Germany · renewables
Wind power in Höxter
363 wind turbines with 889.0 MW of gross capacity were in operation in Höxter (Nordrhein-Westfalen) as of 2026-11-05, with a further 365 units (2.39 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Höxter (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 363 wind turbines with 889.0 MW of gross capacity were in operation in Höxter (Nordrhein-Westfalen) as of 2026-11-05, with a further 365 units (2.39 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Höxter?
- 363 wind turbines with 889.0 MW of gross capacity were in operation in Höxter as of 2026-11-05, with a further 365 units (2.39 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Höxter in 2025?
- 18 wind turbines with 97.8 MW went into operation in Höxter in 2025; the strongest year of the last two decades was 2016 with 153.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Höxter?
- Energiekontor AG operates 25 wind turbines with 171.2 MW in Höxter, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Höxter?
- ENERCON GmbH leads with 328 wind turbines and 1.24 GW in Höxter (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Höxter?
- The largest registered wind turbine in Höxter has 7.20 MW of gross capacity and is operated by Windpark Kühlsen GbR, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Höxter distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.00 MW | 1 | 0 |
| over 100 kW | 818 | 3.35 GW | 362 | 365 |
How much wind power capacity was commissioned in Höxter each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 20 | 118.5 MW |
| 2025 | 18 | 97.8 MW |
| 2024 | 14 | 69.8 MW |
| 2023 | 13 | 59.4 MW |
| 2022 | 9 | 25.7 MW |
| 2021 | 2 | 4.50 MW |
| 2020 | 13 | 39.3 MW |
| 2019 | 1 | 3.45 MW |
| 2018 | 11 | 30.7 MW |
| 2017 | 10 | 25.4 MW |
| 2016 | 57 | 153.0 MW |
| 2015 | 32 | 84.8 MW |
| 2014 | 5 | 9.25 MW |
| 2013 | 1 | 2.30 MW |
| 2012 | 1 | 2.30 MW |
| 2011 | 5 | 11.5 MW |
| 2009 | 2 | 4.00 MW |
| 2008 | 1 | 0.80 MW |
| 2007 | 4 | 2.80 MW |
| 2006 | 2 | 1.60 MW |
How many wind turbines in Höxter are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 365 | 2.39 GW |
| in operation | 363 | 889.0 MW |
| permanently decommissioned | 92 | 65.1 MW |
| temporarily shut down | 1 | 0.00 MW |
Which wind turbines are registered in Höxter?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Windpark Kühlsen WEA_4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Kühlsen GbR |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| Bredenborn Repower WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | SK Wind GmbH & Co. KG |
| WEA PL06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| WEA HW01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Hohenwepel GbR |
| WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Altus Renewables GmbH |
| Drenke 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Auf dem Anger GmbH & Co. KG |
| Drenke 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Auf dem Wiehorn GmbH & Co. KG |
| Marienmünster-Bredenborn WEA 7-Energieverbund | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Energieverbund Marienmünster GmbH & Co. KG |
| WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| Windpark Kühlsen WEA_1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Kühlsen GbR |
| WEA DH05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| Bredenborn Repower WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | SK Wind GmbH & Co. KG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| WEA 8 Entrup/Sommersell | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Entrup/Sommersell GmbH & Co. KG |
| Altenbergen WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energiequelle GmbH |
| WEA | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Hoddenberg-Wind GmbH & Co. KG |
| WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 10 Entrup/Sommersell | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Entrup/Sommersell GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | H & P Windkraft GmbH & Co. KG Windpark Lammert |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Steinheim-Rolfzen GmbH & Co. KG |
| Gut Wertheim WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| Drenke 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Auf dem Wiehorn GmbH & Co. KG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA DH10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| Altenbergen WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energiequelle GmbH |
| WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Hoddenberg-Wind GmbH & Co. KG |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | H & P Windkraft GmbH & Co. KG Windpark Lammert |
| Drenke 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Auf dem Wiehorn GmbH & Co. KG |
| WEA DH07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Steinheim-Rolfzen GmbH & Co. KG |
| Bredenborn Repower WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | SK Wind GmbH & Co. KG |
| Windpark Kühlsen WEA_2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Kühlsen GbR |
