Germany · renewables
Wind power in Warendorf
229 wind turbines with 605.1 MW of gross capacity were in operation in Warendorf (Nordrhein-Westfalen) as of 2026-11-05, with a further 80 units (514.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Warendorf (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 229 wind turbines with 605.1 MW of gross capacity were in operation in Warendorf (Nordrhein-Westfalen) as of 2026-11-05, with a further 80 units (514.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Warendorf?
- 229 wind turbines with 605.1 MW of gross capacity were in operation in Warendorf as of 2026-11-05, with a further 80 units (514.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Warendorf in 2025?
- 14 wind turbines with 79.0 MW went into operation in Warendorf in 2025; the strongest year of the last two decades was 2025 with 79.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Warendorf?
- Stadtwerke Münster GmbH operates 10 wind turbines with 63.2 MW in Warendorf, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Warendorf?
- ENERCON GmbH leads with 171 wind turbines and 434.7 MW in Warendorf (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Warendorf?
- The largest registered wind turbine in Warendorf has 7.20 MW of gross capacity and is operated by Bürgerwind Neuwarendorf-Walgern GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Warendorf distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.02 MW | 2 | 1 |
| 30 to 100 kW | 2 | 0.14 MW | 2 | 0 |
| over 100 kW | 316 | 1.14 GW | 225 | 79 |
How much wind power capacity was commissioned in Warendorf each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 31 | 169.5 MW |
| 2025 | 14 | 79.0 MW |
| 2024 | 13 | 63.8 MW |
| 2023 | 3 | 13.5 MW |
| 2022 | 3 | 14.3 MW |
| 2020 | 5 | 24.9 MW |
| 2018 | 3 | 9.00 MW |
| 2017 | 11 | 25.1 MW |
| 2014 | 1 | 2.30 MW |
| 2013 | 7 | 14.1 MW |
| 2012 | 7 | 16.1 MW |
| 2011 | 8 | 16.9 MW |
| 2010 | 16 | 25.2 MW |
| 2009 | 32 | 50.8 MW |
| 2008 | 2 | 4.00 MW |
| 2007 | 6 | 12.0 MW |
| 2006 | 3 | 5.50 MW |
How many wind turbines in Warendorf are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 229 | 605.1 MW |
| planned | 80 | 514.5 MW |
| permanently decommissioned | 12 | 17.6 MW |
Which wind turbines are registered in Warendorf?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwind Neuwarendorf-Walgern GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Ulmenwind GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Wibberich Windenergie GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Beckum GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Wibberich Windenergie GmbH & Co. KG |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Milte GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Ulmenwind GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Beckum GmbH & Co. KG |
| Füchtorf 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Füchtorf-Winkelsetten Bürgerwindpark GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Wibberich Windenergie GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwind Neuwarendorf-Walgern GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwind Neuwarendorf-Walgern GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Milte GmbH & Co. KG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Milte GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Milte GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energiepark Beckum GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hoetmar Freckenhorst GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Ulmenwind GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex SE | planned | planned 2027 | Vechtruper Bürgerwindpark GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex SE | planned | planned 2026 | Rosendahler Windenergie GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex SE | planned | planned 2027 | Holter Wind GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex SE | planned | planned 2027 | Holter Wind GmbH & Co. KG |
| WEA 3 | 7.00 MW | Nordex SE | planned | planned 2027 | Vechtruper Bürgerwindpark GmbH & Co. KG |
