14 wind turbines with 30.0 MW of gross capacity were in operation in Bad Dürkheim (Rheinland-Pfalz) as of 2026-11-05, with a further 19 units (130.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/rheinland-pfalz/bad-duerkheim

Questions this page answers

How many wind turbines are registered in Bad Dürkheim (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
14 wind turbines with 30.0 MW of gross capacity were in operation in Bad Dürkheim (Rheinland-Pfalz) as of 2026-11-05, with a further 19 units (130.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Bad Dürkheim?
14 wind turbines with 30.0 MW of gross capacity were in operation in Bad Dürkheim as of 2026-11-05, with a further 19 units (130.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Bad Dürkheim in 2017?
2 wind turbines with 5.56 MW went into operation in Bad Dürkheim in 2017; the strongest year of the last two decades was 2014 with 6.10 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Bad Dürkheim?
BayWa r.e. Energieprojekte GmbH operates 17 wind turbines with 115.6 MW in Bad Dürkheim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Bad Dürkheim?
Nordex Germany GmbH leads with 17 wind turbines and 115.6 MW in Bad Dürkheim (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Bad Dürkheim?
The largest registered wind turbine in Bad Dürkheim has 7.20 MW of gross capacity and is operated by Prokon Windpark Haßloch GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Bad Dürkheim distributed by size class?

Size classUnitsCapacityIn operationPlanned
over 100 kW33160.0 MW1419

How much wind power capacity was commissioned in Bad Dürkheim each year?

Commissioning yearUnitsCapacity added
201725.56 MW
201612.35 MW
201426.10 MW
201024.00 MW

How many wind turbines in Bad Dürkheim are in operation, planned or decommissioned?

StatusUnitsCapacity
planned19130.0 MW
in operation1430.0 MW

Which wind turbines are registered in Bad Dürkheim?

UnitCapacityManufacturerStatusCommissionedOperator
WEA 17.20 MWVestas Deutschland GmbHplannedplanned 2027Prokon Windpark Haßloch GmbH & Co. KG
WEA 27.20 MWVestas Deutschland GmbHplannedplanned 2028Prokon Windpark Haßloch GmbH & Co. KG
WEA 096.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 156.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 076.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 136.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 116.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 036.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 176.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 086.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 016.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 066.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 056.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 046.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 126.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 106.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 146.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 166.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
WEA 026.80 MWNordex Germany GmbHplannedplanned 2028BayWa r.e. Energieprojekte GmbH
10107113.05 MWENERCON GmbHin operation2014-09-12KIWI Kindenheimer Windkraftanlage II GmbH & Co. KG
10107103.05 MWENERCON GmbHin operation2014-07-28KIWI Kindenheimer Windkraftanlage I GmbH & Co. KG
Windpark Kindenheim Anlage 12.78 MWGE Wind Energy GmbHin operation2017-01-25Pfalzwerke Neue Energie Rhein-Haardt GmbH & Co. KG
Windpark Kindenheim Anlage 22.78 MWGE Wind Energy GmbHin operation2017-01-27Pfalzwerke Neue Energie Rhein-Haardt GmbH & Co. KG
DIR_E-922.35 MWENERCON GmbHin operation2016-11-11Raquet & Stiegele GbR
WEA 116 -E82-821536 Dirmstein2.00 MWENERCON GmbHin operation2010-12-30LMS Windpark Dirmstein GmbH & Co. KG
WP Stahlberg WEA 022.00 MWENERCON GmbHin operation2010-12-29WKA Stahlberg eGbR
EES Windkraft1.80 MWENERCON GmbHin operation2003-07-17PIONEXT Asset GmbH & Co. KG
Windkraft Kindenheim1.80 MWENERCON GmbHin operation2003-07-24PIONEXT Asset GmbH & Co. KG
Tiefenthal 01-703881.80 MWENERCON GmbHin operation2001-09-18Energiequelle GmbH
E-703891.80 MWENERCON GmbHin operation2001-09-21Szielasko/Wahl Energie Nieder-Olm eGbR
HMS Kindenheim1.80 MWENERCON GmbHin operation2003-07-30PIONEXT Asset GmbH & Co. KG
FL 341-021.50 MWFuhrländer AGin operation2005-12-12Statkraft Windenergie GmbH & Co. KG
FL 340-011.50 MWFuhrländer AGin operation2005-12-22Statkraft Windenergie GmbH & Co. KG

Which organisations operate the most wind power capacity in Bad Dürkheim?

OperatorUnitsCapacity
BayWa r.e. Energieprojekte GmbH17115.6 MW
Prokon Windpark Haßloch GmbH & Co. KG214.4 MW
Pfalzwerke Neue Energie Rhein-Haardt GmbH & Co. KG25.56 MW
PIONEXT Asset GmbH & Co. KG35.40 MW
KIWI Kindenheimer Windkraftanlage II GmbH & Co. KG13.05 MW
KIWI Kindenheimer Windkraftanlage I GmbH & Co. KG13.05 MW
Statkraft Windenergie GmbH & Co. KG23.00 MW
Raquet & Stiegele GbR12.35 MW
WKA Stahlberg eGbR12.00 MW
LMS Windpark Dirmstein GmbH & Co. KG12.00 MW

Which manufacturer accounts for the most wind power capacity in Bad Dürkheim?

ManufacturerUnitsCapacity
Nordex Germany GmbH17115.6 MW
ENERCON GmbH1021.4 MW
Vestas Deutschland GmbH214.4 MW
GE Wind Energy GmbH25.56 MW
Fuhrländer AG23.00 MW

Wind power in Rheinland-Pfalz · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Bad Dürkheim (Rheinland-Pfalz), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.