40 wind turbines with 92.6 MW of gross capacity were in operation in Siegen-Wittgenstein (Nordrhein-Westfalen) as of 2026-11-05, with a further 157 units (999.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Siegen-Wittgenstein (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 40 wind turbines with 92.6 MW of gross capacity were in operation in Siegen-Wittgenstein (Nordrhein-Westfalen) as of 2026-11-05, with a further 157 units (999.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Siegen-Wittgenstein?
- 40 wind turbines with 92.6 MW of gross capacity were in operation in Siegen-Wittgenstein as of 2026-11-05, with a further 157 units (999.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Siegen-Wittgenstein in 2025?
- 1 wind turbines with 3.45 MW went into operation in Siegen-Wittgenstein in 2025; the strongest year of the last two decades was 2013 with 18.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Siegen-Wittgenstein?
- Windpark Berleburg Ost GmbH & Co. KG operates 27 wind turbines with 194.4 MW in Siegen-Wittgenstein, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Siegen-Wittgenstein?
- Vestas Deutschland GmbH leads with 123 wind turbines and 734.8 MW in Siegen-Wittgenstein (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Siegen-Wittgenstein?
- The largest registered wind turbine in Siegen-Wittgenstein has 7.20 MW of gross capacity and is operated by Windpark Berleburg Ost GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Siegen-Wittgenstein distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 2 | 0 |
| over 100 kW | 195 | 1.09 GW | 38 | 157 |
How much wind power capacity was commissioned in Siegen-Wittgenstein each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2025 | 1 | 3.45 MW |
| 2023 | 4 | 13.8 MW |
| 2021 | 1 | 3.30 MW |
| 2018 | 3 | 7.20 MW |
| 2017 | 3 | 6.60 MW |
| 2014 | 2 | 6.15 MW |
| 2013 | 7 | 18.5 MW |
| 2010 | 3 | 7.50 MW |
| 2009 | 7 | 11.4 MW |
| 2008 | 1 | 2.00 MW |
| 2007 | 4 | 8.00 MW |
How many wind turbines in Siegen-Wittgenstein are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 157 | 999.5 MW |
| in operation | 40 | 92.6 MW |
Which wind turbines are registered in Siegen-Wittgenstein?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SMS Wind GmbH |
| WEA N5 Dense II | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SMS Wind GmbH |
| WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA N6 Dense I | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA19 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SMS Wind GmbH |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Winterscheid Energy GmbH & Co. KG |
| WEA04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA N4 Dense I | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| WEA17 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA N1 Dense II | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA N3 Dense I | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA N 7 Dense II | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dense-Wind GmbH & Co. KG |
| WEA10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Winterscheid Energy GmbH & Co. KG |
| WEA18 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg Ost GmbH & Co. KG |
| WEA01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Berleburg Ost GmbH & Co. KG |
| Windpark Rabenhain WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Rabenhain GmbH und Co. KG |
| Windpark Rabenhain WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Rabenhain GmbH und Co. KG |
| WP Neujagen - WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2031 | wpd Windpark Nr. 672 GmbH & Co. KG |
| Ewiger Fuhrmann II | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Ewiger Fuhrmann Windkraft GmbH & Co KG |
| WP Neujagen - WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2031 | wpd Windpark Nr. 672 GmbH & Co. KG |
| WP Neujagen - WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2031 | wpd Windpark Nr. 672 GmbH & Co. KG |
| WEA 8 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| BE_01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark Breite Eiche GmbH & Co. KG |
| BE_02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Windpark Breite Eiche GmbH & Co. KG |
| WEA05 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA03 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA02 | 6.30 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA12 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA07 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA05 | 6.30 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA01 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA04 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA06 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA02 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA11 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA06 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA03 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA10 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA01 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA02 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA03 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA01 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA01 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA02 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA09 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA08 | 6.30 MW | ENERCON GmbH | planned | planned 2027 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA07 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA04 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | Windpark Berleburg-Erndtebrück GmbH & Co. KG |