| WEA01 | 7.00 MW | Nordex SE | planned | planned 2027 | Windpark Oelde Bergeler GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex SE | planned | planned 2028 | Rosendahler Windenergie GmbH & Co. KG |
| WEA 1 Kollenbusch | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Kollenbusch GmbH & Co. KG |
| E175 - 2025 | 6.90 MW | ENERCON GmbH | planned | planned 2028 | BeBüWind GbR |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Elve GmbH & Co. KG |
| VenSol Windpark Beckum | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Vensol Neue Energien GmbH |
| WEA02 | 6.80 MW | Nordex SE | planned | planned 2027 | Windpark Oelde Bergeler GmbH & Co. KG |
| WEA Sassenberg 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-31 | UGE Sassenberg Drei GmbH & Co. KG Umweltgerechte Energie |
| WEA2 Oelde | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bergeler Wind GmbH & Co. KG |
| WEA03 | 6.80 MW | Nordex SE | planned | planned 2027 | Erdland Energie |
| WEA_Aurea | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-10 | Craemer Holding |
| WEA Sassenberg 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-09-08 | UGE Sassenberg Zwei GmbH & Co. KG Umweltgerechte Energie |
| WP Drensteinfurt - WEA 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | Windpark Drensteinfurt GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Elve GmbH & Co. KG |
| WEA1 Oelde | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bergeler Wind GmbH & Co. KG |
| WEA Sendenhorst 1 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2028 | Stadtwerke Münster GmbH |
| WEA Sendenhorst 2 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | Stadtwerke Münster GmbH |
| WEA Sendenhorst 6 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | Stadtwerke Münster GmbH |
| WEA Sendenhorst 4 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | Stadtwerke Münster GmbH |
| WEA Sendenhorst 5 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | Stadtwerke Münster GmbH |
| WEA Sendenhorst 3 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | Stadtwerke Münster GmbH |
| Ostenfelde 4 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-17 | Ostenfelde Bürgerwind GmbH |
| Ostenfelde 2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-19 | Ostenfelde Bürgerwind GmbH |
| Ostenfelde 3 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-02 | Ostenfelde Bürgerwind GmbH |
| Ostenfelde 1 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-12 | Windpark Ostenfelde GmbH & Co. KG |
| WEA 1 (612346309) | 6.10 MW | GE Wind Energy GmbH | in operation | 2025-01-24 | Bürgerwind Fockenbrocks Heide GmbH & Co. KG |
| WEA Warendorf Milte 4 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Stadtwerke Münster GmbH |
| WEA 1 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-01-23 | Bürgerwind Milter Mark GmbH & Co. KG |
| WEA 2 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Bürgerwind Zum Himmelreich GmbH & Co. KG |
| WEA 1 175 Drensteinfurt | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| Jönsthövel Anlage 3 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Sendenhorster Windenergie GmbH & Co. KG |
| Jönsthövel Anlage 1 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Sendenhorster Windenergie GmbH & Co. KG |
| WEA Warendorf Milte 2 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Stadtwerke Münster GmbH |
| WEA 1 (SG8) - 602449626 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-03-23 | Bürgerwind Ennigerloh GmbH & Co. KG |
| WEA 2 Frankenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Schirl Frankenbach GmbH & Co. KG |
| WEA 1 (SG7) - 602449625 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-04-15 | Bürgerwind Ennigerloh GmbH & Co. KG |
| WEA 4 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-02-13 | Bürgerwind Milter Mark GmbH & Co. KG |
| 253753 - WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-08-08 | Windenergie Ameke/Hölter GmbH & Co. KG |
| WEA 2 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-01-23 | Bürgerwind Milter Mark GmbH & Co. KG |
| WEA 3 Frankenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Schirl Frankenbach GmbH & Co. KG |
| WEA 3 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Bürgerwind Zum Himmelreich GmbH & Co. KG |
