Germany · renewables
Wind power in Düren
211 wind turbines with 605.8 MW of gross capacity were in operation in Düren (Nordrhein-Westfalen) as of 2026-11-05, with a further 52 units (324.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Düren (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 211 wind turbines with 605.8 MW of gross capacity were in operation in Düren (Nordrhein-Westfalen) as of 2026-11-05, with a further 52 units (324.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Düren?
- 211 wind turbines with 605.8 MW of gross capacity were in operation in Düren as of 2026-11-05, with a further 52 units (324.6 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Düren in 2025?
- 28 wind turbines with 130.4 MW went into operation in Düren in 2025; the strongest year of the last two decades was 2025 with 130.4 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Düren?
- REA GmbH Umweltinvest operates 10 wind turbines with 61.1 MW in Düren, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Düren?
- ENERCON GmbH leads with 87 wind turbines and 344.3 MW in Düren (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Düren?
- The largest registered wind turbine in Düren has 7.00 MW of gross capacity and is operated by REA GmbH Umweltinvest, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Düren distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.01 MW | 2 | 0 |
| over 100 kW | 291 | 970.8 MW | 209 | 52 |
How much wind power capacity was commissioned in Düren each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 3 | 18.1 MW |
| 2025 | 28 | 130.4 MW |
| 2024 | 6 | 30.5 MW |
| 2023 | 2 | 7.20 MW |
| 2022 | 12 | 51.3 MW |
| 2021 | 13 | 49.5 MW |
| 2020 | 3 | 9.60 MW |
| 2019 | 9 | 29.0 MW |
| 2018 | 2 | 5.57 MW |
| 2017 | 11 | 29.9 MW |
| 2016 | 14 | 43.4 MW |
| 2015 | 7 | 17.2 MW |
| 2014 | 13 | 35.9 MW |
| 2013 | 14 | 31.8 MW |
| 2012 | 16 | 30.8 MW |
| 2011 | 5 | 10.9 MW |
| 2010 | 1 | 2.00 MW |
| 2009 | 1 | 2.00 MW |
| 2007 | 1 | 0.80 MW |
How many wind turbines in Düren are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 211 | 605.8 MW |
| planned | 52 | 324.6 MW |
| permanently decommissioned | 30 | 40.4 MW |
| temporarily shut down | 1 | 0.00 MW |
Which wind turbines are registered in Düren?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 08 Windpark Heimbach-Walbig | 7.00 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| Windpark Linnich L4 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Ventus Bürgerstrom Kofferen Nr. 125 GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | BMR Erneuerbare Energien Nr. 1 GmbH & Co. KG |
| WEA 3 | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Windenergie Jansen GmbH |
| WEA 01 Windpark Hürtgenwald-Ochsenauel | 7.00 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Windenergie Jansen GmbH |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Windenergie Jansen GmbH |
| WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | BMR Erneuerbare Energien Nr. 1 GmbH & Co. KG |
| Windpark Linnich L9 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | MLK Consulting GmbH & Co. KG |
| WEA 4 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| Windpark Linninch WEA L6 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Ventus Bürgerstrom Kofferen Nr. 125 GmbH & Co. KG |
| WEA 03 Windpark Hürtgenwald - Rote Kaul | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 03 Windpark Heimbach-Walbig | 7.00 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WP Aldenhoven-Erweiterung WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Windenergie Jansen GmbH |
| WEA 5 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| Windpark Linnich WEA L5 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | MLK Consulting GmbH & Co. KG |
| WP Aldenhoven-Repowering WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WP Aldenhoven-Erweiterung WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WP Aldenhoven-Repowering WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | STAWAG Energie GmbH |
| WEA 02 Windpark Hürtgenwald-Ochsenauel | 7.00 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| Windpark Linnich WEA L7 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | MLK Consulting GmbH & Co. KG |
| WEA 6 | 7.00 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 2 | 6.80 MW | Nordex Energy GmbH | in operation | 2025-02-05 | PAC Jade GmbH & Co. KG |
