Germany · renewables
Wind power in Hochsauerlandkreis
123 wind turbines with 406.8 MW of gross capacity were in operation in Hochsauerlandkreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 239 units (1.51 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Hochsauerlandkreis (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 123 wind turbines with 406.8 MW of gross capacity were in operation in Hochsauerlandkreis (Nordrhein-Westfalen) as of 2026-11-05, with a further 239 units (1.51 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Hochsauerlandkreis?
- 123 wind turbines with 406.8 MW of gross capacity were in operation in Hochsauerlandkreis as of 2026-11-05, with a further 239 units (1.51 GW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Hochsauerlandkreis in 2025?
- 24 wind turbines with 123.1 MW went into operation in Hochsauerlandkreis in 2025; the strongest year of the last two decades was 2025 with 123.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Hochsauerlandkreis?
- NATURWERK Windenergie GmbH operates 24 wind turbines with 163.2 MW in Hochsauerlandkreis, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Hochsauerlandkreis?
- ENERCON GmbH leads with 134 wind turbines and 637.0 MW in Hochsauerlandkreis (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Hochsauerlandkreis?
- The largest registered wind turbine in Hochsauerlandkreis has 7.20 MW of gross capacity and is operated by ENERTRAG SE, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Hochsauerlandkreis distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 6 | 0.03 MW | 5 | 1 |
| over 100 kW | 359 | 1.92 GW | 118 | 238 |
How much wind power capacity was commissioned in Hochsauerlandkreis each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 11 | 62.8 MW |
| 2025 | 24 | 123.1 MW |
| 2024 | 11 | 42.1 MW |
| 2023 | 10 | 45.3 MW |
| 2022 | 7 | 26.6 MW |
| 2021 | 1 | 3.30 MW |
| 2020 | 8 | 33.2 MW |
| 2017 | 1 | 2.30 MW |
| 2016 | 1 | 3.00 MW |
| 2014 | 4 | 5.06 MW |
| 2013 | 1 | 1.50 MW |
| 2011 | 2 | 2.31 MW |
| 2009 | 3 | 6.60 MW |
| 2008 | 3 | 5.30 MW |
| 2007 | 8 | 15.4 MW |
How many wind turbines in Hochsauerlandkreis are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 239 | 1.51 GW |
| in operation | 123 | 406.8 MW |
| permanently decommissioned | 1 | 1.25 MW |
| temporarily shut down | 2 | 1.00 MW |
Which wind turbines are registered in Hochsauerlandkreis?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WA5 Waldbach 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WP Altenbüren | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | mITWind Brilon GmbH & Co. KG |
| Eslohe WEA 09 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WA3 Waldbach 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Auf der Sange GmbH |
| Sundern WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Auf der Sange GmbH |
| WEA4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Im Bruch GbR |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Auf der Sange GmbH |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| WEA 8 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 1 V172 Diemelwind Marsberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Diemelwind-Marsberg GmbH & Co. KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| Sundern WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| WEA 11 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WA6 Waldbach 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| Eslohe WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Eslohe WEA 05 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| Eslohe WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| Westenfeld | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Auf der Sange GmbH |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| WEA 7 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 5 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| Eslohe WEA 04 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 9 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| Eslohe WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Vestas V172-7.2 WEA 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann-Flocke GbR |
| WEA 6 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | innoVent Planungs |
| WA1 Waldbach 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| Sundern WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| Sundern WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WEA 2 | 7.20 MW | – | planned | planned 2028 | innoVent Planungs |
| WEA 12 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| Eslohe WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Vestas V172-7.2 WEA 15 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Lackmann-Flocke GbR |
