Germany · renewables
Wind power in Uelzen
174 wind turbines with 530.6 MW of gross capacity were in operation in Uelzen (Niedersachsen) as of 2026-11-05, with a further 76 units (460.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Uelzen (Niedersachsen), and how large are they, as of 2026-11-05?
- 174 wind turbines with 530.6 MW of gross capacity were in operation in Uelzen (Niedersachsen) as of 2026-11-05, with a further 76 units (460.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Uelzen?
- 174 wind turbines with 530.6 MW of gross capacity were in operation in Uelzen as of 2026-11-05, with a further 76 units (460.7 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Uelzen in 2025?
- 10 wind turbines with 53.4 MW went into operation in Uelzen in 2025; the strongest year of the last two decades was 2023 with 105.5 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Uelzen?
- JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG operates 14 wind turbines with 80.5 MW in Uelzen, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Uelzen?
- GE Wind Energy GmbH leads with 67 wind turbines and 283.9 MW in Uelzen (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Uelzen?
- The largest registered wind turbine in Uelzen has 7.20 MW of gross capacity and is operated by EnBW Windkraftprojekte GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Uelzen distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 7 | 0.06 MW | 4 | 1 |
| over 100 kW | 261 | 1.02 GW | 170 | 75 |
How much wind power capacity was commissioned in Uelzen each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 1 | 0.00 MW |
| 2025 | 10 | 53.4 MW |
| 2024 | 14 | 67.2 MW |
| 2023 | 20 | 105.5 MW |
| 2022 | 7 | 38.5 MW |
| 2021 | 19 | 80.7 MW |
| 2020 | 2 | 8.40 MW |
| 2019 | 4 | 10.8 MW |
| 2018 | 7 | 20.0 MW |
| 2016 | 1 | 2.20 MW |
| 2015 | 1 | 2.20 MW |
| 2014 | 4 | 9.20 MW |
| 2013 | 3 | 5.26 MW |
| 2010 | 10 | 17.6 MW |
| 2009 | 10 | 17.6 MW |
| 2008 | 1 | 1.50 MW |
| 2007 | 6 | 12.0 MW |
| 2006 | 20 | 30.5 MW |
How many wind turbines in Uelzen are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 174 | 530.6 MW |
| planned | 76 | 460.7 MW |
| permanently decommissioned | 18 | 24.1 MW |
Which wind turbines are registered in Uelzen?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WP Hohenzethen WEA 1 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | EnBW Windkraftprojekte GmbH |
| WP Hohenzethen WEA 3 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | EnBW Windkraftprojekte GmbH |
| WP Hohenzethen WEA 2 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2029 | EnBW Windkraftprojekte GmbH |
| Ue 01 | 7.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Gifhorn 1 GmbH & Co. KG |
| WEA 03 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Weste GmbH & Co. KG |
| WEA 02 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | Windpark Weste GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Aljarn GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Aljarn GmbH & Co. KG |
| WEA 5 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Aljarn GmbH & Co. KG |
| WEA 01 | 6.80 MW | Nordex Energy GmbH | planned | planned 2029 | Windpark Weste GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Aljarn GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2029 | wpd Windpark Aljarn GmbH & Co. KG |
| WEA 12 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 09 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 08 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 01 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Windpark Hanstedt II GmbH & Co. KG |
| WEA 02 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Windpark Hanstedt II GmbH & Co. KG |
| WEA 11 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 05 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 03 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 04 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 06 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 07 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Solventus WP Hanstedt II |
| WEA 10 | 6.60 MW | Siemens Gamesa Renewable Energy GmbH & Co. KG | planned | planned 2026 | Windpark Hanstedt II GmbH & Co. KG |
| Bürgerwindpark Vinstedt - WEA 2 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-06 | Bürgerwindpark Vinstedt GmbH & Co. KG in Gründung |
| NW WEA-03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Nienwohlde GmbH & Co. KG |
| NW WEA-05 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Nienwohlde GmbH & Co. KG |
| NW WEA-02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Nienwohlde GmbH & Co. KG |
| WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Energiekontor AG |
| Bürgerwindpark Vinstedt - WEA 3 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-11-06 | Bürgerwindpark Vinstedt GmbH & Co. KG in Gründung |
| WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Energiekontor AG |
