342 wind turbines with 899.4 MW of gross capacity were in operation in Borken (Nordrhein-Westfalen) as of 2026-11-05, with a further 150 units (956.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Borken (Nordrhein-Westfalen), and how large are they, as of 2026-11-05?
- 342 wind turbines with 899.4 MW of gross capacity were in operation in Borken (Nordrhein-Westfalen) as of 2026-11-05, with a further 150 units (956.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Borken?
- 342 wind turbines with 899.4 MW of gross capacity were in operation in Borken as of 2026-11-05, with a further 150 units (956.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Borken in 2025?
- 10 wind turbines with 61.9 MW went into operation in Borken in 2025; the strongest year of the last two decades was 2017 with 185.7 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Borken?
- Windkraft Heiden II GmbH & Co. KG operates 11 wind turbines with 60.3 MW in Borken, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Borken?
- ENERCON GmbH leads with 265 wind turbines and 827.5 MW in Borken (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Borken?
- The largest registered wind turbine in Borken has 7.20 MW of gross capacity and is operated by Windenergie Lanzenhagen GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Borken distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 12 | 0.10 MW | 11 | 1 |
| 30 to 100 kW | 12 | 0.91 MW | 11 | 0 |
| over 100 kW | 503 | 1.90 GW | 320 | 149 |
How much wind power capacity was commissioned in Borken each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 27 | 152.1 MW |
| 2025 | 10 | 61.9 MW |
| 2024 | 12 | 60.7 MW |
| 2023 | 19 | 75.6 MW |
| 2022 | 2 | 8.40 MW |
| 2021 | 8 | 41.2 MW |
| 2020 | 7 | 20.4 MW |
| 2019 | 15 | 59.2 MW |
| 2018 | 12 | 39.0 MW |
| 2017 | 60 | 185.7 MW |
| 2015 | 2 | 2.41 MW |
| 2014 | 7 | 6.13 MW |
| 2013 | 9 | 7.13 MW |
| 2012 | 6 | 9.20 MW |
| 2011 | 8 | 10.1 MW |
| 2010 | 3 | 5.10 MW |
| 2009 | 12 | 20.4 MW |
| 2007 | 9 | 14.4 MW |
| 2006 | 10 | 15.9 MW |
How many wind turbines in Borken are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 150 | 956.7 MW |
| in operation | 342 | 899.4 MW |
| permanently decommissioned | 35 | 41.2 MW |
Which wind turbines are registered in Borken?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 8 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Lanzenhagen GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Bürgerwind Neuer Kamp GbR |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| WEA W1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA-H3 Borken-Schlatt | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-10-08 | Windenergie Schlatt GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WE Barler Feld GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| WEA-H2 Borken-Venn | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-10-16 | Windenergie Venn GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Dorenfeld Wind GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| Heek-Strönfeld_WEA3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| Heek-Strönfeld_WEA7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dorenfeld Wind GmbH & Co. KG |
| WEA-H1 Borken-Hee | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-10-30 | Windenergie Hee GmbH & Co. KG |
| Gronau WEA 01 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2030 | Eurowind Energy GmbH |
| WEA 9 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Lanzenhagen GmbH & Co. KG |
| WEA 13 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Deepschlatt GmbH & Co. KG |
| Heek-Strönfeld_WEA4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| Heek-Strönfeld_WEA1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Weseke-Ost Wind GmbH & Co.KG |
| Heek-Strönfeld_WEA6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Weseke-Ost Wind GmbH & Co.KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Weseke-Ost Wind GmbH & Co.KG |