| WAF_WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energie & Landwirtschaft Invest GmbH & Co. KG |
| WEA 4 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Bürgerwind Zum Himmelreich GmbH & Co. KG |
| WEA Warendorf Milte 1 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Stadtwerke Münster GmbH |
| Jönsthövel Anlage 2 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Sendenhorster Windenergie GmbH & Co. KG |
| WEA 2 (SG8) - 602449627 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-03-12 | Bürgerwind Ennigerloh GmbH & Co. KG |
| WEA 3 (SG8) - 602449628 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-03-13 | Bürgerwind Ennigerloh GmbH & Co. KG |
| 253752 - WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-08-28 | Windenergie Ameke/Hölter GmbH & Co. KG |
| WEA 1 - 255289 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-26 | Windpark Ostbevern NO1 GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-03-03 | Windpark Hesselertal GmbH & Co. KG |
| WEA Everswinkel 05 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-01-30 | UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie |
| ABO Energy WP Everswinkel Tiergarten WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Wind WP Engden GmbH & Co. KG |
| WPOS WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-05-05 | WPOS GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-03-04 | Windpark Hesselertal GmbH & Co. KG |
| WEA Everswinkel 4 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-07-02 | UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie |
| WPON WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-04-17 | WPON GmbH & Co. KG |
| ABO Energy WP Everswinkel Tiergarten WEA 3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Wind WP Engden GmbH & Co. KG |
| WEA Everswinkel 1 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-08-06 | UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie |
| ABO Energy WP Everswinkel-Versmar WEA 03 | 5.70 MW | Nordex Energy GmbH | planned | planned 2027 | ABO Energy WP Everswinkel-Versmar GmbH & Co. KG |
| ABO Energy WP Everswinkel Tiergarten WEA 2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | ABO Wind WP Engden GmbH & Co. KG |
| WPON WEA 3 | 5.70 MW | Nordex SE | planned | planned 2027 | WPON GmbH & Co. KG |
| Beelen WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | EnBW Windkraftprojekte GmbH |
| WPON WEA 2 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-03-31 | WPON GmbH & Co. KG |
| WEA Everswinkel 2 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-07-03 | UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie |
| WEA 5 | 5.70 MW | Nordex Energy GmbH | in operation | 2026-03-11 | Windpark Hesselertal GmbH & Co. KG |
| WEA Everswinkel 3 | 5.70 MW | Nordex Germany GmbH | in operation | 2024-07-25 | UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie |
| 1605108 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-19 | Alterric Windpark Sassenberg Repowering GmbH & Co. KG |
| Sassenberg-Füchtorfer Moor II WEA 03 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-30 | juwi Wind Germany 264 GmbH & Co. KG |
| WEA SAS 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Sassenberg-Gröblingen GmbH |
| Sassenberg-Füchtorfer Moor II WEA 04 | 5.56 MW | ENERCON GmbH | in operation | 2026-07-27 | juwi Wind Germany 264 GmbH & Co. KG |
| WEA 1 160 Drensteinfurt | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WAF_WEA 06 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energie & Landwirtschaft Invest GmbH & Co. KG |
| Sassenberg-Füchtorfer Moor II WEA 05 | 5.56 MW | ENERCON GmbH | in operation | 2026-08-20 | juwi Wind Germany 264 GmbH & Co. KG |
| 1605109 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-16 | Alterric Windpark Sassenberg Repowering GmbH & Co. KG |
| WEA SAS 04 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Sassenberg-Gröblingen GmbH |
| 1605107 | 5.56 MW | ENERCON GmbH | in operation | 2026-01-14 | Alterric Windpark Sassenberg Repowering GmbH & Co. KG |
| WEA 2 160 Drensteinfurt | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Drehstrom Ahlen eG |