| NW WEA-04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Nienwohlde GmbH & Co. KG |
| WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2026 | Energiekontor AG |
| NW WEA-01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Bürgerwindpark Nienwohlde GmbH & Co. KG |
| Bürgerwindpark Vinstedt - WEA 1 | 6.20 MW | Vestas Deutschland GmbH | in operation | 2025-12-19 | Bürgerwindpark Vinstedt GmbH & Co. KG in Gründung |
| WEA 1 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA 5 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA 3 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 5 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA Bow 04 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-12-11 | UGE Am Kesterberg GmbH & Co. KG Umweltgerechte Energie |
| WEA 2 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dörmte |
| WP Suderburg - WEA 7 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Suderburg GmbH & Co. KG |
| WP Suderburg - WEA 8 | 6.00 MW | ENERCON GmbH | planned | planned 2028 | Windpark Suderburg GmbH & Co. KG |
| WEA 9 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA Bow 02 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-02-05 | UGE Am Kesterberg GmbH & Co. KG Umweltgerechte Energie |
| WEA 12 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dörmte |
| WEA 6 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA Bow 03 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2024-02-29 | UGE Am Kesterberg GmbH & Co. KG Umweltgerechte Energie |
| WEA 3 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA 4 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA 4 K | 6.00 MW | – | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 1 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WP Suderburg - WEA 6 | 6.00 MW | ENERCON GmbH | planned | planned 2027 | Windpark Suderburg GmbH & Co. KG |
| WEA Bow 01 | 6.00 MW | Vestas Deutschland GmbH | in operation | 2023-11-16 | UGE Am Kesterberg GmbH & Co. KG Umweltgerechte Energie |
| WEA 10 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dörmte |
| WEA 13 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dörmte |
| WEA 7 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | Windpark Dörmte |
| WEA 6 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 8 | 6.00 MW | ENERCON GmbH | planned | planned 2029 | ewz Windpark Dörmte II |
| WEA 7 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 2 K | 6.00 MW | ENERCON GmbH | planned | planned 2028 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| HY3 Hoystorf 3 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2030 | Windpark Emmendorf Repowering GmbH & Co. KG |
| WP Müssingen WEA 05 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Müssingen GmbH & Co. KG |
| WP Müssingen WEA 07 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Müssingen GmbH & Co. KG |
| HY1 Hoystorf 1 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2030 | Windpark Emmendorf Repowering GmbH & Co. KG |
| WP Müssingen WEA 06 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Müssingen GmbH & Co. KG |
| HY2 Hoystorf 2 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2030 | Windpark Emmendorf Repowering GmbH & Co. KG |
| WEA 12 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt II GmbH & Co. Betriebs-KG |
| WEA 6 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 11 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 8 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WP Halligdorf 1 | 5.56 MW | ENERCON GmbH | in operation | 2024-05-16 | Windpark Halligdorf 1 GmbH & Co. KG |
| WP Halligdorf 2 | 5.56 MW | ENERCON GmbH | in operation | 2024-05-30 | Solventus WP Halligdorf 2 GmbH & Co. KG |
| WEA 5 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt II GmbH & Co. Betriebs-KG |
| WEA 17/ 3.1 | 5.56 MW | ENERCON GmbH | in operation | 2025-09-10 | get:power WP Nateln 17 |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 7 Süd | 5.56 MW | ENERCON GmbH | planned | planned 2028 | Windpark LOB |
| WEA 4 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 9 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt II GmbH & Co. Betriebs-KG |
| WEA 10 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| WEA 7 | 5.56 MW | ENERCON GmbH | planned | planned 2027 | Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG |
| 01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-14 | Tunkel Windenergie GmbH & Co KG |
| GE 552343815-01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-03-12 | wpd Windpark Klein Süstedt GmbH & Co. KG |
| GE 552205676-04 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-13 | Windpark Müssingen GmbH & Co. KG |
