Germany · renewables
Wind power in Vechta
74 wind turbines with 201.9 MW of gross capacity were in operation in Vechta (Niedersachsen) as of 2026-11-05, with a further 46 units (300.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Vechta (Niedersachsen), and how large are they, as of 2026-11-05?
- 74 wind turbines with 201.9 MW of gross capacity were in operation in Vechta (Niedersachsen) as of 2026-11-05, with a further 46 units (300.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Vechta?
- 74 wind turbines with 201.9 MW of gross capacity were in operation in Vechta as of 2026-11-05, with a further 46 units (300.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Vechta in 2025?
- 3 wind turbines with 12.7 MW went into operation in Vechta in 2025; the strongest year of the last two decades was 2017 with 56.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Vechta?
- EFG Energy-Farming Holding GmbH operates 11 wind turbines with 75.0 MW in Vechta, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Vechta?
- Nordex Germany GmbH leads with 25 wind turbines and 172.0 MW in Vechta (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Vechta?
- The largest registered wind turbine in Vechta has 7.00 MW of gross capacity and is operated by Landwind Planung GmbH & Co. KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Vechta distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.01 MW | 1 | 1 |
| over 100 kW | 132 | 525.0 MW | 73 | 45 |
How much wind power capacity was commissioned in Vechta each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 4 | 27.2 MW |
| 2025 | 3 | 12.7 MW |
| 2024 | 3 | 5.71 MW |
| 2022 | 3 | 10.3 MW |
| 2018 | 1 | 2.30 MW |
| 2017 | 17 | 56.8 MW |
| 2016 | 6 | 21.6 MW |
| 2013 | 1 | 2.30 MW |
| 2012 | 4 | 9.20 MW |
How many wind turbines in Vechta are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 46 | 300.5 MW |
| in operation | 74 | 201.9 MW |
| permanently decommissioned | 15 | 22.6 MW |
Which wind turbines are registered in Vechta?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| Nellinghof WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vechta-Telbrake WEA 04 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Vechta-Telbrake WEA 01 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Nellinghof WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vörden vdD WEA 1 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vörden vdD WEA 3 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vechta-Telbrake WEA 02 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Nellinghof WEA 5 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vörden vdD WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| WEA 2 im WP Elmelage | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| Vechta-Telbrake WEA 06 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Vechta-Telbrake WEA 05 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Nellinghof WEA 2 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Vechta-Telbrake WEA 03 | 7.00 MW | Nordex Energy GmbH | planned | planned 2028 | RWE Wind Onshore & PV Deutschland GmbH |
| Nellinghof WEA 6 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| Nellinghof WEA 4 | 7.00 MW | Nordex Germany GmbH | planned | planned 2028 | Landwind Planung GmbH & Co. KG |
| WEA 3 im WP Lagermühle | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 5 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-10 | Windpark Bünne-Wehdel GmbH & Co. KG |
| WEA 1 im WP Varnhorn | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 2 im WP Hausstette | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Hausstette GmbH & Co. KG |
| WEA 1 im WP Elmelage | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 1 im WP Lagermühle | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 2 im WP Lüscher Polder-Ost | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Lüscher Polder-Ost GmbH & Co. KG |
| WEA 10 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-11 | Windpark Bünne-Wehdel GmbH & Co. KG |
| WEA 2 im WP Erlte-Endel | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Erlte-Endel GmbH & Co. KG |
| WEA 5 im WP Erlte-Endel | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Erlte-Endel GmbH & Co. KG |
