Germany · renewables
Wind power in Wittmund
187 wind turbines with 368.5 MW of gross capacity were in operation in Wittmund (Niedersachsen) as of 2026-11-05, with a further 30 units (178.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Wittmund (Niedersachsen), and how large are they, as of 2026-11-05?
- 187 wind turbines with 368.5 MW of gross capacity were in operation in Wittmund (Niedersachsen) as of 2026-11-05, with a further 30 units (178.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Wittmund?
- 187 wind turbines with 368.5 MW of gross capacity were in operation in Wittmund as of 2026-11-05, with a further 30 units (178.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Wittmund in 2025?
- 1 wind turbines with 4.26 MW went into operation in Wittmund in 2025; the strongest year of the last two decades was 2017 with 87.0 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Wittmund?
- enercity Erneuerbare Projekte GmbH & Co. KG operates 10 wind turbines with 64.1 MW in Wittmund, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Wittmund?
- ENERCON GmbH leads with 183 wind turbines and 449.3 MW in Wittmund (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Wittmund?
- The largest registered wind turbine in Wittmund has 7.58 MW of gross capacity and is operated by NEUH-WERD Energie GmbH & Co. KG, commissioned 2013-12-24 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Wittmund distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 10 | 0.08 MW | 7 | 0 |
| over 100 kW | 213 | 549.6 MW | 180 | 30 |
How much wind power capacity was commissioned in Wittmund each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 0.01 MW |
| 2025 | 1 | 4.26 MW |
| 2023 | 5 | 0.00 MW |
| 2020 | 4 | 0.07 MW |
| 2018 | 1 | 2.30 MW |
| 2017 | 33 | 87.0 MW |
| 2016 | 20 | 48.2 MW |
| 2015 | 2 | 4.60 MW |
| 2014 | 19 | 49.0 MW |
| 2013 | 20 | 68.8 MW |
| 2010 | 4 | 9.20 MW |
| 2009 | 10 | 20.6 MW |
| 2007 | 4 | 8.90 MW |
| 2006 | 2 | 1.80 MW |
How many wind turbines in Wittmund are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 187 | 368.5 MW |
| planned | 30 | 178.7 MW |
| permanently decommissioned | 6 | 2.48 MW |
Which wind turbines are registered in Wittmund?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA04 | 7.58 MW | ENERCON GmbH | in operation | 2013-12-24 | NEUH-WERD Energie GmbH & Co. KG |
| WEA01 | 7.58 MW | ENERCON GmbH | in operation | 2013-10-19 | NEUH-WERD Energie GmbH & Co. KG |
| WEA02 | 7.58 MW | ENERCON GmbH | in operation | 2014-02-10 | NEUH-WERD Energie GmbH & Co. KG |
| WEA03 | 7.58 MW | ENERCON GmbH | in operation | 2013-12-11 | NEUH-WERD Energie GmbH & Co. KG |
| NLN 4 V162 - enercity Windpark Holtriem | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| NLN 2 V162 - enercity Windpark Holtriem | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| NLN 1 V162 - enercity Windpark Holtriem | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| NLN 5 V162 - enercity Windpark Holtriem | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| NLN 3 V162 - enercity Windpark Holtriem | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA03 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA01 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| WEA O05 | 7.00 MW | Nordex SE | planned | planned 2028 | enercity Erneuerbare Projekte GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA05 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA04 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| WEA O01 | 7.00 MW | Nordex SE | planned | planned 2028 | enercity Erneuerbare Projekte GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA02 | 7.00 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| Groß Charlottengroden Repowering WEA06 | 5.70 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark “Vorm Wind” GmbH & Co. KG |
