Germany · renewables
Wind power in Recklinghausen
88 wind turbines with 264.2 MW of gross capacity were in operation in Recklinghausen (Nordrhein-Westfalen) as of 2026-11-05, with a further 25 units (161.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Recklinghausen (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 88 wind turbines with 264.2 MW of gross capacity were in operation in Recklinghausen (Nordrhein-Westfalen) as of 2026-11-05, with a further 25 units (161.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Recklinghausen?
- 88 wind turbines with 264.2 MW of gross capacity were in operation in Recklinghausen as of 2026-11-05, with a further 25 units (161.9 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Recklinghausen in 2025?
- 12 wind turbines with 56.0 MW went into operation in Recklinghausen in 2025; the strongest year of the last two decades was 2025 with 56.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Recklinghausen?
- Bürgerwind Lembecker Elven GmbH & Co. KG operates 5 wind turbines with 36.0 MW in Recklinghausen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Recklinghausen?
- Vestas Deutschland GmbH leads with 19 wind turbines and 123.0 MW in Recklinghausen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Recklinghausen?
- The largest registered wind turbine in Recklinghausen has 7.20 MW of gross capacity and is operated by Bürgerwind Kreienberg GbR, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Recklinghausen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 5 | 0.00 MW | 5 | 0 |
| 30 to 100 kW | 1 | 0.08 MW | 0 | 0 |
| over 100 kW | 111 | 429.7 MW | 83 | 25 |
How much wind power capacity was commissioned in Recklinghausen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 4 | 24.6 MW |
| 2025 | 12 | 56.0 MW |
| 2024 | 3 | 17.0 MW |
| 2023 | 7 | 32.0 MW |
| 2022 | 4 | 14.5 MW |
| 2021 | 2 | 9.00 MW |
| 2020 | 3 | 11.3 MW |
| 2019 | 1 | 3.05 MW |
| 2018 | 2 | 6.37 MW |
| 2017 | 3 | 8.39 MW |
| 2016 | 11 | 32.4 MW |
| 2015 | 5 | 12.4 MW |
| 2014 | 5 | 14.6 MW |
| 2012 | 1 | 2.30 MW |
| 2009 | 5 | 5.25 MW |
How many wind turbines in Recklinghausen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 88 | 264.2 MW |
| planned | 25 | 161.9 MW |
| permanently decommissioned | 3 | 3.60 MW |
| temporarily shut down | 1 | 0.08 MW |
Which wind turbines are registered in Recklinghausen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Bürgerwind Kreienberg GbR |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwind Hammpittenberg GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwind Lembecker Elven GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Im Strein GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Hilgenböcken GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwind Lembecker Elven GmbH & Co. KG |
| T 7 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-08-27 | Windenergie Bensberg GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwind Lembecker Elven GmbH & Co. KG |
| Kaufenberg T8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Tannenberg Wind GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwind Lembecker Elven GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Bürgerwind Lembecker Elven GmbH & Co. KG |
| Maria Born T6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Tannenberg Wind GmbH & Co. KG |
| Holtwick | 7.00 MW | ENERCON GmbH | planned | planned 2029 | B&W Projekt GmbH & Co. KG |
| WEA Dorsten Wulfen 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2024 | Windpark Haltern AV 9 GmbH |
| WEA Dorsten Wulfen 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Haltern AV 9 GmbH |
| WEA Dorsten Wulfen 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Haltern AV 9 GmbH |
| Haltern_Holtwick | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | VERBUND Green Power Deutschland GmbH |