| Wind Onshore Düren-Merken WEA 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-10-08 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 1 | 6.80 MW | Nordex Energy GmbH | in operation | 2025-02-05 | PAC Jade GmbH & Co. KG |
| WEA Mittelberg 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | UKA Umweltgerechte Kraftanlagen GmbH & Co. KG |
| Wind Onshore Düren-Merken WEA 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-10-08 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 7 WP Aldenhoven | 6.80 MW | Nordex Energy GmbH | planned | planned 2027 | Davids & Solty oHG |
| Windpark Kerpen-Marienfeld | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2027 | RWE Wind Onshore & PV Deutschland GmbH |
| WPR GN04 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-06 | MVV Windenergie GmbH |
| WPR GN01 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-06 | MVV Windenergie GmbH |
| WPR GN02 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-06-22 | MVV Windenergie GmbH |
| WPR GN03 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2024-07-02 | MVV Windenergie GmbH |
| WEA 10 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | REA Bürgerwind 2 Nideggen GmbH & Co. KG |
| WEA 04 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Nideggen GmbH & Co. KG |
| WEA 07 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | REA Windpark Nideggen GmbH & Co. KG |
| ABO Wind WP Heimbach-Vlatten WEA 2 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | ABO Wind Windpark 7 GmbH & Co. KG |
| ABO Wind WP Heimbach-Vlatten WEA 1 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2026 | ABO Wind Windpark 7 GmbH & Co. KG |
| WEA 05 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Nideggen GmbH & Co. KG |
| WEA 08 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | REA Windpark Nideggen GmbH & Co. KG |
| WEA 06 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | REA Windpark Nideggen GmbH & Co. KG |
| WEA 01 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2026 | Windenergie Nideggen GmbH & Co. KG |
| WEA 03 Nideggen-Ost | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Nideggen GmbH & Co. KG |
| WEA 3_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-13 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 02 Windpark Hürtgenwald - Rote Kaul | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 1 | 5.70 MW | Nordex Energy GmbH | in operation | 2022-09-22 | NEW Windpark Jülich GmbH & Co. KG |
| BMR WEA Jülich | 5.70 MW | Nordex SE | in operation | 2022-09-15 | BMR Windenergie Jülich GmbH & Co. KG |
| WEA 4_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-12 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA Jülich-Tagebau | 5.70 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 5_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-07 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 4 Jülich Mersch | 5.70 MW | Nordex Energy GmbH | in operation | 2022-09-15 | REA WEA Jülich Mersch GmbH & Co. KG |
| WEA 1_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-12 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 2_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-12 | RWE Wind Onshore & PV Deutschland GmbH |
| NX 94915-03 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-05-22 | Windpark Düren Nr. 29 GmbH & Co.KG |
| WEA R5 Erkelenz Lövenich | 5.70 MW | Nordex Germany GmbH | in operation | 2025-03-31 | MLK Windpark Erkelenz Nr. 76 GmbH & Co. KG |
| WEA 12_WP Aldenhoven | 5.70 MW | Nordex SE | in operation | 2025-08-07 | RWE Wind Onshore & PV Deutschland GmbH |
| NX 94914-02 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-05-21 | Windpark Düren Nr. 29 GmbH & Co.KG |
| WEA Aldenhoven-Nord | 5.70 MW | Nordex Germany GmbH | in operation | 2024-12-11 | MLK Windpark Aldenhoven Nr. 91 GmbH & Co. KG |
| NX 94913-01 | 5.70 MW | Nordex Energy GmbH | in operation | 2025-05-21 | Windpark Düren Nr. 29 GmbH & Co.KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 01 Windpark Heimbach-Walbig | 5.56 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| Aldenhoven-Pattern WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Pattern GmbH & Co. KG |
| WEA 02 Nideggen-Ost | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Nideggen GmbH & Co. KG |