| Bentstreek Repowering WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| Bentstreek Repowering WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| E-160 WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Eggelinger Windpark GmbH & Co.KG |
| E-160 WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Eggelinger Windpark GmbH & Co.KG |
| Bentstreek Repowering WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| WEA Erichswarfen | 5.56 MW | ENERCON GmbH | planned | planned 2027 | WEA Erichswarfen GmbH & Co KG |
| WEA E-160 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| Bentstreek Repowering WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| Bentstreek Repowering WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| unit operated by a private individual | 5.56 MW | ENERCON GmbH | planned | planned 2028 | private individual |
| Windenergieanlage | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Harle Energy GmbH & CO. KG |
| Bentstreek Repowering WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Windpark Bentstreek GmbH & Co. KG |
| WP Südermeedland SML 4 | 4.26 MW | ENERCON GmbH | planned | planned 2027 | WP Südermeedland GmbH Co. KG |
| WEA O14 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | enercity Erneuerbare Projekte GmbH & Co. KG |
| WEA E-138 | 4.26 MW | ENERCON GmbH | planned | planned 2029 | enercity Erneuerbare Projekte GmbH & Co. KG |
| Mühle 2 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | DBC Energie GmbH & Co. KG |
| Bürgerwindpark Nenndorf GmbH & Co. II KG WEA 03 | 4.26 MW | ENERCON GmbH | planned | planned 2026 | Bürgerwindpark Nenndorf GmbH & Co. II KG |
| 1390080 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-28 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo III |
| 1150583 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-27 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| BWP Stedesdorf WEA 06 | 3.00 MW | ENERCON GmbH | in operation | 2013-03-15 | Bürgerwindpark Stedesdorf WEA 6 GmbH & Co. KG |
| BWP Stedesdorf WEA 07 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-30 | Windpark Stedesdorf Bürgerbeteiligungs GmbH & Co. KG |
| 1150580 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-25 | Windpark Norderland GmbH & Co. KG Ochtersum III |
| 1150586 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| 1150584 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-27 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| 1150405 | 3.00 MW | ENERCON GmbH | in operation | 2016-12-05 | Windpark Norderland GmbH & Co. KG Holtriemer Hammrich IX |
| 1150406 | 3.00 MW | ENERCON GmbH | in operation | 2016-12-22 | Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich VIII |
| BWP Stedesdorf WEA 02 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-18 | Bürgerwindpark Grundstückseigentümer Stedesdorf GmbH & Co. KG |
| 1150587 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-20 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| 1150510 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-28 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo I |
| 1150512 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-30 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo I |
| 1150582 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-28 | Windpark Norderland GmbH & Co. KG Ochtersum II |
| 1150513 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-21 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo II |
| BWP Stedesdorf WEA 05 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-24 | Bürgerwindpark Grundstückseigentümer Stedesdorf GmbH & Co. KG |
| 1150581 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-27 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| BWP Stedesdorf WEA 03 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-05 | Windpark Stedesdorf Bürgerbeteiligungs GmbH & Co. KG |