| WEA04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Eurowind Energy GmbH |
| WEA 10 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Eurowind Energy GmbH |
| WEA 06 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Krug Energie GmbH & Co. KG |
| WP Burbach II WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Burbach GmbH |
| WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| Bad Laasphe-Feudingen WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| WEA 05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Krug Energie GmbH & Co. KG |
| Bärenkopf WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| WEA 06 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| Bad Laasphe-Feudingen WEA 07 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| WEA 07 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| Bärenkopf WEA 6 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| WEA 05 | 6.20 MW | – | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| Bärenkopf WEA 4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| WEA EW01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Kilbe Mitte GmbH & Co. KG |
| Bärenkopf WEA 5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| WEA EW02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Kilbe Mitte GmbH & Co. KG |
| WEA EW03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Kilbe Mitte GmbH & Co. KG |
| Bad Laasphe-Feudingen WEA 05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | JUWI GmbH |
| WP Burbach II WEA 5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Burbach GmbH |
| WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| WP Burbach II WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Burbach GmbH |
| Bärenkopf WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| Bärenkopf WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | K E Energy Holding GmbH & Co. KG |
| WEA 08 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Hermannstein GmbH & Co. KG |
| Wilnsdorf WEA 04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | MVV Windenergie GmbH |
| Bad Laasphe-Jagdberg II_WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | JUWI GmbH |
| WEA 2 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Winterscheid Energy GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Osterholz GmbH & Co. KG |
| EW08 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| WEA 7 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| EW07 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| Wilnsdorf WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | MVV Windenergie GmbH |
| EW03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| WEA 5 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| EW02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| EW09 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| WEA 3 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Wilnsdorf WEA 03 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | MVV Windenergie GmbH |
| EW06 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| EW05 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| Wilnsdorf WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | MVV Windenergie GmbH |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Osterholz GmbH & Co. KG |
| WEA 1 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Bad Laasphe-Jagdberg II_WEA 01 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | JUWI GmbH |
| WEA 6 Hilchenbach | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| EW04 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Ohrenbach GmbH & Co. KG |
| WEA 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Osterholz GmbH & Co. KG |
| WEA 6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 7 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| Bad Laasphe-Jagdberg WEA01 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | juwi Wind Germany 255 GmbH & Co. KG |
| Bad Laasphe-Jagdberg WEA02 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | juwi Wind Germany 255 GmbH & Co. KG |
| WP Burbach II WEA 3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Burbach GmbH |
| Bad Laasphe-Jagdberg WEA03 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | juwi Wind Germany 255 GmbH & Co. KG |
| Bad Laasphe-Jagdberg WEA08 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 255 GmbH & Co. KG |
| WP Siegen-Kreuzeiche WEA2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Siegerland GmbH |
| WP Freudenberg-Kuhlenberg WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Siegen-Kreuzeiche WEA4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Siegerland GmbH |
| WP Freudenberg-Kuhlenberg WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | EnBW OnshoreInvest GmbH & Co. KG |
| WP Siegen-Kreuzeiche WEA3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Siegerland GmbH |
| WP Siegen-Kreuzeiche WEA1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Siegerland GmbH |
| WEA 5 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 9 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 1 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| WEA 2 | 4.80 MW | Nordex Germany GmbH | planned | planned 2026 | ATE Windpark Erndtebrück GmbH & Co. KG |
| Bad Laasphe-Jagdberg II_WEA 02 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | JUWI GmbH |
| Bad Laasphe-Jagdberg WEA06 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 255 GmbH & Co. KG |
| Bad Laasphe-Jagdberg WEA05 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 255 GmbH & Co. KG |
| WEA 4 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Winterscheid Energy GmbH & Co. KG |
| Bad Laasphe-Jagdberg WEA07 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | juwi Wind Germany 255 GmbH & Co. KG |