| WEA 1 im WP Lüscher Polder-West | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Lüscher Polder-West GmbH & Co. KG |
| WEA 4 im WP Erlte-Endel | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Erlte-Endel GmbH & Co. KG |
| WEA 3 im WP Hausstette | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Hausstette GmbH & Co. KG |
| WEA 9 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-04 | Windpark Bünne-Wehdel GmbH & Co. KG |
| WEA 2 im WP Lüscher Polder-West | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Lüscher Polder-West GmbH & Co. KG |
| WEA 2 im WP Lagermühle | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 2 im WP Varnhorn | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 4 im WP Elmelage | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 1 im WP Hausstette | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | Windpark Hausstette GmbH & Co. KG |
| WEA 11 | 6.80 MW | Nordex Energy GmbH | in operation | 2026-03-05 | Windpark Bünne-Wehdel GmbH & Co. KG |
| WEA 1 im WP Lüscher Polder-Ost | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | Windpark Lüscher Polder-Ost GmbH & Co. KG |
| WEA 3 im WP Varnhorn | 6.80 MW | Nordex Energy GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 5 im WP Elmelage | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 3 im WP Elmelage | 6.80 MW | Nordex Germany GmbH | planned | planned 2028 | EFG Energy-Farming Holding GmbH |
| WEA 3 im WP Erlte-Endel | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Erlte-Endel GmbH & Co. KG |
| WEA 1 im WP Erlte-Endel | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Erlte-Endel GmbH & Co. KG |
| Windpark Krimpenfort WEA 02 | 5.70 MW | Nordex SE | in operation | 2024-05-29 | UMania GmbH & Co. Windpark Krimpenfort KG |
| Neuenkirchen-Vörden WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| Neuenkirchen-Vörden WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Holtrup WEA 03 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Neuenkirchen-Vörden WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WP Holtrup WEA 02 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| WP Holtrup WEA 01 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Westwind Projektierungs GmbH & Co. KG |
| Neuenkirchen-Vörden WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Alterric Deutschland GmbH |
| WEA 05 ENERCON E-138 EP3 E3 | 4.26 MW | ENERCON GmbH | in operation | 2025-03-31 | Windpark Krimpenfort GmbH & Co. KG |
| WEA 02 | 4.20 MW | ENERCON GmbH | in operation | 2025-05-02 | Windpark Deine GmbH & Co. KG |
| WEA 01 | 4.20 MW | ENERCON GmbH | in operation | 2025-05-02 | Windpark Deine GmbH & Co. KG |
| WEA 01 (E-1270010) | 4.20 MW | ENERCON GmbH | in operation | 2017-01-26 | WP Holdorf GmbH & Co. KG |
| WEA 06 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-30 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 12 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-09-26 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 07 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-09-26 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 04 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-30 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 05 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-27 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 03 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-21 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 01 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-19 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 09 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-09-20 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 02 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2016-12-19 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 11 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-08-31 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 08 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-09-28 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 10 | 3.60 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2017-09-29 | WPD Windpark Damme Gmbh & Co.KG |
| WEA 8 - 242426 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2022-04-28 | Bürgerwindpark Bakum West GmbH & Co. KG |