| WEA 6 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| WEA 4 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Weseke-Ost Wind GmbH & Co.KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| Gronau WEA 03 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2030 | Eurowind Energy GmbH |
| WEA-H5 Erler-Bruch | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Windenergie Erler Bruch GmbH & Co. KG |
| WEA 5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dorenfeld Wind GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Weseke-Ost Wind GmbH & Co.KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| WEA 12 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Deepschlatt GmbH & Co. KG |
| Heek-Strönfeld_WEA2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Naturstrom Eschlohn Brink GmbH & Co. KG |
| WEA 11 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Deepschlatt GmbH & Co. KG |
| Gronau WEA 02 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2030 | Eurowind Energy GmbH |
| WEA 7 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Lanzenhagen GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Dorenfeld Wind GmbH & Co. KG |
| WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Lanzenhagen GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Naturstrom Eschlohn Brink GmbH & Co. KG |
| WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WE Barler Feld GmbH & Co. KG |
| Heek-Strönfeld_WEA5 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwind Heek-Strönfeld GmbH & Co. KG |
| HBW WEA 04 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-11 | Hörsteloer BürgerWind GmbH & Co. KG |
| Elven 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| BWB WEA 07 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| Windpark Reken WEA 03 | 7.00 MW | Nordex Energy GmbH | planned | planned 2030 | RWE Wind Onshore & PV Deutschland GmbH |
| BWB WEA 05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| BWB WEA 04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| WEA-H6 Haart-Venn | 7.00 MW | – | planned | planned 2027 | Windenergie Haart-Venn GmbH & Co. KG |
| HBW WEA 01 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-12 | Hörsteloer BürgerWind GmbH & Co. KG |
| Windpark Reken WEA 04 | 7.00 MW | Nordex Energy GmbH | planned | planned 2030 | RWE Wind Onshore & PV Deutschland GmbH |
| Elven 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| unit operated by a private individual | 7.00 MW | ENERCON GmbH | planned | planned 2028 | private individual |
| BWB WEA 08 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| Schlickenbrook 6 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| HBW WEA 03 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-12 | Hörsteloer BürgerWind GmbH & Co. KG |
| Vossenberg | 7.00 MW | ENERCON GmbH | planned | planned 2027 | B&W Projekt GmbH & Co. KG |
| Windpark Reken WEA 06 | 7.00 MW | Nordex Energy GmbH | planned | planned 2030 | RWE Wind Onshore & PV Deutschland GmbH |
| BWH WEA B | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-13 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| HBW WEA 02 | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-12 | Hörsteloer BürgerWind GmbH & Co. KG |
| BWB WEA 06 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| WEA 2 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windenergie Vierkuhlen GmbH & Co. KG |
| BWH WEA A | 7.00 MW | Nordex Germany GmbH | in operation | 2026-08-11 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| WEA 1 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windenergie Vierkuhlen GmbH & Co. KG |
| WEA 3 | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | Windenergie Vierkuhlen GmbH & Co. KG |
| Schlickenbrook 5 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| Schlickenbrook 4 | 7.00 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| BWB WEA 01 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| WEA5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Vreden-Doemern-Höchte GmbH & Co. KG |
| BWB WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| Hundsfeld-Anlage | 6.80 MW | Nordex SE | planned | planned 2027 | WE Hundsfeld GmbH & Co. KG |
| WEA3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Vreden-Doemern-Höchte GmbH & Co. KG |