| Drenke 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Auf dem Wiehorn GmbH & Co. KG |
| WEA 08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA PL05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| Marienmünster-Bredenborn WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Marienmünster-Bredenborn GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Schmechten GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Altus Renewables GmbH |
| WEA DH01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | H & P Windkraft GmbH & Co. KG Windpark Lammert |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Steinheim-Rolfzen GmbH & Co. KG |
| WEA02_Brakel-Bellersen | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Holzhausen-Bellersen GbR |
| WEA 9 Entrup/Sommersell | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Entrup/Sommersell GmbH & Co. KG |
| WEA DH06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA DH04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Hoddenberg-Wind GmbH & Co. KG |
| WEA DH03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WKA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WKA Helleberg GmbH & Co. KG |
| WEA Auf dem Steinberg Brakel | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie auf dem Steinberg GbR |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 2 | 7.20 MW | – | planned | planned 2028 | Altus Renewables GmbH |
| Bredenborn Repower WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | SK Wind GmbH & Co. KG |
| Wiehorn | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Auf dem Wiehorn GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| Marienmünster-Bredenborn WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie Marienmünster-Bredenborn GmbH & Co. KG |
| Windpark Kühlsen II _ WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Kühlsen II GbR |
| WEA 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Brakel West GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann Green Invest GmbH und Möhring Green Projects UG (haftungsbeschränkt) eGbR |
| WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WKA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WKA Helleberg GmbH & Co. KG |
| Gut Wertheim WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Kühlsen II GbR |
| WEA PL08 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| WEA PL14 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| WEA 06 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Altus Renewables GmbH |
| WEA PL01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| Bredenborn Repower WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | SK Wind GmbH & Co. KG |
| WEA DH02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windenergie LIED GbR |
| WEA PL07 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Bonenburg/Scherfede GmbH & Co. KG |
| WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Schmechten GmbH & Co. KG |
| WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Energiekontor AG |
| WEA PL04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Peckelsheim-Löwen GmbH & Co. KG |
| WEA04 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Gut Alfredshöhe GmbH & Co. KG |
| WEA05 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Haarbrück-West GbR |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | WP Borlinghausen GmbH & Co. KG |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex SE | planned | planned 2027 | Windenergie Marienmünster/Altenbergen GmbH & Co. KG |
| Rieseler WEA1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Rieseler Windgemeinschaft GbR |
| Windpark Neuenheerse Süd WEA 6 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA AH01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Altenheerse GmbH & Co. KG |
| WEA 03 | 7.00 MW | Nordex SE | planned | planned 2027 | Windenergie Marienmünster/Altenbergen GmbH & Co. KG |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Schweckhausen GmbH & Co. KG |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 01 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Peckelsheim-Niesen GbR |
| WEA03 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Peckelsheim-Niesen GbR |
| WEA 09 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| Windpark Neuenheerse Süd WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | WBH GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | WP Borlinghausen GmbH & Co. KG |
| WEA 09 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA05 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Gut Alfredshöhe GmbH & Co. KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | WP Borlinghausen GmbH & Co. KG |
| WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | WBH GmbH & Co. KG |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | WBH GmbH & Co. KG |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Schweckhausen GmbH & Co. KG |
| WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Gut Alfredshöhe GmbH & Co. KG |
| WEA01 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Haarbrück-West GbR |
