Wind power in Paderborn
520 wind turbines with 1.44 GW of gross capacity were in operation in Paderborn (Nordrhein-Westfalen) as of 2026-11-05, with a further 183 units (1.07 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Paderborn (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 520 wind turbines with 1.44 GW of gross capacity were in operation in Paderborn (Nordrhein-Westfalen) as of 2026-11-05, with a further 183 units (1.07 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Paderborn?
- 520 wind turbines with 1.44 GW of gross capacity were in operation in Paderborn as of 2026-11-05, with a further 183 units (1.07 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Paderborn in 2025?
- 35 wind turbines with 181.6 MW went into operation in Paderborn in 2025; the strongest year of the last two decades was 2025 with 181.6 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Paderborn?
- Wind-Plan-Sintfeld II GmbH & Co. KG operates 20 wind turbines with 115.6 MW in Paderborn, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Paderborn?
- ENERCON GmbH leads with 543 wind turbines and 1.80 GW in Paderborn (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Paderborn?
- The largest registered wind turbine in Paderborn has 7.20 MW of gross capacity and is operated by EFG-Energie GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Paderborn distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 7 | 0.04 MW | 4 | 0 |
| 30 to 100 kW | 1 | 0.10 MW | 1 | 0 |
| over 100 kW | 787 | 2.62 GW | 515 | 183 |
How much wind power capacity was commissioned in Paderborn each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 17 | 95.8 MW |
| 2025 | 35 | 181.6 MW |
| 2024 | 17 | 97.9 MW |
| 2023 | 22 | 93.2 MW |
| 2022 | 28 | 113.9 MW |
| 2021 | 8 | 28.5 MW |
| 2020 | 24 | 71.5 MW |
| 2019 | 3 | 8.30 MW |
| 2018 | 18 | 54.0 MW |
| 2017 | 55 | 146.4 MW |
| 2016 | 48 | 124.4 MW |
| 2015 | 18 | 47.5 MW |
| 2014 | 33 | 72.8 MW |
| 2013 | 33 | 74.1 MW |
| 2012 | 27 | 53.2 MW |
| 2011 | 21 | 45.0 MW |
| 2010 | 4 | 8.60 MW |
| 2009 | 20 | 31.6 MW |
| 2007 | 6 | 12.0 MW |
| 2006 | 12 | 16.9 MW |
How many wind turbines in Paderborn are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 520 | 1.44 GW |
| planned | 183 | 1.07 GW |
| permanently decommissioned | 92 | 107.0 MW |
Which wind turbines are registered in Paderborn?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA V4 WP Hirschweg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | EFG-Energie GmbH & Co. KG |
| WEA 11 V172 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Ventus Bene Consideratus GmbH & Co. KG I |
| V-172-7.2 Henglarn I Ebb 02 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-07 | OWL Erneuerbare Energien GmbH&Co.KG |
| ERW8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| Happenberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Austertal GmbH & Co. KG |
| ERW5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| ERW4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| Vestas V162-7.2 B64 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie an der B64 GmbH & Co.KG |
| Sintfeld 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Hirschweg GmbH & Co. KG |
| Sintfeld 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Hirschweg GmbH & Co. KG |
| Etteln V 162 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Öko Power GbR |
| V172-7.2 H2 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-07 | OWL Erneuerbare Energien GmbH&Co.KG |
| WED Dune | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | SoLa Energiepartner GmbH |
| ERW2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| ERW6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| V172 Eikel/Salzkotten | 7.20 MW | Vestas Deutschland GmbH | in operation | 2025-09-05 | Eikel Wind GmbH & Co. KG |
| Schwaney 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | SoLa Energiepartner GmbH |
| WEA 12 V172-7.2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Ventus Bene Consideratus GmbH & Co.KG II |
