Germany · renewables
Wind power in Kleve
213 wind turbines with 458.1 MW of gross capacity were in operation in Kleve (Nordrhein-Westfalen) as of 2026-11-05, with a further 72 units (446.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Kleve (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 213 wind turbines with 458.1 MW of gross capacity were in operation in Kleve (Nordrhein-Westfalen) as of 2026-11-05, with a further 72 units (446.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Kleve?
- 213 wind turbines with 458.1 MW of gross capacity were in operation in Kleve as of 2026-11-05, with a further 72 units (446.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Kleve in 2025?
- 8 wind turbines with 41.0 MW went into operation in Kleve in 2025; the strongest year of the last two decades was 2017 with 104.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Kleve?
- SL Windenergie GmbH operates 13 wind turbines with 56.8 MW in Kleve, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Kleve?
- ENERCON GmbH leads with 165 wind turbines and 468.6 MW in Kleve (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Kleve?
- The largest registered wind turbine in Kleve has 7.00 MW of gross capacity and is operated by Bürgerwind Niers-Maas GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Kleve distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.01 MW | 1 | 0 |
| over 100 kW | 302 | 920.5 MW | 212 | 72 |
How much wind power capacity was commissioned in Kleve each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 8.00 MW |
| 2025 | 8 | 41.0 MW |
| 2024 | 10 | 51.5 MW |
| 2022 | 3 | 12.0 MW |
| 2021 | 5 | 20.4 MW |
| 2019 | 6 | 15.2 MW |
| 2018 | 8 | 23.6 MW |
| 2017 | 38 | 104.5 MW |
| 2016 | 9 | 21.3 MW |
| 2015 | 9 | 17.9 MW |
| 2014 | 6 | 13.3 MW |
| 2013 | 5 | 8.60 MW |
| 2012 | 4 | 6.20 MW |
| 2011 | 2 | 4.30 MW |
| 2010 | 4 | 6.10 MW |
| 2009 | 10 | 11.7 MW |
| 2007 | 5 | 8.00 MW |
| 2006 | 4 | 5.00 MW |
How many wind turbines in Kleve are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 213 | 458.1 MW |
| planned | 72 | 446.6 MW |
| permanently decommissioned | 16 | 15.6 MW |
| temporarily shut down | 2 | 0.22 MW |
Which wind turbines are registered in Kleve?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Bosserweg WEA N1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Niers-Maas GmbH & Co. KG |
| WEA 08 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| ABO Energy WP Kevelaer-Wetten II WEA1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | ABO Energy WP Kevelaer-Wetten II GmbH & Co. KG |
| WEA 14.36 (WEA 4) | 7.00 MW | ENERCON GmbH | planned | planned 2028 | AgrarVolt Buchholt GmbH & Co. KG |
| GW3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| WEA 1 Geldern | 7.00 MW | Nordex SE | planned | planned 2027 | Windpark Geldern GmbH & Co. KG |
| GZ1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| GB1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| Bosserweg WEA S1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Niers-Maas GmbH & Co. KG |
| StepII WEA 4 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Niers-Maas GmbH & Co. KG |
| GW2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| WEA 06 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| GZ2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| WEA 07 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| StepII WEA 5 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Bürgerwind Niers-Maas GmbH & Co. KG |
| WEA 14.34 (WEA 2) | 7.00 MW | ENERCON GmbH | planned | planned 2028 | AgrarVolt Buchholt GmbH & Co. KG |
| WEA 14.37 (WEA 1) | 7.00 MW | ENERCON GmbH | planned | planned 2028 | AgrarVolt Buchholt GmbH & Co. KG |
| WEA 01 WEA E6 WEA 07.19 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | SL Windpark Kengen GmbH & Co. KG |
| WEA 02 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| WEA 04 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| Wanderpesch II | 7.00 MW | Nordex Energy GmbH | planned | planned 2026 | Bürgerwind Niers-Maas GmbH & Co. KG |
| WEA 14.35 (WEA 3) | 7.00 MW | ENERCON GmbH | planned | planned 2028 | AgrarVolt Buchholt GmbH & Co. KG |
| WEA 05 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| WEA 2 Geldern | 7.00 MW | Nordex SE | planned | planned 2027 | Windpark Geldern GmbH & Co. KG |