| Windpark_HOS4_WEA30 | 7.00 MW | Nordex SE | planned | planned 2028 | Holzhausen Wind Süd 4 GmbH & Co.KG |
| WEA06 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Haarbrück-West GbR |
| Rieseler WEA2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Heng Windgemeinschaft GbR |
| WEA 08 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 03 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Brakel II GbR |
| Windpark Neuenheerse Süd | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 01 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| Windpark Neuenheerse Süd WEA 5 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 2 | 7.00 MW | Nordex SE | planned | planned 2028 | wpd Windpark Manrode GmbH & Co. KG |
| WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| Gut Wertheim WEA 11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| WEA 07 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| WEA02 Merlsheim | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Merlsheim GmbH &Co. KG |
| WEA03 Merlsheim | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Merlsheim GmbH &Co. KG |
| WEA 10 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Bühne GmbH & Co. KG |
| Nordex N163/6.X Altenbergen | 7.00 MW | Nordex Germany GmbH | in operation | 2025-08-27 | EOW Altenbergen GmbH & Co.KG |
| WKA Klusenberg | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | MS Megawatt Verwaltungs GmbH |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | WP Borlinghausen GmbH & Co. KG |
| WEA 06 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Bonenburg/Ikenhausen GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex SE | planned | planned 2028 | wpd Windpark Manrode GmbH & Co. KG |
| WEA 02 | 7.00 MW | Nordex SE | planned | planned 2027 | Windenergie Marienmünster/Altenbergen GmbH & Co. KG |
| WEA02 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Haarbrück-West GbR |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | WBH GmbH & Co. KG |
| WEA01 Merlsheim | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Merlsheim GmbH &Co. KG |
| WEA AH03 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Altenheerse II GbR |
| WEA02 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Peckelsheim-Niesen GbR |
| WEA06 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windenergie Gut Alfredshöhe GmbH & Co. KG |
| Gut Wertheim WEA 16 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | WBH GmbH & Co. KG |
| Gut Wertheim WEA 14 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | MS Megawatt Verwaltungs GmbH |
| WEA 3 | 7.00 MW | Nordex SE | planned | planned 2028 | wpd Windpark Manrode GmbH & Co. KG |
| Brakel- Siddessen II | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Felix Nova GmbH |
| WEA 03 | 6.80 MW | Nordex SE | in operation | 2026-10-08 | Bürgerwind Marienmünster I GmbH & Co. KG |
| WEA 15 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| WEA 11 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Fölsen / Gehrden III GmbH & Co. KG |
| WEA Borgentreich 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| Bürgerwind Dringenberg WEA 1 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| WEA22 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Bürgerenergie Gehrden GbR |
| WEA 07 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| WEA 1 | 6.80 MW | – | planned | planned 2028 | ATE Windpark Warburg |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 16 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| CAL 03 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| CAL 10 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| CAL 11 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA Borgentreich-Ost 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-10-29 | Bürgerwind Marienmünster II GmbH & Co. KG |
| WEA 20 | 6.80 MW | Nordex SE | planned | planned 2027 | Windenergie Fölsen Gehrden II GmbH & Co. KG |
| WEA 14 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA 06 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Bredenborn II GbR |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| CAL 06 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA23 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Bürgerenergie Gehrden GbR |
| WEA 2 | 6.80 MW | – | planned | planned 2028 | ATE Windpark Warburg |
| WEA 08 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| WEA Borgentreich 06 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| CAL 08 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA24 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windenergie Niesen GbR |
| WEA 3 | 6.80 MW | – | planned | planned 2028 | ATE Windpark Warburg |
| WEA 1 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Bredenborn II GbR |
| Rimbeck WEA1 | 6.80 MW | Nordex SE | planned | planned 2028 | Energiequelle GmbH |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Möncheberg GmbH & Co. KG |
| CAL 02 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA 02 | 6.80 MW | Nordex SE | planned | planned 2028 | WN Energie GmbH & Co. KG |