| WEA V5 WP Hirschweg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WBG Energie 5 GmbH & Co. KG |
| Fürstenberg_WEA16 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | rentec Fürstenberg GmbH & Co. KG |
| ERW3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Altenautal RE GmbH & Co. KG |
| V 172 - H3 | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-03-04 | OWL Erneuerbare Energien GmbH&Co.KG |
| WEA 1 N175 Fürstenberg | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Lackmann-Flocke GbR |
| BKV | 7.00 MW | ENERCON GmbH | planned | planned 2028 | BKV Windgemeinschaft GmbH & Co. KG |
| HBB WEA1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | HBB GmbH & Co. KG |
| PB WEA 2 | 7.00 MW | – | planned | planned 2027 | Wüseke Baustoffwerke GmbH |
| Böddeken2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| E-175 Knollenkreuz WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft am Knollenkreuz GbR |
| Eggewind 23 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Eggewind Asseln GmbH & Co. KG |
| Böddeken1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| SE-Wind N163 | 7.00 MW | Nordex SE | in operation | 2026-10-20 | SE-Wind GmbH & Co. KG |
| E-175 Knollenkreuz WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Planungsgemeinschaft Hassel |
| Eggewind 35 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Eggewind Asseln GmbH & Co. KG |
| PB WEA 3 | 7.00 MW | – | planned | planned 2027 | Wüseke Baustoffwerke GmbH |
| PB WEA 1 | 7.00 MW | – | planned | planned 2027 | Wüseke Baustoffwerke GmbH |
| Heide-Wind N175 | 6.80 MW | Nordex SE | in operation | 2026-10-21 | Heide-Wind GmbH& Co. KG |
| WEA Hövelhof 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | UGE Hövelhof-Westerloh GmbH & Co. KG Umweltgereche Energie |
| WEA Hövelhof 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Hövelhof-Westerloh GmbH & Co. KG Umweltgereche Energie |
| WEA 1 N-163 164 m NH | 6.80 MW | Nordex Germany GmbH | in operation | 2023-10-18 | Ventus Ante Portas GmbH & Co.KG I |
| Böddeken3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| WEA 6 | 6.80 MW | Nordex SE | in operation | 2025-02-11 | Flütwind GmbH & Co. KG |
| WEA Hövelhof 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Hövelhof-Westerloh GmbH & Co. KG Umweltgereche Energie |
| WEA 1 | 6.80 MW | Nordex SE | in operation | 2024-09-05 | Linas Betriebs GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex SE | in operation | 2024-09-10 | Flütwind GmbH & Co. KG |
| WPA33 Nr. 5 | 6.80 MW | Nordex Germany GmbH | in operation | 2024-05-02 | WP A 33 GmbH& Co.. KG |
| WPA33 Nr. 4 | 6.80 MW | Nordex Germany GmbH | in operation | 2024-01-10 | WP A 33 GmbH& Co.. KG |
| Austerdahl | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Austertal GmbH & Co. KG |
| Vestas V-162 6.2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-02-21 | WP Eilerberg Betriebs GmbH & Co. KG |
| WEA Röhrengrund III | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Am Waldboden 1 GmbH & Co. KG |
| WEA Röhrengrund II | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP Röhrengrund GmbH & Co. KG |
| WEA Röhrengrund IV | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Am Waldboden 2 GmbH & Co. KG |
| WEA Röhrengrund I | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WP Röhrengrund GmbH & Co. KG |
| WEA Röhrengrund V | 6.20 MW | – | planned | planned 2028 | Hirseohre GmbH & Co. KG |
| BADW06_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BADW11_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WEA D02 | 6.00 MW | ENERCON GmbH | in operation | 2026-03-11 | Ort-Wind 2 GmbH & Co. KG |
| WEA 1 Etteln E175 | 6.00 MW | ENERCON GmbH | in operation | 2024-10-29 | Bürgerwind Borchen GmbH & Co. KG |
| WEA01_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| FLE16 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | WestfalenWIND Etteln Ost GmbH & Co. KG |
| E-175 Knipsberg_neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Knipsberg Windpark Verwaltungs GbR |