| Sassenberg-Füchtorfer Moor R WEA 06 | 5.56 MW | ENERCON GmbH | in operation | 2026-02-06 | LHI EE Invest WP Sassenberg 2724 GmbH & Co. KG |
| WEA Warendorf Milte 3 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Stadtwerke Münster GmbH |
| WEA Ennigerloh | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Ennigerloh GmbH & Co. KG |
| WEA SAS 02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Sassenberg-Gröblingen GmbH |
| Sassenberg-Füchtorfer Moor R WEA 01 | 5.56 MW | ENERCON GmbH | in operation | 2026-03-20 | LHI EE Invest WP Sassenberg 2724 GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2026-06-08 | Energiepark Drensteinfurt WP Rieth GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2026-05-08 | Energiepark Drensteinfurt WP Rieth GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Versmarer Energie GmbH & Co. KG |
| Sassenberg-Füchtorfer Moor II WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2026-06-11 | juwi Wind Germany 264 GmbH & Co. KG |
| WEA SAS 03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Sassenberg-Gröblingen GmbH |
| Sassenberg-Füchtorfer Moor II WEA 01 | 5.56 MW | ENERCON GmbH | in operation | 2026-06-16 | juwi Wind Germany 264 GmbH & Co. KG |
| Sassenberg-Füchtorfer Moor R WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2026-03-16 | LHI EE Invest WP Sassenberg 2724 GmbH & Co. KG |
| WEA 5 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-12-18 | Bürgerwind Milter Mark GmbH & Co. KG |
| WEA 3 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-12-18 | Bürgerwind Milter Mark GmbH & Co. KG |
| WEA 1 ( 552343829) | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-11-25 | Holtmar Wind GmbH & Co. KG |
| WEA 1 | 5.50 MW | GE Renewable Germany GmbH | planned | planned 2028 | Bürgerwind Zum Himmelreich GmbH & Co. KG |
| ABO Wind WP Everswinkel WEA 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-07-24 | Windpark Everswinkel GmbH & Co. KG |
| GE53190171 | 5.30 MW | GE Wind Energy GmbH | in operation | 2020-10-15 | Achte Bürgerwind GmbH |
| GE53190172 | 5.30 MW | GE Wind Energy GmbH | in operation | 2020-10-15 | Achte Bürgerwind GmbH |
| GE55219683 | 5.30 MW | GE Wind Energy GmbH | in operation | 2022-12-23 | Beckum Bürgerwindpark GmbH & Co. KG |
| GE53190173 | 5.30 MW | GE Wind Energy GmbH | in operation | 2020-10-24 | Beckum Bürgerwindpark GmbH & Co. KG |
| WEA 2 | 4.80 MW | Nordex Energy GmbH | in operation | 2026-03-12 | Windpark Hesselertal GmbH & Co. KG |
| ABO Wind WP Drensteinfurt WEA 1 | 4.80 MW | Nordex Germany GmbH | in operation | 2024-08-28 | WP Drensteinfurt GmbH & Co. KG |
| WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-12-29 | Windpark Beckum GmbH & Co. KG |
| WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-12-28 | Windpark Beckum GmbH & Co. KG |
| 89388 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-06-23 | Drehstrom Ahlen eG |
| 89387 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-06-23 | Drehstrom Ahlen eG |
| WEA 1 Frankenbach | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Schirl Frankenbach GmbH & Co. KG |
| Windpark Ostbevern SWI - WEA 1 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-12-11 | Windpark Ostbevern PB GmbH & Co. KG |
| WEA2 | 4.20 MW | ENERCON GmbH | in operation | 2023-12-29 | Beelen-Woeste BürgerWind GmbH & Co. KG |
| WP Ahlen Gemmerich 1 | 4.20 MW | ENERCON GmbH | in operation | 2024-04-18 | Bürgerenergie Ahlen |
| WEA1 | 4.20 MW | ENERCON GmbH | in operation | 2024-01-24 | Beelen-Woeste BürgerWind GmbH & Co. KG |
| WP Ahlen Gemmerich 2 | 4.20 MW | ENERCON GmbH | in operation | 2024-04-22 | Bürgerenergie Ahlen |
| Windpark Ostbevern SWI - WEA 2 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-02-22 | Windpark Ostbevern PB GmbH & Co. KG |
| WEA 1381223 Ahlen | 4.20 MW | ENERCON GmbH | in operation | 2025-05-13 | SL Windpark Ahlen GmbH & Co. KG |
| Windpark Ostbevern SWI - WEA 3 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-02-12 | Windpark Ostbevern PB GmbH & Co. KG |
| WEA 1381224 Ahlen | 4.20 MW | ENERCON GmbH | in operation | 2025-05-21 | SL Windpark Ahlen GmbH & Co. KG |
| WEA 1381225 Ahlen | 4.20 MW | ENERCON GmbH | in operation | 2025-05-13 | SL Windpark Ahlen GmbH & Co. KG |