| WEA 21 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| Brakel-Siddessen | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Felix Nova GmbH |
| WEA 10 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Fölsen / Gehrden III GmbH & Co. KG |
| RimbeckWEA2 | 6.80 MW | Nordex SE | planned | planned 2028 | Energiequelle GmbH |
| WEA 04 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| CAL 05 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA 06 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 12 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Fölsen Gehrden II GmbH & Co. KG |
| WEA 6 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| CAL 07 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA 09 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Eversen-Eichholz West GbR |
| Rimbeck WEA3 | 6.80 MW | Nordex SE | planned | planned 2028 | Energiequelle GmbH |
| WEA 02 | 6.80 MW | Nordex SE | planned | planned 2028 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA01 | 6.80 MW | Nordex SE | in operation | 2026-10-08 | Bürgerwind Marienmünster I GmbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 19 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Fölsen / Gehrden III GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex SE | planned | planned 2026 | Windenergie Fölsen/Gehrden GmbH & Co. KG |
| CAL 04 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA Borgentreich-Ost 09 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Borgentreich Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA 13 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Fölsen Gehrden II GmbH & Co. KG |
| CAL 01 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA Borgentreich-Ost 08 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Borgentreich Zwei GmbH & Co. KG Umweltgereche Energie |
| WEA 05 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 04 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Möncheberg GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Möncheberg GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex SE | planned | planned 2028 | WN Energie GmbH & Co. KG |
| CAL 12 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA Borgentreich-Ost 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 04 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-10-22 | Bürgerwind Marienmünster I GmbH & Co. KG |
| WEA 18 | 6.80 MW | Nordex SE | planned | planned 2027 | Bürgerwind Dringenberg GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 03 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 07 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 04 | 6.80 MW | Nordex Energy GmbH | planned | planned 2030 | Energiekontor AG |
| WEA 08 | 6.80 MW | Nordex SE | planned | planned 2028 | Windenergie Eversen-Eichholz West GbR |
| CAL 09 | 6.80 MW | Nordex SE | planned | planned 2028 | NaturStromProjekte GmbH |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| WEA Borgentreich-Ost 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Bürgerwindpark Willebadessen Entwicklungs GmbH & Co. KG |
| WEA Borgentreich-Ost 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Borgentreich Eins GmbH & Co. KG Umweltgerechte Energie |
| WEA 01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 03 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 04 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WEA 05 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2029 | Energiekontor AG |
| WP Warburg II WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| WP Warburg II WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| WP Warburg II WEA 4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| PEC-WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENGIE Windpark Peckelsheim GmbH |
| WP Warburg II WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Schmechten GmbH & Co. KG |
| WP Warburg II WEA 6 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| WEA01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WestfalenWIND Planungs GmbH & Co. KG |
| PEC-WEA 4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENGIE Windpark Peckelsheim GmbH |
| PEC-WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENGIE Windpark Peckelsheim GmbH |
| WP Warburg II WEA 5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | WP Warburg II GmbH & Co. KG |
| PEC-WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENGIE Windpark Peckelsheim GmbH |
| WEA13_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Nieheim-Oeynhausen GmbH & Co. KG |
| Bürgerwindpark Borgentreich 10 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energie & Landwirtschaft Invest GmbH & Co. KG |
| WEA2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | GLS Windpark Nausenberg GmbH & Co. KG |
| WEA 15 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Hegge GmbH & Co. KG |
| Bürgerwindpark Borgentreich 20 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Marienmünster 1 | 6.00 MW | eno energy GmbH | in operation | 2025-10-06 | Marienmünster Bürgerwindpark GmbH & Co. KG |
| WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Brakel Modexen GmbH & Co. KG |