| WEA06B | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Windpark Huser Klee III GmbH & Co. KG |
| BADW15_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WW04 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| BADW18_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BADW07_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| Enercon E-175 EP5 E1 WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwindpark Am alten Postweg GmbH & Co. KG |
| WEA 1B | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Pad-Wind GmbH & Co. KG |
| Enercon E-175 EP5 E1 WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwindpark Am alten Postweg GmbH & Co. KG |
| WEA05_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| bwind kbg_1 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| BADW09_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| Sintfeld 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Muchtwind GmbH & Co. KG |
| WEA26 E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Planungsgemeinschaft Hassel |
| bwind kbg_3 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| WW01 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| WEA 2 Etteln E175 | 6.00 MW | ENERCON GmbH | in operation | 2025-06-06 | Bürgerwind Borchen GmbH & Co. KG |
| WEA E-175 EP5 01 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Vollmer GmbH & Co. KG |
| WEA D01 | 6.00 MW | ENERCON GmbH | in operation | 2026-03-11 | Ort-Wind 1 GmbH & Co. KG |
| bwind kbg_2 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| Bohnenstelle | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Austertal GmbH & Co. KG |
| WEA 02 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Büren GmbH & Co. KG |
| BADW08_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WEA 7 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Flütwind GmbH & Co. KG |
| WEA Rubarth | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Wiehengrund Verwaltungs GmbH |
| WEA03_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| Enercon E-175 EP5 E1 WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwindpark Am alten Postweg GmbH & Co. KG |
| Buke Süd 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Olor Wind GmbH & Co. KG |
| E-175 EP 5 WEA 17 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| BADW17_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| E-175 EP5 WEA 14 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA D04 | 6.00 MW | ENERCON GmbH | in operation | 2026-03-13 | Ort-Wind 1 GmbH & Co. KG |
| BADW16_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BADW04_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WEA E-175 EP5 02 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Vollmer GmbH & Co. KG |
| V-150 Marsberg | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-10-08 | Aufwind Marsberg GmbH & Co. KG |
| WEA25 E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Planungsgemeinschaft Hassel |
| BADW13_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| bwind kbg_5 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| Bro WEA03 Dö | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Brockmann Neue Energien GmbH & Co. KG |
| WEA E-175 EP5 WEA 12 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA 01 Böcksgrund E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BöcksWind GmbH & Co.KG |
| E-175 EP5 E1 WEA 19 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| BADW19_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BADW27 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Wind-Plan-Sintfeld GmbH & Co. KG |
| bwind kbg_4 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| Etteln 5 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| E-175 EP5 WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA 07 E175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Borchen GmbH & Co. KG |
| WEA 04 Böcksgrund E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BöcksWind GmbH & Co.KG |