| WEA 03 Kevelaerer Heide | 7.00 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| GB2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| WEA Kleve 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Kleve Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 04.16 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Goch-Nierswalde GmbH & Co. KG |
| WEA 04.17 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Goch-Nierswalde GmbH & Co. KG |
| WEA 04.18 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Goch-Nierswalde GmbH & Co. KG |
| WEA Kleve 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Kleve Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 04.20 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | wpd Windpark Goch-Nierswalde GmbH & Co. KG |
| WEA 3 | 6.30 MW | ENERCON GmbH | planned | planned 2029 | BürgerWind Vorster Heide GmbH & Co. KG |
| WEA 01 15.13 Wachtendonk Wankum | 6.30 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WEA 4 | 6.30 MW | ENERCON GmbH | planned | planned 2029 | BürgerWind Vorster Heide GmbH & Co. KG |
| WEA 1 | 6.30 MW | ENERCON GmbH | planned | planned 2029 | BürgerWind Vorster Heide GmbH & Co. KG |
| WEA 02 15.14 Wachtendonk Wankum | 6.30 MW | ENERCON GmbH | planned | planned 2026 | SL Windenergie GmbH |
| WEA 2 | 6.30 MW | ENERCON GmbH | planned | planned 2029 | BürgerWind Vorster Heide GmbH & Co. KG |
| WEA 03 15.15 Wachtendonk Wankum | 6.30 MW | ENERCON GmbH | planned | planned 2026 | SL Windenergie GmbH |
| GH3 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BürgerEnergie Gelderner Heide Süd GmbH & Co. KG |
| Kevelaer-Ost WEA1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Neue Energie Kevelaer GmbH & Co. KG |
| HA1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Savershof GmbH |
| GH1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BürgerEnergie Gelderner Heide Nord GmbH & Co. KG |
| Kevelaer-Ost WEA3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Neue Energie Kevelaer GmbH & Co. KG |
| GH2 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | BürgerEnergie Gelderner Heide Süd GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windkraft Bedburg-Hau UG (haftungsbeschränkt) & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windkraft Bedburg-Hau UG (haftungsbeschränkt) & Co. KG |
| Kevelaer-Ost WEA2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Neue Energie Kevelaer GmbH & Co. KG |
| Wember Bruch WEA4 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| Gel WEA 1 | 5.70 MW | Nordex SE | in operation | 2025-07-17 | Grünwerke GmbH |
| Step 1 | 5.70 MW | Nordex SE | in operation | 2024-03-01 | Heideenergie GmbH & Co. KG |
| GN6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | BürgerEnergie Geldern GmbH |
| H1 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-04-25 | Bürgerwindrad Steinstraße Nord GmbH & Co. KG |
| Wember Bruch WEA2 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| Step 2 | 5.70 MW | Nordex SE | in operation | 2024-03-01 | Heideenergie GmbH & Co. KG |
| Wember Bruch WEA1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| Wember Bruch WEA3 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| Gel WEA 2 | 5.70 MW | Nordex SE | in operation | 2025-07-17 | Grünwerke GmbH |
| Step 3 | 5.70 MW | Nordex SE | in operation | 2024-03-01 | Heideenergie GmbH & Co. KG |
| HO1 | 5.70 MW | Nordex Germany GmbH | in operation | 2026-02-17 | BürgerEnergie Holtappelsfeld GmbH & Co. KG |
| GN2 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-12-15 | BürgerEnergie Issum eG |
| GB3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | BürgerEnergie Geldern GmbH |
| S1 | 5.70 MW | Nordex Energy GmbH | in operation | 2024-03-15 | Bürgerwindrad Steinstraße Nord GmbH & Co. KG |
| Wember Bruch WEA7 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| Wember Bruch WEA5 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| GN1 | 5.70 MW | Nordex Germany GmbH | in operation | 2025-12-15 | BürgerEnergie Geldern Nord GmbH & Co. KG |
| Wember Bruch WEA6 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Wember Bruch Betriebs GmbH & Co. KG |
| WEA 01 Kevelaerer Heide | 5.70 MW | Nordex SE | planned | planned 2027 | Energiegenossenschaft Kevelaerer Heide eG |
| NEG WEA4 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Neue Energie Geldern GmbH |
