Germany · renewables
Wind power in Märkischer Kreis
38 wind turbines with 82.8 MW of gross capacity were in operation in Märkischer Kreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 43 units (243.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Märkischer Kreis (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 38 wind turbines with 82.8 MW of gross capacity were in operation in Märkischer Kreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 43 units (243.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Märkischer Kreis?
- 38 wind turbines with 82.8 MW of gross capacity were in operation in Märkischer Kreis as of 2026-11-05, with a further 43 units (243.0 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Märkischer Kreis in 2025?
- 3 wind turbines with 15.7 MW went into operation in Märkischer Kreis in 2025; the strongest year of the last two decades was 2025 with 15.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Märkischer Kreis?
- SL Windenergie GmbH operates 9 wind turbines with 47.8 MW in Märkischer Kreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Märkischer Kreis?
- ENERCON GmbH leads with 50 wind turbines and 189.1 MW in Märkischer Kreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Märkischer Kreis?
- The largest registered wind turbine in Märkischer Kreis has 7.20 MW of gross capacity and is operated by P-Wind Plettenberg GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Märkischer Kreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.01 MW | 0 | 2 |
| 30 to 100 kW | 1 | 0.05 MW | 1 | 0 |
| over 100 kW | 82 | 329.1 MW | 37 | 41 |
How much wind power capacity was commissioned in Märkischer Kreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 3 | 17.6 MW |
| 2025 | 3 | 15.7 MW |
| 2022 | 4 | 10.7 MW |
| 2021 | 4 | 12.0 MW |
| 2017 | 1 | 3.00 MW |
| 2014 | 1 | 0.80 MW |
| 2010 | 1 | 2.00 MW |
| 2007 | 3 | 6.00 MW |
| 2006 | 1 | 0.80 MW |
How many wind turbines in Märkischer Kreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 43 | 243.0 MW |
| in operation | 38 | 82.8 MW |
| permanently decommissioned | 3 | 2.75 MW |
| temporarily shut down | 1 | 0.60 MW |
Which wind turbines are registered in Märkischer Kreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | P-Wind Plettenberg GmbH |
| WP Balver Wald WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | WP Balver Wald Entwicklungs GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | P-Wind Plettenberg GmbH |
| WP Balver Wald WEA 6a | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WP Balver Wald WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | PNE AG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | P-Wind Plettenberg GmbH |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | P-Wind Plettenberg GmbH |
| WP Balver Wald WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Balver Wald Betriebs GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | P-Wind Plettenberg GmbH |
| WPB-WEA5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Platte Bracht GmbH |
| WPB-WEA1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Platte Bracht GmbH |
| WPB-WEA4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Platte Bracht GmbH |
| WPB-WEA2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Platte Bracht GmbH |
| WPB-WEA3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Platte Bracht GmbH |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | PROKON Windpark Affeln GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | PROKON Windpark Affeln GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | PROKON Windpark Affeln GmbH & Co. KG |
| WEA 5 Balve | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 1 Halver Schöneberge | 6.00 MW | ENERCON GmbH | planned | planned 2025 | SLE Invest GmbH & Co. KG |
| L1 Lange Egge 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-02-06 | ENERTRAG Windfeld Märkischer Kreis GmbH & Co. KG |