| WEA07_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| WEA04_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| BADW20_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| bwind kbg_7 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| E-175 EP5 WEA 15 | 6.00 MW | – | planned | planned 2027 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windpark Büren GmbH & Co. KG |
| WW10 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| E-175 EP5 E1 WEA 18 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| E-175 EP5 WEA 22 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| Vestas V-162 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-03-05 | WP Eilerberg Betriebs GmbH & Co. KG |
| WEA 01 | 6.00 MW | ENERCON GmbH | in operation | 2025-11-14 | Windenergie Hövelhof-Oberntudorf GmbH & Co. KG |
| Knipsberg WEA 02_E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Knipsberg Windpark Verwaltungs GbR |
| WW07 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| Enercon E-175 EP5 E1 WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwindpark Am alten Postweg GmbH & Co. KG |
| WEA 08 E175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Borchen GmbH & Co. KG |
| E-175 EP5 WEA 23 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA06_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| WEA 03 Böcksgrund E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BöcksWind GmbH & Co.KG |
| WEA 2B | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | Pad-Wind GmbH & Co. KG |
| BADW03_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BADW05_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| bwind kbg_6 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwindpark Kleinenberg GmbH & Co. KG |
| BADW10_Neu | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WEA Nonnenbreite 175 | 6.00 MW | ENERCON GmbH | in operation | 2025-12-01 | Windenergie Nonnenbreite GmbH & Co. KG |
| WEA D03 | 6.00 MW | ENERCON GmbH | in operation | 2026-03-12 | Ort-Wind 3 GmbH & Co. KG |
| WEA02_V150_BUR | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | NxW Büren GmbH & Co. KG |
| E-175 EP5 WEA 21 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Lichtenauer Bürgerwind II GmbH & Co. KG |
| WEA 02 Böcksgrund E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BöcksWind GmbH & Co.KG |
| Etteln 3 | 6.00 MW | ENERCON GmbH | in operation | 2026-04-10 | Auf dem Steinborn GmbH & Co. KG |
| WEA 5 | 5.70 MW | Nordex SE | in operation | 2024-09-24 | Renker Berg GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex SE | in operation | 2024-10-24 | Flütwind GmbH & Co. KG |
| Hirschweg Ost | 5.70 MW | Nordex Germany GmbH | planned | planned 2025 | SWE ScharfenWindenergie GmbH &Co KG |
| WEA 02 - Repowering Elisenhof | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-07 | RWE Wind Onshore & PV Deutschland GmbH |
| PlanungsgemeinschaftA33 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-28 | WP A 33 GmbH& Co.. KG |
| WEA 4 | 5.70 MW | Nordex SE | in operation | 2024-10-24 | Flütwind GmbH & Co. KG |
| N-WEA2 | 5.70 MW | Nordex SE | in operation | 2024-07-23 | Heng Windgemeinschaft GmbH & Co. KG |
| N-WEA1 | 5.70 MW | Nordex SE | in operation | 2024-07-23 | Heng Windgemeinschaft GmbH & Co. KG |
| PlanungsgemeinschaftA33 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-27 | WP A 33 GmbH& Co.. KG |
| PlanungsgemeinschaftA33 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-18 | WP A 33 GmbH& Co.. KG |
| WEA 01 - Repowering Elisenhof | 5.70 MW | Nordex Energy GmbH | in operation | 2023-12-05 | RWE Wind Onshore & PV Deutschland GmbH |
| WP A 33 WEA 6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | WP A 33 GmbH& Co.. KG |
| Dahl Ost WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Kesselsbohm GmbH & Co. KG |
| WPM II WEA 05 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| WEA 08 in den Gründen | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Aufwind in den Gründen GmbH & Co. KG |
| FLE15 | 5.56 MW | ENERCON GmbH | in operation | 2025-09-08 | WestfalenWIND Etteln II GmbH & Co. KG |
