Germany · renewables
Wind power in Rhein-Erft-Kreis
77 wind turbines with 254.9 MW of gross capacity were in operation in Rhein-Erft-Kreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 51 units (290.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Rhein-Erft-Kreis (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 77 wind turbines with 254.9 MW of gross capacity were in operation in Rhein-Erft-Kreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 51 units (290.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Rhein-Erft-Kreis?
- 77 wind turbines with 254.9 MW of gross capacity were in operation in Rhein-Erft-Kreis as of 2026-11-05, with a further 51 units (290.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Rhein-Erft-Kreis in 2025?
- 13 wind turbines with 45.8 MW went into operation in Rhein-Erft-Kreis in 2025; the strongest year of the last two decades was 2025 with 45.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Rhein-Erft-Kreis?
- RWE Wind Onshore & PV Deutschland GmbH operates 12 wind turbines with 65.3 MW in Rhein-Erft-Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Rhein-Erft-Kreis?
- Nordex Germany GmbH leads with 56 wind turbines and 308.1 MW in Rhein-Erft-Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Rhein-Erft-Kreis?
- The largest registered wind turbine in Rhein-Erft-Kreis has 7.00 MW of gross capacity and is operated by JUWI GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Rhein-Erft-Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| 30 to 100 kW | 1 | 0.08 MW | 1 | 0 |
| over 100 kW | 132 | 552.3 MW | 76 | 51 |
How much wind power capacity was commissioned in Rhein-Erft-Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 15 | 94.6 MW |
| 2025 | 13 | 45.8 MW |
| 2024 | 11 | 39.6 MW |
| 2023 | 1 | 5.60 MW |
| 2018 | 5 | 15.6 MW |
| 2017 | 4 | 13.2 MW |
| 2016 | 1 | 3.05 MW |
| 2015 | 1 | 3.05 MW |
| 2014 | 2 | 4.00 MW |
| 2008 | 1 | 1.50 MW |
| 2007 | 3 | 4.50 MW |
| 2006 | 4 | 8.00 MW |
How many wind turbines in Rhein-Erft-Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 51 | 290.0 MW |
| in operation | 77 | 254.9 MW |
| permanently decommissioned | 5 | 7.50 MW |
Which wind turbines are registered in Rhein-Erft-Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Bergheim R WEA 02B | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Windpark Bergheim-Hüchelhoven WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| Windpark Bergheim-Hüchelhoven WEA 04 | 7.00 MW | Nordex Energy GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| Windpark Bergheim-Hüchelhoven WEA 03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| Wind Onshore Bedburg 3 WEA 05 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-09-23 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| Windpark Bergheim-Hüchelhoven WEA 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| ENOVA Repowering Rurich WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Rurich Betriebs GmbH & Co. KG |
| ENOVA Repowering Elsdorf WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Elsdorf Betriebs GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 09 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-25 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 02 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-25 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| ENOVA Repowering Rurich WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Rurich Betriebs GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 01 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-24 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| ENOVA Repowering Elsdorf WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Elsdorf Betriebs GmbH & Co. KG |
| ENOVA Repowering Elsdorf WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Elsdorf Betriebs GmbH & Co. KG |
| WEA 01 Windpark Bergheim-Hüchelhoven | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | RWE Wind Onshore & PV Deutschland GmbH |
| ENOVA Repowering Elsdorf WEA 4 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Elsdorf Betriebs GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 06 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-09-23 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 07 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-10-14 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 03 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-26 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| Pulheim-Stommeln WEA 01P | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Pulheim-Stommeln WEA 02P | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| Pulheim-Stommeln WEA 03P | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | JUWI GmbH |