| NEG WEA6 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Neue Energie Geldern GmbH |
| WEA 1603344 OBR2 / WEA 05.19 Issum | 5.56 MW | ENERCON GmbH | in operation | 2024-09-05 | SL Windpark Issum GmbH & Co. KG |
| NEG WEA5 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Neue Energie Geldern GmbH |
| 160RheurdtRR4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| 160RheurdtRR2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 1603345 OBR3 / WEA 05.20 Issum | 5.56 MW | ENERCON GmbH | in operation | 2025-02-20 | SL Windpark Issum GmbH & Co. KG |
| GLE WEA8 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Gelderner Land Energie GmbH |
| WEA 1603346 R1 / WEA 12.15 Issum | 5.56 MW | ENERCON GmbH | in operation | 2024-09-03 | Niederrhein Wind GmbH & Co. KG |
| NEG WEA7 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Neue Energie Geldern GmbH |
| WEA OBR1 / WEA 05.18 Issum | 5.56 MW | ENERCON GmbH | in operation | 2024-10-11 | Oermter Berg Wind GmbH & Co.KG |
| ABO Wind WP Kevelaer-Wetten WEA 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-07-24 | Windpark Kevelaer-Wetten GmbH & Co. KG |
| 138RheurdtRR6 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| 138RheurdtRR1 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| GLE WEA9 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Gelderner Land Energie GmbH |
| 138RheurdtRR3 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| 138RheurdtRR5 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| 138RheurdtRR7 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WEA 04 15.16 Wachtendonk Wankum | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windenergie GmbH |
| WEA 6 WEN | 4.20 MW | ENERCON GmbH | in operation | 2025-04-28 | Windenergie Niers Betriebs GmbH & Co. KG |
| WEA 1380454 E3 | 4.20 MW | ENERCON GmbH | in operation | 2021-10-22 | SL Windpark Kerken-Eyll GmbH & Co. KG |
| WEA 5 WEN | 4.20 MW | ENERCON GmbH | in operation | 2025-04-16 | Windenergie Niers Betriebs GmbH & Co. KG |
| WEA 1380455 E4 | 4.20 MW | ENERCON GmbH | in operation | 2021-12-17 | SL Windpark Kerken-Eyll GmbH & Co. KG |
| WEA 7 WEN | 4.20 MW | ENERCON GmbH | in operation | 2025-04-14 | Windenergie Niers Betriebs GmbH & Co. KG |
| 1250341 (P3N) | 4.00 MW | ENERCON GmbH | in operation | 2022-12-19 | Bürgerwind Kerken-Poelyck UG (haftungsbeschränkt) & Co. KG |
| WEA 1250338 E5 | 4.00 MW | ENERCON GmbH | in operation | 2022-01-13 | Bürgerenergie Kerken UG (haftungsbeschränkt) & Co. KG |
| 1250336 (E1) | 4.00 MW | ENERCON GmbH | in operation | 2022-02-14 | Bürgerwind Kerken-Poelyck UG (haftungsbeschränkt) & Co. KG |
| WEA 1250337 E2 | 4.00 MW | ENERCON GmbH | in operation | 2021-10-29 | SL Windpark Kerken-Eyll GmbH & Co. KG |
| 1250339 (P1) | 4.00 MW | ENERCON GmbH | in operation | 2021-07-01 | Bürgerwind Kerken-Poelyck UG (haftungsbeschränkt) & Co. KG |
| 1250340 (P2) | 4.00 MW | ENERCON GmbH | in operation | 2021-07-09 | Bürgerwind Kerken-Poelyck UG (haftungsbeschränkt) & Co. KG |
| WEA02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2019-09-09 | Windpark Straelen GmbH &Co. KG |
| ND WEA 1 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-28 | Bürgerwindpark Gelderland GmbH & Co. KG |
| WEA01 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2018-01-23 | Windpark Straelen GmbH &Co. KG |
| ND WEA 2 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-12-12 | Bürgerwindpark Gelderland GmbH & Co. KG |
| Windenergieanlage | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-08-21 | Haagen Windkraft UG(haftungsbeschränkt) und Co. KG |
| Windrad Speelberg | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-02-09 | Windrad Speelberg GmbH & Co KG |
| WEA 1011478 | 3.05 MW | ENERCON GmbH | in operation | 2017-04-21 | SL Bürgerwindpark Rees GmbH & Co. KG |
| WEA 1011477 | 3.05 MW | ENERCON GmbH | in operation | 2017-05-04 | SL Bürgerwindpark Rees GmbH & Co. KG |
| Issum, Vorster Feld, Anlage 3.1 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-09 | BürgerEnergie Issum eG |
| WEA 1 Windpark Kalbeck | 3.00 MW | ENERCON GmbH | in operation | 2017-02-15 | Windpark Kalbeck Betriebs GmbH & Co. KG |
| WEA 1150769 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-31 | Niederrhein Wind GmbH & Co. KG |
| Issum, Vorster Feld, Anlage 3.3 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-28 | BürgerEnergie Issum eG |