| BWH WEA 03 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-16 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| BWH WEA 02 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-16 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| BWB WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Büngern GmbH & Co. KG |
| BWH WEA 01 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-17 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| BWH WEA 04 | 6.80 MW | Nordex Germany GmbH | in operation | 2025-12-15 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| WEA4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Bürgerwind Vreden-Doemern-Höchte GmbH & Co. KG |
| BWH WEA 05 | 6.80 MW | Nordex Germany GmbH | in operation | 2026-08-14 | Bürgerwind Hengeler-Ächterhook GmbH & Co. KG |
| WEA1 Barke | 6.30 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Esing-Iltinghook GmbH & Co. KG |
| WEA2 Rott | 6.30 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Esing-Iltinghook GmbH & Co. KG |
| Q9 | 6.22 MW | Nordex Germany GmbH | planned | planned 2028 | Windenergie Quantwick GmbH & Co. KG |
| Q8 | 6.22 MW | Nordex Germany GmbH | planned | planned 2028 | Windenergie Quantwick GmbH & Co. KG |
| WE Hachlohfeld Nordex N175/6.X | 6.22 MW | Nordex SE | planned | planned 2027 | WEHachlohfeldGmbH&Co.KG |
| WEA A8 | 6.22 MW | Nordex SE | planned | planned 2027 | Windenergie Almsicker Feld GmbH & Co.KG |
| WEA A6 | 6.22 MW | Nordex SE | planned | planned 2027 | Windenergie Almsicker Feld GmbH & Co.KG |
| WEA A7 | 6.22 MW | Nordex SE | planned | planned 2027 | Windenergie Almsicker Feld GmbH & Co.KG |
| WEA A5 | 6.22 MW | Nordex SE | planned | planned 2027 | Windenergie Almsicker Feld GmbH & Co.KG |
| WEA W5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA W2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA W4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA WQ1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA W3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA W6 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | WMO Quantwick GmbH & Co. KG |
| WEA 1 - 244684 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-10-18 | Windenergie Lehmberg GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Weseker Mark GmbH & Co. KG i. Gr. |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Külver Heide GmbH & Co.KG |
| Bürgerwind Weskerhok GmbH & Co.KG | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind Weskerhok GmbH & CO.KG |
| Pröbsting WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-01-09 | Pröbsting Windkraft GmbH & Co. KG |
| WEA Weseke Wind GmbH & Co. KG | 6.00 MW | ENERCON GmbH | in operation | 2026-01-30 | Weseke Wind GmbH & Co. KG |
| WEA1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-15 | Bürgerwind Horstmar-Schöppingen GmbH & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Wind energy Ahle GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Vossenbülten GmbH & Co. KG |
| WEA 3 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Weseker Mark GmbH & Co. KG i. Gr. |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 2 | 6.00 MW | GE Wind Energy GmbH | planned | planned 2027 | Bürgerwind Ammert GmbH & Co. KG |
| GE-602549830 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-06-17 | Windenergie Heiden-Nordick GmbH & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | BWP Alstätte-Ottenstein GmbH & Co. KG |
| WEA 5 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| WEA2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-09-18 | Bürgerwind Horstmar-Schöppingen GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Wind energy Ahle GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Erler Lohr GmbH & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Marbecker Brook GbR |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Külver Heide GmbH & Co.KG |
| WEA 1 | 6.00 MW | GE Wind Energy GmbH | planned | planned 2027 | Bürgerwind Ammert GmbH & Co. KG |
| WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Vossenbülten GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2030 | Weseker Mark GmbH & Co. KG i. Gr. |
