Germany · renewables
Wind power in Wesel
66 wind turbines with 138.1 MW of gross capacity were in operation in Wesel (Nordrhein-Westfalen) as of 2026-11-05, with a further 41 units (244.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Wesel (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 66 wind turbines with 138.1 MW of gross capacity were in operation in Wesel (Nordrhein-Westfalen) as of 2026-11-05, with a further 41 units (244.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Wesel?
- 66 wind turbines with 138.1 MW of gross capacity were in operation in Wesel as of 2026-11-05, with a further 41 units (244.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Wesel in 2024?
- 1 wind turbines with 0.00 MW went into operation in Wesel in 2024; the strongest year of the last two decades was 2017 with 33.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Wesel?
- SL Windenergie GmbH operates 13 wind turbines with 63.7 MW in Wesel, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Wesel?
- ENERCON GmbH leads with 60 wind turbines and 193.4 MW in Wesel (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Wesel?
- The largest registered wind turbine in Wesel has 7.00 MW of gross capacity and is operated by Bürgerwind Brichter Heide GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Wesel distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.03 MW | 3 | 0 |
| 30 to 100 kW | 1 | 0.05 MW | 1 | 0 |
| over 100 kW | 105 | 383.5 MW | 62 | 41 |
How much wind power capacity was commissioned in Wesel each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 12.0 MW |
| 2024 | 1 | 0.00 MW |
| 2023 | 3 | 12.4 MW |
| 2018 | 7 | 21.0 MW |
| 2017 | 12 | 33.6 MW |
| 2016 | 2 | 5.35 MW |
| 2015 | 6 | 13.3 MW |
| 2011 | 4 | 6.20 MW |
| 2006 | 1 | 0.60 MW |
How many wind turbines in Wesel are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 41 | 244.8 MW |
| in operation | 66 | 138.1 MW |
| permanently decommissioned | 2 | 0.71 MW |
Which wind turbines are registered in Wesel?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 01 Damm GF | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwind Brichter Heide GmbH & Co. KG |
| WEA 02 Wesel Perrich (P2) | 7.00 MW | ENERCON GmbH | planned | planned 2030 | SL Windenergie GmbH |
| WEA 5 Wesel-Büderich | 7.00 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| ABO Energy WP Alpen Winnethal WEA 6 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | ABO Energy Windpark 13 GmbH & Co. KG |
| WEA 04 Bricht BH | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwind Brichter Heide GmbH & Co. KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Overbeck GmbH & Co. KG |
| WEA 02 Bricht BB | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwind Brichter Heide GmbH & Co. KG |
| WEA1 | 7.00 MW | Nordex SE | planned | planned 2028 | Gemeindewerke Hünxe |
| WEA 03 Bricht DB | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Bürgerwind Brichter Heide GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Overbeck GmbH & Co. KG |
| WEA2 | 7.00 MW | Nordex SE | planned | planned 2028 | Gemeindewerke Hünxe |
| ABO Energy WP Alpen Winnethal WEA 7 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | ABO Energy Windpark 13 GmbH & Co. KG |
| WEA Alpen | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | MLK Windpark Alpen Nr. 108 GmbH & Co. KG |
| WEA 2 Niep Mitte | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | ENNI Energie & Umwelt Niederrhein GmbH |
| ABO Energy WP Hünxe WEA 1 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy WP Hünxe GmbH & Co. KG |
| ABO Energy WP Hünxe WEA 2 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy WP Hünxe GmbH & Co. KG |
| ABO Energy WP Hünxe WEA 3 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy WP Hünxe GmbH & Co. KG |
| ABO Energy WP Hünxe WEA 4 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | ABO Energy WP Hünxe GmbH & Co. KG |
| WEA 2 1750126 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-29 | SL Windpark Alpen Veen GmbH & Co. KG |
| WEA 1 1750125 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-29 | SL Windpark Alpen Veen GmbH & Co. KG |
| ABO Energy WP Alpen-Winnenthal WEA 5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Energy Windpark 13 GmbH & Co. KG |
| WEA 1 Niep Nord | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | ENNI Energie & Umwelt Niederrhein GmbH |
| WEA 3 Niep Süd | 5.70 MW | Nordex Energy GmbH | planned | planned 2029 | ENNI Energie & Umwelt Niederrhein GmbH |
| GN5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | BürgerEnergie Geldern GmbH |
| ABO Energy WP Alpen-Winnenthal WEA 4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Energy Windpark 13 GmbH & Co. KG |
| ABO Energy WP Alpen-Winnenthal WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Energy Windpark 13 GmbH & Co. KG |
