Germany · renewables
Wind power in Birkenfeld
76 wind turbines with 171.9 MW of gross capacity were in operation in Birkenfeld (Rheinland-Pfalz) as of 2026-11-05, with a further 19 units (85.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Birkenfeld (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
- 76 wind turbines with 171.9 MW of gross capacity were in operation in Birkenfeld (Rheinland-Pfalz) as of 2026-11-05, with a further 19 units (85.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Birkenfeld?
- 76 wind turbines with 171.9 MW of gross capacity were in operation in Birkenfeld as of 2026-11-05, with a further 19 units (85.3 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Birkenfeld in 2025?
- 1 wind turbines with 6.20 MW went into operation in Birkenfeld in 2025; the strongest year of the last two decades was 2014 with 49.9 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Birkenfeld?
- GERES Power III GmbH operates 7 wind turbines with 30.1 MW in Birkenfeld, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Birkenfeld?
- ENERCON GmbH leads with 45 wind turbines and 131.9 MW in Birkenfeld (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Birkenfeld?
- The largest registered wind turbine in Birkenfeld has 7.00 MW of gross capacity and is operated by Windpark Sien II GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Birkenfeld distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 4 | 0.02 MW | 4 | 0 |
| over 100 kW | 91 | 257.1 MW | 72 | 19 |
How much wind power capacity was commissioned in Birkenfeld each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 1 | 6.20 MW |
| 2024 | 2 | 12.4 MW |
| 2019 | 2 | 5.95 MW |
| 2018 | 1 | 3.60 MW |
| 2017 | 5 | 11.8 MW |
| 2016 | 4 | 12.8 MW |
| 2014 | 19 | 49.9 MW |
| 2013 | 8 | 19.2 MW |
| 2012 | 2 | 2.00 MW |
| 2010 | 1 | 2.50 MW |
| 2008 | 2 | 4.00 MW |
| 2006 | 8 | 16.0 MW |
How many wind turbines in Birkenfeld are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 76 | 171.9 MW |
| planned | 19 | 85.3 MW |
Which wind turbines are registered in Birkenfeld?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Sien II GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Sien II GmbH & Co. KG |
| WEA MB1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | GERES Power III GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Sien II GmbH & Co. KG |
| WEA1 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-11-07 | Windpark Reichenbach GmbH |
| WEA3 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-03-13 | Windpark Reichenbach GmbH |
| WEA2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-11-26 | Windpark Reichenbach GmbH |
| WEA FL 1 175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Axma Windenergie GmbH |
| WEA FL 2 160 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Axma Windenergie GmbH |
| WEA S-4 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | GERES Power III GmbH |
| WEA S-2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | GERES Power III GmbH |
| WEA S-3 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | GERES Power III GmbH |
| WEA S-1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | GERES Power III GmbH |
| VHS 02 | 3.60 MW | Senvion Deutschland GmbH | planned | planned 2027 | GAIA mbH |
| VHS 01 | 3.60 MW | Senvion Deutschland GmbH | planned | planned 2027 | GAIA mbH |
| VHS 05 | 3.60 MW | Senvion Deutschland GmbH | planned | planned 2027 | GAIA mbH |
| VHS 04 | 3.60 MW | Senvion Deutschland GmbH | planned | planned 2027 | GAIA mbH |
| VHS 03 | 3.60 MW | Senvion Deutschland GmbH | planned | planned 2027 | GAIA mbH |
| WEA05 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2018-12-31 | Windpark Sien GmbH & Co. KG |
| WEA04 | 3.60 MW | Vestas Deutschland GmbH | in operation | 2019-02-02 | Windpark Sien GmbH & Co. KG |
| Windpark Niederhambach WEA02 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-06-10 | Mainova Windpark Niederhambach GmbH & Co. KG |
| Windpark Niederhambach WEA04 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-07-01 | Mainova Windpark Niederhambach GmbH & Co. KG |
| Windpark Niederhambach WEA05 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-06-12 | Mainova Windpark Niederhambach GmbH & Co. KG |
| Windpark Niederhambach WEA01 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-05-06 | Mainova Windpark Niederhambach GmbH & Co. KG |