| WEA 4 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | BWP Alstätte-Ottenstein GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | BWP Alstätte-Ottenstein GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Vossenbülten GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Wind energy Ahle GmbH & Co. KG |
| WEA 17 - Repowering | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Schöppinger Berg GmbH & Co. KG |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 5 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Vossenbülten GmbH & Co. KG |
| WEA 2 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| WEA 01 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Hülstener Brook Energiegemeinschaft GmbH & Co. KG |
| WEA 3 | 6.00 MW | Vestas Deutschland GmbH | planned | planned 2027 | WE Barler Feld GmbH & Co. KG |
| Erler Heide P7 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Erler Heide Wind GmbH & Co. KG |
| Tungerloh WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-12-14 | VenSol Windpark Tungerloh GmbH & Co. KG |
| Haabusch WEA 1 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-04-25 | Haabusch Windkraft GmbH & Co. KG |
| Bürgerwind Hösel GmbH & Co. KG | 6.00 MW | ENERCON GmbH | in operation | 2026-02-03 | Bürgerwind Hösel GmbH & Co. KG |
| unit operated by a private individual | 6.00 MW | ENERCON GmbH | planned | planned 2027 | private individual |
| WEA 1 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| GE-602549829 | 6.00 MW | GE Wind Energy GmbH | in operation | 2026-06-18 | Windenergie Heiden-Nordick GmbH & Co. KG |
| WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Wind energy Ahle GmbH & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Vossenbülten GmbH & Co. KG |
| WEA 5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Wind energy Ahle GmbH & Co. KG |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Erler Lohr GmbH & Co. KG |
| WEA 6, Marbecker Straße | 6.00 MW | ENERCON GmbH | in operation | 2026-10-08 | Windenergie Marbecker Straße GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Marbecker Brook GbR |
| 175RekR1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | SL Windpark Cluse Harpering GmbH & Co. KG |
| Pröbsting WEA 2 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2025-01-09 | Pröbsting Windkraft GmbH & Co. KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Külver Heide GmbH & Co.KG |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Rhedebrügge GmbH & Co. KG |
| WEA 18 - Repowering | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Schöppinger Berg GmbH & Co. KG |
| WEA 6 | 6.00 MW | GE Renewable Germany GmbH | planned | planned 2028 | Anthornshook Bürgerwind GmbH & Co. KG |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Bürgerwind Erler Lohr GmbH & Co. KG |
| WEA 3 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windenergie Steggerhook Werk 1 GmbH & Co. KG |
| WEA Südlohn-Eschlohn/Wellschlatt 3 | 5.70 MW | Nordex SE | in operation | 2025-05-07 | Stadtwerke Münster Windenergie GmbH & Co. KG |
| WEA Südlohn-Eschlohn/Wellschlatt 1 | 5.70 MW | Nordex SE | in operation | 2025-05-07 | Stadtwerke Münster Windenergie GmbH & Co. KG |
| WEA Südlohn-Eschlohn/Wellschlatt 2 | 5.70 MW | Nordex SE | in operation | 2025-05-06 | Stadtwerke Münster Windenergie GmbH & Co. KG |
| WEA 2 | 5.70 MW | Nordex Energy GmbH | planned | planned 2028 | Windenergie Steggerhook Werk 1 GmbH & Co. KG |
| Haabusch WEA 2 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-04-25 | Haabusch Windkraft GmbH & Co. KG |
| 236775 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-12-22 | Gescher Bürgerwind GmbH & Co. KG |
| 236776 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-12-23 | Gescher Bürgerwind GmbH & Co. KG |
| Lohner Brook | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-09-02 | Windenergie Lohner Brook GmbH & Co. KG |
| 236773 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-12-30 | Gescher Bürgerwind GmbH & Co. KG |
| Wellschlatt II (WEA 3) | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-08-29 | Windenergie Wellschlatt GmbH & Co. KG |