| WEA01 WP Rietweyen Kevelaer-Twisteden | 3.00 MW | Nordex Energy GmbH | in operation | 2017-08-03 | BW-Kevelaer GmbH & Co. KG |
| WEA 1150798 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-14 | SL Windpark Oermten GmbH & Co. KG |
| WEA05 WP Rietweyen Kevelaer-Twisteden | 3.00 MW | Nordex Energy GmbH | in operation | 2017-08-18 | BW-Kevelaer GmbH & Co. KG |
| WEA Kalkar | 3.00 MW | Nordex Energy GmbH | in operation | 2017-11-20 | Stadtwerke Kalkar Erneuerbare Energien GmbH & Co. KG |
| WEA 1150771 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-31 | SL Windrad SW Rees GmbH & Co. KG |
| WEA 2 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-07-27 | DKW Wind GbR |
| WEA 4 Windpark Kalbeck | 3.00 MW | ENERCON GmbH | in operation | 2017-01-26 | Windpark Kalbeck Betriebs GmbH & Co. KG |
| WEA 1150770 | 3.00 MW | ENERCON GmbH | in operation | 2017-06-29 | SL Bürgerwindpark Rees GmbH & Co. KG |
| WEA 1150773 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-22 | SL Windrad SW Rees GmbH & Co. KG |
| WEA 1150797 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-06 | SL Windpark Oermten GmbH & Co. KG |
| Issum, Vorster Feld, Anlage 3.2 | 3.00 MW | ENERCON GmbH | in operation | 2018-02-23 | BürgerEnergie Issum eG |
| WEA 1150772 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-22 | SL Windrad Rees-Haldern GmbH & Co. KG |
| WEA 5.2 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-28 | 8L Green Energy GmbH & Co. KG |
| WEA 3 Windpark Kalbeck | 3.00 MW | ENERCON GmbH | in operation | 2017-02-10 | Windpark Kalbeck Betriebs GmbH & Co. KG |
| WEA 1150768 | 3.00 MW | ENERCON GmbH | in operation | 2017-07-15 | SL Windrad Rees-Speldrop GmbH & Co. KG |
| WEA 2 Windpark Kalbeck | 3.00 MW | ENERCON GmbH | in operation | 2017-02-01 | Windpark Kalbeck Betriebs GmbH & Co. KG |
| WEA 1 | 3.00 MW | Nordex Energy GmbH | in operation | 2017-07-20 | DKW Wind GbR |
| WEA 5.1 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | 8L Green Energy GmbH & Co. KG |
| WEA03 WP Rietweyen Kevelaer-Twisteden | 3.00 MW | Nordex Energy GmbH | in operation | 2017-08-22 | BW-Kevelaer GmbH & Co. KG |
| Issum, Vorster Feld, Anlage 3.4 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-21 | BürgerEnergie Issum eG |
| JWD Till Moyland | 2.50 MW | Nordex Energy GmbH | in operation | 2001-08-09 | JWD Till Moyland Windpark GmbH & Co. KG |
| WAW 1 - GE 25170002 | 2.50 MW | GE Wind Energy GmbH | in operation | 2017-06-30 | Windpark Wachtendonk-Wankum WP WAW GmbH & Co. KG |
| WEA04 WP Rietweyen Kevelaer-Twisteden | 2.40 MW | Nordex Energy GmbH | in operation | 2017-08-30 | BW-Kevelaer GmbH & Co. KG |
| NX82981 | 2.40 MW | Nordex Energy GmbH | in operation | 2013-12-31 | Duif- te Boekhorst Windenergie GbR |
| WP WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-27 | Bürgerwindrad Wanderpesch |
| LH WEA 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-23 | Bürgerwindpark Gelderland GmbH & Co. KG |
| LH WEA 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-17 | Bürgerwindpark Gelderland GmbH & Co. KG |
| WEA02 WP Rietweyen Kevelaer-Twisteden | 2.40 MW | Nordex Energy GmbH | in operation | 2017-07-20 | BW-Kevelaer GmbH & Co. KG |
| Nx85254 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-06-27 | Greilackwind GbR |
| LH WEA 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-03-30 | Bürgerwindpark Gelderland GmbH & Co. KG |
| WEA04 WP Schwarzbruch-Nord | 2.35 MW | ENERCON GmbH | in operation | 2019-10-21 | Bürgerenergie Schwarzbruch-Nord GmbH & Co. KG |
| WEA03 WP Schwarzbruch-Nord | 2.35 MW | ENERCON GmbH | in operation | 2019-10-23 | Bürgerenergie Schwarzbruch-Nord GmbH & Co. KG |
| WEA 9 Windpark Baaler Bruch | 2.35 MW | ENERCON GmbH | in operation | 2017-07-31 | Windpark Baaler Bruch Betriebs GmbH & Co.KG |
| 920555 | 2.35 MW | ENERCON GmbH | in operation | 2015-08-12 | Windenergie Lindchen GmbH & Co.KG |
| WEA01 WP Schwarzbruch-Nord | 2.35 MW | ENERCON GmbH | in operation | 2019-11-12 | Bürgerenergie Schwarzbruch-Nord GmbH & Co. KG |
| WEA 10 Windpark Baaler Bruch | 2.35 MW | ENERCON GmbH | in operation | 2017-09-11 | Windpark Baaler Bruch Betriebs GmbH & Co.KG |
| WEA02 WP Schwarzbruch-Nord | 2.35 MW | ENERCON GmbH | in operation | 2019-10-30 | Bürgerenergie Schwarzbruch-Nord GmbH & Co. KG |