| WA4 Waldbach 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA 10 Sundern | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Deutschland GmbH |
| WA2 Waldbach 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | ENERTRAG SE |
| WEA 2 V162 Diemelwind Marsberg | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Diemelwind-Marsberg GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Meschede-West GmbH & Co. KG |
| Eslohe WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| WEA8 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| Winterberg-Hildfeld WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Grönebach_West WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA M1 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Nonnenbusch |
| WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Lattenberg Dienstleistungs GmbH |
| Windpark Brilon Repowering: WEA VS06 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | VERUM Brilon R 2024 GmbH & Co. KG |
| WEA 06 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| Winterberg-Hildfeld WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA5 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| Grönebach_West WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA M3 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Nonnenbusch |
| Windpark Brilon Repowering: WEA VS03 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | VERUM Brilon R 2024 GmbH & Co. KG |
| Windpark Brilon Repowering: WEA VS01 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | VERUM Brilon R 2024 GmbH & Co. KG |
| WEA 05 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Meierberg GmbH & Co. KG |
| Grönebach_Sued WEA 2 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Arnsberg Bruchhausen 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Felix Nova GmbH |
| WEA 03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Lattenberg Dienstleistungs GmbH |
| WEA 01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| WEA2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| WEA M2 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Nonnenbusch |
| WEA10 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| Arnsberg Bruchhausen 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Felix Nova GmbH |
| Grönebach_West WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA7 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| Grönebach_Sued WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Winterberg-Hildfeld WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Windpark Brilon Repowering: WEA VS04 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | VERUM Brilon R 2024 GmbH & Co. KG |
| WEA 01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Lattenberg Dienstleistungs GmbH |
| WEA 04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Lattenberg Dienstleistungs GmbH |
| Baumke WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Baumke GmbH & Co.KG |
| WEA 2 N175 Fürstenberg | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | Lackmann-Flocke GbR |
| Winterberg-Hildfeld WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 04 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Meierberg GmbH & Co. KG |
| Baumke WEA 2 | 7.00 MW | Nordex SE | planned | planned 2026 | Baumke GmbH & Co.KG |
| WEA9 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | C. & A. Veltins GmbH & Co. KG |
| Grönebach_West WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| Grönebach_Sued WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Lattenberg Dienstleistungs GmbH |
| WEA 05 (SKI) | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA Frielinghausen 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Drasenbeck GmbH & Co. KG Umweltgereche Energie |
| WEA Frie-Hör 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WP Sundern-Allendorf WEA 3 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-05 | PNE Windpark Sundern-Allendorf |
| WEA Frielinghausen 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Drasenbeck GmbH & Co. KG Umweltgereche Energie |
| WP Sundern-Allendorf WEA 1 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-02-25 | PNE Windpark Sundern-Allendorf |
| WP Sundern-Allendorf WEA 5 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-31 | PNE Windpark Sundern-Allendorf |
| WEA 14 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | ATE Windpark Padberg GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 10 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WEA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | ATE Windpark Padberg GmbH & Co. KG |
| WEA 05 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 13 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 9 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Philma Ventus Service GmbH & Co. KG |