| WEA 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| 236774 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2021-12-23 | Gescher Bürgerwind GmbH & Co. KG |
| Wellschlatt | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-08-30 | Windenergie Wellschlatt GmbH & Co. KG |
| WEA 4 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windenergie Kierit GmbH & Co. KG |
| WEA 6 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | EnergieGemeinschaft Hülsterholt GmbH & Co. KG |
| Steenkulhenweg P10 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Marbeck Steenkuhlenweg GmbH & Co. KG |
| 1605091 | 5.56 MW | ENERCON GmbH | in operation | 2025-11-13 | Windenergie Steggerhook Werk 2 GmbH & Co. KG |
| Kreulkerhok 2 | 5.56 MW | ENERCON GmbH | in operation | 2026-06-24 | Windkraft Kreulkerhok GmbH & Co. KG |
| WEA-2/Nord | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Ammeln Süd GmbH &Co. KG |
| WEA 3, Greven Esch | 5.56 MW | ENERCON GmbH | in operation | 2026-08-20 | Windenergie Marbeck Greven Esch GmbH & Co. KG |
| 160HeidH1 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | SL Windpark Cluse Harpering GmbH & Co. KG |
| WEA 5, Große Heide | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windenergie Marbeck Große Heide GmbH & Co. KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Bürgerwind 2W GmbH & Co. KG |
| E160 ,Liekfor, | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Reinhard Benneker GmbH |
| WEA-1 Gescher Estern | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Gescher Wind GmbH & Co. KG |
| WEA 4, Greven Esch | 5.56 MW | ENERCON GmbH | in operation | 2026-10-23 | Windenergie Marbeck Greven Esch GmbH & Co. KG |
| Steenkuhlenweg P11 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windenergie Marbeck Steenkuhlenweg GmbH & Co. KG |
| WEA-1/Süd | 5.56 MW | ENERCON GmbH | planned | planned 2026 | Windpark Ammeln Süd GmbH &Co. KG |
| WEA Dorsten | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-01-31 | WEA Dorsten Betreibergesellschaft mbH & Co. KG |
| WEA 1 (552203901) | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-20 | Gemeindewerke Reken GmbH |
| Südlohn Oeding Look | 5.50 MW | GE Renewable Germany GmbH | in operation | 2024-07-24 | Windenergie Oeding Weseke GmbH & Co. KG |
| Südlohn Oeding Look | 5.50 MW | GE Renewable Germany GmbH | in operation | 2024-07-03 | Windenergie Oeding Weseke GmbH & Co. KG |
| 53202765 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-10-25 | Bürgerwind Gronau Epe GmbH & Co. KG |
| 53202764 | 5.50 MW | GE Wind Energy GmbH | in operation | 2021-10-20 | Bürgerwind Gronau Epe GmbH & Co. KG |
| Südlohn Oeding Look | 5.50 MW | GE Renewable Germany GmbH | in operation | 2024-07-30 | Windenergie Oeding Weseke GmbH & Co. KG |
| WEA 1 | 4.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windenergie Steggerhook Werk 1 GmbH & Co. KG |
| WEA 2, Rhader Straße | 4.26 MW | ENERCON GmbH | in operation | 2026-08-03 | Windenergie Marbeck Rhader Straße GmbH & Co. KG |
| E 138 Stadtlohn | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Münsterlandwind GmbH & Co. KG |
| WEA 16 - Repowering | 4.26 MW | ENERCON GmbH | planned | planned 2029 | Windpark Schöppinger Berg GmbH & Co. KG |
| WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Stadtlohn GmbH & Co. Eschlohn Betriebs KG |
| 1390005 | 4.26 MW | ENERCON GmbH | in operation | 2024-06-10 | Windpark Wersche GmbH & Co. KG |
| 1390004 | 4.26 MW | ENERCON GmbH | in operation | 2024-04-30 | Windpark Wersche GmbH & Co. KG |
| WEA 01 Heiden Repow | 4.26 MW | ENERCON GmbH | planned | planned 2027 | SL Windpark Cluse Harpering GmbH & Co. KG |
| Schlickenbrook 7 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | Windkraft Heiden II GmbH & Co. KG |
| 1410126 | 4.20 MW | ENERCON GmbH | in operation | 2020-01-10 | Gescher Bürgerwind GmbH & Co. KG |
| 1410102 | 4.20 MW | ENERCON GmbH | in operation | 2019-09-06 | Bürgerwind Schöppingen-Strönfeld GmbH & Co. KG |
| WEA6 | 4.20 MW | ENERCON GmbH | in operation | 2024-02-05 | Bürgerwind Ammeloe GmbH & Co. KG |