| WEA 5 - 242424 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2022-04-28 | Bürgerwindpark Bakum West GmbH & Co. KG |
| WEA 7 - 242425 | 3.45 MW | Vestas Deutschland GmbH | in operation | 2022-04-28 | Bürgerwindpark Bakum West GmbH & Co. KG |
| Vörden Landwind 01 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-08-08 | Vörden Landwind 01 GmbH & Co.KG |
| Vörden Landwind 05 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-25 | Vörden Landwind 01 GmbH & Co.KG |
| Vörden Landwind 02 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-27 | Vörden Landwind 01 GmbH & Co.KG |
| Vörden Landwind 06 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-08-18 | Vörden Landwind 06 GmbH & Co.KG |
| Vörden Landwind 07 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-08-23 | Vörden Landwind 07 GmbH & Co.KG |
| Vörden Landwind 03 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-28 | Vörden Landwind 01 GmbH & Co.KG |
| Vörden Landwind 04 GmbH & Co. KG | 3.23 MW | GE Wind Energy GmbH | in operation | 2017-07-28 | Vörden Landwind 01 GmbH & Co.KG |
| WEA 02 ENERCON 1150928 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-29 | Windpark Krimpenfort GmbH & Co. KG |
| WEA 01 ENERCON 1150929 | 3.00 MW | ENERCON GmbH | in operation | 2017-09-15 | Windpark Krimpenfort GmbH & Co. KG |
| Windpark_Krimpenfort_WEA_01 | 2.35 MW | ENERCON GmbH | in operation | 2017-08-11 | UMania GmbH & Co. Windpark Krimpenfort KG |
| Bürgerwindrad Varenesch | 2.30 MW | ENERCON GmbH | in operation | 2018-06-15 | Bürgerwindrad Varenesch GmbH & Co. KG |
| 824584 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | Windpark Holzkämpe |
| 824586 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | Windpark Holzkämpe |
| WEA 825168 | 2.30 MW | ENERCON GmbH | in operation | 2013-04-18 | Agrowind Steinfeld GmbH & Co. KG |
| 824585 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | Windpark Holzkämpe |
| 824587 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-06 | Windpark Holzkämpe |
| V 17953-04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-10-31 | Windpark Lohne GmbH & Co. KG Renditefonds |
| V 17951-02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-12 | Windpark Lohne GmbH & Co. KG Renditefonds |
| V 17950-01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-14 | Windpark Lohne GmbH & Co. KG Renditefonds |
| Windpark Langwege | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-11 | All in Energy Windpark Langwege GmbH |
| windagrar AiE WP Steinfeld WEA 1 | 2.00 MW | AN Windenergie GmbH | in operation | 2004-12-23 | All in Energy Windpark Steinfeld GmbH |
| windagrar AiE WP Steinfeld WEA 2 | 2.00 MW | Bonus Energy A/S | in operation | 2004-12-23 | windagrar Gesellschaft für Energieumwandlung mbH & Co. Vierte WEA KG |
| Windpark Langwege | 2.00 MW | Vestas Deutschland GmbH | in operation | 2002-11-11 | All in Energy Windpark Langwege GmbH |
| V 17952-03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-11-12 | Windpark Lohne GmbH & Co. KG Renditefonds |
| WEA 04 (E-701347) | 1.80 MW | ENERCON GmbH | in operation | 2003-08-01 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| WEA 01 (E-70593) | 1.80 MW | ENERCON GmbH | in operation | 2002-02-26 | WP Wie-Wulfenau GmbH & Co. Kommanditgesellschaft |
| WEA 09 (E-701352) | 1.80 MW | ENERCON GmbH | in operation | 2003-07-31 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| WEA 01 ( E-701344) | 1.80 MW | ENERCON GmbH | in operation | 2003-08-20 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| WEA 02 (E-70594) | 1.80 MW | ENERCON GmbH | in operation | 2002-02-26 | WP Wie-Wulfenau GmbH & Co. Kommanditgesellschaft |
| WEA 06 (E-701349) | 1.80 MW | ENERCON GmbH | in operation | 2003-07-22 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-12 | private individual |
| WEA 08 (E-701351) | 1.80 MW | ENERCON GmbH | in operation | 2003-08-12 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-09-19 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-01 | private individual |
| 70373 | 1.80 MW | ENERCON GmbH | in operation | 2001-09-13 | WPH Windpark Elmelage |