| WEA 07 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-04-14 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 05 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-03-23 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 04 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-03-27 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| DG-5 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-03-23 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| GE 552201371-04 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-21 | Windpark Bankewitz GmbH & Co. KG |
| GE 552206454-02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-26 | wpd Windpark Flinten GmbH & Co. KG |
| 552201374 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-02 | Windpark Bankewitz GmbH & Co. KG |
| DG-6 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-03-31 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| DG-7 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-04-26 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| WF-1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-09-21 | Bürgerwindpark Wulfstorf GmbH & Co. KG |
| 552201373 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-09-30 | Windpark Bankewitz GmbH & Co. KG |
| WEA 02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-05-09 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WEA 5 Süd | 5.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark LOB |
| DG-3 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-01-31 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| GE 552201372-05 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-09-20 | Windpark Bankewitz GmbH & Co. KG |
| WEA 06 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-04-22 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| GE 552201375-08 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-07 | Windpark Bankewitz GmbH & Co. KG |
| DG-1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-02-25 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| GE 552205675-02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-12 | Windpark Müssingen GmbH & Co. KG |
| WEA 03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-05-19 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| GE 552206455-03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-26 | wpd Windpark Flinten GmbH & Co. KG |
| GE 552205673-03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-13 | Windpark Müssingen GmbH & Co. KG |
| GE 552206456-04 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-27 | wpd Windpark Flinten GmbH & Co. KG |
| KLNSÜ-WEA-4 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-03-12 | Hätzer Heide Wind GmbH & Co. KG |
| DG-2 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-02-05 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| GE 552343814-02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-03-12 | wpd Windpark Klein Süstedt GmbH & Co. KG |
| GE 552343813-03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2025-03-12 | wpd Windpark Klein Süstedt GmbH & Co. KG |
| WEA 01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-05-12 | JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG |
| WF-2 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-09-26 | Bürgerwindpark Wulfstorf GmbH & Co. KG |
| GE 552206453-01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-25 | wpd Windpark Flinten GmbH & Co. KG |
| GE 552201370-03 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-18 | Windpark Bankewitz GmbH & Co. KG |
| WEA 6 Süd | 5.50 MW | ENERCON GmbH | planned | planned 2028 | Windpark LOB |
| DG-4 | 5.50 MW | GE Wind Energy GmbH | in operation | 2022-03-04 | Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG |
| GE 552201369-02 | 5.50 MW | GE Wind Energy GmbH | in operation | 2023-10-21 | Windpark Bankewitz GmbH & Co. KG |
| GE 552205674-01 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-04-12 | Windpark Müssingen GmbH & Co. KG |
| WEA 3 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-18 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| WEA 5 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-10 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| WEA 4 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-14 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| WEA 6 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-11 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| WEA6 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-10-15 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA 2 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-29 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| WEA 1 | 5.30 MW | GE Wind Energy GmbH | in operation | 2021-06-14 | Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG |
| Schwienau III WEA 2 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2020-12-28 | EnBW Windkraftprojekte GmbH |
| Schwienau III WEA 1 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2020-12-23 | EnBW Windkraftprojekte GmbH |
| Schwienau III WEA 3 | 4.20 MW | Vestas Deutschland GmbH | in operation | 2021-01-14 | EnBW Windkraftprojekte GmbH |