| WEA 08 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 4 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WP Sundern-Allendorf WEA 4 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-24 | PNE Windpark Sundern-Allendorf |
| WEA Frielinghausen 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UGE Drasenbeck GmbH & Co. KG Umweltgereche Energie |
| WEA 4 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 01 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| WEA 11 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WP Sundern-Allendorf WEA 2 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-02-25 | PNE Windpark Sundern-Allendorf |
| WEA 06 (SKI) | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 11 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 02 (SKI) | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA Frie-Hör 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| WEA 04 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| WEA 7 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Philma Ventus Service GmbH & Co. KG |
| WEA 04 (SKI) | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 3 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WEA 03 (SKI) | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 2 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WEA 12 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 10 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Philma Ventus Service GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| WEA 11 | 6.80 MW | Nordex Germany GmbH | planned | planned 2026 | Philma Ventus Service GmbH & Co. KG |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Remblinghausen GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 05 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Rotes Land Erlinghausen GmbH & Co. KG |
| WEA 09 | 6.80 MW | – | planned | planned 2028 | NATURWERK Windenergie GmbH |
| WEA 02 | 6.80 MW | Nordex SE | planned | planned 2027 | NATURWERK Windenergie GmbH |
| Olsberg-Plackweg WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 10 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| W2 Wilde Wiese 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENERTRAG SE |
| Olsberg-Plackweg WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 09 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| Olsberg-Plackweg WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 08 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| W3 Wilde Wiese 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | ENERTRAG SE |
| Olsberg-Plackweg WEA 07 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| Olsberg-Plackweg WEA 06 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | JUWI GmbH |
| E-175 Calle | 6.00 MW | ENERCON GmbH | in operation | 2025-12-23 | rentec Calle GmbH & Co. KG |
| HR NO | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Himmelreich GmbH & Co.KG |
| WEA Arnsberg 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | VSB Windpark Arnsberg GmbH & Co. KG |
| Arnsberg Bruchhausen WEA 3 | 6.00 MW | Nordex Germany GmbH | planned | planned 2028 | VERBUND Green Power Deutschland GmbH |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Giershagen |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Giershagen |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | WestfalenWIND Planungs GmbH & Co. KG |
| Trianel Windpark Sundern WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Trianel Wind und Solar GmbH & Co. KG |
| WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2029 | Eurowind Energy GmbH |
| 175FinEslo1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 59889 HS | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Ketten Wulf Betriebs GmbH |
| Hülsenberg 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| 175SundRöhr | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| Hülsenberg 3 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Energieplan Ost West GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Briloner Hochfläche Wind GmbH & Co. KG |
| Hülsenberg 4 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Energieplan Ost West GmbH & Co. KG |
| WEA 02 Finnentrop-Schöndelt (HSK) | 6.00 MW | ENERCON GmbH | planned | planned 2026 | SL Windenergie GmbH |
| WEA Arnsberg 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | VSB Windpark Arnsberg GmbH & Co. KG |
| WEA Arnsberg 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | VSB Windpark Arnsberg GmbH & Co. KG |
| Trianel Windpark Sundern WEA 14 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Trianel Wind und Solar GmbH & Co. KG |
| Hülsenberg 2 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Energieplan Ost West GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Meschede Betriebs GmbH & Co. KG |