| WEA 04 Windpark Kerpen-Marienfeld | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| Erftstadt WEA 4 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-03-19 | Windpark Erftstadt GmbH & Co. KG |
| Erftstadt WEA 3 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-03-19 | Windpark Erftstadt GmbH & Co. KG |
| WEA 05 - WP Bergheim Wiedenfelder Höhe - Erweiterung | 5.70 MW | Nordex Germany GmbH | in operation | 2026-05-28 | RWE Wind Onshore & PV Deutschland GmbH |
| Wind Onshore Bedburg 3 WEA 04 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-08-26 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| WEA 5N Erftstadt Erp | 5.70 MW | Nordex SE | planned | planned 2029 | RheinEnergie AG |
| WEA 3 | 5.70 MW | Nordex SE | planned | planned 2027 | Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG |
| Wind Onshore Bedburg 3 WEA 08 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-10-15 | RWE Windpark Bedburg A44n GmbH & Co. KG |
| WEA 5 | 5.70 MW | Nordex SE | planned | planned 2027 | Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG |
| Stommeln N-149-5,7 WEA3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RheinEnergie AG |
| WEA4 Erftstadt Erp | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | RheinEnergie AG |
| WP Kerpen - WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | Energiepark Elsdorf WP Tollhausen GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | Energiepark Elsdorf WP Tollhausen GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex SE | in operation | 2026-09-01 | Energiepark Elsdorf WP Frankeshoven GmbH & Co. KG |
| WP Kerpen - WEA 2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WEA2 Erftstadt Erp | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | RheinEnergie AG |
| WEA 3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | Energiepark Elsdorf WP Tollhausen GmbH & Co. KG |
| WEA 10 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | NHR Windenergie GmbH & Co.KG |
| WEA 07 WP Bergheim Wiedenfelder Höhe - Erweiterung | 5.70 MW | Nordex Germany GmbH | in operation | 2026-05-27 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 4 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | Energiepark Elsdorf WP Tollhausen GmbH & Co. KG |
| WEA 4 | 5.70 MW | Nordex SE | planned | planned 2027 | Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG |
| Stommeln N-149-5,7 WEA1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RheinEnergie AG |
| WEA 1 | 5.70 MW | Nordex SE | in operation | 2026-09-24 | Energiepark Elsdorf WP Frankeshoven GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex SE | in operation | 2026-09-01 | Energiepark Elsdorf WP Frankeshoven GmbH & Co. KG |
| Stommeln N-149-5,7 WEA4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RheinEnergie AG |
| WEA1 Erftstadt Erp | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | RheinEnergie AG |
| WEA 2 | 5.70 MW | Nordex SE | planned | planned 2027 | Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG |
| WEA 2 Fischbachhöhe II | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | STAWAG Energie GmbH |
| WEA 4 Fischbachhöhe II | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | STAWAG Energie GmbH |
| WEA 3 Fischbachhöhe II | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | STAWAG Energie GmbH |
| WEA 1 | 5.70 MW | Nordex SE | planned | planned 2027 | Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG |
| WEA 03 Windpark Kerpen-Marienfeld | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 06 - WP Bergheim Wiedenfelder Höhe - Erweiterung | 5.70 MW | Nordex Germany GmbH | in operation | 2026-05-27 | RWE Wind Onshore & PV Deutschland GmbH |
| Stommeln N-149-5,7 WEA2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | RheinEnergie AG |
| WEA 1 Fischbachhöhe II | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | STAWAG Energie GmbH |
| WEA 2 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-11-16 | Energiepark Bergheim-Repowering RE WP BE GmbH & Co. KG |
| WEA 2 | 4.50 MW | Nordex SE | planned | planned 2027 | Energiepark Frechen WP GmbH & Co. KG |
| WEA 1 | 4.50 MW | Nordex SE | planned | planned 2027 | Energiepark Frechen WP GmbH & Co. KG |