| ABO Energy WP Alpen-Winnenthal WEA 3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Energy Windpark 13 GmbH & Co. KG |
| ABO Energy WP Alpen-Winnenthal WEA 2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Energy Windpark 13 GmbH & Co. KG |
| AlBö WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiekontor AG |
| WEA 01 Wesel Perrich (P1) | 5.56 MW | ENERCON GmbH | planned | planned 2030 | SL Windenergie GmbH |
| AlBö WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Energiepark Alpen-Bönninghardt WP AB GmbH & Co. KG |
| AlBö WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Energiepark Alpen-Bönninghardt WP AB GmbH & Co. KG |
| AlBö WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiekontor AG |
| 160Schermb5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WEA 03 Wesel Perrich (P3) | 5.56 MW | ENERCON GmbH | planned | planned 2030 | SL Windenergie GmbH |
| 149Hammi1 | 5.00 MW | Nordex SE | planned | planned 2027 | SL Windenergie GmbH |
| 149Hammi3 | 5.00 MW | Nordex SE | planned | planned 2027 | SL Windenergie GmbH |
| 149Hammi2 | 5.00 MW | Nordex SE | planned | planned 2027 | SL Windenergie GmbH |
| 138Sonsb1 SR1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| 138Sonsb2 SR2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WEA 4 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Hünxe GmbH |
| WEA 01 Alpen Winnenthal | 4.26 MW | ENERCON GmbH | planned | planned 2025 | SL Windenergie GmbH |
| WEA Repow. 44655 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | SL Windenergie GmbH |
| Brömmel GbR | 4.20 MW | ENERCON GmbH | in operation | 2023-04-27 | Brömmel GbR |
| WEA Voerde, Hohe Str. | 4.20 MW | ENERCON GmbH | in operation | 2023-11-23 | Voerde Windenergie GmbH |
| WEA 1380813 | 4.03 MW | ENERCON GmbH | in operation | 2023-05-26 | SL Windpark Wesel GmbH & CO. KG |
| 301397 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-12-21 | Windenergie Schermbeck-Rüste GmbH & Co. KG |
| 301396 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-11-24 | Windenergie Schermbeck-Rüste GmbH & Co. KG |
| 301395 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-10-13 | Windenergie Schermbeck-Rüste GmbH & Co. KG |
| WEA 1, 78 | 3.00 MW | ENERCON GmbH | in operation | 2018-08-27 | Windpark Hünxer Heide GmbH |
| WEA 3, 76 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-26 | Windpark Hünxer Heide GmbH |
| WEA01-1150196 | 3.00 MW | ENERCON GmbH | in operation | 2016-02-19 | Windkraft Lohberg GmbH |
| WEA 4. 79 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-20 | Windpark Hünxer Heide GmbH |
| WEA05-115623 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | ENNI RMI Windpark Kohlenhuck GmbH |
| WEA 1150637 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-29 | SL Windpark Lühlerheim GmbH & Co. KG |
| WEA 2, 76 | 3.00 MW | ENERCON GmbH | in operation | 2018-09-11 | Windpark Hünxer Heide GmbH |
| WEA01-115620 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-27 | ENNI RMI Windpark Kohlenhuck GmbH |
| WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-25 | Windpark Hünxe GmbH |
| WEA 1150638 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-31 | SL Windpark Lühlerheim GmbH & Co. KG |
| WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-01 | Windpark Hünxe GmbH |
| WEA02-115621 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-29 | ENNI RMI Windpark Kohlenhuck GmbH |
| WEA 1150636 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-21 | SL Windpark Lühlerheim GmbH & Co. KG |
| WEA04-115622 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-28 | ENNI RMI Windpark Kohlenhuck GmbH |
| WEA 1150639 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-27 | SL Windpark Lühlerheim GmbH & Co. KG |
| WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2018-06-16 | Windpark Hünxe GmbH |
| WEA Alpen-Drüpt | 2.35 MW | ENERCON GmbH | in operation | 2015-08-31 | Windpark Alpen-Drüpt GmbH & Co. KG |
| WEA 920858 | 2.35 MW | ENERCON GmbH | in operation | 2016-03-31 | SL Windpark Wesel GmbH & CO. KG |
| Voerde WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-27 | Windpark Voerde GmbH & Co. KG |
| Voerde WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2015-04-17 | Windpark Voerde GmbH & Co. KG |
| E82 | 2.30 MW | ENERCON GmbH | in operation | 2015-05-21 | Windpark Blumenkamp GmbH & Co.KG |
| WEA 823802 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-02 | SL Windpark Wesel GmbH & CO. KG |
| WEA 823801 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-07 | SL Windpark Wesel GmbH & CO. KG |
| WEA 2 Moers Ost Verbandsstraße | 2.05 MW | Senvion Deutschland GmbH | in operation | 2015-12-11 | ENNI Energie & Umwelt Niederrhein GmbH |
| WEA 1 Moers West Verbandsstraße | 2.05 MW | Senvion Deutschland GmbH | in operation | 2015-12-23 | ENNI Energie & Umwelt Niederrhein GmbH |