| L2 Lange Egge 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-02-24 | ENERTRAG Windfeld Märkischer Kreis GmbH & Co. KG |
| StwBo: WEA Schälker Heide 02 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-03-26 | Stadtwerke Bochum Windpark Schälker Heide GmbH & Co. KG |
| StwBo: WEA Schälker Heide 01 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-03-26 | Stadtwerke Bochum Windpark Schälker Heide GmbH & Co. KG |
| Schalksmühle WEA 3 (SMU 03) | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Kooperation Nr. 7 GmbH & Co. KG |
| WEA 3 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2026 | SL Windpark Balve GmbH & Co. KG |
| WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiedienstleistungen Bals GmbH |
| WEA 2 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2026 | SL Windpark Balve GmbH & Co. KG |
| WEA 9 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 8 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| Hardenberg-160 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windgesellschaft Hardenberg GmbH & Co. KG |
| WEA 4 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiedienstleistungen Bals GmbH |
| WEA 7 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 1 Balve Garbeck | 5.56 MW | ENERCON GmbH | in operation | 2026-06-29 | SL Windenergie GmbH |
| WEA 6 Balve | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energiedienstleistungen Bals GmbH |
| WKA Halver-Munitionsdepot | 4.26 MW | ENERCON GmbH | planned | planned 2030 | Mark-E Aktiengesellschaft |
| Windpark Lüdenscheid-Kälberberg WKA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Mark-E Aktiengesellschaft |
| Windpark Lüdenscheid-Kälberberg WKA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Mark-E Aktiengesellschaft |
| Windpark Lüdenscheid-Kälberberg WKA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Mark-E Aktiengesellschaft |
| Rölvede Repowering | 4.26 MW | ENERCON GmbH | in operation | 2025-08-08 | Ruhrwind IV GmbH &Co.KG |
| OLD WEA 3 Balve Garbeck | 4.20 MW | ENERCON GmbH | planned | planned 2025 | SL Windenergie GmbH |
| Wersbecke Repowering | 4.20 MW | ENERCON GmbH | planned | planned 2026 | Ruhrwind GmbH&Co KG |
| OLD WEA 2 Balve Garbeck | 4.20 MW | ENERCON GmbH | planned | planned 2026 | SL Windenergie GmbH |
| Schalksmühle WEA 2 (SMU 02) | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Kooperation Nr. 7 GmbH & Co. KG |
| Schalksmühle WEA 1 (SMU 01) | 3.60 MW | Vestas Deutschland GmbH | planned | planned 2027 | wpd Windpark Kooperation Nr. 7 GmbH & Co. KG |
| Windkraft Versetalsperre | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | Windkraft Versetalsperre GmbH & Co. KG |
| WEA 1151207 | 3.00 MW | ENERCON GmbH | in operation | 2021-02-23 | SL Windpark Neuenrade GmbH & Co. KG |
| WEA 1151203 | 3.00 MW | ENERCON GmbH | in operation | 2021-10-25 | SL Windpark Neuenrade GmbH & Co. KG |
| WEA 1151204 | 3.00 MW | ENERCON GmbH | in operation | 2021-10-01 | SL Windpark Neuenrade GmbH & Co. KG |
| WEA 1151202 | 3.00 MW | ENERCON GmbH | in operation | 2022-03-04 | SL Windpark Neuenrade GmbH & Co. KG |
| WEA 1151205 | 3.00 MW | ENERCON GmbH | in operation | 2021-02-19 | SL Windpark Neuenrade GmbH & Co. KG |
| WEA 1151206 | 3.00 MW | ENERCON GmbH | in operation | 2022-01-06 | SL Windpark Neuenrade GmbH & Co. KG |
| E92 WEA 1 | 2.35 MW | ENERCON GmbH | in operation | 2022-03-17 | Naturstrom Veserde GmbH & Co. KG |
| E92 WEA2 | 2.35 MW | ENERCON GmbH | in operation | 2022-03-11 | Naturstrom Veserde GmbH & Co. KG |
| Holthausen WEA 1 | 2.00 MW | ENERCON GmbH | in operation | 2007-07-26 | B & H eGbR |
| Windrad Balve | 2.00 MW | Vestas Deutschland GmbH | in operation | 2010-10-26 | Windrad Balve UG+CoKG |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | in operation | 2007-07-26 | private individual |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | in operation | 2007-07-26 | private individual |