| WPOS WEA 2 | 3.60 MW | Nordex Energy GmbH | in operation | 2023-05-05 | WPOS GmbH & Co. KG |
| 1150955 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-11 | Schmiesbach Wind GmbH & Co. KG |
| 1150567 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-30 | Windkraft Schirl GmbH & Co.KG |
| 1150956 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-19 | Schmiesbach Wind GmbH & Co. KG |
| 1150975 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-31 | Wersewind Beckum GmbH & Co. KG |
| 1150974 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-21 | Wersewind Beckum GmbH & Co. KG |
| 1150569 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-22 | Windkraft Schirl GmbH & Co.KG |
| 1150973 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-27 | Wersewind Beckum GmbH & Co. KG |
| 1150568 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-28 | Windkraft Schirl GmbH & Co.KG |
| 1150954 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-23 | Wadersloh Wind GmbH |
| 921455 | 2.35 MW | ENERCON GmbH | in operation | 2017-12-28 | Wersewind Beckum GmbH & Co. KG |
| E82/6 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-16 | Stübbe-Holtkötter GmbH&CoKG |
| Wißling Windkraftanlagen GmbH & Co.KG | 2.30 MW | ENERCON GmbH | in operation | 2011-12-16 | Wißling Windkraftanlagen GmbH und Co KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2011-12-28 | private individual |
| Ahlener Windenergie Gbr | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | Ahlener Windenergie Gbr |
| Anlage 4 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-31 | Berkhoff Breloh Post Gbr |
| Windkraftanlage | 2.30 MW | ENERCON GmbH | in operation | 2014-10-09 | Schulze Niehues KG |
| Anlage 1 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-22 | Breloh Windenergie GmbH & Co. KG |
| Windrad 10 | 2.30 MW | ENERCON GmbH | in operation | 2012-02-24 | Heimann Windenergie GmbH & Co.KG |
| E-82/5 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-16 | Stübbe-Holtkötter GmbH&CoKG |
| Anlage 2 | 2.30 MW | ENERCON GmbH | in operation | 2012-02-10 | Breloh Windenergie GmbH & Co. KG |
| Freckenhorst Marktwind GmbH & Co.KG | 2.30 MW | ENERCON GmbH | in operation | 2017-09-08 | Freckenhorst Marktwind GmbH & Co.KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2012-12-04 | private individual |
| maxcap141 Ahrenhorst | 2.30 MW | windwise GmbH | in operation | 2026-03-26 | Windpark Lienen GmbH |
| Anlage 9 | 2.30 MW | ENERCON GmbH | in operation | 2012-01-25 | H&C Deter Gbr |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2012-12-04 | private individual |
| Windrad 11 | 2.30 MW | ENERCON GmbH | in operation | 2012-02-28 | Heimann Windenergie GmbH & Co.KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2011-12-16 | private individual |
| Dolberg 92514 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-02-13 | Windkraft ELKA GmbH & Co.KG |
| Dolberg 92515 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-02-13 | Windkraft ELKA GmbH & Co.KG |
| EWL-2.3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-03-22 | SWS Windpark Everswinkel II GmbH & Co. KG |
| 782607 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-30 | Windpark GmbH & Co. Ennigerloh KG |
| WAD-2(80346) | 2.00 MW | REpower Systems SE | in operation | 2006-11-23 | JENC Wind GmbH & Co. KG |
| EWL-1.2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-05-20 | SWS Windpark Everswinkel I GmbH & Co. KG |
| 782544 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-22 | Windpark Warendorf I GmbH & Co. KG |
| Beckum VII | 2.00 MW | ENERCON GmbH | in operation | 2010-03-11 | Vensol Neue Energien GmbH |
| 782608 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-23 | Windpark GmbH & Co. Ennigerloh KG |
| 781693 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| 782548 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-23 | Windpark Warendorf I GmbH & Co. KG |
| 782549 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-30 | Windpark Warendorf I GmbH & Co. KG |
| 782546 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-29 | Windpark Warendorf I GmbH & Co. KG |