| WKA3 | 1.80 MW | ENERCON GmbH | in operation | 2004-12-21 | Windpark Nordbrock GmbH |
| E66 | 1.80 MW | ENERCON GmbH | in operation | 2004-10-29 | Windpark Blumenkamp GmbH & Co.KG |
| WKA2 | 1.80 MW | ENERCON GmbH | in operation | 2002-11-22 | Windpark Nordbrock GmbH |
| Loikum 4 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-03-21 | Loikum Windpark GmbH&Co.KG |
| Loikum 2 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-03-21 | Loikum Windpark GmbH&Co.KG |
| Töven II | 1.50 MW | GE Wind Energy GmbH | in operation | 2004-12-20 | BeMa Wind |
| Loikum 5 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-03-21 | Loikum Windpark GmbH&Co.KG |
| Windkraft 11206 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-09-07 | Exigenz GmbH & Co.KG |
| Töven I | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-30 | BeMa Wind |
| Windrad II | 1.50 MW | Nordex Energy GmbH | in operation | 2003-05-27 | Wickrath Eyll Windkraft GmbH & Co. KG |
| Windkraft 11204 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-09-06 | Exigenz GmbH & Co.KG |
| WEA Hamminkeln-Lankern I | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-04-09 | Boston Energy GmbH & Co. KG |
| Windkraft 11205 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-09-08 | Exigenz GmbH & Co.KG |
| Windrad I | 1.50 MW | Nordex Energy GmbH | in operation | 2003-05-27 | Wickrath Eyll Windkraft GmbH & Co. KG |
| WEA III | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-04-11 | ON3B GmbH & Co. KG |
| 58174 | 1.00 MW | ENERCON GmbH | in operation | 2003-12-19 | Bürgerwindräder Rheinberg GmbH und Co. KG |
| WKA 1 | 1.00 MW | ENERCON GmbH | in operation | 2002-11-22 | Windpark Nordbrock GmbH |
| 58175 | 1.00 MW | ENERCON GmbH | in operation | 2003-12-23 | Bürgerwindräder Rheinberg GmbH und Co. KG |
| 58172 | 1.00 MW | ENERCON GmbH | in operation | 2003-12-19 | Bürgerwindräder Rheinberg GmbH und Co. KG |
| WEA 58088 (10332) | 1.00 MW | ENERCON GmbH | in operation | 2002-09-29 | SL Windenergie GmbH |
| 58173 | 1.00 MW | ENERCON GmbH | in operation | 2003-12-19 | Bürgerwindräder Rheinberg GmbH und Co. KG |
| 58171 | 1.00 MW | ENERCON GmbH | in operation | 2004-02-05 | Bürgerwindräder Rheinberg GmbH und Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | in operation | 2003-08-28 | private individual |
| WKA Kentersbaum | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-11-09 | WIENA GmbH |
| WEA 144 E-531342 | 0.80 MW | ENERCON GmbH | in operation | 2011-12-28 | Gisela Kaiser, Prof. Hans-Dieter Kaiser, Dr. Friederike Kaiser und Florian Kaiser GbR |
| ERS Erneuerbare Energien GmbH & Co.KG | 0.80 MW | – | in operation | 2011-09-16 | Adelheid u. Volker Elsässer WEA GbR |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2000-12-22 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 1999-10-22 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-04-10 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2006-06-13 | private individual |
| unit operated by a private individual | 0.11 MW | Sonstige | permanently decommissioned | 1994-06-13 | private individual |
| Windkraftanlage Kamp-Lintfort | 0.05 MW | Lagerwey GmbH | in operation | 1989-07-18 | Raatschen GmbH& CO. KG |
| unit operated by a private individual | 0.03 MW | Fuhrländer AG | in operation | 1996-06-30 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2024-07-01 | private individual |
| unit operated by a private individual | 0.00 MW | WSD - Windsysteme | in operation | 2017-09-30 | private individual |
Which organisations operate the most wind power capacity in Wesel?
| Operator | Units | Capacity |
|---|---|---|
| SL Windenergie GmbH | 13 | 63.7 MW |
| ABO Energy Windpark 13 GmbH & Co. KG | 7 | 42.5 MW |
| Bürgerwind Brichter Heide GmbH & Co. KG | 4 | 28.0 MW |
| ABO Energy WP Hünxe GmbH & Co. KG | 4 | 26.4 MW |
| ENNI Energie & Umwelt Niederrhein GmbH | 5 | 22.3 MW |
| Gemeindewerke Hünxe | 2 | 14.0 MW |
| Windenergie Overbeck GmbH & Co. KG | 2 | 14.0 MW |
| Windpark Hünxe GmbH | 4 | 13.3 MW |
| ENNI RMI Windpark Kohlenhuck GmbH | 4 | 12.0 MW |
| SL Windpark Alpen Veen GmbH & Co. KG | 2 | 12.0 MW |
Which manufacturer accounts for the most wind power capacity in Wesel?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 60 | 193.4 MW |
| Nordex Germany GmbH | 11 | 69.0 MW |
| Nordex Energy GmbH | 7 | 35.2 MW |
| Nordex SE | 5 | 29.0 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 4 | 26.4 MW |
| GE Wind Energy GmbH | 10 | 15.0 MW |
| Senvion Deutschland GmbH | 5 | 13.7 MW |
| Vestas Deutschland GmbH | 1 | 0.85 MW |
| Sonstige | 1 | 0.11 MW |
| Lagerwey GmbH | 1 | 0.05 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Wesel (Nordrhein-Westfalen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.