| Windpark Niederhambach WEA03 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2013-05-27 | Mainova Windpark Niederhambach GmbH & Co. KG |
| S 301076-04 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-08-29 | Windpark Fohren-Linden GmbH & Co. KG |
| S 301077-06 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-09-01 | Windpark Fohren-Linden GmbH & Co. KG |
| S 301075-07 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-09-03 | Windpark Fohren-Linden GmbH & Co. KG |
| S 301074-05 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-08-29 | Windpark Fohren-Linden GmbH & Co. KG |
| Windpark Dickesbach I GmbH & Co.KG | 3.05 MW | ENERCON GmbH | in operation | 2014-08-22 | Windpark Dickesbach I GmbH & Co.KG |
| 1010752 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-31 | GERES Power II GmbH |
| WEA Si 4 | 3.05 MW | ENERCON GmbH | planned | planned 2026 | GERES Power III GmbH |
| 1010620 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-15 | GERES Meckenbach GmbH & Co. KG |
| 1010619 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-24 | GERES Meckenbach GmbH & Co. KG |
| WEA Si 1 | 3.05 MW | ENERCON GmbH | planned | planned 2026 | GERES Power III GmbH |
| 1010750 | 3.05 MW | ENERCON GmbH | in operation | 2014-11-26 | GERES Power II GmbH |
| 1010749 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-10 | GERES Power II GmbH |
| Windpark Dickesbach II | 3.05 MW | ENERCON GmbH | in operation | 2014-08-11 | Windpark Dickesbach II GmbH & Co. KG |
| unit operated by a private individual | 3.05 MW | ENERCON GmbH | in operation | 2014-08-22 | private individual |
| 1010751 | 3.05 MW | ENERCON GmbH | in operation | 2014-12-07 | GERES Power II GmbH |
| 1010618 | 3.05 MW | ENERCON GmbH | in operation | 2014-07-25 | GERES Meckenbach GmbH & Co. KG |
| VE-01-205928 | 3.00 MW | Vestas Deutschland GmbH | in operation | 2014-12-29 | InvestInvent 24. Windpark GmbH & Co. KG |
| WEA | 2.50 MW | Nordex SE | in operation | 2010-06-15 | Windpark Berschweiler GmbH & Co. KG |
| Dienstweiler WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-06 | EnBW WindInvest GmbH & Co. KG |
| Dienstweiler WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-11 | EnBW WindInvest GmbH & Co. KG |
| 920339 | 2.35 MW | ENERCON GmbH | in operation | 2014-08-04 | GERES Meckenbach GmbH & Co. KG |
| E921296 - WEI2 | 2.35 MW | ENERCON GmbH | in operation | 2017-09-30 | Windkraft Ehrenhübel GmbH |
| 921323 | 2.35 MW | ENERCON GmbH | in operation | 2017-12-01 | GERES Power II GmbH |
| E921297 - WEI3 | 2.35 MW | ENERCON GmbH | in operation | 2019-02-07 | Windkraft Ehrenhübel GmbH |
| 920333 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-16 | GERES Birkenfeld GmbH & Co. KG |
| 920335 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-19 | GERES Birkenfeld GmbH & Co. KG |
| 920338 | 2.35 MW | ENERCON GmbH | in operation | 2014-09-11 | GERES Meckenbach GmbH & Co. KG |
| 920334 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-17 | GERES Birkenfeld GmbH & Co. KG |
| NX 8393-03 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-12-14 | Statkraft Windenergie GmbH & Co. KG |
| 825715 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-27 | GERES Gimbweiler GmbH & Co. KG |
| OB1 | 2.30 MW | ENERCON GmbH | planned | planned 2028 | WEAG Future Energies AG |
| 826822 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-25 | GERES WIND GmbH & Co. KG |
| NX 8391-01 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-12-15 | Statkraft Windenergie GmbH & Co. KG |
| NX 8395-05 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-12-12 | Statkraft Windenergie GmbH & Co. KG |
| E826039 - WEI1C | 2.30 MW | ENERCON GmbH | in operation | 2014-07-30 | WEAG Windkraft Zeilstein GmbH & Co. KG |
| NX 8394-04 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-12-13 | Statkraft Windenergie GmbH & Co. KG |
| OB4 | 2.30 MW | ENERCON GmbH | planned | planned 2028 | WEAG Future Energies AG |
| NX 8392-02 | 2.30 MW | Nordex Energy GmbH | in operation | 2006-12-20 | Statkraft Windenergie GmbH & Co. KG |
| 825716 | 2.30 MW | ENERCON GmbH | in operation | 2014-02-06 | GERES Gimbweiler GmbH & Co. KG |
| 19313 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-11-12 | Dienstweiler I/S |
| 19312 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-10-20 | Dienstweiler I/S |
| 19311 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-11-16 | Dienstweiler I/S |