| Aldenhoven-Pattern WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Pattern GmbH & Co. KG |
| WEA 01 Nideggen Wollersheim-Süd | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Bürgerenergie Kreis Düren eG |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Energiepark Nideggen WP Wollersheim-Süd GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Energiepark Nideggen WP Wollersheim-Süd GmbH & Co. KG |
| WEA 07 Windpark Heimbach-Walbig | 5.56 MW | ENERCON GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 03 Nideggen Wollersheim-Süd | 5.56 MW | ENERCON GmbH | planned | planned 2026 | REA Bürgerwind 1 Nideggen GmbH & Co. KG |
| WEA 7 Jülich Bourheim | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-07-07 | Windenergie Jülich GmbH & Co. KG |
| WEA 8 Jülich Bourheim | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-08-30 | Windenergie Jülich GmbH & Co. KG |
| WEA 01 Aldenhoven-Indebogen | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-10-06 | REA Windpark Indebogen GmbH & Co. KG |
| WEA 02 Aldenhoven-Indebogen | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-10-08 | REA Windpark Indebogen GmbH & Co. KG |
| Jülich WEA 04 | 5.30 MW | GE Wind Energy GmbH | in operation | 2022-06-18 | Windpark Jülich GmbH & Co. KG |
| Jülich WEA 05 | 5.30 MW | GE Wind Energy GmbH | in operation | 2022-06-10 | Windpark Jülich GmbH & Co. KG |
| CEE Windpark Jülich-Ost WEA 5 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-08-30 | CEE Windpark Jülich-Ost GmbH & Co. KG |
| WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2022-08-30 | NEW Windpark Jülich GmbH & Co. KG |
| WEA 2 Repowering Heimbach Vlatten | 4.50 MW | Nordex SE | in operation | 2025-12-15 | Windpark Heimbach-Vlatten Nr. 21 GmbH & Co. KG |
| WEA 1 Repowering Heimbach Vlatten | 4.50 MW | Nordex SE | in operation | 2025-12-15 | Energiepark Schäfer GmbH Heimbach- Vlatten Gesellschaft für regenerative Energie |
| CEE Windpark Jülich-Barmen-Merzenhausen WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-12-22 | CEE Windpark Jülich-Barmen-Merzenhausen GmbH & Co. KG |
| CEE Windpark Jülich-Barmen-Merzenhausen WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-12-22 | CEE Windpark Jülich-Barmen-Merzenhausen GmbH & Co. KG |
| WEA 4 Repowering Heimbach Vlatten | 4.50 MW | Nordex SE | in operation | 2026-01-07 | RE Windenergie Heimbach GmbH & Co. KG |
| WEA 3 Repowering Heimbach Vlatten | 4.50 MW | Nordex SE | in operation | 2025-12-15 | Windpark Heimbach-Vlatten Nr. 21 GmbH & Co. KG |
| CEE Windpark Jülich-Barmen-Merzenhausen WEA 3 | 4.50 MW | Nordex Energy GmbH | in operation | 2021-12-09 | CEE Windpark Jülich-Barmen-Merzenhausen GmbH & Co. KG |
| WEA 5 Repowering Heimbach Vlatten | 4.50 MW | Nordex SE | in operation | 2025-12-15 | Windpark Heimbach-Vlatten Nr. 21 GmbH & Co. KG |
| WEA 1170010 05 Vettweiß | 4.26 MW | ENERCON GmbH | in operation | 2025-06-20 | SL Windpark Vettweiß GmbH & Co. KG |
| WEA 1170009 04 Vettweiß | 4.26 MW | ENERCON GmbH | in operation | 2025-06-23 | SL Windpark Vettweiß GmbH & Co. KG |
| PropellerSchmidt2 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windpark Schmidt/Nordeifel GmbH & Co. KG |
| LIN-R/N3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | ENGIE Windpark Lövenich Repowering GmbH |
| WEA 1170008 03 Vettweiß | 4.26 MW | ENERCON GmbH | in operation | 2025-06-27 | SL Windpark Vettweiß GmbH & Co. KG |
| WEA 1170007 01 Vettweiß | 4.26 MW | ENERCON GmbH | in operation | 2025-07-07 | SL Windpark Vettweiß GmbH & Co. KG |
| Linnich Repowering WEA R1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Bürgerenergie Am Lindchen eG |
| Windpark Linnich | 4.00 MW | ENERCON GmbH | in operation | 2019-08-15 | LE Windenergie GmbH & Co. KG |
| WEA 04-88810 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-12-08 | BMR Windenergie Gereonsweiler GmbH & Co KG |
| WEA 10-88808 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-11-30 | SL Windpark Linnich GmbH & Co. KG |
| WEA 2 | 3.60 MW | Nordex SE | in operation | 2023-10-04 | Energiepark Vettweiß WP MH GmbH & Co. KG |
| WEA Hürtgenwald-Raffelsbrand | 3.60 MW | Nordex Germany GmbH | planned | planned 2028 | REA GmbH Umweltinvest |
| WEA 05-88803 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-09-30 | SL Windpark Linnich GmbH & Co. KG |
| WEA Aldenhoven Nord (WEA 6) | 3.60 MW | Nordex SE | in operation | 2022-11-17 | Davids Windpark GmbH & Co. KG |