| Haltern_Holtwick WEA3 | 6.80 MW | Nordex SE | planned | planned 2027 | VERBUND Green Power Deutschland GmbH |
| WEA 2 (252445) | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-08-11 | Windenergie Lehmberg GmbH & Co. KG |
| Besenkamp | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Besenkamp GmbH & Co. KG |
| WEA 1 | 6.00 MW | GE Renewable Germany GmbH | in operation | 2026-08-24 | Windenergie Gälkenheide GmbH & Co. KG |
| WEA 1 - 92126 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-11-07 | Windpark Datteln GmbH & Co. KG |
| Haltern_Uphusen_WEAC3 | 5.70 MW | Nordex SE | in operation | 2026-08-04 | VERBUND Green Power Deutschland GmbH |
| Windkraft Polsum GmbH | 5.70 MW | Nordex Germany GmbH | in operation | 2025-06-27 | Windkraft Polsum |
| WEA 2 - 92127 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-11-21 | Windpark Datteln GmbH & Co. KG |
| Haltern_Uphusen_WEAC2 | 5.70 MW | Nordex SE | in operation | 2026-08-04 | VERBUND Green Power Deutschland GmbH |
| V 246619-02 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-29 | Windpark Antrup GmbH & Co. KG |
| WEA1-251581 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-08-09 | Tannenberg Wind GmbH & Co. KG |
| V 246618-01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-29 | Windpark Antrup GmbH & Co. KG |
| V 246617-01 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-10-19 | Windpark Roggenkamp GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Orthöver Windenergie GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Dahlbrei GmbH & Co. KG |
| Windenergieanlage II 5560 kW | 5.56 MW | ENERCON GmbH | in operation | 2025-04-15 | Wellbruch Windenergie GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Dahlbrei GmbH & Co. KG |
| Windenergieanlage 5560 kW | 5.56 MW | ENERCON GmbH | in operation | 2025-02-26 | Hessling Windenergie GmbH & Co. KG |
| WEA 2 (552202049) | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-17 | Bürgerwind Torfvenn GmbH & Co.KG |
| Datteln Löringhof | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-01-31 | Ostenhof Wind GmbH & Co. KG |
| WEA4 / 552343170 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-01-15 | Windenergie Große Heide GmbH & Co. KG |
| WEA 3 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2029 | Bürgerwind Torfvenn GmbH & Co.KG |
| WEA3 / 552343169 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-02-11 | Windenergie Große Heide GmbH & Co. KG |
| WEA5 / 552343171 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-01-28 | Windenergie Große Heide GmbH & Co. KG |
| 552014985 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-02-11 | Windenergie Ennenberg GmbH & Co. KG |
| WEA 1 (552202048) | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-14 | Bürgerwind Torfvenn GmbH & Co.KG |
| WEA2 / 552343168 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-01-16 | Windenergie Große Heide GmbH & Co. KG |
| 552014984 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-02-04 | Windenergie Ennenberg GmbH & Co. KG |
| WEA 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-06-06 | RombrookWind GmbH & Co. KG |
| WEA T5 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-04-01 | Windpark Haltern AV 9 GmbH |
| WEA T4 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-03-11 | Windpark Haltern AV 9 GmbH |
| Repowering Datteln | 4.40 MW | Senvion Deutschland GmbH | planned | planned 2026 | Windkraft Datteln GmbH & Co. KG |
| QW HAL WEA | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Quarzwerke GmbH |
| WEA 138GlaZw1 01 Gladbeck Zweckel | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WKA Emmelkamp GbR | 4.20 MW | ENERCON GmbH | in operation | 2023-09-13 | WKA Emmelkamp GbR |
| 234676 | 4.00 MW | Vestas Deutschland GmbH | in operation | 2020-09-30 | Windenergie Sebbel GmbH & Co. KG |