| 781695 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| EWL-1.3 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-05-26 | SWS Windpark Everswinkel I GmbH & Co. KG |
| 30614 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2008-01-29 | SW Wind 1 GmbH & Co. KG |
| E 822086-03 | 2.00 MW | ENERCON GmbH | in operation | 2010-04-14 | QE Portfolio 2 GmbH & Co. KG |
| 782545 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-22 | Windpark Warendorf I GmbH & Co. KG |
| Füchtorf-90192 | 2.00 MW | – | in operation | 2008-02-01 | WKA Füchtorf Markus Daniel |
| EWL-1.1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-05-19 | SWS Windpark Everswinkel I GmbH & Co. KG |
| 782539 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-18 | Windpark Warendorf I GmbH & Co. KG |
| EWL-2.4 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-04-02 | SWS Windpark Everswinkel II GmbH & Co. KG |
| 782543 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-22 | Windpark Warendorf I GmbH & Co. KG |
| EWL-2.2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-03-18 | SWS Windpark Everswinkel II GmbH & Co. KG |
| 782542 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-23 | Windpark Warendorf I GmbH & Co. KG |
| WAD-3(80345) | 2.00 MW | REpower Systems SE | in operation | 2006-11-29 | JENC Wind GmbH & Co. KG |
| 782603 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-05 | Windpark GmbH & Co. Ennigerloh KG |
| E 822084-01 | 2.00 MW | – | in operation | 2010-04-30 | QE Portfolio 2 GmbH & Co. KG |
| WEA 18266 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2004-01-29 | Windpark Oelde-Menninghausen GmbH & Co. KG |
| 781745 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| 781692 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| E 822085-02 | 2.00 MW | ENERCON GmbH | in operation | 2010-05-06 | QE Portfolio 2 GmbH & Co. KG |
| EWL-2.1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-03-13 | SWS Windpark Everswinkel II GmbH & Co. KG |
| E 822087-04 | 2.00 MW | ENERCON GmbH | in operation | 2010-04-30 | QE Portfolio 2 GmbH & Co. KG |
| Osterdünen Wind | 2.00 MW | ENERCON GmbH | in operation | 2010-11-15 | Osterdünen Wind GmbH und Co KG |
| 782547 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-30 | Windpark Warendorf I GmbH & Co. KG |
| 782604 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-27 | Windpark GmbH & Co. Ennigerloh KG |
| WEA Ostbevern 1 (34486) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-06-25 | Windfarm Weimar GmbH & Co. KG |
| 781696 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| 782609 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-18 | Windpark GmbH & Co. Ennigerloh KG |
| 781694 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | Windpark Sendenhorst GmbH & Co. KG |
| Windenergieanlage E 82 Vohren 7Z | 2.00 MW | ENERCON GmbH | in operation | 2010-03-25 | Vohrener Höhenwind GmbH & Co. KG |
| 782606 | 2.00 MW | ENERCON GmbH | in operation | 2009-10-09 | Windpark GmbH & Co. Ennigerloh KG |
| 782541 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-23 | Windpark Warendorf I GmbH & Co. KG |
| 782605 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-23 | Windpark GmbH & Co. Ennigerloh KG |
| EWL-2.5 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2013-03-04 | SWS Windpark Everswinkel II GmbH & Co. KG |
| 782601 | 2.00 MW | ENERCON GmbH | in operation | 2009-08-26 | Windpark GmbH & Co. Ennigerloh KG |
| 782602 | 2.00 MW | ENERCON GmbH | in operation | 2009-09-17 | Windpark GmbH & Co. Ennigerloh KG |
| 782540 | 2.00 MW | ENERCON GmbH | in operation | 2009-12-22 | Windpark Warendorf I GmbH & Co. KG |
| Beckum VI | 2.00 MW | ENERCON GmbH | in operation | 2010-03-11 | Vensol Neue Energien GmbH |
| 701451 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-01 | Momentum Energy Germany GmbH & Co.KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-05-14 | private individual |
| Anlage 3 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-14 | Netzbetreiber Gesellschaft Wadersloh GbR |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-03-24 | private individual |
| Anlage 2 | 1.80 MW | ENERCON GmbH | in operation | 2004-07-21 | Netzbetreiber Gesellschaft Wadersloh GbR |