| Windpark Seske WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2025-09-11 | Seske GmbH & Co.KG |
| WEA26 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Huser Klee GmbH & Co. KG |
| WPM II WEA 07 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| Buke WEA 03_falsch | 5.56 MW | Vestas Deutschland GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| Buke WEA 05 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| E-160 Altes Feld | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Lackmann Green Invest GmbH |
| Buke WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| WEA 7 WP Hirschweg | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WBG Energie 7 GmbH & Co. KG |
| Windpark Seske WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2025-09-11 | Seske GmbH & Co.KG |
| WEA 10 Buker Windkraft E-160 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windenergie am Tiewenberg GmbH & Co.KG |
| BADW14_Neu | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| Buke WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| WEA 09 E 160 SoLa | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Altenbeken GmbH & Co. KG |
| E-160 Chara Aspera | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Lackmann Green Invest GmbH |
| WW05 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| WEA 12 E-160 Egge Energie | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Egge Energie GmbH & Co.KG |
| FLE 09 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-14 | BürgerWIND Westfalen eG |
| BADW28 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wind-Plan-Sintfeld GmbH & Co. KG |
| WW09 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| WPM II WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| WW06 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| WB04 - 1603310 | 5.56 MW | ENERCON GmbH | in operation | 2024-07-04 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| WW03 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| Buke WEA 07 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| Ebb03 | 5.56 MW | ENERCON GmbH | in operation | 2024-08-27 | Breeze I GmbH & Co. KG |
| WEA Keimberg Buke | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Montes Germinus GmbH & Co. KG |
| WEA 07 - VaV | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Ventus at Via GmbH & Co. KG |
| FLE 08 | 5.56 MW | ENERCON GmbH | in operation | 2025-05-07 | WestfalenWIND Etteln Ost GmbH & Co. KG |
| Buke WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Occare Ventus GmbH & Co.KG |
| WEA 02 (FÜ 02) | 5.56 MW | ENERCON GmbH | in operation | 2026-05-07 | Windpark Runder Busch Meerhof GmbH & Co. KG |
| WW11 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| Buke WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| Windpark Seske WEA 5 | 5.56 MW | ENERCON GmbH | in operation | 2025-10-22 | Seske GmbH & Co.KG |
| FLE13 | 5.56 MW | ENERCON GmbH | in operation | 2023-10-20 | WP Etteln A33 GmbH & Co.KG |
| WEA 10 | 5.56 MW | ENERCON GmbH | in operation | 2025-05-15 | Windkraft Sommerberg GmbH & Co. KG |
| Buke Süd | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Olor Wind GmbH & Co. KG |
| WW08 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wewelsburger Windenergie GmbH & Co. KG |
| Ebb06 | 5.56 MW | ENERCON GmbH | in operation | 2025-07-11 | Athena Energy GmbH & Co. KG |
| WEA KÖ 01 neu | 5.56 MW | ENERCON GmbH | in operation | 2026-03-12 | Windpark Körtge GmbH & Co. KG |
| WB09 -1603311 | 5.56 MW | ENERCON GmbH | in operation | 2024-07-09 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| WPM II WEA 06 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| E-160 Salzkotten Ost WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2024-07-01 | Ventus Ante Portas GmbH & Co.KG II |
| WEA 05 Böcksgrund E-160 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | BöcksWind GmbH & Co.KG |
| WEA Saure Heide | 5.56 MW | ENERCON GmbH | in operation | 2026-06-22 | Saure Heide Wind GmbH & Co.KG |
| WEA 4 WP Hirschweg | 5.56 MW | ENERCON GmbH | in operation | 2025-12-22 | WBG Energie 4 GmbH & Co.KG |
