |
| WKA Illerich | 2.30 MW | ENERCON GmbH | in operation | 2014-08-15 | Leskan Power GmbH & Co. KG |
| NX 8327-02 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-10-07 | Windpark Gamlen ApS & Co. KG |
| WS02 GA7791 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2006-05-19 | MVV Windenergie GmbH |
| WS01 GA7793 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2006-05-16 | MVV Windenergie GmbH |
| Illerich 822362 | 2.00 MW | ENERCON GmbH | in operation | 2010-07-15 | Windfarm Rothenkopf GmbH & Co. KG |
| WEA 821518 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-19 | BKW Energie Deutschland GmbH |
| WS03-GA-7792 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2006-05-23 | MVV Windenergie GmbH |
| WEA 821516 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-12 | BKW Energie Deutschland GmbH |
| 1 V(29770) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-07-23 | Norddeutsche Energie WP Roes GmbH & Co. KG |
| WS05 GA8996 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2006-12-29 | MVV Windenergie GmbH |
| Walhausen W174 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-14 | wi Wind & Solar 10 GmbH & Co KG |
| WEA 821517 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-17 | BKW Energie Deutschland GmbH |
| Illerich G2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-07-24 | Dritte ENP Windpark GmbH & Co. KG |
| Illerich G3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-07-19 | Dritte ENP Windpark GmbH & Co. KG |
| Gamlen 44517 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-27 | Windpark Alzheim GmbH & Co. KG |
| WEA 825521 | 2.00 MW | ENERCON GmbH | in operation | 2013-10-14 | Höhen-Wind 5 Düngenheim GmbH & Co. KG |
| DUE01_24964 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-19 | WP Düngenheim GmbH & Co. KG |
| DUE02_24963 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-01-22 | WP Düngenheim GmbH & Co. KG |
| Illerich 822361 | 2.00 MW | ENERCON GmbH | in operation | 2010-08-11 | Windfarm Rothenkopf GmbH & Co. KG |
| Walhausen W173 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-22 | Sonnenwind GbR |
| WEA 821515 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-12 | BKW Energie Deutschland GmbH |
| Gamlen 42959 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-06-21 | Windpark Alzheim GmbH & Co. KG |
| V37232 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-01-05 | ENP Sechsundzwanzigste Windpark GmbH & Co. KG |
| WS04-GA-7790 | 2.00 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2006-05-25 | MVV Windenergie GmbH |
| Gamlen 44516 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-12-21 | Windpark Alzheim GmbH & Co. KG |
| V37231 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2011-01-07 | ENP Sechsundzwanzigste Windpark GmbH & Co. KG |
| W172 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-27 | juwi Beteiligungs GmbH & Co. Walhausen I KG |
| WEA Illerich 01 (694) | 1.50 MW | Fuhrländer AG | in operation | 2009-04-07 | Windfarm Idesheim GmbH & Co. KG |
| Windpark Haserich Anlage 2 | 1.50 MW | Fuhrländer AG | in operation | 2006-12-19 | pfalzwind GmbH |
| DUE-3(15541477) | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-11 | DW Wind GmbH & Co. KG |
| DUE-4(15541476) | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-11 | DW Wind GmbH & Co. KG |
| DUE-2(15541478) | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-10 | DW Wind GmbH & Co. KG |
| WEA Illerich 02 (695) | 1.50 MW | Fuhrländer AG | in operation | 2009-04-14 | Windfarm Idesheim GmbH & Co. KG |
| Windpark Haserich Anlage 1 | 1.50 MW | Fuhrländer AG | in operation | 2006-12-21 | pfalzwind GmbH |