| WEA4 | 3.63 MW | GE Wind Energy GmbH | in operation | 2021-09-24 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA5 | 3.63 MW | GE Wind Energy GmbH | in operation | 2021-10-02 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA3 | 3.63 MW | GE Wind Energy GmbH | in operation | 2021-10-27 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA1 | 3.63 MW | GE Wind Energy GmbH | in operation | 2021-09-03 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA2 | 3.63 MW | GE Wind Energy GmbH | in operation | 2021-09-08 | Bürgerwindpark Altenmedingen Betreibergesellschaft mbH & Co. KG |
| WEA 04 | 3.60 MW | Nordex SE | in operation | 2019-01-17 | PNE WIND Park XIX |
| WP Mehlenkamp WEA 01 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-11-06 | EE Süstedt ApS & Co. KG |
| WEA 05 | 3.60 MW | Nordex SE | in operation | 2019-01-25 | PNE WIND Park XIX |
| BWP Wellendorf WEA 2 | 3.60 MW | GE Wind Energy GmbH | in operation | 2021-04-20 | Bürgerwindpark Wellendorf Betreibergesellschaft mbH & Co. KG |
| WEA 06 | 3.60 MW | Nordex Energy GmbH | in operation | 2019-01-16 | PNE WIND Park XIX |
| Gerdau WEA 01 | 3.60 MW | Nordex Energy GmbH | in operation | 2018-12-13 | PNE WIND Park XIX |
| BWP Wellendorf WEA 1 | 3.60 MW | GE Renewable Germany GmbH | in operation | 2021-04-20 | Bürgerwindpark Wellendorf Betreibergesellschaft mbH & Co. KG |
| WEA 03 | 3.60 MW | Nordex Energy GmbH | in operation | 2018-12-13 | PNE WIND Park XIX |
| WP Mehlenkamp WEA 02 | 3.60 MW | Nordex Energy GmbH | in operation | 2025-11-06 | EE Süstedt ApS & Co. KG |
| WEA 02 | 3.60 MW | Nordex SE | in operation | 2018-12-21 | PNE WIND Park XIX |
| WEA 14 | 3.50 MW | VENSYS Energy AG | in operation | 2021-09-09 | Windpark Nateln GmbH & Co. KG |
| WEA 3 | 3.50 MW | VENSYS Energy AG | in operation | 2021-01-14 | Bürgerwind Uelzen 1 GmbH & Co. KG |
| WEA 15 | 3.50 MW | VENSYS Energy AG | in operation | 2021-09-09 | Windpark Nateln GmbH & Co. KG |
| WEA 4.1 | 3.50 MW | VENSYS Energy AG | in operation | 2021-09-24 | Bürgerwind Uelzen 2 GmbH & Co. KG |
| E 1010372-01 | 3.05 MW | ENERCON GmbH | in operation | 2013-09-19 | Swisspower Renewables Wind 2 GmbH |
| WP Nateln WEA 12 (NX85507) | 2.40 MW | Nordex Energy GmbH | in operation | 2018-02-22 | Windpark Nateln 12 GmbH & Co. KG |
| WP Nateln WEA 11 (NX85506) | 2.40 MW | Nordex Energy GmbH | in operation | 2018-02-15 | Windpark Nateln 11 GmbH & Co. KG |
| WP Nateln WEA 13 (NX85508) | 2.40 MW | Nordex Energy GmbH | in operation | 2018-02-12 | Windpark Nateln 13 GmbH & Co. KG |
| 784367 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-22 | Windpark GmbH & Co. Haaßel KG |
| 784365 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-23 | Windpark GmbH & Co. Haaßel KG |
| 784368 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-23 | Windpark GmbH & Co. Haaßel KG |
| 784366 | 2.30 MW | ENERCON GmbH | in operation | 2014-12-22 | Windpark GmbH & Co. Haaßel KG |
| NAT 10 eno100010 | 2.20 MW | eno energy GmbH | in operation | 2016-01-14 | Windpark Nateln 10 GmbH & Co. KG |
| SUD 03 eno920022 | 2.20 MW | eno energy GmbH | in operation | 2013-12-22 | Windpark Böddenstedt GmbH & Co. KG |
| NAT 09 eno100009 | 2.20 MW | eno energy GmbH | in operation | 2015-12-30 | Windpark Nateln 9 GmbH & Co. KG |
| SUD 04 R91316 | 2.05 MW | REpower Systems SE | in operation | 2010-10-15 | Bürgerwindpark Suderburg GmbH & Co. KG |
| unit operated by a private individual | 2.05 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-06-24 | private individual |
| Planet energy Windpark Langenbrügge GmbH & Co. KG - 901026 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-01-06 | Planet energy Windpark Langenbrügge GmbH & Co. KG |
| WEA 16211 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-16 | Windpark Emmendorf GmbH & Co. KG |
| Windpark Brauel 2 WEA01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | Windpark Brauel II GmbH & Co. WP BR II KG |
| WEA 16210 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-11 | Windpark Emmendorf GmbH & Co. KG |
| WEA 16215 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-17 | Windpark Emmendorf GmbH & Co. KG |
| WEA 16213 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-18 | Windpark Emmendorf GmbH & Co. KG |
| Planet energy Windpark Suderburg GmbH & Co. KG - WEA 5 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-06-17 | Planet energy Windpark Suderburg GmbH & Co. KG |
| WEA 16216 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-17 | Windpark Emmendorf GmbH & Co. KG |
| V 24131 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-01-25 | EOS Windpark Masendorf GmbH & Co. KG |
| SOWIWAS - Westerweyhe GmbH & Co.KG | 2.00 MW | ENERCON GmbH | in operation | 2010-05-18 | SOWIWAS - Westerweyhe GmbH & Co.KG |
| V 24130 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-02-21 | EOS Windpark Masendorf GmbH & Co. KG |
