FACTANKER · measured, cited, anchored official records connected

Germany · renewables

Wind power in Ahrweiler

9 wind turbines with 13.2 MW of gross capacity were in operation in Ahrweiler (Rheinland-Pfalz) as of 2026-11-05, with a further 2 units (8.40 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.

Cite: FACTANKER, https://factanker.com/germany-renewables/wind/rheinland-pfalz/ahrweiler

Questions this page answers

How many wind turbines are registered in Ahrweiler (Rheinland-Pfalz), and how large are they, as of 2026-11-05?
9 wind turbines with 13.2 MW of gross capacity were in operation in Ahrweiler (Rheinland-Pfalz) as of 2026-11-05, with a further 2 units (8.40 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
How many wind turbines are in operation in Ahrweiler?
9 wind turbines with 13.2 MW of gross capacity were in operation in Ahrweiler as of 2026-11-05, with a further 2 units (8.40 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How much wind power capacity was commissioned in Ahrweiler in 2017?
1 wind turbines with 2.30 MW went into operation in Ahrweiler in 2017; the strongest year of the last two decades was 2011 with 6.50 MW (Bundesnetzagentur, Marktstammdatenregister).
Which company operates the most wind power capacity in Ahrweiler?
JUWI GmbH operates 2 wind turbines with 8.40 MW in Ahrweiler, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
Which manufacturer has the most wind power capacity in Ahrweiler?
Vestas Deutschland GmbH leads with 5 wind turbines and 10.4 MW in Ahrweiler (Bundesnetzagentur, Marktstammdatenregister).
What is the largest wind turbine in Ahrweiler?
The largest registered wind turbine in Ahrweiler has 4.20 MW of gross capacity and is operated by JUWI GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).

How are the wind turbines in Ahrweiler distributed by size class?

Size classUnitsCapacityIn operationPlanned
over 100 kW1121.6 MW92

How much wind power capacity was commissioned in Ahrweiler each year?

Commissioning yearUnitsCapacity added
201712.30 MW
201212.30 MW
201136.50 MW

How many wind turbines in Ahrweiler are in operation, planned or decommissioned?

StatusUnitsCapacity
in operation913.2 MW
planned28.40 MW

Which wind turbines are registered in Ahrweiler?

UnitCapacityManufacturerStatusCommissionedOperator
WP Nürburgring N014.20 MWVestas Deutschland GmbHplannedplanned 2028JUWI GmbH
WP Nürburgring N024.20 MWVestas Deutschland GmbHplannedplanned 2028JUWI GmbH
NX-817602.50 MWNordex Energy GmbHin operation2011-06-28Maibara Mobiliengesellschaft mbH & Co. KG
Windpark Weibern GmbH & Co.KG 7833552.30 MWENERCON GmbHin operation2012-02-15Windpark Weibern GmbH & Co.KG
unit operated by a private individual2.30 MWENERCON GmbHin operation2017-12-06private individual
Windpark Weibern GmbH & Co.KG 8236192.00 MWENERCON GmbHin operation2011-08-24Windpark Weibern GmbH & Co.KG
Windpark Weibern 8236172.00 MWENERCON GmbHin operation2011-08-24Windpark Weibern GmbH & Co.KG
Weibern_Rieden_WEA_50.66 MWVestas Deutschland GmbHin operation2002-04-10Trennewurth Repowering GmbH & Co. KG
Weibern_Rieden_WEA_10.66 MWVestas Deutschland GmbHin operation2001-12-05Trennewurth Repowering GmbH & Co. KG
Weibern_Rieden_WEA_20.66 MWVestas Deutschland GmbHin operation2001-12-07Trennewurth Repowering GmbH & Co. KG
WKA Volkesfelder Höhe0.11 MWSEEWIND Windenergiesysteme GmbHin operation1994-04-14Thomas und Markus Müller GbR

Which organisations operate the most wind power capacity in Ahrweiler?

OperatorUnitsCapacity
JUWI GmbH28.40 MW
Windpark Weibern GmbH & Co.KG36.30 MW
Maibara Mobiliengesellschaft mbH & Co. KG12.50 MW
Trennewurth Repowering GmbH & Co. KG31.98 MW
Thomas und Markus Müller GbR10.11 MW

Which manufacturer accounts for the most wind power capacity in Ahrweiler?

ManufacturerUnitsCapacity
Vestas Deutschland GmbH510.4 MW
ENERCON GmbH48.60 MW
Nordex Energy GmbH12.50 MW
SEEWIND Windenergiesysteme GmbH10.11 MW

Wind power in Rheinland-Pfalz · Wind power in Germany

Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.

Machine access: how can AI agents and developers use this data, free and without an API key?

Every figure shown here about How many wind turbines are registered in Ahrweiler (Rheinland-Pfalz), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.

These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.