| FLE17 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WEA 6 WP Hirschweg | 5.56 MW | ENERCON GmbH | in operation | 2025-11-10 | EFG-Energie GmbH & Co. KG |
| BADW29 | 5.56 MW | ENERCON GmbH | planned | planned 2030 | Wind-Plan-Sintfeld GmbH & Co. KG |
| WEA 07 Buker Windkraft E-160 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Buker Windkraft GmbH & Co.KG |
| WEA 01 - E-160 Am Henkelberge | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Windenergie am Henkelberge GbR |
| E-160 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Freenfeld GbR |
| WEA 02 - E-160 Am Henkelberge | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windenergie am Henkelberge GbR |
| E160 Helmsberg | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windkraft Rönickerfeld 3 GmbH&Co.KG |
| WPM II WEA 11 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| Etteln 4 | 5.56 MW | ENERCON GmbH | in operation | 2026-04-02 | Auf dem Steinborn GmbH & Co. KG |
| WEA KÖ 02 neu | 5.56 MW | ENERCON GmbH | in operation | 2026-03-11 | Windpark Körtge GmbH & Co. KG |
| BroWi Ahlemeyer II | 5.56 MW | ENERCON GmbH | in operation | 2025-09-04 | Brockmann Wind GmbH & Co. KG Altenbeken |
| Windpark Seske WEA 4 | 5.56 MW | ENERCON GmbH | in operation | 2025-10-06 | Seske GmbH & Co.KG |
| E-160 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-06 | Windkraft MAAS GmbH & Co. KG |
| Buke WEA 08 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| WEA 3 WP Hirschweg | 5.56 MW | ENERCON GmbH | in operation | 2025-09-26 | WBG Energie 5 GmbH & Co. KG |
| Windpark Seske WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2025-09-12 | Bürgerwind Beke GmbH & Co. KG |
| E-160 Salzkotten Ost WEA 2 | 5.56 MW | ENERCON GmbH | in operation | 2024-04-25 | Ventus Ante Portas GmbH & Co.KG II |
| WEA 23 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Huser Klee GmbH & Co. KG |
| Buke WEA 06 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Occare Ventus GmbH & Co.KG |
| WEA27 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Huser Klee GmbH & Co. KG |
| FLE 07 | 5.56 MW | ENERCON GmbH | in operation | 2025-05-19 | Windkraft Etteln GmbH & Co. KG |
| Buke WEA 9 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Occare Ventus GmbH & Co.KG |
| WEA 2 | 5.00 MW | ENERCON GmbH | in operation | 2022-09-13 | WP Dahl Ost GmbH & Co.KG |
| WEA 3 | 5.00 MW | ENERCON GmbH | in operation | 2022-08-16 | WP Dahl Ost GmbH & Co.KG |
| WP Dahl Ost WEA1 | 5.00 MW | ENERCON GmbH | in operation | 2022-10-07 | WP Dahl Ost GmbH & Co.KG |
| WEA 4 | 5.00 MW | ENERCON GmbH | in operation | 2022-12-02 | WP Dahl Ost GmbH & Co.KG |
| Windpark Hassel WEA 3 | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | Eggewind Asseln IV GmbH & Co. KG |
| Heu6 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-09-07 | Windenergie Heubuscher Weg GmbH & Co. KG |
| Heu7 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-09-09 | Windenergie Heubusch Sintfeld GmbH & Co. KG |
| Heu9 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-10-12 | Windenergie Heubuscher Weg GmbH & Co. KG |
| Heu8 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-10-15 | Windenergie Heubusch Sintfeld GmbH & Co. KG |
| DWP WEA1 | 4.30 MW | ENERCON GmbH | in operation | 2022-09-20 | DWP Centrum GmbH & Co.KG |
| E-147 B64 | 4.30 MW | ENERCON GmbH | in operation | 2021-06-18 | Windenergie an der B64 GmbH & Co.KG |
| Haaren E138 | 4.26 MW | ENERCON GmbH | in operation | 2026-04-30 | An der Windmühle Haaren GmbH & Co. KG |
| FLE14 | 4.26 MW | ENERCON GmbH | in operation | 2025-05-09 | WestfalenWIND Etteln Ost GmbH & Co. KG |
| E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Sintfeld Windkraft GmbH & Co. Windpark Helmern West KG |
| WEA 9 WP Hirschweg | 4.26 MW | ENERCON GmbH | planned | planned 2027 | WBG Energie 1 GmbH & Co. KG |
| E-138 Hassel WEA 21 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Planungsgemeinschaft Hassel |
| WEA FÜE10 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Fündling Entwicklungs GmbH & Co. KG |