| WEA15_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| WEA03_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| Bürgerwindpark Borgentreich 26 | 6.00 MW | – | planned | planned 2029 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Höxter Bruchhausen WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Felix Nova GmbH |
| WEA 10 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Brakel Modexen GmbH & Co. KG |
| Bürgerwindpark Borgentreich 8 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-14 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Bürgerwindpark Borgentreich 12 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-18 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Greinberg 6 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Greinberg II GbR |
| Hanbünge 1 | 6.00 MW | – | planned | planned 2028 | Hoppe und Dietz GmbH und Co.KG |
| Bürgerwindpark Borgentreich 9 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-21 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Hoppe 65 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Hoppe & Dietz GbR |
| Bürgerwindpark Borgentreich 21 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WKA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | WKA Helleberg GmbH & Co. KG |
| Marienmünster 2 | 6.00 MW | eno energy GmbH | in operation | 2025-06-11 | Marienmünster Bürgerwind GmbH |
| Bürgerwindpark Borgentreich 2 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA04_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| Bürgerwindpark Borgentreich 5 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WKA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2028 | WKA Helleberg GmbH & Co. KG |
| Bürgerwindpark Borgentreich 6 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-17 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Bürgerwindpark Borgentreich 25 | 6.00 MW | – | planned | planned 2029 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA05_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| Greinberg 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Greinberg GbR |
| WEA 05 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Windpark Brakel Modexen GmbH & Co. KG |
| WEA 12 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Hegge GmbH & Co. KG |
| WEA 07 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Nieheim-Oeynhausen GmbH & Co. KG |
| WEA10_Daseburg | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Daseburg Betriebs GmbH & Co. KG |
| Bürgerwindpark Borgentreich 18 | 6.00 MW | ENERCON GmbH | in operation | 2026-09-29 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA 08 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Nieheim-Oeynhausen GmbH & Co. KG |
| Bürgerwindpark Borgentreich 27 | 6.00 MW | – | planned | planned 2028 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Bürgerwindpark Borgentreich 4 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | GLS Windpark Nausenberg GmbH & Co. KG |
| Hanbünge 2 | 6.00 MW | – | planned | planned 2028 | Hoppe und Dietz GmbH und Co.KG |
| Bürgerwindpark Borgentreich 16 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| Bürgerwindpark Borgentreich 1 | 6.00 MW | – | planned | planned 2026 | Bürgerwindpark Borgentreich GmbH & Co. KG |
| WEA 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Hegge GmbH & Co. KG |
| Greinberg 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Greinberg GbR |
| WEA 03 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Brakel Modexen GmbH & Co. KG |
| WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Hegge GmbH & Co. KG |
| WEA5 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | GLS Windpark Nausenberg GmbH & Co. KG |
| WEA 14 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Brakel Modexen GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Höxter?
| Operator | Units | Capacity |
|---|---|---|
| Energiekontor AG | 25 | 171.2 MW |
| Bürgerwindpark Borgentreich GmbH & Co. KG | 28 | 168.0 MW |
| Windpark Reinhardswald GmbH & Co.KG | 18 | 100.8 MW |
| NaturStromProjekte GmbH | 12 | 81.6 MW |
| MS Megawatt Verwaltungs GmbH | 11 | 72.7 MW |
| Windpark Daseburg Betriebs GmbH & Co. KG | 11 | 66.0 MW |
| Bürgerwind Nieheim-Oeynhausen GmbH & Co. KG | 11 | 63.8 MW |
| Windenergie Bonenburg/Ikenhausen GmbH & Co. KG | 9 | 63.0 MW |
| Windenergie Bonenburg/Scherfede GmbH & Co. KG | 8 | 57.6 MW |
| Windenergie LIED GbR | 8 | 57.6 MW |
Which manufacturer accounts for the most wind power capacity in Höxter?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 328 | 1.24 GW |
| Vestas Deutschland GmbH | 181 | 1.02 GW |
| Nordex SE | 57 | 352.2 MW |
| Nordex Energy GmbH | 73 | 214.4 MW |
| Nordex Germany GmbH | 25 | 169.6 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 7 | 46.2 MW |
| GE Wind Energy GmbH | 17 | 31.1 MW |
| AN Windenergie GmbH | 17 | 20.5 MW |
| eno energy GmbH | 3 | 18.0 MW |
| Senvion Deutschland GmbH | 4 | 12.7 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Höxter (Nordrhein-Westfalen), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.