| WEA 09-89566 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-12-28 | Bürgerwind Gereonsweiler GmbH & Co. KG |
| WEA 11-88809 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-12-22 | SL Windpark Linnich GmbH & Co. KG |
| WEA 03-88807 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-11-30 | SL Windpark Linnich GmbH & Co. KG |
| WEA 02-88806 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-11-18 | SL Windpark Linnich GmbH & Co. KG |
| WEA 08-88802 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-10-11 | SL Windpark Linnich GmbH & Co. KG |
| WEA 06-88805 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-11-30 | SL Gereonsweiler Wind GmbH & Co. KG |
| WEA 1 | 3.60 MW | Nordex SE | in operation | 2023-09-20 | Energiepark Vettweiß WP MH GmbH & Co. KG |
| WEA Langerwehe | 3.60 MW | Nordex Energy GmbH | in operation | 2019-08-20 | Windenergie Langerwehe 1 GmbH & Co. KG |
| WEA 01-88804 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-10-14 | SL Gereonsweiler Wind GmbH & Co. KG |
| Windpark Aldenhoven-Nord WEA 4 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-09-26 | Vis Venti GmbH & Co. KG |
| WEA 3 Kreuzau | 3.20 MW | GE Wind Energy GmbH | in operation | 2020-02-03 | Windenergie Kreuzau GmbH & Co. KG |
| WEA 4 Kreuzau | 3.20 MW | GE Wind Energy GmbH | in operation | 2020-02-05 | Windenergie Kreuzau GmbH & Co. KG |
| WEA 01 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2015-12-19 | Energiepark Linnich-Körrenzig GmbH & Co. WP LIKÖ KG |
| WEA 6 Kreuzau | 3.20 MW | GE Wind Energy GmbH | in operation | 2019-12-12 | Windenergie Kreuzau GmbH & Co. KG |
| 301387_Eschweiler Fronhoven | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-09-14 | RWE indeland Windpark Eschweiler GmbH & Co KG |
| Windpark Aldenhoven-Nord WEA 3 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-09-21 | Davids Windpark GmbH & Co. KG |
| WEA 5 Kreuzau | 3.20 MW | GE Wind Energy GmbH | in operation | 2020-02-17 | Windenergie Kreuzau GmbH & Co. KG |
| Windpark Aldenhoven-Nord WEA 2 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-09-15 | Davids Windpark GmbH & Co. KG |
| WEA 2 Kreuzau | 3.20 MW | GE Wind Energy GmbH | in operation | 2019-12-20 | Windenergie Kreuzau GmbH & Co. KG |
| A7381336040988 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-05-19 | Windpark Linnich GmbH & Co. KG |
| A4245245040978 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-05-17 | Windpark Linnich GmbH & Co. KG |
| WEA 17, Niederzier-Steinstraß | 3.17 MW | Senvion Deutschland GmbH | in operation | 2017-09-15 | NIMBUS WEA-Beteiligungsgesellschaft mbH & Co.KG |
| A7759228041038 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-06-18 | Windpark Linnich GmbH & Co. KG |
| WP Linnich WEA 14 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2018-03-07 | Windpark Linnich GmbH & Co. KG |
| Windpark Aldenhoven-Nord WEA 1 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-09-12 | BMR Windenergie Aldenhoven GmbH & Co. KG |
| A9637865041025 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-06-01 | Windpark Linnich GmbH & Co. KG |
| WKA Aldenhoven | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-11-07 | Tholen Vermögensverwaltung GmbH |
| A7214141040990 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-05-24 | Windpark Linnich GmbH & Co. KG |
| A5167455041004 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-06-17 | Windpark Linnich GmbH & Co. KG |
| Windkraftanlage Senvion 300365 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2013-08-02 | Firma RWG Rheinische Windkraftanlagen Gülden I GmgH &Co .KG |
| A7399776041014 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-05-27 | Windpark Linnich GmbH & Co. KG |
| A6486819041047 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2016-06-21 | Windpark Linnich GmbH & Co. KG |
| W611-V202750 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-02-26 | Windpark Aldenhoven GmbH & Co. KG |
| W612-V202751 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-02-25 | Windpark Aldenhoven GmbH & Co. KG |
| W615-V202754 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2013-12-26 | Windpark Aldenhoven GmbH & Co. KG |
| W613-V202752 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-03-05 | Windpark Aldenhoven GmbH & Co. KG |