| WEA Sassenberg 70993 | 1.80 MW | ENERCON GmbH | in operation | 2002-11-20 | Energiequelle GmbH & Co. Windenergieanlage Sassenberg KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-11-05 | private individual |
| 70860 | 1.80 MW | ENERCON GmbH | in operation | 2004-04-06 | Alterric Windpark GmbH & Co. Passat II KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-09-09 | private individual |
| 70799 | 1.80 MW | ENERCON GmbH | in operation | 2002-09-19 | Alterric Windpark GmbH & Co. Passat II KG |
| 70800 | 1.80 MW | ENERCON GmbH | in operation | 2002-08-27 | Alterric Windpark GmbH & Co. Passat II KG |
| Versmarer Energie E-70 | 1.80 MW | ENERCON GmbH | in operation | 2003-04-03 | Versmarer Energie GmbH&Co.KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-11-09 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2003-05-13 | private individual |
| 701452 | 1.80 MW | ENERCON GmbH | in operation | 2003-10-06 | Sechsundzwanzigste Westwind Windpark ApS & Co KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-11-12 | private individual |
| FBB Ekmann GmbH + Co KG | 1.80 MW | ENERCON GmbH | in operation | 2003-08-04 | FBB Ekmann GmbH & Co KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2004-04-01 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-17 | private individual |
| Lehmbrock 1 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-11-19 | Münsterländische Windenergie |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-11-19 | private individual |
| unit operated by a private individual | 1.50 MW | Enron Wind GmbH | in operation | 2001-03-20 | private individual |
| WAD-1(70600) | 1.50 MW | REpower Systems SE | in operation | 2006-11-30 | JENC Wind GmbH & Co. KG |
| TW 1.5 sl | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-03-21 | Heuberg Windenergie GbR |
| BEIII 01 | 1.30 MW | AN Windenergie GmbH | in operation | 2001-03-20 | Energiekontor Windinvest GmbH & Co. ZWP BE KG |
| WEA3 - 260019 | 1.25 MW | DeWind GmbH | in operation | 2001-12-27 | Heckenkamp GmbH |
| unit operated by a private individual | 1.00 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2001-03-16 | private individual |
| Anlage 1 | 1.00 MW | ENERCON GmbH | in operation | 2004-07-01 | Netzbetreiber Gesellschaft Wadersloh GbR |
| unit operated by a private individual | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-10-19 | private individual |
| unit operated by a private individual | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-10-18 | private individual |
| WEA 1-E58 | 1.00 MW | ENERCON GmbH | in operation | 2000-04-05 | Beesen-Wind GmbH & Co. KG |
| Flimmerberg Windkraft | 1.00 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2001-03-01 | Flimmerberg Windkraft GmbH Ludger Bunne und Josef Roxel |
| unit operated by a private individual | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-10-19 | private individual |
| unit operated by a private individual | 1.00 MW | HSW Husumer Schiffswerft GmbH & Co. KG | in operation | 2001-03-16 | private individual |
| 15728 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2000-02-29 | VE 2010 GmbH |
| Beckum II | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-12-30 | Vensol Neue Energien GmbH |
| Beckum I | 0.85 MW | Vestas Deutschland GmbH | in operation | 2004-12-30 | Vensol Neue Energien GmbH |
| WEA 18265 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2003-11-03 | Windpark Oelde-Menninghausen GmbH & Co. KG |
| WKA Oelde III | 0.80 MW | ENERCON GmbH | in operation | 2017-08-22 | Windenergie Schierl GmbH & Co KG |
| WKA Telgte - 481705 | 0.80 MW | ENERCON GmbH | in operation | 2009-06-24 | Holger Hanle Handel und Dienstleistungen |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2009-01-12 | private individual |
| Telgte WEA 05 | 0.80 MW | ENERCON GmbH | in operation | 2009-06-30 | GbR WKA Telgte 5 |
| 531183 | 0.80 MW | ENERCON GmbH | in operation | 2010-12-27 | Windpark GmbH & Co. Telgte KG |
| 531181 | 0.80 MW | ENERCON GmbH | in operation | 2010-12-27 | Windpark GmbH & Co. Telgte KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2009-06-18 | private individual |