| 234675 | 4.00 MW | Vestas Deutschland GmbH | in operation | 2020-12-30 | Westwind Hawig GmbH & Co. KG |
| WEA Halde Mottbruch | 3.50 MW | ENERCON GmbH | in operation | 2022-02-02 | Gladbeck-Wind GmbH |
| WEA01 | 3.30 MW | Nordex Energy GmbH | in operation | 2020-11-19 | Stadtwerke Castrop-Rauxel GmbH |
| unit operated by a private individual | 3.20 MW | Senvion Deutschland GmbH | in operation | 2014-09-09 | private individual |
| 301516 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2018-06-20 | Windenergie Essel-Suderwich GmbH & Co. KG |
| WP Brinkfortsheide WEA 3 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2014-11-28 | Windkraft Brinkfortsheide GmbH |
| Windkraftanlage EDO | 3.17 MW | Senvion Deutschland GmbH | in operation | 2017-05-04 | EDO Wind GmbH & Co. KG |
| 301327 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2017-04-27 | Windenergie Hawig GmbH & Co. KG |
| WEA Marl | 3.17 MW | Senvion Deutschland GmbH | in operation | 2018-03-22 | WEA Marl Betreibergesellschaft mbH & Co. KG |
| WP Brinkfortsheide WEA 1 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2014-11-25 | Windkraft Brinkfortsheide GmbH |
| Ruhrwind Herten, Halde Hoppenbruch, E101 | 3.05 MW | ENERCON GmbH | in operation | 2016-08-17 | Ruhrwind Herten GmbH |
| WEA 1010851 | 3.05 MW | ENERCON GmbH | in operation | 2014-10-10 | SL Windrad Marl GmbH & Co. KG |
| WEA 1011565 | 3.05 MW | ENERCON GmbH | in operation | 2019-04-17 | SL Windpark A-52 GmbH & Co. KG |
| WEA 1150378 | 3.00 MW | ENERCON GmbH | in operation | 2016-08-10 | SL-T Haltern-Synergie GmbH & Co. KG |
| 85006 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-11-04 | Windenergie Haltern am See GmbH & Co. KG |
| B5 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-08 | Windpark Uphuser Mark GmbH & Co.KG |
| B2 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-15 | Windpark Uphuser Mark GmbH & Co.KG |
| 85005 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-10-27 | Windenergie Haltern am See GmbH & Co. KG |
| B4 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-09 | Windpark Uphuser Mark GmbH & Co.KG |
| 85004 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-10-13 | Windenergie Haltern am See GmbH & Co. KG |
| A3 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-12-02 | Windpark Uphuser Mark GmbH & Co.KG |
| B3 | 3.00 MW | Nordex Energy GmbH | in operation | 2016-11-24 | Windpark Uphuser Mark GmbH & Co.KG |
| unit operated by a private individual | 3.00 MW | Senvion Deutschland GmbH | in operation | 2015-06-19 | private individual |
| Becklem | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-01 | Windenergie Becklem GmbH & Co. KG |
| 84085 | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-14 | Windenergie Frentrop GmbH & Co. KG |
| WEA 824557 | 2.30 MW | ENERCON GmbH | in operation | 2012-08-23 | SL BürgerEnergie Gladbeck GmbH & Co. KG |
| CasWind | 2.30 MW | ENERCON GmbH | in operation | 2016-03-22 | CAS-Wind-GmbH&Co. KG |
| WKA Östrich GbR | 2.30 MW | ENERCON GmbH | in operation | 2015-03-12 | WKA Östrich GbR |
| WEA 826467 | 2.30 MW | ENERCON GmbH | in operation | 2015-12-29 | SL Windrad Wiesenbusch GmbH & Co. KG |
| S93139 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2014-12-15 | Ecopart Haltern GmbH & Co. KG |
| 90916 | 2.05 MW | REpower Systems SE | in operation | 2009-10-02 | Windenergie Neuer Kamp GmbH & Co. KG |
| WP Brinkfortsheide WEA 2 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2017-09-29 | Windkraft Brinkfortsheide GmbH |
| 78449 | 2.00 MW | ENERCON GmbH | in operation | 2005-12-27 | Windenergie Lehmberg GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2004-06-25 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2004-06-25 | private individual |
| Kolter GbR | 1.00 MW | ENERCON GmbH | in operation | 2004-07-01 | Bioenergie Kremerskothen |