| WEA 07 (E-701350) | 1.80 MW | ENERCON GmbH | in operation | 2003-07-16 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| 70374 | 1.80 MW | ENERCON GmbH | in operation | 2001-09-13 | WPH Windpark Elmelage |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-01 | private individual |
| WEA 03 (E-701346) | 1.80 MW | ENERCON GmbH | in operation | 2003-07-29 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-09-20 | private individual |
| WEA 03 (E-70595) | 1.80 MW | ENERCON GmbH | in operation | 2002-02-26 | WP Wie-Wulfenau GmbH & Co. Kommanditgesellschaft |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-17 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-09-27 | private individual |
| WEA 02 (E-701345) | 1.80 MW | ENERCON GmbH | in operation | 2003-08-06 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-27 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-01 | private individual |
| 70375 | 1.80 MW | ENERCON GmbH | in operation | 2001-09-13 | WPH Windpark Elmelage |
| WEA 05 (E-701348) | 1.80 MW | ENERCON GmbH | in operation | 2003-08-06 | WP Höne Planungs-und Betriebs GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-10-16 | private individual |
| 70320 | 1.50 MW | REpower Systems SE | in operation | 2003-10-16 | HT Aiwanger GmbH & Co. KG |
| WP Ellenstedt - WEA 2 Bokern | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-30 | WKB - Windenergieanlagen Konrad Bokern |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-07-26 | private individual |
| WP Ellenstedt - WEA 3 Öko Energie | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-26 | Öko Energie Ellenstedt GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | Nordex Energy GmbH | permanently decommissioned | 2001-06-20 | private individual |
| Goldenstedt 1300-675-01 WEA1 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-28 | Hanse Windkraft GmbH |
| Vechta 1-1290 | 1.30 MW | Nordex Energy GmbH | in operation | 2001-07-26 | Windpark Vahrenkamp |
| ADAD GmbH & Co KG | 1.30 MW | AN Windenergie GmbH | in operation | 2004-12-20 | ADAD GmbH & Co. KG |
| Anlage 5 | 1.30 MW | Sonstige | in operation | 2004-12-20 | ADAD GmbH & Co. KG |
| WEA 02 (E-58021) | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2000-11-14 | WP Ihorst GmbH & Co. Kommanditgesellschaft |
| WEA 01 (E-58020) | 1.00 MW | ENERCON GmbH | permanently decommissioned | 2000-11-14 | WP Ihorst GmbH & Co. Kommanditgesellschaft |
| Windkraftanlage Visbek | 0.50 MW | ENERCON GmbH | in operation | 1998-10-07 | Westermann Zucht und Mast GmbH |
| 41232 | 0.50 MW | ENERCON GmbH | in operation | 1998-04-27 | LÜWI Windenergie GbR |
| 41231 | 0.50 MW | ENERCON GmbH | in operation | 1998-04-27 | LÜWI Windenergie GbR |
| Windkraftanlage Bei der Riede 2, Goldenstedt | 0.01 MW | LuvSide GmbH | in operation | 2024-04-10 | New Power Pack Goldenstedt GmbH % Co. KG |
| Windenergieanalge Listewinkel | 0.00 MW | SkyWind GmbH | permanently decommissioned | 2024-04-24 | NRgie Dienstleistungen Nicole Enneking |
| unit operated by a private individual | 0.00 MW | – | planned | planned 2025 | private individual |
Which organisations operate the most wind power capacity in Vechta?
| Operator | Units | Capacity |
|---|---|---|
| EFG Energy-Farming Holding GmbH | 11 | 75.0 MW |
| Landwind Planung GmbH & Co. KG | 9 | 63.0 MW |
| WPD Windpark Damme Gmbh & Co.KG | 12 | 43.2 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 6 | 42.0 MW |
| Windpark Erlte-Endel GmbH & Co. KG | 5 | 34.0 MW |
| Windpark Bünne-Wehdel GmbH & Co. KG | 4 | 27.2 MW |
| Alterric Deutschland GmbH | 4 | 22.2 MW |
| Windpark Hausstette GmbH & Co. KG | 3 | 20.4 MW |
| Westwind Projektierungs GmbH & Co. KG | 3 | 16.7 MW |
| WP Höne Planungs-und Betriebs GmbH & Co. KG | 9 | 16.2 MW |
Which manufacturer accounts for the most wind power capacity in Vechta?
| Manufacturer | Units | Capacity |
|---|---|---|
| Nordex Germany GmbH | 25 | 172.0 MW |
| ENERCON GmbH | 50 | 126.4 MW |
| Nordex Energy GmbH | 20 | 120.7 MW |
| Siemens Wind Power GmbH & Co. KG | 15 | 47.1 MW |
| GE Wind Energy GmbH | 7 | 22.6 MW |
| Vestas Deutschland GmbH | 9 | 22.4 MW |
| Nordex SE | 1 | 5.70 MW |
| AN Windenergie GmbH | 2 | 3.30 MW |
| Bonus Energy A/S | 1 | 2.00 MW |
| REpower Systems SE | 1 | 1.50 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Vechta (Niedersachsen), and how large are they, a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.