| 1410099 | 4.20 MW | ENERCON GmbH | in operation | 2019-06-14 | Bürgerwind Schöppingen-Ramsberg GmbH & Co. KG |
| BWP Heek-Ahle: WEA 1 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-08 | Bürgerwindpark Heek-Ahle Dannenkamp GmbH & Co. KG |
| Schulze Hauling Wind Anlage 1 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-28 | Schulze Hauling Wind GmbH & Co. KG |
| Schulze Hauling Wind Anlage 2 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-28 | Schulze Hauling Wind GmbH & Co. KG |
| WE 1380594 | 4.20 MW | ENERCON GmbH | in operation | 2021-12-22 | Bürgerwindpark A 31 Hohe Mark Wessendorf GmbH & Co. KG |
| 1410105 | 4.20 MW | ENERCON GmbH | in operation | 2019-09-20 | Bürgerwind Schöppingen-Strönfeld GmbH & Co. KG |
| WEA 01 Grenzweg in Heiden | 4.20 MW | ENERCON GmbH | in operation | 2023-12-01 | Windenergie Marbeck GmbH & Co. FKP Betriebs KG |
| Windenergie Marbeck Estern 2, Enercon E-138 EP3 E2 | 4.20 MW | ENERCON GmbH | in operation | 2023-04-04 | Windenergie Marbeck GmbH & Co. Estern Betriebs KG |
| 1410029 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-22 | Bürgerwind Almsicker Loh GmbH & Co. KG |
| 1410125 | 4.20 MW | ENERCON GmbH | in operation | 2019-11-08 | Gescher Bürgerwind GmbH & Co. KG |
| 1410101 | 4.20 MW | ENERCON GmbH | in operation | 2019-07-30 | Bürgerwind Schöppingen-Strönfeld GmbH & Co. KG |
| Halterner Straße 4 | 4.20 MW | ENERCON GmbH | in operation | 2026-08-28 | Windkraft Heiden II GmbH & Co. KG |
| 1410031 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-01 | Energiegenossenschaft Ahaus-Heek-Legden eG |
| 1410124 | 4.20 MW | ENERCON GmbH | in operation | 2019-12-17 | Gescher Bürgerwind GmbH & Co. KG |
| WE 1380593 | 4.20 MW | ENERCON GmbH | in operation | 2022-01-25 | Bürgerwindpark A 31 Hohe Mark Wessendorf GmbH & Co. KG |
| WE 1380592 | 4.20 MW | ENERCON GmbH | in operation | 2022-01-13 | Bürgerwindpark A 31 Hohe Mark Wessendorf GmbH & Co. KG |
| 1410047 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-21 | Bürgerwind 2W GmbH & Co. KG |
| 1410028 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-21 | Bürgerwind Almsicker Loh GmbH & Co. KG |
| Halterner Straße 3 | 4.20 MW | ENERCON GmbH | in operation | 2026-06-17 | Windkraft Heiden II GmbH & Co. KG |
| 1410034 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-29 | Windenergie Quantwick GmbH & Co. KG |
| Enercon E138 West | 4.20 MW | ENERCON GmbH | in operation | 2023-12-20 | Windkraft Stadtlohn GmbH & Co. Marbecker Betriebs KG |
| 1410035 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-29 | Energiegenossenschaft Ahaus-Heek-Legden eG |
| WEA7 | 4.20 MW | ENERCON GmbH | in operation | 2023-12-21 | Bürgerwind Ammeloe GmbH & Co. KG |
| 1410100 | 4.20 MW | ENERCON GmbH | in operation | 2019-09-17 | Bürgerwind Schöppingen-Ramsberg GmbH & Co. KG |
| BWW - WEA4 | 4.20 MW | ENERCON GmbH | in operation | 2018-03-28 | BürgerWindWichum GmbH & Co. KG |
| 1410103 | 4.20 MW | ENERCON GmbH | in operation | 2019-09-09 | Bürgerwind Schöppingen-Ramsberg GmbH & Co. KG |
| 1410104 | 4.20 MW | ENERCON GmbH | in operation | 2019-08-14 | Bürgerwind Schöppingen-Strönfeld GmbH & Co. KG |
| 1410120 | 4.20 MW | ENERCON GmbH | in operation | 2019-10-02 | Windenergie Schöppingen-Brook GmbH & Co. KG |
| 1410027 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-20 | Bürgerwind Almsicker Loh GmbH & Co. KG |
| Tungerloh WEA 2 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2024-12-14 | VenSol Windpark Tungerloh GmbH & Co. KG |
| Kreulkerhok 1 | 4.20 MW | ENERCON GmbH | in operation | 2026-06-27 | Windkraft Kreulkerhok GmbH & Co. KG |
| Halterner Straße 2 | 4.20 MW | ENERCON GmbH | in operation | 2026-09-11 | Windkraft Heiden II GmbH & Co. KG |
| 1410121 | 4.20 MW | ENERCON GmbH | in operation | 2019-10-11 | Windenergie Schöppingen-Brook GmbH & Co. KG |
| 1160186 | 4.20 MW | ENERCON GmbH | in operation | 2024-05-02 | Windpark Wersche GmbH & Co. KG |
| 1410032 | 4.20 MW | ENERCON GmbH | in operation | 2017-09-30 | Windenergie Quantwick GmbH & Co. KG |
| 1410026 | 4.20 MW | ENERCON GmbH | in operation | 2017-10-26 | Bürgerwind Almsicker Loh GmbH & Co. KG |