| WEA 58147 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-06 | SL Windpark Recklinghausen GmbH & Co. KG |
| WEA 58145 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-06 | SL Windpark Recklinghausen GmbH & Co. KG |
| WEA 58146 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-06 | SL Windpark Recklinghausen GmbH & Co. KG |
| WEA 58144 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-06 | SL Windpark Recklinghausen GmbH & Co. KG |
| WEA 58226 | 1.00 MW | ENERCON GmbH | in operation | 2002-11-25 | SL EnergieTeam GmbH & Co. KG |
| Waltrop 53787 | 0.80 MW | ENERCON GmbH | in operation | 2009-01-29 | DEW21 Windkraftbeteiligungsgesellschaft mbH |
| Waltrop 53786 | 0.80 MW | ENERCON GmbH | in operation | 2009-01-29 | DEW21 Windkraftbeteiligungsgesellschaft mbH |
| Waltrop 53785 | 0.80 MW | ENERCON GmbH | in operation | 2009-01-29 | DEW21 Windkraftbeteiligungsgesellschaft mbH |
| Waltrop 53784 | 0.80 MW | ENERCON GmbH | in operation | 2009-01-30 | DEW21 Windkraftbeteiligungsgesellschaft mbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-08-17 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-08-14 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-11-19 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-11-09 | private individual |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | in operation | 2001-04-05 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2003-12-03 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-09-13 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-08-16 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-08-16 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2000-11-14 | private individual |
| Castrop-Rauxel | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1999-02-10 | H+F Energie GmbH & Co KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1996-11-21 | private individual |
| E 40 | 0.50 MW | ENERCON GmbH | in operation | 1998-08-31 | Bioenergie Kremerskothen |
| unit operated by a private individual | 0.08 MW | Tacke GmbH & Co. KG | temporarily shut down | 1994-12-21 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2023-06-01 | private individual |
| Fritz-Erler-Str. IDG-Wind | 0.00 MW | – | in operation | 2005-07-04 | Stadt Gladbeck |
| Kleinwindkraftanlage Wind 2 | 0.00 MW | SkyWind GmbH | in operation | 2025-07-04 | AGR Abfallentsorgungs-Gesellschaft Ruhrgebiet mbH |
| Kleinwindkraftanlage Wind 1 | 0.00 MW | SkyWind GmbH | in operation | 2025-07-04 | AGR Abfallentsorgungs-Gesellschaft Ruhrgebiet mbH |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2022-03-10 | private individual |
Which organisations operate the most wind power capacity in Recklinghausen?
| Operator | Units | Capacity |
|---|---|---|
| Bürgerwind Lembecker Elven GmbH & Co. KG | 5 | 36.0 MW |
| Windpark Haltern AV 9 GmbH | 5 | 30.0 MW |
| VERBUND Green Power Deutschland GmbH | 4 | 25.0 MW |
| Windenergie Große Heide GmbH & Co. KG | 4 | 22.0 MW |
| Tannenberg Wind GmbH & Co. KG | 3 | 20.0 MW |
| Bürgerwind Torfvenn GmbH & Co.KG | 3 | 16.5 MW |
| Windpark Uphuser Mark GmbH & Co.KG | 5 | 15.0 MW |
| Windpark Datteln GmbH & Co. KG | 2 | 11.4 MW |
| Windpark Antrup GmbH & Co. KG | 2 | 11.2 MW |
| Windenergie Dahlbrei GmbH & Co. KG | 2 | 11.1 MW |
Which manufacturer accounts for the most wind power capacity in Recklinghausen?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 19 | 123.0 MW |
| ENERCON GmbH | 41 | 96.0 MW |
| GE Wind Energy GmbH | 13 | 63.5 MW |
| Nordex Energy GmbH | 15 | 52.5 MW |
| Senvion Deutschland GmbH | 11 | 33.8 MW |
| Nordex Germany GmbH | 5 | 33.5 MW |
| Nordex SE | 3 | 18.2 MW |
| GE Renewable Germany GmbH | 1 | 6.00 MW |
| REpower Systems SE | 1 | 2.05 MW |
| NEG Micon Deutschland GmbH | 1 | 0.60 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Recklinghausen (Nordrhein-Westfalen), and how lar can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.