| 1150511 | 3.00 MW | ENERCON GmbH | in operation | 2017-03-27 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo I |
| 1150578 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-22 | Windpark Norderland GmbH & Co. KG Ochtersum II |
| 1150407 | 3.00 MW | ENERCON GmbH | in operation | 2016-12-29 | Windpark Norderland GmbH & Co. KG Holtriemer Hammrich IX |
| 1150579 | 3.00 MW | ENERCON GmbH | in operation | 2017-04-28 | Windpark Norderland GmbH & Co. KG Ochtersum III |
| BWP Stedesdorf WEA 08 | 3.00 MW | ENERCON GmbH | in operation | 2013-05-09 | Bürgerwindpark Repowering Stedesdorf GmbH & Co. KG |
| 1150509 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-08 | Windpark Norderland GmbH & Co. KG Blomberg/Neuschoo I |
| BWP Stedesdorf WEA 10 | 3.00 MW | ENERCON GmbH | in operation | 2013-05-06 | Bürgerwindpark Stedesdorf WEA 10 GmbH & Co. KG |
| BWP Stedesdorf WEA 09 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-20 | Bürgerwindpark Grundstückseigentümer Stedesdorf GmbH & Co. KG |
| BWP Stedesdorf WEA 04 | 3.00 MW | ENERCON GmbH | in operation | 2013-04-10 | Windpark Stedesdorf Bürgerbeteiligungs GmbH & Co. KG |
| BWP Stedesdorf WEA 01 | 3.00 MW | ENERCON GmbH | in operation | 2013-05-23 | Bürgerwindpark Grundstückseigentümer Stedesdorf GmbH & Co. KG |
| 1150585 | 3.00 MW | ENERCON GmbH | in operation | 2017-05-31 | Windpark Norderland GmbH & Co. KG Ochtersum I |
| H16-863 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-26 | Harlingerland Energiepark GmbH & Co. KG |
| H15-855 | 2.35 MW | ENERCON GmbH | in operation | 2016-12-01 | Harlingerland Energiepark GmbH & Co. KG |
| H07-859 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-24 | Harlingerland Energiepark GmbH & Co. KG |
| H04-935 | 2.35 MW | ENERCON GmbH | in operation | 2017-03-31 | Harlingerland Energiepark GmbH & Co. KG |
| H12-858 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-29 | Harlingerland Energiepark GmbH & Co. KG |
| H08-860 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-28 | Harlingerland Energiepark GmbH & Co. KG |
| H13-854 | 2.35 MW | ENERCON GmbH | in operation | 2016-12-07 | Harlingerland Energiepark GmbH & Co. KG |
| H11-856 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-28 | Harlingerland Energiepark GmbH & Co. KG |
| H09-861 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-24 | Harlingerland Energiepark GmbH & Co. KG |
| H10-862 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-31 | Harlingerland Energiepark GmbH & Co. KG |
| H03-934 | 2.35 MW | ENERCON GmbH | in operation | 2017-04-28 | Harlingerland Energiepark GmbH & Co. KG |
| H06-936 | 2.35 MW | ENERCON GmbH | in operation | 2017-03-31 | Harlingerland Energiepark GmbH & Co. KG |
| H14-857 | 2.35 MW | ENERCON GmbH | in operation | 2017-05-23 | Harlingerland Energiepark GmbH & Co. KG |
| W10 | 2.30 MW | ENERCON GmbH | in operation | 2016-09-29 | Sielhammer- Wind I GmbH & Co. KG |
| 825619 | 2.30 MW | ENERCON GmbH | in operation | 2014-11-18 | Windpark Holtriemer Land V GmbH & Co. KG |
| 825629 | 2.30 MW | ENERCON GmbH | in operation | 2014-11-27 | Windpark Holtriemer Land V GmbH & Co. KG |
| H05-853 (EWE) | 2.30 MW | ENERCON GmbH | in operation | 2016-12-17 | Harlingerland Energiepark GmbH & Co. KG |
| W03 | 2.30 MW | ENERCON GmbH | in operation | 2010-02-15 | Windmöhlen Utgast GmbH & Co. KG |
| 825622 | 2.30 MW | ENERCON GmbH | in operation | 2014-10-10 | Windpark Holtriemer Land V GmbH & Co. KG |
| 825617 | 2.30 MW | ENERCON GmbH | in operation | 2013-10-25 | Windpark Holtriemer Land I GmbH & Co. KG |
| W15 | 2.30 MW | ENERCON GmbH | in operation | 2018-06-15 | Sielhammer- Wind I GmbH & Co. KG |
| unit operated by a private individual | 2.30 MW | ENERCON GmbH | in operation | 2010-06-04 | private individual |
| 825626 | 2.30 MW | ENERCON GmbH | in operation | 2014-10-06 | Windpark Holtriemer Land II GmbH & Co. KG |
| M02 | 2.30 MW | ENERCON GmbH | in operation | 2013-07-16 | Windgesellschaft Mimstede GmbH & Co. KG |