| Hamm-Stemmel WEA 2 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-09-28 | Bürgerwind Hamm-Stemmel GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Remblinghausen GmbH & Co. KG |
| ABO Energy WP Eslohe-Murenberg WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy Windpark 24 GmbH & Co. KG |
| WEA 8 | 5.70 MW | Nordex Germany GmbH | planned | planned 2026 | Philma Ventus Service GmbH & Co. KG |
| HEU 12 | 5.70 MW | Nordex SE | in operation | 2023-02-16 | Steinhaufen Windenergie |
| WEA 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Meschede Betriebs GmbH & Co. KG |
| WEA 02 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Remblinghausen GmbH & Co. KG |
| ABO Wind WP Remblinghausen-Süd WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind WP Remblinghausen-Süd GmbH & Co. KG |
| ABO Wind WP Remblinghausen-Süd WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind WP Remblinghausen-Süd GmbH & Co. KG |
| ABO Energy WP Eslohe-Murenberg WEA 1 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | ABO Energy Windpark 24 GmbH & Co. KG |
| HEU 11 | 5.70 MW | Nordex SE | in operation | 2023-02-16 | Windenergie Heu 11 |
| HEU 10 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-02-27 | Windenergie Heu 10 |
| ABO Wind WP Remblinghausen-Süd WEA 3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind WP Remblinghausen-Süd GmbH & Co. KG |
| ABO Wind WP Remblinghausen-Süd WEA 4 | 5.70 MW | Nordex Energy GmbH | planned | planned 2026 | ABO Wind WP Remblinghausen-Süd GmbH & Co. KG |
| WEA 1 | 5.70 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Remblinghausen GmbH & Co. KG |
| Hamm-Stemmel WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-09-28 | Bürgerwind Hamm-Stemmel GmbH & Co. KG |
| WEA 03 | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | ENOVA Windpark Meschede Betriebs GmbH & Co. KG |
| WEA1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windkraft-Wicheln-Wennigloh GmbH |
| WEA2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windkraft-Wicheln-Wennigloh GmbH |
| WEA3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windkraft-Wicheln-Wennigloh GmbH |
| WEA4 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windkraft-Wicheln-Wennigloh GmbH |
| HR2 | 5.56 MW | ENERCON GmbH | in operation | 2025-10-07 | Windpark Himmelreich GmbH & Co.KG |
| HR12 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-19 | Windpark Himmelreich GmbH & Co.KG |
| Trianel Windpark Sundern WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| WEA07 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| Trianel Windpark Sundern WEA 11 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| Trianel Windpark Sundern WEA 12 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Sundern ENERGIE Windpark I GmbH & Co. KG |
| Trianel Windpark Sundern WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| KB02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Himmelreich GmbH & Co.KG |
| Wieen GmbH & Co. KG | 5.56 MW | ENERCON GmbH | in operation | 2025-09-30 | Wieen GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | WestfalenWIND Planungs GmbH & Co. KG |
| Trianel Windpark Sundern WEA 3 | 5.56 MW | ENERCON GmbH | in operation | 2026-10-27 | Trianel Windpark Sundern GmbH & Co. KG |
| Trianel Windpark Sundern WEA 8 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| HR10 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-05 | Windpark Himmelreich GmbH & Co.KG |
| Trianel Windpark Sundern WEA 1 | 5.56 MW | ENERCON GmbH | in operation | 2026-10-26 | Trianel Windpark Sundern GmbH & Co. KG |
| WEA 01 | 5.56 MW | ENERCON GmbH | in operation | 2025-04-03 | WEA Bleiwäsche GmbH & Co. KG |
| HR7 | 5.56 MW | ENERCON GmbH | in operation | 2025-10-16 | Windpark Himmelreich GmbH & Co.KG |
| unit operated by a private individual | 5.56 MW | ENERCON GmbH | in operation | 2025-10-17 | private individual |
| WEA01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| WEA 02 | 5.56 MW | ENERCON GmbH | in operation | 2026-09-21 | WEA Bleiwäsche GmbH & Co. KG |
| WG Antfeld WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEPA Antfeld GmbH & Co. KG |
| WG Antfeld WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEPA Antfeld GmbH & Co. KG |
| WEA03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| KB01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Himmelreich GmbH & Co.KG |
| WEA10 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| HR3 | 5.56 MW | ENERCON GmbH | in operation | 2025-10-16 | Windpark Himmelreich GmbH & Co.KG |
| WEA05 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| Westerfeld | 5.56 MW | ENERCON GmbH | in operation | 2026-10-08 | MW-Energie |