| WEA25 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Windpark Huser Klee GmbH & Co. KG |
| BADW12_Neu | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| BroWi Salzkotten E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Brockmann Wind GmbH & Co. KG Salzkotten |
| WEA 10 WP Hirschweg | 4.26 MW | ENERCON GmbH | planned | planned 2026 | WBG Energie 1 GmbH & Co. KG |
| Happenberg | 4.26 MW | ENERCON GmbH | in operation | 2026-08-28 | Happenberg Windgemeinschaft GbR |
| WEA 01 (FÜ 01) | 4.26 MW | ENERCON GmbH | in operation | 2026-04-22 | Windpark Meerhof GmbH |
| Enercon E-138 EP3 E3 | 4.26 MW | ENERCON GmbH | in operation | 2025-10-10 | Windenergie Am Kleeberg GmbH & Co. KG |
| WEA 10 | 4.26 MW | ENERCON GmbH | planned | planned 2030 | Bürgerwindpark Weiberg GmbH & Co. KG |
| BADW26 | 4.26 MW | ENERCON GmbH | planned | planned 2030 | Wind-Plan-Sintfeld II GmbH & Co. KG |
| WB01 - 1380875 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-26 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| DWP WEA2 | 4.20 MW | ENERCON GmbH | in operation | 2021-11-12 | DWP Centrum GmbH & Co.KG |
| Enercon4.2 Im Knick 2 | 4.20 MW | ENERCON GmbH | in operation | 2017-07-28 | BWP Lange Wendung GmbH & Co. KG |
| Sehrt | 4.20 MW | ENERCON GmbH | in operation | 2023-12-09 | Naturavis Sehrt GmbH & Co.KG |
| Oberfeld WEA1 V136 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | rentec Energie GmbH & Co. KG |
| E-138 Hassel WEA 22 - S-Nr: 1381159 | 4.20 MW | ENERCON GmbH | in operation | 2025-10-13 | Planungsgemeinschaft Hassel |
| 1380275 (ME06) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-05 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| Oberfeld WEA2 V136 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | rentec Energie GmbH & Co. KG |
| AVE E-138 | 4.20 MW | ENERCON GmbH | in operation | 2023-03-20 | A.V.E. Paderborner Abfallverwertung und Energie GmbH |
| Windfang WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2022-06-07 | Windfang Energie eG |
| Aeolus05 | 4.20 MW | ENERCON GmbH | in operation | 2017-09-04 | Aeolus05 GmbH & Co. KG |
| WPM II WEA 15 | 4.20 MW | ENERCON GmbH | planned | planned 2026 | WP Mittelberg II GmbH & Co. KG |
| 1380276 (ME07) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-05 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| Oberfeld WEA3 V136 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | rentec Energie GmbH & Co. KG |
| Sintfeld 6 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Muchtwind GmbH & Co. KG |
| E-138 Hassel WEA 23 - S-Nr: 1381160 | 4.20 MW | ENERCON GmbH | in operation | 2025-10-18 | Bürgerwindpark Hassel II GmbH & Co. KG |
| WEA 15 | 4.20 MW | ENERCON GmbH | planned | planned 2029 | Teichwind GmbH |
| 1380621 (ME13) | 4.20 MW | ENERCON GmbH | in operation | 2022-01-10 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WB05 - 1380878 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-27 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| Oberfeld WEA4 V136 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | rentec Energie GmbH & Co. KG |
| 1270044 | 4.20 MW | ENERCON GmbH | in operation | 2017-07-10 | BePa Windkraft GmbH & Co.KG |
| 1380625 (ME22) | 4.20 MW | ENERCON GmbH | in operation | 2022-01-12 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WB08 - 1381107 | 4.20 MW | ENERCON GmbH | in operation | 2024-08-30 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| 1380277 (ME09) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-20 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| 1380281 (ME16) | 4.20 MW | ENERCON GmbH | in operation | 2020-10-12 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| Windfang WEA 4 | 4.20 MW | ENERCON GmbH | in operation | 2022-06-29 | Windfang Energie eG |
| WB07 - 1380879 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-04 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| Enercon E-115 EP3 E3 | 4.20 MW | ENERCON GmbH | in operation | 2023-05-31 | Mönikes Energie GmbH & Co.KG |