| 825628 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-16 | Windpark Holtriemer Land V GmbH & Co. KG |
| EN-02-784932 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-28 | EWF Sechs Sieben GmbH & Co. KG |
| OST WKA | 2.30 MW | ENERCON GmbH | in operation | 2007-07-18 | Berdumer Bürger Windpark GmbH & Co.KG |
| 825624 | 2.30 MW | ENERCON GmbH | in operation | 2014-09-26 | Windpark Holtriemer Land V GmbH & Co. KG |
| W16 | 2.30 MW | ENERCON GmbH | in operation | 2017-02-27 | Sielhammer- Wind I GmbH & Co. KG |
| W13 | 2.30 MW | ENERCON GmbH | in operation | 2016-12-30 | Sielhammer- Wind I GmbH & Co. KG |
| 825623 | 2.30 MW | ENERCON GmbH | in operation | 2014-09-29 | Windpark Holtriemer Land III GmbH & Co. KG |
| WEA 03 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-24 | Bürgerwindpark Nenndorf GmbH & Co. XIII KG |
| W09 | 2.30 MW | ENERCON GmbH | in operation | 2016-09-28 | Sielhammer- Wind I GmbH & Co. KG |
| W 01 | 2.30 MW | ENERCON GmbH | in operation | 2010-01-20 | Windmöhlen Utgast GmbH & Co. KG |
| WEA 02 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-22 | Bürgerwindpark Nenndorf GmbH & Co. X KG |
| 784099 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-05 | Windpark Holtriemer Land I GmbH & Co. KG |
| M03 | 2.30 MW | ENERCON GmbH | in operation | 2015-10-05 | Windgesellschaft Mimstede GmbH & Co. KG |
| 825625 | 2.30 MW | ENERCON GmbH | in operation | 2014-09-26 | Windpark Holtriemer Land IV GmbH & Co. KG |
| W02 | 2.30 MW | ENERCON GmbH | in operation | 2009-12-21 | Windmöhlen Utgast GmbH & Co. KG |
| 825614 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-03 | Windpark Holtriemer Land I GmbH & Co. KG |
| 825620 | 2.30 MW | ENERCON GmbH | in operation | 2014-10-22 | Windpark Holtriemer Land V GmbH & Co. KG |
| WEA 06 | 2.30 MW | ENERCON GmbH | in operation | 2016-07-13 | Bürgerwindpark Nenndorf GmbH & Co. VIII KG |
| EN-03-784933 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-28 | EWF Sechs Sieben GmbH & Co. KG |
| 825632 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-12 | Windpark Holtriemer Land V GmbH & Co. KG |
| W14 | 2.30 MW | ENERCON GmbH | in operation | 2016-12-30 | Sielhammer- Wind I GmbH & Co. KG |
| 825627 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-12 | Windpark Holtriemer Land V GmbH & Co. KG |
| WEA 04 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-03 | Bürgerwindpark Nenndorf GmbH & Co. I KG |
| 825631 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-05 | Windpark Holtriemer Land V GmbH & Co. KG |
| H02-852 (EWE) | 2.30 MW | ENERCON GmbH | in operation | 2016-12-30 | Harlingerland Energiepark GmbH & Co. KG |
| W17 | 2.30 MW | ENERCON GmbH | in operation | 2017-03-30 | Sielhammer- Wind I GmbH & Co. KG |
| 825615 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-18 | Windpark Holtriemer Land I GmbH & Co. KG |
| H01-851 (EWE) | 2.30 MW | ENERCON GmbH | in operation | 2016-12-27 | Harlingerland Energiepark GmbH & Co. KG |
| WEA 01 | 2.30 MW | ENERCON GmbH | in operation | 2016-08-26 | Bürgerwindpark Nenndorf GmbH & Co. VI KG |
| N02 | 2.30 MW | ENERCON GmbH | in operation | 2014-07-22 | Küstenwind GmbH & Co. KG |
| Windpark Utgast R01 | 2.30 MW | ENERCON GmbH | in operation | 2016-03-23 | BRS Windpark Verwaltungs- u. Beteiligungs GmbH |
| Süd-WKA | 2.30 MW | ENERCON GmbH | in operation | 2007-07-18 | Berdumer Bürger Windpark GmbH & Co.KG |
| 825621 | 2.30 MW | ENERCON GmbH | in operation | 2015-02-02 | Windpark Holtriemer Land V GmbH & Co. KG |
| W05 | 2.30 MW | ENERCON GmbH | in operation | 2009-12-09 | Windmöhlen Utgast GmbH & Co. KG |
| W08 | 2.30 MW | ENERCON GmbH | in operation | 2017-03-24 | Damsumer Wind GmbH |
| WEA 05 | 2.30 MW | ENERCON GmbH | in operation | 2016-07-20 | Bürgerwindpark Nenndorf GmbH & Co. IV KG |
| 825630 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-15 | Windpark Holtriemer Land V GmbH & Co. KG |