| DUE-1(15541479) | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-15 | DW Wind GmbH & Co. KG |
| Windpark Peterswald-Löffelscheid 2 Anlage 2 | 0.80 MW | ENERCON GmbH | in operation | 2009-08-06 | pfalzwind GmbH |
| Windpark Peterswald-Löffelscheid 2 Anlage 3 | 0.80 MW | ENERCON GmbH | in operation | 2009-08-19 | pfalzwind GmbH |
| Windpark Peterswald-Löffelscheid Anlage 3 | 0.80 MW | ENERCON GmbH | in operation | 2006-12-22 | pfalzwind GmbH |
| E 53 | 0.80 MW | ENERCON GmbH | in operation | 2013-05-17 | BRE Bost Regenerative Energien GmbH & Co.KG |
| Windpark Peterswald-Löffelscheid Anlage 2 | 0.80 MW | ENERCON GmbH | in operation | 2006-09-15 | pfalzwind GmbH |
| Windpark Peterswald-Löffelscheid Anlage 1 | 0.80 MW | ENERCON GmbH | in operation | 2006-12-19 | pfalzwind GmbH |
| WEA Eulgem | 0.80 MW | ENERCON GmbH | in operation | 2010-06-07 | Hofmann Energie GmbH&Co.KG |
| Windpark Peterswald-Löffelscheid 2 Anlage 1 | 0.80 MW | ENERCON GmbH | in operation | 2009-08-04 | pfalzwind GmbH |
| WKA-Hambuch | 0.80 MW | ENERCON GmbH | in operation | 2010-06-08 | Werner Tempelmann Verwaltungs GmbH & Co. KG, p.A. Werner Tempelmann |
| Windpark Peterswald-Löffelscheid Anlage 5 | 0.80 MW | ENERCON GmbH | in operation | 2006-09-22 | pfalzwind GmbH |
| WEA 531503 | 0.80 MW | ENERCON GmbH | in operation | 2013-10-04 | Höhen-Wind 5 Düngenheim GmbH & Co. KG |
| Windpark Peterswald-Löffelscheid Anlage 4 | 0.80 MW | ENERCON GmbH | in operation | 2006-09-20 | pfalzwind GmbH |
| Düngenheim 1 | 0.60 MW | ENERCON GmbH | in operation | 2001-09-27 | GMA-Energy Hohenlohe GmbH Marius Mulawka |
| WEA2 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-20 | CPC Germania GmbH & Co. KG |
| WEA1 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-20 | CPC Germania GmbH & Co. KG |
| WEA4 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-20 | CPC Germania GmbH & Co. KG |
| Düngenheim 3 | 0.60 MW | ENERCON GmbH | in operation | 2001-10-08 | GMA-Energy Hohenlohe GmbH Marius Mulawka |
| Düngenheim 4 | 0.60 MW | ENERCON GmbH | in operation | 2001-10-09 | GMA-Energy Hohenlohe GmbH Marius Mulawka |
| Düngenheim 2 | 0.60 MW | ENERCON GmbH | in operation | 2001-10-04 | GMA-Energy Hohenlohe GmbH Marius Mulawka |
| WEA3 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-20 | CPC Germania GmbH & Co. KG |
| WKA 1 | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1997-06-19 | NES-Wind GmbH |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1997-06-19 | private individual |
Which organisations operate the most wind power capacity in Cochem-Zell?
| Operator | Units | Capacity |
|---|---|---|
| enercity Windpark Beuren GmbH | 7 | 24.1 MW |
| InvestInvent 26. Windpark GmbH & Co. KG | 5 | 16.5 MW |
| Ingka Deutschland Windfarms GmbH | 6 | 15.0 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 3 | 12.9 MW |
| MVV Windenergie GmbH | 5 | 10.0 MW |
| Windpark Kaifenheim GmbH & Co. KG | 3 | 9.90 MW |
| pfalzwind GmbH | 10 | 9.40 MW |
| BKW Energie Deutschland GmbH | 4 | 8.00 MW |
| GGEW WP Kalenborn GmbH & Co. KG | 3 | 7.59 MW |
| wpd Windpark Zettingen GmbH & Co. KG | 1 | 7.00 MW |
Which manufacturer accounts for the most wind power capacity in Cochem-Zell?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 28 | 84.5 MW |
| ENERCON GmbH | 31 | 39.9 MW |
| Nordex Energy GmbH | 9 | 22.0 MW |
| GE Wind Energy GmbH | 7 | 13.6 MW |
| Nordex SE | 3 | 12.9 MW |
| Gamesa Corporación Tecnológica S.A. | 5 | 10.0 MW |
| Nordex Germany GmbH | 1 | 7.00 MW |
| Fuhrländer AG | 4 | 6.00 MW |
| Tacke GmbH & Co. KG | 4 | 2.40 MW |
Wind power in Rheinland-Pfalz · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Cochem-Zell (Rheinland-Pfalz), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.