19 wind turbines with 21.4 MW of gross capacity were in operation in Herford (Nordrhein-Westfalen) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Herford (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 19 wind turbines with 21.4 MW of gross capacity were in operation in Herford (Nordrhein-Westfalen) as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Herford?
- 19 wind turbines with 21.4 MW of gross capacity were in operation in Herford as of 2026-11-05, with a further 0 units (0.00 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Herford in 2015?
- 1 wind turbines with 0.01 MW went into operation in Herford in 2015; the strongest year of the last two decades was 2006 with 4.50 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Herford?
- Windpark Löhne A/S & Co. KG operates 2 wind turbines with 3.00 MW in Herford, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Herford?
- ENERCON GmbH leads with 13 wind turbines and 12.9 MW in Herford (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Herford?
- The largest registered wind turbine in Herford has 2.35 MW of gross capacity and is operated by Windkraft Hollenhagen, commissioned 2026-06-18 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Herford distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.01 MW | 1 | 0 |
| 30 to 100 kW | 1 | 0.08 MW | 1 | 0 |
| over 100 kW | 19 | 22.4 MW | 17 | 0 |
How much wind power capacity was commissioned in Herford each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 2.35 MW |
| 2015 | 1 | 0.01 MW |
| 2008 | 1 | 2.00 MW |
| 2007 | 1 | 1.50 MW |
| 2006 | 3 | 4.50 MW |
How many wind turbines in Herford are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 19 | 21.4 MW |
| permanently decommissioned | 2 | 1.10 MW |
Which wind turbines are registered in Herford?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| HOL1 | 2.35 MW | ENERCON GmbH | in operation | 2026-06-18 | Windkraft Hollenhagen |
| WKA Rehmerloh | 2.00 MW | ENERCON GmbH | in operation | 2008-06-01 | Bürgerwindpark Königsmoor GmbH & Co KG z. H. Gerold Walter |
| 702769 | 1.80 MW | ENERCON GmbH | in operation | 2005-12-12 | Windkraft Herford I GmbH & Co. KG |
| E-66 Herford | 1.80 MW | ENERCON GmbH | in operation | 2002-06-18 | Dettmer Windpark 10 |
| WKA Solter | 1.50 MW | Fuhrländer AG | in operation | 2007-06-15 | Johnson's Invest GmbH |
| WEA Steinegge | 1.50 MW | Fuhrländer AG | in operation | 2006-12-26 | WKA Steinegge GbR |
| WRD FL433 | 1.50 MW | Fuhrländer AG | in operation | 2006-12-30 | CHE Invest GmbH & Co. KG |
| Löhne WEA 23252 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2005-12-21 | Windpark Löhne A/S & Co. KG |
| HLH-01-70119 | 1.50 MW | REpower Systems SE | in operation | 2002-10-31 | Porta Windkraft Planungs- u. Verwaltungs GmbH & Co. KG |
| Löhne WEA 26020 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2006-12-19 | Windpark Löhne A/S & Co. KG |
| Ringsthof Schlösser & König GbR | 1.00 MW | ENERCON GmbH | in operation | 2002-06-26 | Ringsthof - Schlösser - König GbR |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2005-10-27 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-04-08 | private individual |
| Rödinghausen-Südholz | 0.60 MW | ENERCON GmbH | in operation | 2002-01-11 | Wullengerd Hagenlüke GbR |
| WR-Rödinghausen | 0.60 MW | Nordex Energy GmbH | in operation | 2001-09-27 | Dirk Kolfhaus u. Rolf Beele GbR |
| Windkraftwerk | 0.60 MW | ENERCON GmbH | in operation | 2003-01-23 | Storma |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1996-10-01 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1996-01-01 | private individual |
| unit operated by a private individual | 0.28 MW | ENERCON GmbH | in operation | 1992-08-04 | private individual |
| unit operated by a private individual | 0.08 MW | ENERCON GmbH | in operation | 1989-08-04 | private individual |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2015-08-20 | private individual |
Which organisations operate the most wind power capacity in Herford?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Löhne A/S & Co. KG | 2 | 3.00 MW |
| Windkraft Hollenhagen | 1 | 2.35 MW |
| Bürgerwindpark Königsmoor GmbH & Co KG z. H. Gerold Walter | 1 | 2.00 MW |
| Windkraft Herford I GmbH & Co. KG | 1 | 1.80 MW |
| Dettmer Windpark 10 | 1 | 1.80 MW |
| Porta Windkraft Planungs- u. Verwaltungs GmbH & Co. KG | 1 | 1.50 MW |
| Johnson's Invest GmbH | 1 | 1.50 MW |
| WKA Steinegge GbR | 1 | 1.50 MW |
| CHE Invest GmbH & Co. KG | 1 | 1.50 MW |
| Ringsthof - Schlösser - König GbR | 1 | 1.00 MW |
Which manufacturer accounts for the most wind power capacity in Herford?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 13 | 12.9 MW |
| Fuhrländer AG | 3 | 4.50 MW |
| NEG Micon Deutschland GmbH | 2 | 3.00 MW |
| REpower Systems SE | 1 | 1.50 MW |
| Nordex Energy GmbH | 1 | 0.60 MW |
| BRAUN Windturbinen GmbH | 1 | 0.01 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Herford (Nordrhein-Westfalen), and how large are can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.