| W614-V202753 | 3.08 MW | Vestas Deutschland GmbH | in operation | 2014-02-13 | Windpark Aldenhoven GmbH & Co. KG |
| WEA02-E1010444 | 3.05 MW | ENERCON GmbH | in operation | 2014-03-21 | Windpark Düren-Echtz GmbH & Co. KG |
| WEA 5 Düren-Echtz E-101 | 3.05 MW | ENERCON GmbH | in operation | 2014-02-19 | REA GmbH & Co. KG WEA 5 Düren |
| WEA 4 Düren-Echtz E-101 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-23 | REA GmbH & Co. KG Windenergie Echtz |
| WEA 1 Düren-Echtz E-101 | 3.05 MW | ENERCON GmbH | in operation | 2014-05-02 | REA GmbH & Co. KG WEA 1 Düren |
| WEA03-E1010445 | 3.05 MW | ENERCON GmbH | in operation | 2014-02-04 | Windpark Düren-Echtz GmbH & Co. KG |
| WEA06-E1010448 | 3.05 MW | ENERCON GmbH | in operation | 2013-12-19 | Windpark Düren-Echtz GmbH & Co. KG |
| Hürtgenwald-Peterberg WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2019-09-13 | Windpower Brandenberg GmbH & Co. KG |
| Hürtgenwald-Peterberg WEA 3 | 3.00 MW | ENERCON GmbH | in operation | 2019-12-20 | Bürgerenergie Kreis Düren eG |
| Hürtgenwald-Peterberg WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2019-09-27 | WEA 4 Hürtgenwald GmbH & Co. KG |
| Hürtgenwald-Peterberg WEA 5 | 3.00 MW | ENERCON GmbH | in operation | 2019-11-28 | Windpower Brandenberg GmbH & Co. KG |
| Hürtgenwald-Peterberg WEA 4 | 3.00 MW | ENERCON GmbH | in operation | 2019-11-06 | WEA 4 Hürtgenwald GmbH & Co. KG |
| NST 04 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-09-29 | HSW Windpark Niederzier GmbH&Co.KG |
| KS 02 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-08-16 | Energiepark Kreuzau WP ST GmbH & Co. KG |
| NST 06 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-09-30 | HSW Windpark Niederzier GmbH&Co.KG |
| NST 03 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-09-27 | HSW Windpark Niederzier GmbH&Co.KG |
| KS 01 | 2.78 MW | GE Wind Energy GmbH | in operation | 2017-08-12 | Energiepark Kreuzau WP ST GmbH & Co. KG |
| BMR WEA 4 Windpark Linnich Boslar | 2.40 MW | Nordex Energy GmbH | in operation | 2017-12-28 | BMR Windenergie Linnich GmbH & Co .KG |
| BMR WEA 5 Windpark Linnich Boslar | 2.40 MW | Nordex Energy GmbH | in operation | 2018-02-01 | BMR Windenergie Linnich GmbH & Co .KG |
| WEA Linnich Boslar 1 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-11-16 | NEW Windpark Linnich GmbH & Co. KG |
| WEA Linnich Boslar 3 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-12-27 | NEW Windpark Linnich GmbH & Co. KG |
| WEA Linnich Boslar 2 | 2.40 MW | Nordex Energy GmbH | in operation | 2017-11-24 | NEW Windpark Linnich GmbH & Co. KG |
| Linnich WEA 2 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-11 | Windenergie Körrenzig GmbH |
| Linnich WEA 4 | 2.35 MW | ENERCON GmbH | in operation | 2015-12-02 | Windenergie Körrenzig GmbH |
| 920578 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-20 | Schreiber&Jansen GbR |
| Linnich WEA 6 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-24 | Windenergie Körrenzig GmbH |
| Linnich WEA 5 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-05 | Windenergie Körrenzig GmbH |
| Körrenzig 2 | 2.35 MW | ENERCON GmbH | in operation | 2015-11-02 | Wind EV GmbH Co. KG |
| 920577 | 2.35 MW | ENERCON GmbH | in operation | 2014-12-20 | Schreiber&Jansen GbR |
| WEA 827827 10 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-06-24 | SL Windpark Vettweiß GmbH & Co. KG |
| WEA 827829 07 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-07-02 | SL Windpark Vettweiß GmbH & Co. KG |
| WKA Schmidt | 2.30 MW | ENERCON GmbH | in operation | 2011-09-09 | Nüsser Ingenieurges.mbH & CoKG |
| WEA 1_WP Siersdorf II | 2.30 MW | ENERCON GmbH | in operation | 2014-07-02 | Schlun Windenergie Siersdorf KG |
| WEA Schmidt | 2.30 MW | ENERCON GmbH | in operation | 2012-06-29 | REA GmbH & Co. KG Windenergie Schmidt |
| WEA 827832 14 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-06-26 | SL Windpark Vettweiß GmbH & Co. KG |
| WEA 827830 08 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-06-23 | SL Windpark Vettweiß GmbH & Co. KG |
| E82 | 2.30 MW | ENERCON GmbH | in operation | 2013-05-03 | Eifelwind Energie GmbH&Co.KG |
| WEA Raffelsbrand | 2.30 MW | ENERCON GmbH | in operation | 2015-06-08 | Windenergie Raffelsbrand GmbH & Co. KG |
| WEA 827831 11 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-07-04 | SL Windpark Vettweiß GmbH & Co. KG |