| 531180 | 0.80 MW | ENERCON GmbH | in operation | 2010-12-27 | Windpark GmbH & Co. Telgte KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2009-01-13 | private individual |
| Ameke-Berger-WKA mittlere Anlage Enercon 800 KW | 0.80 MW | – | in operation | 2005-07-30 | Ameke-Berger-Windkraftanlagen GmbH & Co. KG |
| Beckum IV | 0.80 MW | ENERCON GmbH | in operation | 2009-04-07 | Vensol Neue Energien GmbH |
| Beckum III | 0.80 MW | ENERCON GmbH | in operation | 2009-04-28 | Vensol Neue Energien GmbH |
| n50 | 0.80 MW | Nordex Energy GmbH | in operation | 2000-12-22 | Erlenbusch GmbH & Co. KG |
| WEA Telgte 01 | 0.80 MW | ENERCON GmbH | in operation | 2009-06-19 | T & G Doser Windkraft GbR |
| Beckum V | 0.80 MW | ENERCON GmbH | in operation | 2009-04-08 | Vensol Neue Energien GmbH |
| WKA Oelde II | 0.80 MW | ENERCON GmbH | in operation | 2017-08-22 | Windenergie Schierl GmbH & Co KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2009-06-25 | private individual |
| Telgte WEA 03 | 0.80 MW | ENERCON GmbH | in operation | 2009-06-24 | Holger Hanle Handel und Dienstleistungen |
| WKA Oelde I | 0.80 MW | ENERCON GmbH | in operation | 2017-08-22 | Windenergie Schierl GmbH & Co KG |
| 531182 | 0.80 MW | ENERCON GmbH | in operation | 2011-02-02 | Windpark GmbH & Co. Telgte KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2010-07-24 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-06-25 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-01-27 | private individual |
| 44788 | 0.60 MW | ENERCON GmbH | in operation | 2001-06-28 | Windstrom Schirlesch GbR |
| EA-12756 | 0.60 MW | ENERCON GmbH | in operation | 2000-10-23 | Agricola GmbH & Co. KG |
| WEA 2-E44 | 0.60 MW | ENERCON GmbH | in operation | 2000-01-06 | Beesen-Wind GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-09-11 | private individual |
| Ameke-Berger-WKA nördl. Anlage Enercon 600 KW | 0.60 MW | ENERCON GmbH | in operation | 2002-09-09 | Ameke-Berger-Windkraftanlagen GmbH & Co. KG |
| TW 600 | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1997-04-22 | Heuberg Windenergie GbR |
| E44 | 0.60 MW | ENERCON GmbH | in operation | 2001-07-11 | Manthom GbR |
| 44789 | 0.60 MW | ENERCON GmbH | in operation | 2001-06-25 | Windstrom Schirlesch GbR |
| unit operated by a private individual | 0.60 MW | Nordex Energy GmbH | in operation | 1997-10-28 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-09-11 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2003-07-25 | private individual |
| Wka | 0.60 MW | ENERCON GmbH | in operation | 2003-03-25 | Erter Wind GbR |
| Sassenberg | 0.60 MW | Nordex SE | permanently decommissioned | 1998-09-25 | LiSa GmbH & Co. KG |
| 44785 | 0.60 MW | ENERCON GmbH | in operation | 2001-06-21 | Leve-Witte GbR |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-09-11 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-11-25 | private individual |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Warendorf?
| Operator | Units | Capacity |
|---|---|---|
| Stadtwerke Münster GmbH | 10 | 63.2 MW |
| Windenergie Hoetmar Freckenhorst GmbH & Co. KG | 8 | 57.6 MW |
| Bürgerwind Milter Mark GmbH & Co. KG | 5 | 29.0 MW |
| Windpark Milte GmbH & Co. KG | 4 | 28.8 MW |
| UGE Everswinkel GmbH & Co. KG Umweltgerechte Energie | 5 | 28.5 MW |
| juwi Wind Germany 264 GmbH & Co. KG | 5 | 27.8 MW |
| Bürgerwind Ennigerloh GmbH & Co. KG | 4 | 24.0 MW |
| Bürgerwind Zum Himmelreich GmbH & Co. KG | 4 | 23.5 MW |
| Windpark Sassenberg-Gröblingen GmbH | 4 | 22.2 MW |
| Windpark Warendorf I GmbH & Co. KG | 11 | 22.0 MW |
Which manufacturer accounts for the most wind power capacity in Warendorf?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 171 | 434.7 MW |
| Vestas Deutschland GmbH | 49 | 259.9 MW |
| Nordex Energy GmbH | 22 | 101.8 MW |
| GE Wind Energy GmbH | 19 | 95.8 MW |
| Nordex Germany GmbH | 14 | 84.4 MW |
| Nordex SE | 11 | 68.9 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 6 | 39.6 MW |
| GE Renewable Germany GmbH | 4 | 23.5 MW |
| REpower Systems SE | 3 | 5.50 MW |
| Senvion Deutschland GmbH | 2 | 4.10 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Warendorf (Nordrhein-Westfalen), and how large ar can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.