Germany · renewables
Wind power in Gütersloh
46 wind turbines with 92.4 MW of gross capacity were in operation in Gütersloh (Nordrhein-Westfalen) as of 2026-11-05, with a further 42 units (251.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Gütersloh (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 46 wind turbines with 92.4 MW of gross capacity were in operation in Gütersloh (Nordrhein-Westfalen) as of 2026-11-05, with a further 42 units (251.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Gütersloh?
- 46 wind turbines with 92.4 MW of gross capacity were in operation in Gütersloh as of 2026-11-05, with a further 42 units (251.8 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Gütersloh in 2023?
- 2 wind turbines with 10.2 MW went into operation in Gütersloh in 2023; the strongest year of the last two decades was 2016 with 24.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Gütersloh?
- Rheda-Wiedenbrücker Energiegenossenschaft eG operates 12 wind turbines with 68.6 MW in Gütersloh, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Gütersloh?
- ENERCON GmbH leads with 59 wind turbines and 253.6 MW in Gütersloh (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Gütersloh?
- The largest registered wind turbine in Gütersloh has 7.20 MW of gross capacity and is operated by Alterric Windpark Heidwiesken GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Gütersloh distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 2 | 0.04 MW | 2 | 0 |
| 30 to 100 kW | 1 | 0.08 MW | 1 | 0 |
| over 100 kW | 87 | 348.0 MW | 43 | 42 |
How much wind power capacity was commissioned in Gütersloh each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2023 | 2 | 10.2 MW |
| 2020 | 1 | 3.60 MW |
| 2018 | 1 | 2.40 MW |
| 2017 | 5 | 14.0 MW |
| 2016 | 10 | 24.7 MW |
| 2012 | 1 | 2.30 MW |
| 2011 | 2 | 4.60 MW |
| 2010 | 4 | 8.00 MW |
| 2009 | 2 | 4.00 MW |
| 2007 | 2 | 1.53 MW |
| 2006 | 2 | 3.00 MW |
How many wind turbines in Gütersloh are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 42 | 251.8 MW |
| in operation | 46 | 92.4 MW |
| permanently decommissioned | 2 | 4.00 MW |
Which wind turbines are registered in Gütersloh?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Harsewinkel WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Alterric Windpark Heidwiesken GmbH & Co. KG |
| Rheda-Wiedenbrück Lintel WEA 10 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Rheda-Wiedenbrück Lintel WEA 07 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Greffen Nord WEA1 E-175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 10. GmbH & Co. KG |
| Langenberg WEA2 E-175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 6. GmbH & Co. KG |
| Rheda-Wiedenbrück Lintel WEA 11 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Rheda-Wiedenbrück WEA 02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2030 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Rheda-Wiedenbrück Lintel WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Greffen Nord WEA3 E-175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 10. GmbH & Co. KG |
| Langenberg WEA1 E-175 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 6. GmbH & Co. KG |
| Greffen Süd WEA2 E-175 | 6.90 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 11. GmbH & Co. KG |
| Greffen Süd WEA1 E-175 | 6.90 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 11. GmbH & Co. KG |
| WEA Weißes Venn 04 | 6.30 MW | ENERCON GmbH | planned | planned 2026 | STAWAG Energie GmbH |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Greffen |
| Harsewinkel SW 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Erneuerbare Energie Weißes Venn |
| Harsewinkel WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark Heidwiesken GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Greffen |
| Rheda-Wiedenbrück WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Fahrenkamp WEA 02 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JUWI GmbH |
| Harsewinkel WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark Heidwiesken GmbH & Co. KG |
| Harsewinkel WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark Heidwiesken GmbH & Co. KG |
| Gütersloh Repowering E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Deutsche WindXperts 4. GmbH & Co. KG |