| 825616 | 2.30 MW | ENERCON GmbH | in operation | 2013-12-30 | Windpark Holtriemer Land I GmbH & Co. KG |
| M01 | 2.30 MW | ENERCON GmbH | in operation | 2014-09-30 | Windgesellschaft Mimstede GmbH & Co. KG |
| 825618 | 2.30 MW | ENERCON GmbH | in operation | 2013-11-12 | Windpark Holtriemer Land I GmbH & Co. KG |
| Nord WKA | 2.30 MW | ENERCON GmbH | in operation | 2007-07-18 | Berdumer Bürger Windpark GmbH & Co.KG |
| 784100 | 2.30 MW | ENERCON GmbH | in operation | 2014-09-09 | Windpark Holtriemer Land V GmbH & Co. KG |
| W11 | 2.30 MW | ENERCON GmbH | in operation | 2017-03-17 | Fulkumer Wind GmbH & Co. KG |
| M04 | 2.30 MW | ENERCON GmbH | in operation | 2016-09-30 | Windgesellschaft Mimstede GmbH & Co. KG |
| WEA W06 | 2.30 MW | ENERCON GmbH | in operation | 2014-11-11 | Windmöhlen Utgast GmbH & Co. KG |
| EN-01-784931 | 2.30 MW | ENERCON GmbH | in operation | 2017-04-28 | EWF Sechs Sieben GmbH & Co. KG |
| N01 | 2.30 MW | ENERCON GmbH | in operation | 2014-07-11 | Küstenwind GmbH & Co. KG |
| W04 | 2.30 MW | ENERCON GmbH | in operation | 2010-02-15 | Windmöhlen Utgast GmbH & Co. KG |
| 82728 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-20 | "Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich IV" |
| unit operated by a private individual | 2.00 MW | ENERCON GmbH | permanently decommissioned | 2005-06-16 | private individual |
| 82731 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-16 | "Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich IV" |
| 82735 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-20 | "Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich IV" |
| 82730 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-13 | Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich V |
| 82729 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-21 | Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich VI |
| 82734 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-14 | "Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich IV" |
| E 82 | 2.00 MW | ENERCON GmbH | in operation | 2007-05-09 | Eggelinger Windpark GmbH & Co.KG |
| 702320 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-08 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 82733 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-09 | Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich VII |
| 702321 | 2.00 MW | ENERCON GmbH | in operation | 2005-06-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 82732 | 2.00 MW | ENERCON GmbH | in operation | 2009-01-20 | Windpark Norderland GmbH & Co. KG, Holtriemer Hammrich VII |
| 702322 | 2.00 MW | Enron Wind GmbH | in operation | 2005-06-03 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66041 | 1.50 MW | ENERCON GmbH | in operation | 1998-04-08 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66022 | 1.50 MW | ENERCON GmbH | in operation | 1997-10-31 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66029 | 1.50 MW | ENERCON GmbH | in operation | 1997-12-19 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66051 | 1.50 MW | ENERCON GmbH | in operation | 1998-06-25 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66021 | 1.50 MW | ENERCON GmbH | in operation | 1997-10-27 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66028 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66048 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66034 | 1.50 MW | ENERCON GmbH | in operation | 1998-02-06 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66039 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-26 | Norderland "Ausblick" GmbH & Co. KG |
| 66040 | 1.50 MW | ENERCON GmbH | in operation | 1998-04-02 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66045 | 1.50 MW | ENERCON GmbH | in operation | 1998-05-08 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66038 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Norderland "Ausblick" GmbH & Co. KG |