| WEA 8 Windpark Baaler Bruch | 2.35 MW | ENERCON GmbH | in operation | 2017-07-25 | Windpark Baaler Bruch Betriebs GmbH & Co.KG |
| Gaesdonck | 2.35 MW | ENERCON GmbH | in operation | 2015-12-29 | Eichelkamp Windenergie Beteiligungs GmbH & Co. KG |
| WEA 26 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-15 | AgrarVolt Heidkamp GmbH & Co. KG |
| WPB Windpark Berendonk GmbH | 2.30 MW | ENERCON GmbH | in operation | 2014-12-19 | WPB Windpark Berendonk GmbH |
| WEA 29 826585 | 2.30 MW | ENERCON GmbH | in operation | 2019-05-20 | AgrarVolt Keppeln GmbH & Co. KG |
| WEA 827034 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-28 | SL Bürgerwindpark Rees GmbH & Co. KG |
| E 826032-04 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-18 | Windpark Berendonk GmbH & Co. KG |
| E 826030-02 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-19 | Windpark Berendonk GmbH & Co. KG |
| 827264 | 2.30 MW | ENERCON GmbH | in operation | 2018-03-26 | Windenergie Lindchen GmbH & Co.KG |
| WEA 7 Windpark Baaler Bruch | 2.30 MW | – | in operation | 2017-09-12 | Windpark Baaler Bruch Betriebs GmbH & Co.KG |
| WKA Straelen-Broekhuysen 2 | 2.30 MW | ENERCON GmbH | in operation | 2013-10-14 | WKA Straelen GmbH & Co. KG |
| Rückenwind GmbH & Co. KG | 2.30 MW | ENERCON GmbH | in operation | 2011-12-13 | Rückenwind GmbH & Co. KG |
| WEA 28 | 2.30 MW | ENERCON GmbH | in operation | 2016-06-30 | AgrarVolt Pfalzdorf GmbH & Co. KG |
| Feldwind | 2.30 MW | ENERCON GmbH | in operation | 2015-06-10 | Feldwind UG (haftungsbeschränkt)& Co.KG |
| WEA 6 Windpark Baaler Bruch | 2.30 MW | ENERCON GmbH | in operation | 2017-09-15 | Windpark Baaler Bruch Betriebs GmbH & Co.KG |
| WEA 27 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-12 | AgrarVolt Fösken GmbH & Co. KG |
| Windenergieanlage Straelen Nord | 2.30 MW | ENERCON GmbH | in operation | 2012-07-09 | Renewable Energy Harvest Seven GmbH & Co. KG |
| 827201 | 2.30 MW | ENERCON GmbH | in operation | 2017-11-17 | Windpark Niederrhein-Keppeln GmbH & Co. KG |
| Windenergie Gocher Heide UG | 2.30 MW | ENERCON GmbH | in operation | 2015-11-04 | Windenergie Gocher Heide UG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2016-12-23 | private individual |
| WEA Kläranlage Kleve-Salmorth | 2.30 MW | ENERCON GmbH | in operation | 2026-08-31 | Umweltbetriebe der Stadt Kleve AöR |
| 826919 | 2.30 MW | ENERCON GmbH | in operation | 2016-12-15 | WKT Windkraft GmbH & Co. KG |
| WEA 23 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-03 | AgrarVolt Goch GmbH & Co. KG |
| WEA 827033 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-29 | SL Bürgerwindpark Rees GmbH & Co. KG |
| 825710 | 2.30 MW | ENERCON GmbH | in operation | 2015-11-27 | Progress Energy Kalkar GmbH |
| 784299 | 2.30 MW | ENERCON GmbH | in operation | 2014-03-11 | TKK Windkraft GmbH & Co. KG |
| NWW | 2.30 MW | ENERCON GmbH | in operation | 2016-09-21 | NWW Neie Wälder Windenergie UG & Co. KG |
| WEA 22 | 2.30 MW | ENERCON GmbH | in operation | 2015-11-24 | AgrarVolt Goch GmbH & Co. KG |
| Hunsrückstraße Wind | 2.30 MW | ENERCON GmbH | in operation | 2010-12-23 | Hunsrückstraße Wind UG & Co. KG |
| Windenergieanlage Straelen Süd | 2.30 MW | ENERCON GmbH | in operation | 2012-07-09 | Renewable Energy Harvest Seven GmbH & Co. KG |
| Straelen 3 | 2.30 MW | ENERCON GmbH | in operation | 2013-10-09 | Windpark Broekhuysen 1 GbR |
| WEA B57 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2016-11-23 | Windpark Alpen B57 GmbH & Co. KG |
| STRA III - RE 93109 | 2.05 MW | REpower Systems SE | in operation | 2014-10-16 | Energiepark Straelen - Auwel II GmbH & Co. WP STRA III KG |
| Pfälzer Wind GbR 82142 | 2.05 MW | REpower Systems SE | in operation | 2009-07-31 | Pfälzer-Wind GbR |
| Pfälzer Wind GbR 82141 | 2.05 MW | REpower Systems SE | in operation | 2009-07-31 | Pfälzer-Wind GbR |
| STRA II | 2.05 MW | REpower Systems SE | in operation | 2014-10-21 | Bürgerenergie Straelen Auwel Wind eG & Co. KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-09-06 | private individual |
| Pfalzdorfer Wind UG (haftungsbeschränkt) & Co KG | 2.00 MW | Senvion Deutschland GmbH | in operation | 2011-03-31 | Pfalzdorfer Wind UG ( haftungsbeschränkt) &Co KG |
| 90905-MM92 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2009-09-10 | Landwind GbR |
| WEA 70994 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-12 | SL Windpark Alpen Veen GmbH & Co. KG |