| PropellerSchmidt | 2.30 MW | ENERCON GmbH | in operation | 2012-06-28 | Windpark Schmidt/Nordeifel GmbH & Co. KG |
| WEA 2_WP Siersdorf II | 2.30 MW | ENERCON GmbH | in operation | 2014-07-02 | BMR Windenergie Siersdorf GmbH & Co. KG |
| WEA 827828 06 Vettweiß | 2.30 MW | ENERCON GmbH | in operation | 2025-07-01 | SL Windpark Vettweiß GmbH & Co. KG |
| Windenergie Hürtgenwald | 2.30 MW | ENERCON GmbH | in operation | 2011-09-23 | Windenergie Hürtenwald GmbH & Co. KG |
| WEA Brandenberg | 2.30 MW | ENERCON GmbH | in operation | 2011-09-23 | REA GmbH & Co. KG Windkraftanlage Brandenberg |
| S 93748-01 (Distelrath) | 2.05 MW | Senvion Deutschland GmbH | in operation | 2016-11-16 | WEA Distelrath GmbH & Co. KG |
| 91348_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-29 | RWE Green Gecco Windparks GmbH |
| JÜL II 1 -RE 91759 | 2.05 MW | REpower Systems SE | in operation | 2011-12-09 | Energiepark Jülich II ApS & Co. WEA Jülich II KG |
| Rödingen WEA 4 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-15 | Windpark Rödingen GmbH & Co. KG |
| 91349_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-31 | RWE Green Gecco Windparks GmbH |
| Rödingen WEA 6 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-28 | Windpark Rödingen GmbH & Co. KG |
| 91823_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-22 | RWE Green Gecco Windparks GmbH |
| S 82667-05 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2014-09-30 | SLB Topwind GmbH & Co. KG |
| Röd. 2 | 2.05 MW | – | in operation | 2013-05-22 | WE Rödingen GmbH & Co.KG |
| Rödingen WEA 1 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-26 | Windpark Rödingen GmbH & Co. KG |
| T9 92475 | 2.05 MW | REpower Systems SE | in operation | 2012-12-31 | WINDPOOL Titz GmbH & Co. KG |
| 91821_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-15 | RWE Green Gecco Windparks GmbH |
| 91824_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-09-05 | RWE Green Gecco Windparks GmbH |
| 91825_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-11-26 | RWE Green Gecco Windparks GmbH |
| 91822_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-08-16 | RWE Green Gecco Windparks GmbH |
| Rödingen WEA 5 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-06 | Windpark Rödingen GmbH & Co. KG |
| Röd. 1 | 2.05 MW | – | in operation | 2013-05-17 | WE Rödingen GmbH & Co.KG |
| 91350_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-07-25 | RWE Green Gecco Windparks GmbH |
| 91351_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-07-23 | RWE Green Gecco Windparks GmbH |
| T6 92474 | 2.05 MW | REpower Systems SE | in operation | 2012-12-28 | WINDPOOL Titz GmbH & Co. KG |
| Rödingen WEA 2 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-22 | Windpark Rödingen GmbH & Co. KG |
| 91352_Titz_Nord | 2.05 MW | Senvion Deutschland GmbH | in operation | 2012-07-17 | RWE Green Gecco Windparks GmbH |
| Rödingen WEA 3 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-03-23 | Windpark Rödingen GmbH & Co. KG |
| V 16812-01 (Brachelen) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-12-29 | Bürgerwindpark Brachelen Nr. 39 GmbH & Co. KG |
| Windpark Brachelen/Lindern Hückelhoven | 2.00 MW | REpower Systems SE | in operation | 2010-01-13 | Davids & Solty oHG |
| Windpark Düren-Arnoldsweiler WEA 4 | 2.00 MW | ENERCON GmbH | in operation | 2011-04-01 | BMR Windenergie Düren GmbH & Co. KG |
| Windpark Düren-Distelrath WEA 4 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2009-01-29 | Franz Davids Wind GbR |
| V 16813-02 (Brachelen) | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-01-22 | Bürgerwindpark Brachelen Nr. 39 GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-01 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-29 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-06-12 | private individual |
| JB11 GE15561324 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-04-27 | MVV Windenergie GmbH |
| 15518 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-08-28 | WP Düren-Ost GmbH &Co. KG |
| WEA Merzenich 3 | 1.50 MW | Fuhrländer AG | in operation | 2002-01-16 | Bernardo Wind GmbH & Co. KG |
| 15561784 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-01 | Orbis GmbH & Co Energie- und Umwelttechnik Neunzehnte KG |
| WEA Vettweiß | 1.50 MW | Fuhrländer AG | in operation | 2002-11-07 | Bernardo Wind GmbH & Co. KG |