| 701799 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-01 | Alterric Windpark GmbH & Co. Valbert KG |
| 701800 | 1.80 MW | ENERCON GmbH | in operation | 2004-05-27 | Alterric Windpark GmbH & Co. Valbert KG |
| FL 355-02 | 1.50 MW | Fuhrländer AG | in operation | 2005-11-29 | Statkraft Windenergie GmbH & Co. KG |
| FL 354-01 | 1.50 MW | Fuhrländer AG | in operation | 2005-11-29 | Statkraft Windenergie GmbH & Co. KG |
| unit operated by a private individual | 1.25 MW | DeWind GmbH | permanently decommissioned | 2003-01-01 | private individual |
| Hardenberg-114 | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-03-01 | Windgesellschaft Hardenberg GmbH & Co. KG |
| WEA 58143 | 1.00 MW | ENERCON GmbH | in operation | 2003-07-29 | SL Betriebs GmbH & Co. KG |
| BK | 0.85 MW | Vestas Deutschland GmbH | in operation | 2001-12-30 | BürgerWIND Benkamp GmbH & Co. KG |
| WK | 0.80 MW | ENERCON GmbH | in operation | 2006-12-22 | Windkraft Benkamp GmbH & Co. KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2005-12-02 | private individual |
| Vogelhenne E-48 | 0.80 MW | ENERCON GmbH | in operation | 2014-12-19 | Vogelhenne GmbH & Co. KG |
| unit operated by a private individual | 0.66 MW | Vestas Deutschland GmbH | in operation | 2000-12-01 | private individual |
| Brenscheid | 0.60 MW | DeWind GmbH | temporarily shut down | 2001-12-01 | Dunkel Verwaltungs GmbH |
| Menden-Oesbern WO | 0.60 MW | Tacke GmbH & Co. KG | in operation | 2000-01-14 | Windkraft Oesbern GbR |
| Iserlohn | 0.60 MW | DeWind GmbH | in operation | 1998-03-25 | Stadtwerke Iserlohn GmbH |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | in operation | 2001-10-25 | private individual |
| WEA 441714 | 0.60 MW | ENERCON GmbH | in operation | 2003-07-29 | SL Betriebs GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1994-09-21 | private individual |
| Lüdenscheid-Leisberg WL | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1997-06-26 | Windkraft Leisberg GbR |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-07-20 | private individual |
| WKA Dörnen | 0.50 MW | ENERCON GmbH | in operation | 1998-09-01 | Ehringhaus |
| Balve-Leveringhausen BB | 0.20 MW | ENERCON GmbH | in operation | 1997-12-30 | BürgerWIND Balve GbR |
| Windkraftanlage Immergrün | 0.05 MW | Lagerwey GmbH | in operation | 1989-12-06 | Fa. Immergrün GaLaBau & Umwelttechnik, Inh. Herr Klaus Hölcke |
| unit operated by a private individual | 0.01 MW | Sonstige | planned | planned 2026 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2026 | private individual |
Which organisations operate the most wind power capacity in Märkischer Kreis?
| Operator | Units | Capacity |
|---|---|---|
| SL Windenergie GmbH | 9 | 47.8 MW |
| P-Wind Plettenberg GmbH | 5 | 36.0 MW |
| Windpark Platte Bracht GmbH | 5 | 35.0 MW |
| PNE AG | 3 | 21.6 MW |
| PROKON Windpark Affeln GmbH & Co. KG | 3 | 20.4 MW |
| SL Windpark Neuenrade GmbH & Co. KG | 6 | 18.0 MW |
| Mark-E Aktiengesellschaft | 4 | 17.0 MW |
| Energiedienstleistungen Bals GmbH | 3 | 16.7 MW |
| wpd Windpark Kooperation Nr. 7 GmbH & Co. KG | 3 | 12.8 MW |
| ENERTRAG Windfeld Märkischer Kreis GmbH & Co. KG | 2 | 12.0 MW |
Which manufacturer accounts for the most wind power capacity in Märkischer Kreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 50 | 189.1 MW |
| Vestas Deutschland GmbH | 18 | 100.3 MW |
| Nordex Energy GmbH | 3 | 20.4 MW |
| Nordex Germany GmbH | 2 | 11.4 MW |
| DeWind GmbH | 4 | 3.05 MW |
| Fuhrländer AG | 2 | 3.00 MW |
| Tacke GmbH & Co. KG | 2 | 1.20 MW |
| NEG Micon Deutschland GmbH | 1 | 0.60 MW |
| Lagerwey GmbH | 1 | 0.05 MW |
| Sonstige | 1 | 0.01 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Märkischer Kreis (Nordrhein-Westfalen), and how l can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.