| Marienfeld Süd WEA1 E-175 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 14. GmbH & Co. KG |
| Fahrenkamp WEA 03 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JUWI GmbH |
| Rheda-Wiedenbrück WEA 14 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Erneuerbare Energie Weißes Venn |
| Harsewinkel SW 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| Rheda-Wiedenbrück Lintel WEA 03 | 5.70 MW | – | planned | planned 2029 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| Windrad-Langenberg-1 | 5.70 MW | Nordex Energy GmbH | in operation | 2023-06-07 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| WEA01 Aurea | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Rheda-Marburg GmbH & Co. KG |
| Lintel II - WEA1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windrad Lintel II E 160 GmbH & Co. KG |
| Emskämpe 1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| WEA02 Aurea | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Rheda-Marburg GmbH & Co. KG |
| WP Harsewinkel/Kattenstrot WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| Emskämpe 2 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Energieplan Ost West GmbH & Co. KG |
| Rheda-Wiedenbrück WEA 15 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| WP Harsewinkel/Kattenstrot WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Westwind Projektierungs GmbH & Co. KG |
| Windrad Brock N149 | 4.50 MW | Nordex SE | in operation | 2023-07-10 | Windrad Brock N149 GmbH |
| Marienfeld Süd WEA2 E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 8. GmbH & Co. KG |
| Greffen Nord WEA2 E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 10. GmbH & Co. KG |
| Marienfeld Süd WEA3 E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 9. GmbH & Co. KG |
| Greffen Nord WEA6 E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 12. GmbH & Co. KG |
| Greffen Nord WEA5 E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Deutsche WindXperts 10. GmbH & Co. KG |
| WEA Häger | 3.60 MW | Vestas Deutschland GmbH | in operation | 2020-09-23 | PWG GmbH & Co. Windpark Häger KG |
| WKA 3 - 218619 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-07-07 | Bielefeld-Gütersloh Wind GmbH & Co. KG |
| WEA 2 - 1150192 | 3.00 MW | ENERCON GmbH | in operation | 2016-03-30 | Windpark Ostwestfalen GmbH & Co. KG |
| WEA 1 - 1150191 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-10 | Windpark Ostwestfalen GmbH & Co. KG |
| WEA 5 - 1150193 | 3.00 MW | ENERCON GmbH | in operation | 2016-03-24 | Windpark Ostwestfalen GmbH & Co. KG |
| WEA 7 - 1150195 | 3.00 MW | ENERCON GmbH | in operation | 2016-06-01 | Windpark Ostwestfalen GmbH & Co. KG |
| WEA 6 - 1150194 | 3.00 MW | ENERCON GmbH | in operation | 2016-05-28 | Windpark Ostwestfalen GmbH & Co. KG |
| Windrad Lintel E-115 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-05 | Windrad Lintel E 115 GmbH & Co. KG |
| Mühlenbrede Wind | 3.00 MW | ENERCON GmbH | in operation | 2016-10-24 | Mühlenbrede Wind GmbH & Co. KG |
| 25168382 | 2.53 MW | GE Wind Energy GmbH | in operation | 2017-09-30 | Windpark Gütersloh GmbH & Co. KG |
| 25168381 | 2.53 MW | GE Wind Energy GmbH | in operation | 2017-09-29 | Windpark Gütersloh GmbH & Co. KG |
| 25168383 | 2.53 MW | GE Wind Energy GmbH | in operation | 2017-09-28 | Windpark Gütersloh GmbH & Co. KG |
| WEA Möhler | 2.40 MW | Nordex Energy GmbH | in operation | 2018-02-27 | Windpark Möhler GmbH & Co. KG |
| WEA Hollandskopf | 2.30 MW | ENERCON GmbH | in operation | 2012-03-16 | Ergo Nova Gesellschaft für regenerative Energien mbH&Co.KG |
| E82-Nord | 2.30 MW | ENERCON GmbH | in operation | 2016-01-25 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| E82-Süd | 2.30 MW | ENERCON GmbH | in operation | 2016-02-19 | Rheda-Wiedenbrücker Energiegenossenschaft eG |
| 823393 | 2.30 MW | ENERCON GmbH | in operation | 2011-04-19 | Windpark GmbH & Co. Harsewinkel KG |
| 823394 | 2.30 MW | ENERCON GmbH | in operation | 2011-04-28 | Windpark GmbH & Co. Harsewinkel KG |
| 93503 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2016-02-04 | Westernwiese Wind GmbH & Co. KG |
| WEA 1 Friedrichsdorf | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-04-23 | Stadtwerke Bielefeld GmbH Assetmanagement Onshore Wind und PV (ZA) |