| V 29647-02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-04-09 | SWM 50 MW Windpark Portfolio GmbH & Co. KG |
| V 29646-01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-04-11 | SWM 50 MW Windpark Portfolio GmbH & Co. KG |
| 19314 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-11-11 | Dienstweiler I/S |
| 6-R | 2.00 MW | Vestas Deutschland GmbH | in operation | 2012-03-08 | Windpark Saar GmbH & Co. Repower KG |
| GE15541261 - LW1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-06-27 | WEAG Windkraft Weiersbach GmbH & Co. KG |
| Windpark Dickesbach Anlage 2 | 1.50 MW | Fuhrländer AG | in operation | 2006-09-29 | pfalzwind GmbH |
| NX70367 - LWE1 | 1.50 MW | Nordex SE | in operation | 2006-03-31 | WEAG Power GmbH & Co. KG |
| 15 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-07-30 | Windpark Saar GmbH & Co. Repower KG |
| GE15541456 - LW2 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-02 | Windkraft Kirf Weiersbach GmbH & Co. KG |
| Mettweiler 3 | 1.50 MW | ENERCON GmbH | in operation | 2000-10-12 | Windkraftwerke Obere Nahe GmbH & Co. KG |
| Windpark Dickesbach Anlage 1 | 1.50 MW | Fuhrländer AG | in operation | 2006-09-29 | pfalzwind GmbH |
| Weiersbach 15541263 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-07-16 | Eco-Mobilität GmbH & Co. KG |
| Weiersbach 15541262 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-07-08 | Eco-Mobilität GmbH & Co. KG |
| 16 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-07-16 | Windpark Saar GmbH & Co. Repower KG |
| Hahnweiler 2 | 1.25 MW | DeWind GmbH | in operation | 2002-12-20 | Eupheme Wind GmbH & Co. KG |
| Hahnweiler 1 | 1.25 MW | DeWind GmbH | in operation | 2002-12-21 | Eupheme Wind GmbH & Co. KG |
| Mettweiler 4 | 1.00 MW | ENERCON GmbH | in operation | 2003-05-07 | Windkraftwerke Obere Nahe GmbH & Co. KG |
| Mettweiler 5 | 0.60 MW | ENERCON GmbH | in operation | 2003-05-06 | Windkraftwerke Obere Nahe GmbH & Co. KG |
| WWW Ho 1 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-19 | Windkraftwerke Obere Nahe GmbH & Co. KG Windstrom Waschbär Westrich |
| WWW Ho 3 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-19 | Windkraftwerke Obere Nahe GmbH & Co. KG Windstrom Waschbär Westrich |
| WKA Dambach | 0.50 MW | ENERCON GmbH | in operation | 1995-06-29 | Windkraftwerke Obere Nahe GmbH & Co. KG Dambach |
| WWW Ho 2 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-19 | Windkraftwerke Obere Nahe GmbH & Co. KG Windstrom Waschbär Westrich |
| WWW Me 1 | 0.50 MW | ENERCON GmbH | in operation | 1996-12-01 | Windkraftwerke Obere Nahe GmbH & Co. KG Windstrom Waschbär Westrich |
| E40795 - OB | 0.50 MW | ENERCON GmbH | in operation | 1996-12-20 | WEAG Future Energies AG |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2013-08-24 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2014-08-21 | private individual |
| Wind Hey Alex | 0.00 MW | BRAUN Windturbinen GmbH | in operation | 2012-12-03 | Landschaftspflege Hey GmbH & Co. KG |
| unit operated by a private individual | 0.00 MW | BRAUN Windturbinen GmbH | in operation | 2013-11-15 | private individual |
Which organisations operate the most wind power capacity in Birkenfeld?
| Operator | Units | Capacity |
|---|---|---|
| GERES Power III GmbH | 7 | 30.1 MW |
| Windpark Sien II GmbH & Co. KG | 3 | 21.0 MW |
| Windpark Reichenbach GmbH | 3 | 18.6 MW |
| GAIA mbH | 5 | 18.0 MW |
| Mainova Windpark Niederhambach GmbH & Co. KG | 5 | 16.9 MW |
| GERES Power II GmbH | 5 | 14.6 MW |
| GERES Meckenbach GmbH & Co. KG | 5 | 13.8 MW |
| Windpark Fohren-Linden GmbH & Co. KG | 4 | 12.8 MW |
| Axma Windenergie GmbH | 2 | 11.6 MW |
| Statkraft Windenergie GmbH & Co. KG | 5 | 11.5 MW |
Which manufacturer accounts for the most wind power capacity in Birkenfeld?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 45 | 131.9 MW |
| Senvion Deutschland GmbH | 14 | 47.6 MW |
| Vestas Deutschland GmbH | 13 | 42.8 MW |
| Nordex Energy GmbH | 7 | 16.3 MW |
| GE Wind Energy GmbH | 4 | 6.00 MW |
| Nordex SE | 2 | 4.00 MW |
| Fuhrländer AG | 2 | 3.00 MW |
| Südwind Borsig Energy GmbH | 2 | 3.00 MW |
| DeWind GmbH | 2 | 2.50 MW |
| BRAUN Windturbinen GmbH | 4 | 0.02 MW |
Wind power in Rheinland-Pfalz · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Birkenfeld (Rheinland-Pfalz), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.