| V 24133 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-02-08 | EOS Windpark Masendorf GmbH & Co. KG |
| V 24128 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-01-19 | EOS Windpark Masendorf GmbH & Co. KG |
| Planet energy Windpark Suderburg GmbH & Co. KG - WEA 2 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-06-15 | Planet energy Windpark Suderburg GmbH & Co. KG |
| Windpark Brauel 2 WEA02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | Windpark Brauel II GmbH & Co. WP BR II KG |
| unit operated by a private individual | 2.00 MW | Vestas Deutschland GmbH | permanently decommissioned | 2004-06-30 | private individual |
| LOB 04 (sen100365) | 2.00 MW | Senvion Deutschland GmbH | in operation | 2018-01-15 | Windpark Langenbrügge 4 GmbH & Co. KG |
| SOWIWAS - Westerweyhe GmbH & Co.KG | 2.00 MW | ENERCON GmbH | in operation | 2010-06-01 | SOWIWAS - Westerweyhe GmbH & Co.KG |
| Schwienau_II WEA 18 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | EnBW Onshore Portfolio GmbH |
| Schwienau_II WEA 15 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-05 | EnBW Onshore Portfolio GmbH |
| Planet energy Windpark Suderburg GmbH & Co. KG - WEA 1 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-06-09 | Planet energy Windpark Suderburg GmbH & Co. KG |
| WEA 16209 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-05 | Windpark Emmendorf GmbH & Co. KG |
| Windpark Brauel 2 WEA03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | Windpark Brauel II GmbH & Co. WP BR II KG |
| WEA 16214 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-17 | Windpark Emmendorf GmbH & Co. KG |
| V 24129 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-02-13 | EOS Windpark Masendorf GmbH & Co. KG |
| Schwienau_II WEA 17 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | EnBW Onshore Portfolio GmbH |
| Schwienau_II WEA 16 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | EnBW Onshore Portfolio GmbH |
| WEA 16212 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2003-06-12 | Windpark Emmendorf GmbH & Co. KG |
| Planet energy Windpark Langenbrügge GmbH & Co. KG - 901025 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-01-14 | Planet energy Windpark Langenbrügge GmbH & Co. KG |
| V 24127 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-02-14 | EOS Windpark Masendorf GmbH & Co. KG |
| Schwienau_II WEA 14 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-02-02 | EnBW Onshore Portfolio GmbH |
| V 24132 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-12-30 | EOS Windpark Masendorf GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-08-13 | private individual |
| HW 06 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-19 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| WEA 07 (R70598) | 1.50 MW | REpower Systems SE | in operation | 2006-10-09 | Bürgerwindpark Nateln GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2002-12-01 | private individual |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-12-27 | private individual |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-12-01 | private individual |
| R 70592 | 1.50 MW | REpower Systems SE | in operation | 2006-10-16 | ewz Windpark Dörmte GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-12-27 | private individual |
| WEA 13 | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2002-12-09 | Host Windpower |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-12-01 | private individual |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2003-08-12 | private individual |
| HW 11 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-01-30 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| R 70587 | 1.50 MW | REpower Systems SE | in operation | 2006-08-25 | ewz Windpark Dörmte GmbH |
| HW 02 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| WEA 08 (R70599) | 1.50 MW | REpower Systems SE | in operation | 2006-11-02 | Windpark Nateln GmbH & Co. KG |
| R 70603 | 1.50 MW | REpower Systems SE | in operation | 2006-11-03 | ewz Windpark Dörmte GmbH |
| BR 03 | 1.50 MW | Fuhrländer AG | in operation | 2002-12-19 | Energiekontor Ökofonds GmbH & Co. WP BR KG |
| WP Hanstedt II, WEA 11 (GE15560486) | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2002-12-01 | Windpark Hanstedt 3 GmbH & Co. KG |
| R 70593 | 1.50 MW | REpower Systems SE | in operation | 2006-10-24 | ewz Windpark Dörmte GmbH |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2006-10-06 | private individual |
| R 70589 | 1.50 MW | REpower Systems SE | in operation | 2006-10-19 | ewz Windpark Dörmte GmbH |
| HW 03 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-13 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| BR 01 | 1.50 MW | Fuhrländer AG | in operation | 2002-12-13 | Energiekontor Ökofonds GmbH & Co. WP BR KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-12-27 | private individual |
| WEA 06 (R70597) | 1.50 MW | REpower Systems SE | in operation | 2006-09-29 | Windpark Nateln GmbH & Co. KG |