| WEA 6 | 4.50 MW | Nordex SE | planned | planned 2027 | Energiepark Frechen WP GmbH & Co. KG |
| WEA 1 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp I GmbH & Co. KG |
| WEA 11 | 3.60 MW | Nordex Germany GmbH | in operation | 2025-01-16 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 07 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-05 | REA Bürgerwind Erftstadt A1 GmbH & Co. KG |
| WEA 12 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-04 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 08 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-03 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 6 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp I GmbH & Co. KG |
| WEA 2 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp I GmbH & Co. KG |
| Erftstadt WEA 10 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-27 | Windpark Erftstadt GmbH & Co. KG |
| WEA 3 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp I GmbH & Co. KG |
| WEA 4 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp II GmbH & Co. KG |
| Erftstadt WEA 9 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-20 | Windpark Erftstadt GmbH & Co. KG |
| Erftstadt WEA 6 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-25 | Windpark Erftstadt GmbH & Co. KG |
| WEA 5 | 3.60 MW | Nordex Germany GmbH | planned | planned 2026 | Energiepark Erftstadt-Erp II GmbH & Co. KG |
| Erftstadt WEA 5 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-26 | Windpark Erftstadt GmbH & Co. KG |
| WEA 06 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-11-28 | REA WEA Erftstadt A1 GmbH & Co. KG |
| WEA 03 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-10 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| Erftstadt WEA 7 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-25 | Windpark Erftstadt GmbH & Co. KG |
| Erftstadt WEA 8 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-03-20 | Windpark Erftstadt GmbH & Co. KG |
| WEA 04 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-11-28 | REA Bürgerwind Erftstadt A1 GmbH & Co. KG |
| WEA 05 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-19 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 02 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-10 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 09 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-10 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| WEA 10 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-11-28 | REA WEA Erftstadt A1 GmbH & Co. KG |
| WEA 01 | 3.60 MW | Nordex Germany GmbH | in operation | 2024-12-17 | REA Windpark Erftstadt A1 GmbH & Co. KG |
| 218218_Wiedenfelder Höhe A | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-28 | RWE Wind Onshore & PV Deutschland GmbH |
| 218219_Wiedenfelder Höhe B | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-17 | RWE Wind Onshore & PV Deutschland GmbH |
| 218220_Wiedenfelder Höhe B | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-15 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 1 Windpark Paffendorf | 3.30 MW | Vestas Deutschland GmbH | in operation | 2018-03-21 | Windpark Paffendorf GmbH & Co. KG |
| Wiedenfelder Höhe A_218217 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-28 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 2 Windpark Paffendorf | 3.30 MW | Vestas Deutschland GmbH | in operation | 2018-03-29 | Windpark Paffendorf GmbH & Co. KG |
| Elsd IV | 3.05 MW | – | in operation | 2015-12-22 | WE Elsdorf GmbH & Co. KG |
| Elsd III | 3.05 MW | – | in operation | 2016-01-21 | WE Elsdorf GmbH & Co. KG |
| WEA02 - NX85695 | 3.00 MW | Nordex Energy GmbH | in operation | 2018-02-15 | Windpark Fischbachhöhe GmbH & Co. KG |
| WEA01 - NX85696 | 3.00 MW | Nordex Energy GmbH | in operation | 2018-02-28 | Windpark Fischbachhöhe GmbH & Co. KG |
| WEA03 - NX85889 | 3.00 MW | Nordex Energy GmbH | in operation | 2018-08-30 | Windpark Fischbachhöhe GmbH & Co. KG |
| WEA 05 Kerpen Türnich | 2.30 MW | ENERCON GmbH | planned | planned 2025 | SL Windpark Berrenrather Börde GmbH & Co. KG |
| WEA 827840 02 Kerpen Türnich | 2.30 MW | ENERCON GmbH | in operation | 2025-09-03 | SL Windpark Berrenrather Börde GmbH & Co. KG |
| WEA 827839 01 Kerpen Türnich | 2.30 MW | ENERCON GmbH | in operation | 2025-08-29 | SL Windpark Berrenrather Börde GmbH & Co. KG |
| WEA 827841 03 Hürth Gleuel | 2.30 MW | ENERCON GmbH | in operation | 2025-09-03 | SL Windpark Berrenrather Börde GmbH & Co. KG |