| 66033 | 1.50 MW | ENERCON GmbH | in operation | 1998-01-30 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66035 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66379 | 1.50 MW | ENERCON GmbH | in operation | 1998-02-26 | Norderland "Ausblick" GmbH & Co. KG |
| 66026 | 1.50 MW | ENERCON GmbH | in operation | 1997-11-28 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66042 | 1.50 MW | ENERCON GmbH | in operation | 1998-04-18 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66037 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-12 | Norderland "Ausblick" GmbH & Co. KG |
| 66044 | 1.50 MW | ENERCON GmbH | in operation | 1998-05-02 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66024 | 1.50 MW | ENERCON GmbH | in operation | 1997-11-14 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66047 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66050 | 1.50 MW | ENERCON GmbH | in operation | 1998-06-18 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66043 | 1.50 MW | ENERCON GmbH | in operation | 1998-04-25 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66049 | 1.50 MW | ENERCON GmbH | in operation | 1998-03-01 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| 66031 | 1.50 MW | ENERCON GmbH | in operation | 1998-01-10 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 66046 | 1.50 MW | ENERCON GmbH | in operation | 1998-05-15 | Windpark Norderland GmbH & Co. Holtriemer Hammrich II |
| 66027 | 1.50 MW | ENERCON GmbH | in operation | 1997-12-04 | Windpark Norderland GmbH & Co. Holtriemer Hammrich III |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | in operation | 2006-05-05 | private individual |
| 48087 | 0.80 MW | ENERCON GmbH | in operation | 2005-07-08 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| 48088 | 0.80 MW | ENERCON GmbH | in operation | 2005-07-06 | Windpark Norderland GmbH & Co. Holtriemer Hammrich I |
| E53 | 0.80 MW | ENERCON GmbH | in operation | 2006-08-23 | Eggelinger Windpark GmbH & Co.KG |
| E-48 | 0.80 MW | ENERCON GmbH | in operation | 2005-07-11 | Bürgerwindpark Nenndorf GmbH & Co. II KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2003-12-23 | private individual |
| unit operated by a private individual | 0.60 MW | Sonstige | in operation | 1996-04-17 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-09-18 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1994-11-15 | private individual |
| WKA Wittmund 1 | 0.60 MW | ENERCON GmbH | in operation | 2001-04-26 | Projekt Windpark Wittmund GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | NEG Micon Deutschland GmbH | in operation | 1994-12-15 | private individual |
| WEA Funnix 441103 | 0.60 MW | ENERCON GmbH | in operation | 2002-01-31 | ETO GbR |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1994-11-29 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1994-08-08 | private individual |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-21 | private individual |
| WEA E44 | 0.60 MW | ENERCON GmbH | in operation | 2001-08-10 | Sielhammer- Wind I GmbH & Co. KG |
| Oma-Tacke | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1996-08-21 | Harlingerland Energiepark GmbH & Co. KG |
| 40383 | 0.50 MW | ENERCON GmbH | in operation | 1995-07-12 | Windkraft Richter GbR |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1995-05-24 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1994-06-08 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1996-06-19 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1997-07-03 | private individual |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1997-09-07 | private individual |
| WKA 4 | 0.50 MW | Vestas Deutschland GmbH | in operation | 1995-10-05 | bs windkraft GmbH & CO. KG |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | in operation | 1995-07-18 | private individual |