| WEA3 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2023-09-06 | Bürgerwind Horstmar-Schöppingen GmbH & Co. KG |
| 1410122 | 4.20 MW | ENERCON GmbH | in operation | 2019-11-06 | Windenergie Schöppingen-Brook GmbH & Co. KG |
| Halterner Straße 1 | 4.20 MW | ENERCON GmbH | in operation | 2026-08-31 | Windkraft Heiden II GmbH & Co. KG |
| Havixhorst | 4.20 MW | ENERCON GmbH | in operation | 2026-06-17 | Windkraft Heiden II GmbH & Co. KG |
| 1410033 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-01 | Windenergie Quantwick GmbH & Co. KG |
| 1410030 | 4.20 MW | ENERCON GmbH | in operation | 2017-12-14 | Windenergie Quantwick GmbH & Co. KG |
| 1410123 | 4.20 MW | ENERCON GmbH | in operation | 2019-11-18 | Gescher Bürgerwind GmbH & Co. KG |
| 89384 | 3.60 MW | Nordex Energy GmbH | in operation | 2021-10-14 | Glockenstadt Energiegenossenschaft eG |
| V 232398-02 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-11-20 | Windpark Heek GmbH & Co. KG |
| V 232397-01 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2020-12-03 | Windpark Heek GmbH & Co. KG |
| Wind Energy Farming II V219021 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2017-09-28 | Wind Energy Farming II UG (haftungsbeschränkt) & Co. KG |
| 301410 | 3.40 MW | Senvion Deutschland GmbH | in operation | 2017-09-28 | Bürgerwind 2W GmbH & Co. KG |
| WEA4 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-06-21 | HeWe-Windpark GmbH & Co.KG |
| Stadtlohn Hundewick WEA 10 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-08-29 | Windkraft Stadtlohn GmbH & Co Eschlohner Mark Betriebs KG |
| WEA7 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-05-29 | HeWe-Windpark GmbH & Co.KG |
| WEA6 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-05-31 | HeWe-Windpark GmbH & Co.KG |
| WEA8 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-05-11 | HeWe-Windpark GmbH & Co.KG |
| Stadtlohn Hundewick WEA 11 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-15 | Windkraft Stadtlohn GmbH & Co Eschlohner Mark Betriebs KG |
| WEA 2.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-20 | Windkraft Stadtlohn GmbH & Co. Eschlohn Betriebs KG |
| Stadtlohn Hundewick 8.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-27 | Windkraft Stadtlohn GmbH & Co. Ostlohner Betriebs KG |
| Stadtlohn Hundewick WEA 7.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-29 | Windkraft Stadtlohn GmbH & Co. Ostlohner Betriebs KG |
| WEA 5.1 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-12 | Windkraft Stadtlohn GmbH & Co. Eschlohn Betriebs KG |
| WEA2 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-05-18 | HeWe-Windpark GmbH & Co.KG |
| WEA1 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-06-28 | HeWe-Windpark GmbH & Co.KG |
| WEA3 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-04-27 | HeWe-Windpark GmbH & Co.KG |
| WEA5 | 3.30 MW | Nordex Energy GmbH | in operation | 2017-04-25 | HeWe-Windpark GmbH & Co.KG |
| 32165269 | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-05-26 | Bürgerwindpark Lünten GmbH & Co. KG |
| 32165059 | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-27 | Bürgerwind Isingort GmbH & Co. KG |
| 32165058 | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-06-30 | Bürgerwind Isingort GmbH & Co. KG |
| 32165268 | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-05-26 | Bürgerwindpark Lünten GmbH & Co. KG |
| 32165060 | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-14 | Energiegenossenschaft Ahaus-Heek-Legden eG |
| WE 1150866 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-11 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| Windenergieanlage 1 (ENERCON) | 3.00 MW | ENERCON GmbH | in operation | 2017-11-28 | Entsorgungsgesellschaft Westmünsterland mbH |
| 301362 | 3.00 MW | Senvion Deutschland GmbH | in operation | 2017-08-03 | Bürgerwindpark Dömern GmbH & Co. KG |
| WE 1150867 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-20 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| WE 1150863 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-15 | Windkraft Heiden GmbH & Co. KG |
| 1150968 | 3.00 MW | ENERCON GmbH | in operation | 2018-01-18 | Bürgerwind Ammeloe GmbH & Co. KG |