| WEA 827842 04 Hürth Gleuel | 2.30 MW | ENERCON GmbH | in operation | 2025-08-29 | SL Windpark Berrenrather Börde GmbH & Co. KG |
| Elsd I | 2.00 MW | – | in operation | 2014-08-12 | WE Elsdorf GmbH & Co. KG |
| 78105 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-07 | Alterric Windpark GmbH & Co. Erftstadt KG |
| Elsd II | 2.00 MW | – | in operation | 2014-08-14 | WE Elsdorf GmbH & Co. KG |
| 702274 | 2.00 MW | ENERCON GmbH | in operation | 2005-03-09 | Alterric Windpark GmbH & Co. Erftstadt KG |
| 78107 | 2.00 MW | ENERCON GmbH | in operation | 2006-05-29 | Alterric Windpark GmbH & Co. Erftstadt KG |
| 78108 | 2.00 MW | ENERCON GmbH | in operation | 2006-05-26 | Alterric Windpark GmbH & Co. Erftstadt KG |
| 78106 | 2.00 MW | ENERCON GmbH | in operation | 2006-06-01 | Alterric Windpark GmbH & Co. Erftstadt KG |
| 702275 | 2.00 MW | ENERCON GmbH | in operation | 2005-03-07 | Alterric Windpark GmbH & Co. Erftstadt KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-07-22 | private individual |
| BM04 GE15501257 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-04 | MVV Windenergie GmbH |
| BM01 GE15501260 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-09 | MVV Windenergie GmbH |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2005-06-30 | private individual |
| ELS 02 | 1.50 MW | REpower Systems SE | in operation | 2007-06-30 | ENOVA Windpark Elsdorf GmbH & Co. KG |
| ELS 01 | 1.50 MW | REpower Systems SE | in operation | 2007-07-09 | ENOVA Windpark Elsdorf GmbH & Co. KG |
| BM03 GE15501258 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-04 | MVV Windenergie GmbH |
| RU 01 | 1.50 MW | REpower Systems SE | in operation | 2007-12-18 | ENOVA Windpark Rurich GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2005-06-30 | private individual |
| BM02 GE15501256 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-10 | MVV Windenergie GmbH |
| RU 02 | 1.50 MW | REpower Systems SE | in operation | 2008-02-08 | ENOVA Windpark Rurich GmbH & Co. KG |
| WP Titz WEA 6 | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-04 | PAC Jade GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2005-06-30 | private individual |
| BM05 GE15501259 | 1.50 MW | GE Wind Energy GmbH | in operation | 2003-12-05 | MVV Windenergie GmbH |
| 442347 | 0.60 MW | ENERCON GmbH | in operation | 2004-11-23 | Windpark GmbH & Co. Erp KG |
| WEA Erftstadt 6 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-21 | Bernardo Wind GmbH & Co. KG |
| WEA Erftstadt 4 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-20 | Bernardo Wind GmbH & Co. KG |
| WEA Erftstadt 2 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-15 | Bernardo Wind GmbH & Co. KG |
| 442346 | 0.60 MW | ENERCON GmbH | in operation | 2004-11-22 | Windpark GmbH & Co. Erp KG |
| WEA Erftstadt 5 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-23 | Bernardo Wind GmbH & Co. KG |
| WEA Erftstadt 1 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-12 | Bernardo Wind GmbH & Co. KG |
| WEA Erftstadt 3 | 0.60 MW | ENERCON GmbH | in operation | 2002-08-29 | Bernardo Wind GmbH & Co. KG |
| unit operated by a private individual | 0.08 MW | Lagerwey GmbH | in operation | 1995-05-11 | private individual |
Which organisations operate the most wind power capacity in Rhein-Erft-Kreis?
| Operator | Units | Capacity |
|---|---|---|
| RWE Wind Onshore & PV Deutschland GmbH | 12 | 65.3 MW |
| RWE Windpark Bedburg A44n GmbH & Co. KG | 9 | 60.4 MW |
| RheinEnergie AG | 8 | 45.6 MW |
| STAWAG Energie GmbH | 6 | 34.2 MW |
| Windpark Erftstadt GmbH & Co. KG | 8 | 33.0 MW |
| REA Windpark Erftstadt A1 GmbH & Co. KG | 8 | 28.8 MW |
| Energiepark Kerpen-Manheim WP KeMa I GmbH & Co. KG | 5 | 28.5 MW |
| ENOVA Windpark Elsdorf Betriebs GmbH & Co. KG | 4 | 28.0 MW |
| JUWI GmbH | 4 | 27.4 MW |
| Energiepark Elsdorf WP Tollhausen GmbH & Co. KG | 4 | 22.8 MW |
Which manufacturer accounts for the most wind power capacity in Rhein-Erft-Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 56 | 308.1 MW |
| Nordex Energy GmbH | 20 | 94.6 MW |
| Nordex SE | 12 | 64.8 MW |
| ENERCON GmbH | 19 | 28.3 MW |
| Vestas Deutschland GmbH | 7 | 25.4 MW |
| GE Wind Energy GmbH | 7 | 10.5 MW |
| REpower Systems SE | 7 | 10.5 MW |
| Lagerwey GmbH | 1 | 0.08 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Rhein-Erft-Kreis (Nordrhein-Westfalen), and how l can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.