| WEA 70996 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-18 | SL Windpark Alpen Veen GmbH & Co. KG |
| WEA 70995 | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-18 | SL Windpark Alpen Veen GmbH & Co. KG |
| KEV01 70290 | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2004-12-05 | A+S Windkraft Investitions GmbH & Co. KG |
| JWD Rees | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-01-23 | JWD Rees Windpark GmbH & Co. KG |
| NX-70354 | 1.50 MW | Nordex SE | in operation | 2005-12-28 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| WEA Kalkar Wissel 2 | 1.50 MW | Fuhrländer AG | in operation | 2001-12-29 | Bernardo Wind GmbH & Co. KG & WKA Wissel GmbH & Co. KG |
| WEA Neukirchen-Vluyn 2 (670) | 1.50 MW | Fuhrländer AG | in operation | 2010-07-05 | Windfarm Weimar GmbH & Co. KG |
| NX-70335 | 1.50 MW | Nordex SE | in operation | 2005-12-14 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| STRA 02 | 1.50 MW | Enron Wind GmbH | in operation | 2002-01-03 | Bürgerwindpark Gelderland GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | in operation | 2004-11-26 | private individual |
| NX-70332 | 1.50 MW | Nordex SE | in operation | 2005-10-30 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| WEA Neukirchen-Vluyn 1 (669) | 1.50 MW | Fuhrländer AG | in operation | 2010-07-08 | Windfarm Weimar GmbH & Co. KG |
| GEL 01 | 1.50 MW | REpower Systems SE | in operation | 2006-08-12 | Energiekontor Ökofonds GmbH & Co. WP GEL KG |
| WEA Weeze-Wemb 70424 | 1.50 MW | Nordex Energy GmbH | in operation | 2007-02-07 | SK Wind GmbH & Co. KG |
| GE-15561199 | 1.50 MW | Enron Wind GmbH | in operation | 2003-04-28 | Momentum Energy Germany GmbH & Co.KG |
| Windrad Dürkolf GmbH & Co KG | 1.50 MW | REpower Systems SE | in operation | 2004-12-27 | Windrad Dürkolf GmbH C0 KG |
| NX-70336 | 1.50 MW | Nordex SE | in operation | 2005-12-18 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| 70187-MD77 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2002-10-01 | Windenergie Ruwi GmbH & Co.KG |
| WEA Weeze-Wemb 70423 | 1.50 MW | Nordex Energy GmbH | in operation | 2007-02-08 | SK Wind GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Renewable Germany GmbH | in operation | 2004-11-25 | private individual |
| WEA Weeze-Wemb 70422 | 1.50 MW | Nordex Energy GmbH | in operation | 2007-02-01 | SK Wind GmbH & Co. KG |
| NX-70334 | 1.50 MW | Nordex SE | in operation | 2005-12-16 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| NX-70333 | 1.50 MW | Nordex SE | in operation | 2005-11-06 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| WEA Weeze-Wemb 70421 | 1.50 MW | Nordex Energy GmbH | in operation | 2007-01-26 | SK Wind GmbH & Co. KG |
| Pfälzer Wind GbR II | 1.50 MW | REpower Systems SE | in operation | 2003-05-21 | Pfälzer-Wind GbR II |
| STRA 01 | 1.50 MW | Enron Wind GmbH | in operation | 2001-12-27 | Bürgerwindpark Gelderland GmbH & Co. KG |
| NX-70337 | 1.50 MW | Nordex SE | in operation | 2005-12-22 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| GEL 02 | 1.50 MW | REpower Systems SE | in operation | 2006-08-16 | Energiekontor Ökofonds GmbH & Co. WP GEL KG |
| Windrad Regenitt | 1.50 MW | REpower Systems SE | in operation | 2003-11-11 | Windrad Regenitt GmbH &Co KG |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-12-05 | private individual |
| NX-70331 | 1.50 MW | Nordex SE | in operation | 2005-10-29 | MOKAR Mobiliengesellschaft mbH & Co. KG |
| WEA Hetter | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2002-02-05 | Windrad Hetter GmbH & Co KG |
| Anlage 14 | 1.25 MW | DeWind GmbH | in operation | 2002-06-28 | Eichelkamp Windenergie Beteiligungs GmbH & Co. KG |
| WP Lindchen WEA 2 | 1.00 MW | DeWind GmbH | in operation | 2000-06-25 | Windpark Lindchen GmbH & Co. KG |
| 58186 | 1.00 MW | ENERCON GmbH | in operation | 2004-02-13 | Windpark Niederrhein-Keppeln GmbH & Co. KG |
| WP Lindchen WEA 3 | 1.00 MW | DeWind GmbH | in operation | 2000-06-28 | Windpark Lindchen GmbH & Co. KG |
| Vrasselt 3 | 1.00 MW | ENERCON GmbH | in operation | 2002-09-27 | Windrad van de Sandt KG |
| WEA Kalkar Wissel 3 | 1.00 MW | Fuhrländer AG | in operation | 2001-12-12 | Bernardo Wind GmbH & Co. KG & WKA Wissel GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-28 | private individual |