| Trianel Windpark Sundern WEA 9 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Sundern ENERGIE Windpark I GmbH & Co. KG |
| HR5 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-22 | Windpark Himmelreich GmbH & Co.KG |
| HR6 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-23 | Windpark Himmelreich GmbH & Co.KG |
| WG Antfeld WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEPA Antfeld GmbH & Co. KG |
| HR4 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-14 | Windpark Himmelreich GmbH & Co.KG |
| Trianel Windpark Sundern WEA 10 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Sundern ENERGIE Windpark I GmbH & Co. KG |
| WEA06 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| Trianel Windpark Sundern WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| HR13 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark Himmelreich GmbH & Co.KG |
| Suhrenberg | 5.56 MW | ENERCON GmbH | planned | planned 2026 | MW-Energie |
| HR8 | 5.56 MW | ENERCON GmbH | in operation | 2025-12-04 | Windpark Himmelreich GmbH & Co.KG |
| WEA02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| WG Antfeld WEA 04 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | WEPA Antfeld GmbH & Co. KG |
| Trianel Windpark Sundern WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| Trianel Windpark Sundern WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Trianel Windpark Sundern GmbH & Co. KG |
| WEA 2 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | Energiekontor AG |
| S2 Schieberg 2 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| S1 Schieberg 1 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| Olsberg-Antfeld WEA 04 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-07-09 | MVV Windenergie GmbH |
| S4 Schieberg 4 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| WEA04 | 5.50 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| WEA 3 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | Energiekontor AG |
| S6 Schieberg 6 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| Olsberg-Antfeld WEA 02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-07-10 | MVV Windenergie GmbH |
| Olsberg-Antfeld WEA 01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-07-10 | MVV Windenergie GmbH |
| WEA08 | 5.50 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| WEA 1 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | Energiekontor AG |
| HSW Windpark Herrscheid-Eslohe WEA 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-01-31 | HSW Windpark Herrscheid GmbH & Co. KG |
| Olsberg-Antfeld WEA 03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-07-09 | MVV Windenergie GmbH |
| HSW Windpark Herrscheid-Eslohe WEA 2 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-02-04 | HSW Windpark Herrscheid GmbH & Co. KG |
| WEA09 | 5.50 MW | ENERCON GmbH | planned | planned 2027 | Windpark Westheim GmbH & Co. KG |
| S3 Schieberg 3 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| S5 Schieberg 5 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| S7 Schieberg 7 | 5.50 MW | GE Wind Energy GmbH | planned | planned 2027 | ENERTRAG SE |
| Hellefeld HE 01 Meerhof | 4.80 MW | Nordex Germany GmbH | planned | planned 2027 | Hellefeld Windenergie GmbH & Co.KG |
| ABO Wind WP Meschede-Freienohl WEA 2 | 4.80 MW | Nordex Energy GmbH | in operation | 2025-01-16 | LHI SW WP Meschede-Freienohl 2686 GmbH & Co.KG |
| ABO Wind WP Meschede-Freienohl WEA 4 | 4.80 MW | Nordex Energy GmbH | in operation | 2024-12-17 | LHI SW WP Meschede-Freienohl 2686 GmbH & Co.KG |
| ABO Wind WP Meschede-Freienohl WEA 1 | 4.80 MW | Nordex Energy GmbH | in operation | 2025-02-06 | LHI SW WP Meschede-Freienohl 2686 GmbH & Co.KG |
| Hellefeld HE 02 Erlinghausen | 4.80 MW | Nordex Germany GmbH | planned | planned 2028 | Hellefeld Windenergie GmbH & Co.KG |
| ABO Wind WP Meschede-Freienohl WEA 5 | 4.80 MW | Nordex Energy GmbH | in operation | 2024-12-17 | LHI SW WP Meschede-Freienohl 2686 GmbH & Co.KG |
| ABO Wind WP Meschede-Freienohl WEA 3 | 4.80 MW | Nordex Energy GmbH | in operation | 2025-02-06 | LHI SW WP Meschede-Freienohl 2686 GmbH & Co.KG |
| Heu4 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-09-09 | Windenergie Heubuscher Weg GmbH & Co. KG |
| WEA 1 | 4.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark Olsberg GmbH & Co. KG |
| WEA 4 | 4.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark Olsberg GmbH & Co. KG |
| Heu3 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-09-08 | Windenergie Heubusch Sintfeld GmbH & Co. KG |
| WEA 2 | 4.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark Olsberg GmbH & Co. KG |
| WEA 3 | 4.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark Olsberg GmbH & Co. KG |
| Heu5 | 4.50 MW | Nordex Energy GmbH | in operation | 2020-09-08 | Windenergie Heubuscher Weg GmbH & Co. KG |