| E-782946 | 2.00 MW | ENERCON GmbH | in operation | 2010-08-11 | Windpark GmbH & Co. Delbrück KG |
| WEA 2 Friedrichsdorf | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-04-23 | Stadtwerke Bielefeld GmbH Assetmanagement Onshore Wind und PV (ZA) |
| E-821858 | 2.00 MW | ENERCON GmbH | in operation | 2010-08-12 | Windpark GmbH & Co. Delbrück KG |
| 14095 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2002-07-18 | Deutsche Windtechnik GmbH & Co. KG |
| 14906 | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2002-07-17 | Deutsche Windtechnik GmbH & Co. KG |
| E-821860 | 2.00 MW | ENERCON GmbH | in operation | 2010-08-19 | Windpark GmbH & Co. Delbrück KG |
| E-821859 | 2.00 MW | ENERCON GmbH | in operation | 2010-08-17 | Windpark GmbH & Co. Delbrück KG |
| Niehorstwind | 1.80 MW | ENERCON GmbH | in operation | 2000-07-05 | Niehorstwind |
| WKA Gütersloh | 1.80 MW | ENERCON GmbH | in operation | 2002-08-05 | Windstrom Gmbh & Co KG Gütersloh |
| WEA Borgholzhausen | 1.80 MW | ENERCON GmbH | in operation | 2002-06-26 | 10. Projektgesellschaft Krummbek UG (haftungsbeschränkt) & Co. KG |
| Windanlage | 1.50 MW | Nordex Energy GmbH | in operation | 2006-03-01 | Windpark Halle UG (haftungsbeschränkt) & Co. KG |
| WKA Halle | 1.50 MW | Senvion Deutschland GmbH | in operation | 2007-12-29 | WKA Halle Energy GmbH & Co. KG |
| Windanlage | 1.50 MW | Nordex Energy GmbH | in operation | 2006-03-01 | Windpark Halle UG (haftungsbeschränkt) & Co. KG |
| Hövelriege II | 1.00 MW | ENERCON GmbH | in operation | 2004-12-02 | Windpark Hövelriege GmbH & Co. KG |
| V 68307 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2004-05-03 | CHE Invest GmbH & Co. KG |
| V 68303 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2004-05-10 | CHE Invest GmbH & Co. KG |
| WEA Borgholzhausen | 1.00 MW | AN Windenergie GmbH | in operation | 2001-11-14 | Stadtwerke Bielefeld GmbH Assetmanagement Onshore Wind und PV (ZA) |
| V-68304 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2004-05-03 | CHE Invest GmbH & Co. KG |
| Hövelriege I | 1.00 MW | ENERCON GmbH | in operation | 2004-12-01 | Windpark Hövelriege GmbH & Co. KG |
| unit operated by a private individual | 0.75 MW | NEG Micon Deutschland GmbH | in operation | 2002-08-28 | private individual |
| WKA E 441830 | 0.60 MW | ENERCON GmbH | in operation | 2003-11-05 | Windkraft Sende GmbH & Co.KG |
| WEA Versmold 2 | 0.60 MW | ENERCON GmbH | in operation | 2002-04-22 | Stadtwerke Münster GmbH |
| WEA Versmold 1 | 0.60 MW | ENERCON GmbH | in operation | 2002-04-22 | Stadtwerke Münster GmbH |
| unit operated by a private individual | 0.08 MW | Tacke GmbH & Co. KG | in operation | 1992-09-23 | private individual |
| unit operated by a private individual | 0.03 MW | Pfleiderer Wind Energy GmbH | in operation | 2007-08-29 | private individual |
| Kleinwindanlage | 0.01 MW | S & W ENERGIESYSTEME UG (haftungsbeschränkt) | in operation | 2016-08-07 | Eigentümergemeinschaft Eggersglüß & Grasse |
Which organisations operate the most wind power capacity in Gütersloh?
| Operator | Units | Capacity |
|---|---|---|
| Rheda-Wiedenbrücker Energiegenossenschaft eG | 12 | 68.6 MW |
| Alterric Windpark Heidwiesken GmbH & Co. KG | 4 | 25.2 MW |
| Energieplan Ost West GmbH & Co. KG | 4 | 23.1 MW |
| Deutsche WindXperts 10. GmbH & Co. KG | 4 | 22.5 MW |
| Windpark Ostwestfalen GmbH & Co. KG | 5 | 15.0 MW |
| Deutsche WindXperts 6. GmbH & Co. KG | 2 | 14.0 MW |
| Deutsche WindXperts 11. GmbH & Co. KG | 2 | 13.8 MW |
| Erneuerbare Energie Weißes Venn | 2 | 12.0 MW |
| Bürgerwind Greffen | 2 | 12.0 MW |
| JUWI GmbH | 2 | 12.0 MW |
Which manufacturer accounts for the most wind power capacity in Gütersloh?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 59 | 253.6 MW |
| Nordex Germany GmbH | 5 | 35.0 MW |
| Vestas Deutschland GmbH | 7 | 22.2 MW |
| Nordex Energy GmbH | 4 | 11.1 MW |
| GE Wind Energy GmbH | 3 | 7.59 MW |
| Nordex SE | 1 | 4.50 MW |
| NEG Micon Deutschland GmbH | 4 | 3.75 MW |
| Senvion Deutschland GmbH | 2 | 3.55 MW |
| AN Windenergie GmbH | 1 | 1.00 MW |
| Tacke GmbH & Co. KG | 1 | 0.08 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Gütersloh (Nordrhein-Westfalen), and how large ar can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.