| WEA 58218 | 1.00 MW | ENERCON GmbH | in operation | 2005-10-07 | SL Windpark Kerken GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-21 | private individual |
| WEA 58217 | 1.00 MW | ENERCON GmbH | in operation | 2005-10-10 | SL Windpark Kerken GmbH & Co. KG |
| Vrasselt 2 | 1.00 MW | ENERCON GmbH | in operation | 2003-04-30 | Windrad Schönebögel GbR |
| WEA 58064 | 1.00 MW | ENERCON GmbH | in operation | 2002-05-24 | SL Windpark Rheurdt GmbH & Co. KG |
| WEA 58060 | 1.00 MW | ENERCON GmbH | in operation | 2002-05-07 | SL Windpark Rheurdt GmbH & Co. KG |
| WEA 58068 | 1.00 MW | ENERCON GmbH | in operation | 2002-05-21 | SL Windpark Rheurdt GmbH & Co. KG |
| WP Lindchen WEA 8 | 1.00 MW | DeWind GmbH | in operation | 2000-07-05 | Windpark Lindchen GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-20 | private individual |
| WEA 58063 | 1.00 MW | ENERCON GmbH | in operation | 2002-06-11 | SL Windpark Rheurdt GmbH & Co. KG |
| Vrasselt 1 | 1.00 MW | ENERCON GmbH | in operation | 2003-04-03 | Windrad Schönebögel GbR |
| WEA Kalkar Wissel 1 | 1.00 MW | Fuhrländer AG | in operation | 2001-12-12 | Bernardo Wind GmbH & Co. KG & WKA Wissel GmbH & Co. KG |
| WEA 58062 | 1.00 MW | ENERCON GmbH | in operation | 2002-10-22 | SL Windpark Rheurdt GmbH & Co. KG |
| Anlage 8 | 1.00 MW | DeWind GmbH | in operation | 2000-06-21 | Windenergie Lindchen GmbH & Co.KG |
| WEA 58215 | 1.00 MW | ENERCON GmbH | in operation | 2005-10-12 | SL Windpark Kerken GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-05 | private individual |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-14 | private individual |
| WP Lindchen WEA 4 | 1.00 MW | DeWind GmbH | in operation | 2000-06-23 | Windpark Lindchen GmbH & Co. KG |
| WP Lindchen WEA 1 | 1.00 MW | DeWind GmbH | in operation | 2000-06-25 | Windpark Lindchen GmbH & Co. KG |
| Vrasselt 4 | 1.00 MW | ENERCON GmbH | in operation | 2003-02-28 | Windrad van de Sandt KG |
| WEA 58216 | 1.00 MW | ENERCON GmbH | in operation | 2005-10-14 | SL Windpark Kerken GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-04-14 | private individual |
| WEA 58222 | 1.00 MW | ENERCON GmbH | in operation | 2006-08-17 | SL Windpark Niederrhein GmbH & Co. KG |
| WEA 58061 | 1.00 MW | ENERCON GmbH | in operation | 2002-05-13 | SL Windpark Rheurdt GmbH & Co. KG |
| WEA Kleve | 1.00 MW | ENERCON GmbH | in operation | 2005-07-11 | Bernardo Wind GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-07 | private individual |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-05-06 | private individual |
| Anlage 9 | 1.00 MW | DeWind GmbH | in operation | 2000-06-21 | Windenergie Lindchen GmbH & Co.KG |
| Zitterhuck GbR | 1.00 MW | ENERCON GmbH | in operation | 2003-12-10 | Zitterhuck eGbR |
| WP Lindchen WEA 5 | 1.00 MW | DeWind GmbH | in operation | 2000-06-29 | Windpark Lindchen GmbH & Co. KG |
| WP Lindchen WEA 6 | 1.00 MW | DeWind GmbH | in operation | 2000-07-04 | Windpark Lindchen GmbH & Co. KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2003-06-16 | private individual |
| Zitterhuck GbR | 1.00 MW | ENERCON GmbH | in operation | 2003-12-10 | Zitterhuck eGbR |
| Brienen | 1.00 MW | ENERCON GmbH | in operation | 2004-10-13 | Windrad Schönebögel GbR |
| WP Lindchen WEA 7 | 1.00 MW | DeWind GmbH | in operation | 2000-07-04 | Windpark Lindchen GmbH & Co. KG |
| WEA 58059 | 1.00 MW | ENERCON GmbH | in operation | 2002-06-11 | SL Windpark Rheurdt GmbH & Co. KG |
| Windenergieanlage | 1.00 MW | ENERCON GmbH | in operation | 2001-05-09 | Windrad Schönebögel GbR |
| WEA 58058 | 1.00 MW | ENERCON GmbH | in operation | 2002-05-07 | SL Windpark Rheurdt GmbH & Co. KG |
| Anlage 7 | 1.00 MW | DeWind GmbH | in operation | 2000-06-21 | Windenergie Lindchen GmbH & Co.KG |
| WEA 58223 | 1.00 MW | ENERCON GmbH | in operation | 2006-08-23 | SL Windpark Niederrhein GmbH & Co. KG |
| WKKH Weetze GmbH & Co. KG | 0.90 MW | NEG Micon Deutschland GmbH | in operation | 2004-07-31 | WKKH Weetze GmbH & Co. KG |
| WEA 53812 | 0.80 MW | ENERCON GmbH | in operation | 2009-03-04 | SL Windpark Kengen GmbH & Co. KG |
| WEA 53856 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-02 | SL Windpark Kengen GmbH & Co. KG |
| 19 | 0.80 MW | ENERCON GmbH | in operation | 2012-12-17 | mITwind GmbH & Co. Kg |
| WEA 53813 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-25 | SL Windpark Kengen GmbH & Co. KG |