| Wasserfall I | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Anröchter Windkraft GmbH & Co. Windpark Wasserfall KG |
| Brilon II WEA 03 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Brilon II WEA 04 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Windfang WEA 6 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Windfang Planungs- Betriebs- und Infrastruktur GmbH & Co. KG |
| Windfang WEA 7 | 4.26 MW | ENERCON GmbH | in operation | 2026-09-25 | Windfang Energie eG |
| 138FinEslo2 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | SL Windenergie GmbH |
| WEA 3 V136 Diemelwind Marsberg | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Diemelwind-Marsberg GmbH & Co. KG |
| 1381108 (ME20) | 4.20 MW | ENERCON GmbH | in operation | 2024-06-14 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WEA 5 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Klinksberg-Humberg GmbH |
| 1380280 (ME12) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-18 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| E-138 Mittelfeld - S-Nr. 1381062 | 4.20 MW | ENERCON GmbH | in operation | 2024-12-18 | Mittelfeld GmbH & Co.KG |
| 1380623 (ME18) | 4.20 MW | ENERCON GmbH | in operation | 2022-12-13 | Energiehof GmbH |
| Radlinghausen_WEA04 | 4.20 MW | ENERCON GmbH | in operation | 2023-07-13 | Windpark Bülen GmbH & Co. KG |
| Radlinghausen_WEA03 | 4.20 MW | ENERCON GmbH | in operation | 2023-06-15 | Windpark Bülen GmbH & Co. KG |
| Radlinghausen_WEA01 | 4.20 MW | ENERCON GmbH | in operation | 2023-06-16 | Windpark Bülen GmbH & Co. KG |
| WEA 7 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Klinksberg-Humberg GmbH |
| WEA 8 | 4.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | Windpark Klinksberg-Humberg GmbH |
| Radlinghausen_WEA02 | 4.20 MW | ENERCON GmbH | in operation | 2023-07-28 | Windpark Bülen GmbH & Co. KG |
| 1380279 (ME11) | 4.20 MW | ENERCON GmbH | in operation | 2020-11-13 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| 1250357 (ME 8B) | 4.00 MW | ENERCON GmbH | in operation | 2022-12-13 | Windpark Runder Busch Meerhof GmbH & Co. KG |
| 1250203 (ME14) | 4.00 MW | ENERCON GmbH | in operation | 2020-11-19 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| 1250356 (ME 8A) | 4.00 MW | ENERCON GmbH | in operation | 2022-12-13 | Windpark Meerhof GmbH |
| 1250202 (ME04) | 4.00 MW | ENERCON GmbH | in operation | 2020-11-20 | Windpark Grüner Weg Meerhof GmbH & Co.KG |
| WEA 1 (Nord) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-23 | Eder Energy GmbH & Co. KG |
| WEA 2 (Süd) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-09 | Eder Energy GmbH & Co. KG |
| WEA 1 (Süd) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-09 | Eder Energy GmbH & Co. KG |
| WEA 2 (Nord) | 3.60 MW | Vestas Deutschland GmbH | in operation | 2022-06-23 | Eder Energy GmbH & Co. KG |
| Olsberg-Mannstein WEA 02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-11 | MVV Windenergie GmbH |
| Olsberg-Mannstein WEA 07 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-09-05 | MVV Windenergie GmbH |
| Olsberg-Mannstein WEA 06 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-08-28 | MVV Windenergie GmbH |
| Olsberg-Mannstein WEA 01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-07-25 | MVV Windenergie GmbH |
| Olsberg-Mannstein WEA 04 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-06-18 | MVV Windenergie GmbH |
| Olsberg-Mannstein WEA 05 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2024-08-12 | MVV Windenergie GmbH |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Hochsauerlandkreis?
| Operator | Units | Capacity |
|---|---|---|
| NATURWERK Windenergie GmbH | 24 | 163.2 MW |
| VERBUND Green Power Deutschland GmbH | 20 | 140.6 MW |
| Alterric Deutschland GmbH | 15 | 97.4 MW |
| ENERTRAG SE | 15 | 94.1 MW |
| Windpark Himmelreich GmbH & Co.KG | 14 | 75.7 MW |
| JUWI GmbH | 10 | 62.0 MW |
| Windpark Westheim GmbH & Co. KG | 10 | 55.4 MW |
| innoVent Planungs | 7 | 50.4 MW |
| Windpark Meschede-West GmbH & Co. KG | 7 | 50.4 MW |
| Trianel Windpark Sundern GmbH & Co. KG | 9 | 50.0 MW |
Which manufacturer accounts for the most wind power capacity in Hochsauerlandkreis?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 134 | 637.0 MW |
| Vestas Deutschland GmbH | 95 | 568.5 MW |
| Nordex Germany GmbH | 40 | 262.7 MW |
| Nordex Energy GmbH | 33 | 181.3 MW |
| GE Wind Energy GmbH | 17 | 89.5 MW |
| Nordex SE | 11 | 72.8 MW |
| VENSYS Energy AG | 5 | 7.50 MW |
| DeWind GmbH | 3 | 3.00 MW |
| Senvion Deutschland GmbH | 1 | 2.05 MW |
| Wind World A/S | 3 | 1.15 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Hochsauerlandkreis (Nordrhein-Westfalen), and how can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.