| WEA 4 Hilchenbach | 3.50 MW | – | planned | planned 2027 | Alterric Deutschland GmbH |
| 254963 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2025-05-21 | Windpark Burbach GmbH |
| WEA 1N | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-10-26 | Lahn Energy GmbH & Co. KG |
| WEA 2 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-10-23 | Lahn Energy GmbH & Co. KG |
| WEA 4 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-10-30 | Lahn Energy GmbH & Co. KG |
| WEA 3 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2023-10-23 | Lahn Energy GmbH & Co. KG |
| Bluehouse Energy GmbH & Co. KG - WEA 12 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2021-03-31 | Bluehouse Energy GmbH & Co. KG |
| WEA 10 - V219365 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-29 | Greyhouse Energy GmbH & Co. KG |
| WEA 9-2 V219364 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-20 | Greyhouse Energy GmbH & Co. KG |
| WEA 8 - V205794 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-11-21 | Sayn Energy GmbH & Co. KG |
| WEA 3 - V201142 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-18 | Wittgenstein New Energy Holding GmbH |
| WEA 4 - V201143 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-25 | Wittgenstein New Energy Holding GmbH |
| WEA 1- V201580 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-09 | Wittgenstein New Energy Holding GmbH |
| WEA 2 - V201581 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-12 | Wittgenstein New Energy Holding GmbH |
| WEA 5 - V201144 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-27 | Wittgenstein New Energy Holding GmbH |
| WEA 7 - V205793 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-11-27 | Sayn Energy GmbH & Co. KG |
| WEA 6 - V201145 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-09-28 | Wittgenstein New Energy Holding GmbH |
| 699 | 2.50 MW | Fuhrländer AG | in operation | 2010-12-01 | Achte Volkswind GmbH & Co.KG |
| FL 425 | 2.50 MW | Fuhrländer AG | in operation | 2009-09-30 | Windpark Burbach 2008 2 UG (haftungsbeschränkt) & Co. KG |
| 698 | 2.50 MW | Fuhrländer AG | in operation | 2010-12-03 | Achte Volkswind GmbH & Co.KG |
| 700 | 2.50 MW | Fuhrländer AG | in operation | 2010-12-07 | Achte Volkswind GmbH & Co.KG |
| FL 424 | 2.50 MW | Fuhrländer AG | in operation | 2009-09-28 | Windpark Burbach 2008 1 UG (haftungsbeschränkt) & Co. KG |
| WEA3 | 2.40 MW | Nordex SE | in operation | 2018-07-25 | Windpark Knippen GmbH & Co. KG |
| WEA1a | 2.40 MW | Nordex SE | in operation | 2018-06-29 | Windpark Knippen GmbH & Co. KG |
| WEA2 | 2.40 MW | Nordex SE | in operation | 2018-07-11 | Windpark Knippen GmbH & Co. KG |
| 82255 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-07 | RothaarWind GmbH & Co. KG |
| 82254 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-21 | RothaarWind GmbH & Co. KG |
| 82253 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-22 | RothaarWind GmbH & Co. KG |
| WP Bad Berleburg WEA 01 (33296) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-25 | Alterric Windpark Betriebs GmbH & Co. KG |
| WP Bad Berleburg WEA 02 (33295) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-25 | Alterric Windpark Betriebs GmbH & Co. KG |
| 82252 | 2.00 MW | – | in operation | 2008-03-19 | RothaarWind GmbH & Co. KG |
| 82256 | 2.00 MW | ENERCON GmbH | in operation | 2007-12-03 | RothaarWind GmbH & Co. KG |
| Ewiger Fuhrmann | 1.65 MW | Vestas Deutschland GmbH | in operation | 2000-12-21 | Ewiger Fuhrmann Windkraft GmbH & Co KG |
| Anlagen Nr. 70179 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-01-29 | Mark-E Aktiengesellschaft |
| unit operated by a private individual | 1.00 MW | Fuhrländer AG | in operation | 2001-10-12 | private individual |
| WEA Netphen 3 (481682) | 0.80 MW | ENERCON GmbH | in operation | 2009-04-08 | Windhagen Projekt Netphen GmbH & Co. KG |
| WEA Netphen 2 (481681) | 0.80 MW | ENERCON GmbH | in operation | 2009-04-08 | Windhagen Projekt Netphen GmbH & Co. KG |
| WEA Netphen 1 (481674) | 0.80 MW | ENERCON GmbH | in operation | 2009-04-07 | Windhagen Projekt Netphen GmbH & Co. KG |
| 441415 | 0.60 MW | ENERCON GmbH | in operation | 2002-10-09 | Windpark Meiswinkel GmbH |
| Kleinwindanlage | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2013-10-21 | Dirk u. Christian Schöneborn GbR |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2017-06-02 | private individual |
Which organisations operate the most wind power capacity in Siegen-Wittgenstein?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Berleburg Ost GmbH & Co. KG | 27 | 194.4 MW |
| Windpark Berleburg-Erndtebrück GmbH & Co. KG | 24 | 151.2 MW |
| Prinz Wittgenstein Projektentwicklung (Ludwig Ferdinand Prinz zu Sayn-Wittgenstein-Berleburg) | 8 | 57.6 MW |
| ATE Windpark Erndtebrück GmbH & Co. KG | 9 | 48.8 MW |
| Windpark Ohrenbach GmbH & Co. KG | 8 | 48.0 MW |
| Windpark Hermannstein GmbH & Co. KG | 7 | 43.4 MW |
| Dense-Wind GmbH & Co. KG | 6 | 43.2 MW |
| Alterric Deutschland GmbH | 7 | 39.5 MW |
| K E Energy Holding GmbH & Co. KG | 6 | 37.2 MW |
| juwi Wind Germany 255 GmbH & Co. KG | 7 | 35.0 MW |
Which manufacturer accounts for the most wind power capacity in Siegen-Wittgenstein?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 123 | 734.8 MW |
| ENERCON GmbH | 48 | 261.0 MW |
| Nordex Germany GmbH | 9 | 48.8 MW |
| Nordex Energy GmbH | 2 | 13.6 MW |
| Fuhrländer AG | 6 | 13.5 MW |
| Nordex SE | 3 | 7.20 MW |
| Südwind Borsig Energy GmbH | 1 | 1.50 MW |
| BRAUN Windturbinen GmbH | 1 | 0.01 MW |
| Sonstige | 1 | 0.00 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Siegen-Wittgenstein (Nordrhein-Westfalen), and ho can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.