| WEA Nideggen 1 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-06-07 | Bernardo Wind GmbH & Co. KG |
| Langweiler | 1.50 MW | Südwind Borsig Energy GmbH | in operation | 2003-01-03 | Eichelkamp Windenergie Beteiligungs GmbH & Co. KG |
| WEA Merzenich 2 | 1.50 MW | Fuhrländer AG | in operation | 2002-01-30 | Bernardo Wind GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2005-12-08 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2005-12-19 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-10 | private individual |
| 15561782 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-05-24 | Orbis GmbH & Co. Energie- und Umwelttechnik Sechzehnte KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-01-16 | private individual |
| JB08 GE15561329 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-04-07 | MVV Windenergie GmbH |
| JU 09 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-07-06 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| JB05 GE15561328 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-05-12 | MVV Windenergie GmbH |
| Aldenhoven WEA 1 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2003-03-12 | Davids & Solty oHG |
| Aldenhoven WEA 2 | 1.50 MW | ENERCON GmbH | in operation | 2003-03-14 | Davids & Solty oHG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-16 | private individual |
| 15561781 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-05-31 | Orbis GmbH & Co Energie- und Umwelttechnik Siebzehnte KG |
| JU 06 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-23 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-16 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-07-16 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-16 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2005-12-28 | private individual |
| WEA Nideggen 2 | 1.50 MW | NEG Micon Deutschland GmbH | in operation | 2001-06-07 | Bernardo Wind GmbH & Co. KG |
| JU 04 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-23 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| JB01 GE15561327 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-05-23 | MVV Windenergie GmbH |
| WEA Merzenich 1 | 1.50 MW | Fuhrländer AG | in operation | 2002-01-24 | Bernardo Wind GmbH & Co. KG |
| 15516 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-05 | WP Düren-Ost GmbH &Co. KG |
| 15561783 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-08 | Orbis GmbH & Co Energie- und Umwelttechnik Achtzehnte KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-05 | private individual |
| JB02 GE15561330 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-04-06 | MVV Windenergie GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-25 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-17 | private individual |
| JU 12 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-07-15 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| 15517 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-10 | WP Düren-Ost GmbH &Co. KG |
| JU 07 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-23 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-18 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-16 | private individual |
| unit operated by a private individual | 1.50 MW | Senvion Deutschland GmbH | permanently decommissioned | 2003-12-04 | private individual |
| 15514 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-09-11 | WP Düren-Ost GmbH &Co. KG |
| 15515 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-08-28 | WP Düren-Ost GmbH &Co. KG |
| JU 03 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-06-21 | Energiekontor Ökofonds GmbH & Co. WP JÜ KG |
| GE 15540698-02 (Distelrath) | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-18 | Windpark Düren Nr. 29 GmbH & Co.KG |
| JB13 GE15561326 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-04-21 | MVV Windenergie GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-04-09 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-16 | private individual |
| JB10 GE15561325 | 1.50 MW | GE Wind Energy GmbH | in operation | 2005-04-13 | MVV Windenergie GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2001-12-28 | private individual |