| WE 1150862 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-07 | Windkraft Heiden GmbH & Co. KG |
| Schlickenbrook 3 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-28 | Windenergie Marbeck GmbH & Co. BWK Betriebs KG |
| 1150972 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-29 | Bürgerwind Ammeloe GmbH & Co. KG |
| WE 1150869 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-07 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| Feld Nord GmbH & Co. KG | 3.00 MW | ENERCON GmbH | in operation | 2017-04-28 | Feld Nord GmbH & Co. KG |
| 1150971 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | Bürgerwind Ammeloe GmbH & Co. KG |
| Feld Süd GmbH & Co. KG | 3.00 MW | ENERCON GmbH | in operation | 2017-04-28 | Feld Süd GmbH & Co. KG |
| 1150969 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-29 | Bürgerwind Ammeloe GmbH & Co. KG |
| 301360 | 3.00 MW | Senvion Deutschland GmbH | in operation | 2017-07-26 | Bürgerwindpark Dömern GmbH & Co. KG |
| Windenergieanlage 2 (ENERCON) | 3.00 MW | ENERCON GmbH | in operation | 2017-11-27 | Entsorgungsgesellschaft Westmünsterland mbH |
| WEA 2 | 3.00 MW | ENERCON GmbH | in operation | 2018-05-25 | Bürgerwind Wexter Mark GmbH & CO. KG |
| WE 1150865 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-02 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| WEA 1 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-30 | Bürgerwind Wexter Mark GmbH & CO. KG |
| WE 1150868 | 3.00 MW | ENERCON GmbH | in operation | 2017-08-31 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| 301361 | 3.00 MW | Senvion Deutschland GmbH | in operation | 2017-07-31 | Bürgerwindpark Dömern GmbH & Co. KG |
| WE 1150870 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-20 | Bürgerwindpark A 31 Hohe Mark GmbH & Co. KG |
| 1150970 | 3.00 MW | ENERCON GmbH | in operation | 2017-12-20 | Bürgerwind Ammeloe GmbH & Co. KG |
| 301359 | 3.00 MW | Senvion Deutschland GmbH | in operation | 2017-07-26 | Bürgerwindpark Dömern GmbH & Co. KG |
| 1150958 | 3.00 MW | ENERCON GmbH | in operation | 2018-03-23 | Bürgerwind 2W GmbH & Co. KG |
| Windenergiegemeinschaft Reken | 2.40 MW | Nordex Energy GmbH | in operation | 2015-10-01 | Windenergiegemeinschaft Reken GmbH & Co. KG |
| L2 Lasterfeld 2 | 2.35 MW | ENERCON GmbH | in operation | 2020-05-27 | ENERTRAG Lasterfeld GmbH & Co. KG |
| LF3 | 2.35 MW | ENERCON GmbH | in operation | 2020-04-17 | grogeno Windkraft Lasterfeld GmbH |
| L1 Lasterfeld 1 | 2.35 MW | ENERCON GmbH | in operation | 2020-04-29 | ENERTRAG Lasterfeld GmbH & Co. KG |
| WEA22BOR07 - 827707 | 2.30 MW | ENERCON GmbH | in operation | 2023-07-07 | Windkraftanlagen Schöppingen Haverbeck GmbH & Co. KG |
The 300 largest units are listed.
Which organisations operate the most wind power capacity in Borken?
| Operator | Units | Capacity |
|---|---|---|
| Windkraft Heiden II GmbH & Co. KG | 11 | 60.3 MW |
| Bürgerwind Büngern GmbH & Co. KG | 8 | 55.4 MW |
| Bürgerwind Heek-Strönfeld GmbH & Co. KG | 7 | 50.4 MW |
| Bürgerwind Hengeler-Ächterhook GmbH & Co. KG | 7 | 48.0 MW |
| WMO Quantwick GmbH & Co. KG | 7 | 44.4 MW |
| Windenergie Kierit GmbH & Co. KG | 6 | 41.6 MW |
| EnergieGemeinschaft Hülsterholt GmbH & Co. KG | 6 | 40.0 MW |
| Gescher Bürgerwind GmbH & Co. KG | 8 | 39.2 MW |
| Anthornshook Bürgerwind GmbH & Co. KG | 6 | 36.0 MW |
| Weseke-Ost Wind GmbH & Co.KG | 5 | 36.0 MW |
Which manufacturer accounts for the most wind power capacity in Borken?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 265 | 827.5 MW |
| Vestas Deutschland GmbH | 86 | 519.4 MW |
| Nordex Germany GmbH | 24 | 164.2 MW |
| GE Wind Energy GmbH | 51 | 119.2 MW |
| Nordex Energy GmbH | 23 | 92.0 MW |
| Nordex SE | 14 | 62.5 MW |
| GE Renewable Germany GmbH | 10 | 54.0 MW |
| Senvion Deutschland GmbH | 13 | 31.4 MW |
| NEG Micon Deutschland GmbH | 4 | 5.50 MW |
| General Electric Deutschland Holding GmbH | 3 | 4.50 MW |
Wind power in Nordrhein-Westfalen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Borken (Nordrhein-Westfalen), and how large are t can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.