| Windfang WEA 5 | 4.20 MW | ENERCON GmbH | in operation | 2022-08-30 | Windfang Energie eG |
| 1380278 (ME10) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-18 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WB03 - 1380876 | 4.20 MW | ENERCON GmbH | in operation | 2023-01-06 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| Dieken | 4.20 MW | ENERCON GmbH | in operation | 2026-06-17 | Windpark Dieken GmbH & Co.KG |
| 1380824 | 4.20 MW | ENERCON GmbH | in operation | 2023-01-20 | Salzkotten Windparkbetriebs GmbH & Co. KG |
| Dunetal E-138 | 4.20 MW | ENERCON GmbH | in operation | 2021-06-24 | Dunetal Windenergie GmbH & Co. KG |
| 1380274 (ME05) | 4.20 MW | ENERCON GmbH | in operation | 2020-10-12 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| MRA E-138 | 4.20 MW | ENERCON GmbH | in operation | 2023-08-31 | MRA Wind GbR |
| Aufwind Schwaney E-138 - S-Nr: 1381009 | 4.20 MW | ENERCON GmbH | in operation | 2024-01-17 | Aufwind Schwaney GmbH & Co.KG |
| BW Widey E-141 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-16 | Bürgerwind Widey GmbH & Co. KG |
| Windfang WEA 3 | 4.20 MW | ENERCON GmbH | in operation | 2022-05-25 | Windfang Planungs- Betriebs- und Infrastruktur GmbH & Co. KG |
| WB02 - 1380877 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-06 | Windpark Wohlbedacht GmbH & Co. KG I. Betriebsgesellschaft |
| 1380624 (ME 21) | 4.20 MW | ENERCON GmbH | in operation | 2022-01-11 | Windpark Runder Busch Meerhof GmbH & Co. KG |
| WEA 5 WP Hirschweg | 4.20 MW | ENERCON GmbH | in operation | 2025-03-06 | WBG Energie 3 GmbH & Co.KG |
| WEA Schwalkhohl | 4.20 MW | ENERCON GmbH | in operation | 2022-11-16 | Schwalkhohl GmbH & Co.KG |
| 1380622 (ME17) | 4.20 MW | ENERCON GmbH | in operation | 2022-01-11 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WEA bei Böddecker | 4.20 MW | ENERCON GmbH | planned | planned 2026 | BENE Erneuerbare Energien GmbH |
| 1270007 | 4.20 MW | ENERCON GmbH | in operation | 2016-12-22 | Windkraft TLF |
| Windfang WEA 2 | 4.20 MW | ENERCON GmbH | in operation | 2022-07-14 | Windfang Planungs- Betriebs- und Infrastruktur GmbH & Co. KG |
| WEA 01 | 4.10 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2022-10-03 | Bürgerwind Borchen GmbH & Co. KG |
| WEA 03 | 4.10 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2022-10-24 | Bürgerwind Borchen GmbH & Co. KG |
| WEA 05 | 4.10 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2022-09-26 | Bürgerwind Borchen GmbH & Co. KG |
| WEA 04 | 4.10 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | in operation | 2022-10-08 | Bürgerwind Borchen GmbH & Co. KG |
| 1250201 (ME03) | 4.00 MW | ENERCON GmbH | in operation | 2020-11-16 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Paderborn?
| Operator | Units | Capacity |
|---|---|---|
| Wind-Plan-Sintfeld II GmbH & Co. KG | 20 | 115.6 MW |
| Wewelsburger Windenergie GmbH & Co. KG | 14 | 66.6 MW |
| NxW Büren GmbH & Co. KG | 17 | 62.0 MW |
| Lichtenauer Bürgerwind II GmbH & Co. KG | 10 | 60.0 MW |
| Occare Ventus GmbH & Co.KG | 10 | 55.6 MW |
| Windpark Grüner Weg Meerhof GmbH & Co.KG | 13 | 51.6 MW |
| WP Eilerberg Betriebs GmbH & Co. KG | 12 | 44.8 MW |
| WP Altenautal RE GmbH & Co. KG | 6 | 43.2 MW |
| Wind-Plan-Sintfeld GmbH & Co. KG | 14 | 42.4 MW |
| Bürgerwindpark Kleinenberg GmbH & Co. KG | 7 | 42.0 MW |
Which manufacturer accounts for the most wind power capacity in Paderborn?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 543 | 1.80 GW |
| Vestas Deutschland GmbH | 99 | 433.1 MW |
| Nordex Germany GmbH | 14 | 92.0 MW |
| Nordex Energy GmbH | 29 | 82.7 MW |
| Nordex SE | 19 | 75.8 MW |
| NEG Micon Deutschland GmbH | 33 | 25.0 MW |
| VENSYS Energy AG | 6 | 20.9 MW |
| Senvion Deutschland GmbH | 8 | 17.0 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 4 | 16.4 MW |
| Tacke GmbH & Co. KG | 10 | 6.00 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Paderborn (Nordrhein-Westfalen), and how large ar can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.