| unit operated by a private individual | 0.50 MW | Vestas Deutschland GmbH | in operation | 1995-02-09 | private individual |
| WEA Altfunnix | 0.50 MW | ENERCON GmbH | in operation | 1995-09-27 | Strenge Wind GmbH & Co. KG |
| unit operated by a private individual | 0.45 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 1993-08-18 | private individual |
| WEA 01 | 0.45 MW | Siemens Wind Power GmbH & Co. KG | in operation | 1998-06-15 | WP1 Hohenlohe GmbH |
| unit operated by a private individual | 0.30 MW | ENERCON GmbH | in operation | 2004-02-23 | private individual |
| unit operated by a private individual | 0.30 MW | ENERCON GmbH | in operation | 1993-04-20 | private individual |
| unit operated by a private individual | 0.30 MW | ENERCON GmbH | in operation | 1992-09-03 | private individual |
| unit operated by a private individual | 0.25 MW | Tacke GmbH & Co. KG | permanently decommissioned | 1992-05-08 | private individual |
| unit operated by a private individual | 0.23 MW | ENERCON GmbH | permanently decommissioned | 1997-07-22 | private individual |
| unit operated by a private individual | 0.23 MW | Vestas Deutschland GmbH | in operation | 1991-09-12 | private individual |
| HLS Windkraftanlage | 0.23 MW | Vestas Deutschland GmbH | in operation | 1995-11-06 | Hermann Lietz-Schule Spiekeroog gGmbH |
| unit operated by a private individual | 0.23 MW | Sonstige | in operation | 1994-12-19 | private individual |
| Windkraftanlage E-30 | 0.20 MW | ENERCON GmbH | in operation | 2001-04-17 | Janssen |
| unit operated by a private individual | 0.03 MW | Lely Aircon B.V. Niederlassung Leer | in operation | 2020-08-13 | private individual |
| Kleinwindkraftanlage | 0.01 MW | Sonstige | in operation | 2020-09-03 | Rietman/Regelink GbR |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2020-12-01 | private individual |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2020-12-01 | private individual |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | in operation | 2026-07-01 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | permanently decommissioned | 2023-10-11 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | permanently decommissioned | 2023-02-06 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | permanently decommissioned | 2023-06-24 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2023-05-12 | private individual |
| unit operated by a private individual | 0.00 MW | Sonstige | in operation | 2023-07-01 | private individual |
Which organisations operate the most wind power capacity in Wittmund?
| Operator | Units | Capacity |
|---|---|---|
| enercity Erneuerbare Projekte GmbH & Co. KG | 10 | 64.1 MW |
| Windpark “Vorm Wind” GmbH & Co. KG | 6 | 40.7 MW |
| Harlingerland Energiepark GmbH & Co. KG | 17 | 38.0 MW |
| Alterric Windpark Bentstreek GmbH & Co. KG | 6 | 33.4 MW |
| NEUH-WERD Energie GmbH & Co. KG | 4 | 30.3 MW |
| Windpark Holtriemer Land V GmbH & Co. KG | 12 | 27.6 MW |
| Windpark Norderland GmbH & Co. Holtriemer Hammrich I | 12 | 18.1 MW |
| Windpark Norderland GmbH & Co. KG Ochtersum I | 6 | 18.0 MW |
| Sielhammer- Wind I GmbH & Co. KG | 8 | 16.7 MW |
| Eggelinger Windpark GmbH & Co.KG | 4 | 13.9 MW |
Which manufacturer accounts for the most wind power capacity in Wittmund?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 183 | 449.3 MW |
| Nordex Germany GmbH | 6 | 40.7 MW |
| Vestas Deutschland GmbH | 9 | 37.5 MW |
| Nordex SE | 2 | 14.0 MW |
| Tacke GmbH & Co. KG | 7 | 3.85 MW |
| Enron Wind GmbH | 1 | 2.00 MW |
| Sonstige | 6 | 0.87 MW |
| NEG Micon Deutschland GmbH | 1 | 0.60 MW |
| Siemens Wind Power GmbH & Co. KG | 1 | 0.45 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 1 | 0.45 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Wittmund (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.