| GE 15540697-03 (Distelrath) | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-18 | Windpark Düren Nr. 29 GmbH & Co.KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-12-16 | private individual |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2001-09-28 | private individual |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2001-09-26 | private individual |
| KEII 02 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-11-01 | Hanse Windkraft GmbH |
| unit operated by a private individual | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2001-12-12 | private individual |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2001-09-27 | private individual |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2001-08-30 | private individual |
| WKA 1511 | 1.30 MW | Nordex SE | in operation | 2002-04-15 | WKA 1511 GmbH & Co.KG |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2001-09-27 | private individual |
| KEII 01 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-11-01 | Hanse Windkraft GmbH |
| HN 04 | 1.00 MW | Nordex Energy GmbH | in operation | 1998-02-05 | Energiekontor Windpower GmbH & Co. ÜWP HN KG |
| WEA Hürtgen | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-06-26 | REA GmbH & Co. KG Windkraftanlage Hürtgen |
| HNII 07 | 1.00 MW | Nordex Energy GmbH | in operation | 1998-05-01 | Energiekontor Windpower GmbH & Co. ÜWP HN II KG |
| BürgerWIND Ginnicker Heide | 1.00 MW | ENERCON GmbH | in operation | 2001-10-18 | BürgerWIND Ginnicker Heide GmbH & Co. KG |
| WEA Kerpen 1 | 1.00 MW | Fuhrländer AG | in operation | 2001-04-06 | Bernardo Wind GmbH & Co. KG |
| HN 05 | 1.00 MW | Nordex Energy GmbH | in operation | 1998-01-30 | Energiekontor Windpower GmbH & Co. ÜWP HN KG |
| HNII09 | 1.00 MW | Nordex Energy GmbH | in operation | 1998-05-03 | Energiekontor Windpower GmbH & Co. ÜWP HN II KG |
| WEA Kerpen 2 | 1.00 MW | Fuhrländer AG | in operation | 2001-04-06 | Bernardo Wind GmbH & Co. KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2013-09-23 | private individual |
| WEA Nörvenich | 0.80 MW | ENERCON GmbH | in operation | 2007-03-20 | Windparc Rheinland GmbH |
| WP Nörvenich | 0.80 MW | ENERCON GmbH | in operation | 2012-03-29 | PLK-Energie GmbH |
| WP Nörvenich | 0.80 MW | ENERCON GmbH | in operation | 2012-03-30 | PLK-Energie GmbH |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2000-07-27 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2003-05-01 | private individual |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2000-06-15 | private individual |
| DW 50119-01 (Stockheim) | 0.60 MW | DeWind GmbH | in operation | 2000-10-23 | Windpark Euregio-Fonds Nr. 9 GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2000-06-16 | private individual |
| unit operated by a private individual | 0.60 MW | DeWind GmbH | permanently decommissioned | 2000-06-30 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1998-07-08 | private individual |
| FZJ_KWEA_04.11 | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2022-03-31 | Forschungszentrum Jülich GmbH |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | temporarily shut down | 2022-07-15 | private individual |
| Wind | 0.00 MW | SkyWind GmbH | in operation | 2024-07-09 | Monjean Transporte |
Which organisations operate the most wind power capacity in Düren?
| Operator | Units | Capacity |
|---|---|---|
| REA GmbH Umweltinvest | 10 | 61.1 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 9 | 54.4 MW |
| MVV Windenergie GmbH | 11 | 35.3 MW |
| SL Windpark Vettweiß GmbH & Co. KG | 10 | 30.8 MW |
| Windenergie Nideggen GmbH & Co. KG | 5 | 29.6 MW |
| Windpark Linnich GmbH & Co. KG | 9 | 28.5 MW |
| Windenergie Jansen GmbH | 4 | 28.0 MW |
| STAWAG Energie GmbH | 4 | 28.0 MW |
| Energiekontor AG | 4 | 26.6 MW |
| SL Windpark Linnich GmbH & Co. KG | 6 | 21.6 MW |
Which manufacturer accounts for the most wind power capacity in Düren?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 87 | 344.3 MW |
| Nordex Energy GmbH | 35 | 141.0 MW |
| GE Wind Energy GmbH | 61 | 130.0 MW |
| Senvion Deutschland GmbH | 39 | 99.1 MW |
| Nordex Germany GmbH | 13 | 81.8 MW |
| Nordex SE | 16 | 74.5 MW |
| Vestas Deutschland GmbH | 13 | 56.2 MW |
| REpower Systems SE | 4 | 8.15 MW |
| Fuhrländer AG | 6 | 8.00 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 1 | 6.60 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Düren (Nordrhein-Westfalen), and how large are th can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.