| WEA 53810 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-02 | SL Windpark Kengen GmbH & Co. KG |
| Repowering WKA Kläranlage Hönnepel | 0.80 MW | ENERCON GmbH | in operation | 2024-05-22 | Abwasserbehandlungsverband Kalkar-Rees |
| Windrad Finkenberg | 0.80 MW | Fuhrländer AG | in operation | 1998-05-01 | Aufwind GmbH |
| WEA Kevelaer 1 | 0.80 MW | ENERCON GmbH | in operation | 2015-12-18 | Solvest GmbH |
| WEA 53809 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-03 | SL Windpark Kengen GmbH & Co. KG |
| Zitterhuck GbR | 0.80 MW | ENERCON GmbH | in operation | 2010-12-15 | Zitterhuck eGbR |
| WEA 53811 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-25 | SL Windpark Kengen GmbH & Co. KG |
| Straelen-Broekhuysen 1 | 0.80 MW | ENERCON GmbH | in operation | 2013-10-09 | Tekloth Solar GmbH |
| WEA 53808 | 0.80 MW | ENERCON GmbH | in operation | 2009-02-03 | SL Windpark Kengen GmbH & Co. KG |
| WEA 19 | 0.80 MW | ENERCON GmbH | in operation | 2013-06-21 | AgrarVolt Kleve GmbH & Co. KG |
| 16 | 0.80 MW | ENERCON GmbH | in operation | 2012-12-17 | mITwind GmbH & Co. Kg |
| unit operated by a private individual | 0.75 MW | Wind World A/S | in operation | 1999-11-29 | private individual |
| Seewind 750-52 | 0.75 MW | SEEWIND Windenergiesysteme GmbH | in operation | 1998-11-28 | te Boekhorst Windkraft GbR |
| WEA 44015 (10329) | 0.60 MW | ENERCON GmbH | in operation | 1999-08-09 | SL Windenergie GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-04-02 | private individual |
| EA-1473 | 0.60 MW | DeWind GmbH | in operation | 2004-03-22 | Heutrik GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2002-03-22 | private individual |
| WEA 44252 (10330) | 0.60 MW | ENERCON GmbH | in operation | 2000-03-28 | SL Windenergie GmbH |
| EA-16863 Weeze E40 | 0.60 MW | ENERCON GmbH | in operation | 2004-07-31 | Christine Gelhausen und Sabine Graalfs |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1996-07-30 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-08-14 | private individual |
| 10333 | 0.30 MW | ENERCON GmbH | in operation | 2004-07-13 | W. Vos GmbH & Co. KG |
| Kersten Wind Empeler Str. 95 | 0.25 MW | Nordex SE | in operation | 1997-06-17 | Dipl. Ing. Georg Kersten Maschinenfabrik |
| Windenergieanlage Seewind 20/110 | 0.11 MW | SEEWIND Windenergiesysteme GmbH | in operation | 1994-02-07 | Blome GBR |
| Windkraftanlage Josef Tümmers | 0.11 MW | SEEWIND Windenergiesysteme GmbH | temporarily shut down | 1994-05-21 | Tümmers BIO-ENERGY GmbH |
| Seewind 20/110 | 0.11 MW | SEEWIND Windenergiesysteme GmbH | temporarily shut down | 1994-01-04 | te Boekhorst Windkraft GbR |
| unit operated by a private individual | 0.11 MW | SEEWIND Windenergiesysteme GmbH | permanently decommissioned | 1994-09-05 | private individual |
| unit operated by a private individual | 0.11 MW | SEEWIND Windenergiesysteme GmbH | permanently decommissioned | 1994-04-28 | private individual |
| unit operated by a private individual | 0.11 MW | SEEWIND Windenergiesysteme GmbH | in operation | 1994-01-25 | private individual |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Kleve?
| Operator | Units | Capacity |
|---|---|---|
| SL Windenergie GmbH | 13 | 56.8 MW |
| Energiegenossenschaft Kevelaerer Heide eG | 8 | 54.7 MW |
| BürgerEnergie Geldern GmbH | 8 | 53.4 MW |
| Windpark Wember Bruch Betriebs GmbH & Co. KG | 7 | 39.9 MW |
| Bürgerwind Niers-Maas GmbH & Co. KG | 5 | 35.0 MW |
| AgrarVolt Buchholt GmbH & Co. KG | 4 | 28.0 MW |
| wpd Windpark Goch-Nierswalde GmbH & Co. KG | 4 | 27.2 MW |
| BürgerWind Vorster Heide GmbH & Co. KG | 4 | 25.2 MW |
| Neue Energie Geldern GmbH | 4 | 22.2 MW |
| Neue Energie Kevelaer GmbH & Co. KG | 3 | 18.0 MW |
Which manufacturer accounts for the most wind power capacity in Kleve?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 165 | 468.6 MW |
| Nordex Germany GmbH | 21 | 131.5 MW |
| Nordex Energy GmbH | 32 | 125.4 MW |
| Nordex SE | 24 | 109.5 MW |
| REpower Systems SE | 9 | 15.7 MW |
| Senvion Deutschland GmbH | 7 | 15.4 MW |
| DeWind GmbH | 13 | 12.8 MW |
| GE Wind Energy GmbH | 3 | 9.50 MW |
| Vestas Deutschland GmbH | 3 | 8.75 MW |
| Fuhrländer AG | 6 | 7.30 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Kleve (Nordrhein-Westfalen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.