| HW 05 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-18 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| Lehmke Windenergie | 1.50 MW | REpower Systems SE | in operation | 2008-01-01 | Lehmke Windenergie |
| HW 04 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-12 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| R 70590 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2006-10-26 | ewz Windpark Dörmte GmbH |
| BR 02 | 1.50 MW | Fuhrländer AG | in operation | 2002-12-20 | Energiekontor Ökofonds GmbH & Co. WP BR KG |
| HW 09 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-01-29 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| HW 08 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-20 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| HW 01 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-18 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| BR 04 | 1.50 MW | Fuhrländer AG | in operation | 2003-01-10 | Energiekontor Ökofonds GmbH & Co. WP BR KG |
| R 70591 | 1.50 MW | REpower Systems SE | in operation | 2006-10-24 | ewz Windpark Dörmte GmbH |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-12-27 | private individual |
| WEA 02 (R70596) | 1.50 MW | REpower Systems SE | in operation | 2006-09-29 | Windpark Nateln GmbH & Co. KG |
| R 70586 | 1.50 MW | REpower Systems SE | in operation | 2006-08-23 | ewz Windpark Dörmte GmbH |
| R 70588 | 1.50 MW | REpower Systems SE | in operation | 2006-10-17 | ewz Windpark Dörmte GmbH |
| HW 10 | 1.50 MW | GE Wind Energy GmbH | in operation | 2002-01-25 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| R 70602 | 1.50 MW | REpower Systems SE | in operation | 2006-10-26 | ewz Windpark Dörmte GmbH |
| R 70601 | 1.50 MW | REpower Systems SE | in operation | 2006-11-09 | ewz Windpark Dörmte GmbH |
| WP Nateln | 1.50 MW | REpower Systems SE | in operation | 2006-09-27 | EE Rosche GmbH & Co. KG |
| HW 07 | 1.50 MW | GE Wind Energy GmbH | in operation | 2001-12-19 | Energiekontor Windstrom GmbH & Co. ÜWP HW KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-12-27 | private individual |
| WP Hanstedt II, WEA 10 (GE15560487) | 1.50 MW | General Electric Deutschland Holding GmbH | in operation | 2002-12-01 | Windpark Hanstedt 3 GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | GE Wind Energy GmbH | permanently decommissioned | 2002-12-27 | private individual |
| WEA 01 (R70595) | 1.50 MW | REpower Systems SE | in operation | 2006-09-29 | Windpark Nateln GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | REpower Systems SE | permanently decommissioned | 2006-10-24 | private individual |
| unit operated by a private individual | 1.50 MW | General Electric Deutschland Holding GmbH | permanently decommissioned | 2002-12-01 | private individual |
| Stöcken Wind | 0.80 MW | ENERCON GmbH | in operation | 2009-11-06 | Stöcken Wind GbR |
| Stöcken1 | 0.80 MW | ENERCON GmbH | in operation | 2009-11-05 | Windwerk Krummhörn GmbH & Co.KG |
| Ohbergs GbR | 0.80 MW | ENERCON GmbH | in operation | 2010-04-20 | Ohbergs GbR |
| Ohbergs GbR | 0.80 MW | ENERCON GmbH | in operation | 2010-04-20 | Ohbergs GbR |
| 441581 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-24 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441579 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-16 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441570 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-16 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441571 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-16 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| WEA2 | 0.60 MW | ENERCON GmbH | in operation | 2001-08-14 | Äolus GbR |
| 441580 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-24 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441569 | 0.60 MW | ENERCON GmbH | in operation | 2002-12-29 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441568 | 0.60 MW | ENERCON GmbH | in operation | 2002-12-28 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| 441582 | 0.60 MW | ENERCON GmbH | in operation | 2003-04-30 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| WEA1 | 0.60 MW | ENERCON GmbH | in operation | 2001-08-16 | Äolus GbR |
| 441567 | 0.60 MW | ENERCON GmbH | in operation | 2002-12-28 | Loccumer Windparkbetriebsgesellschaft mit beschränkter Haftung |
| unit operated by a private individual | 0.50 MW | ENERCON GmbH | permanently decommissioned | 1998-12-10 | private individual |
| unit operated by a private individual | 0.03 MW | Sonstige | in operation | 2024-11-06 | private individual |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | permanently decommissioned | 2013-03-28 | private individual |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | permanently decommissioned | 2019-02-20 | private individual |
| unit operated by a private individual | 0.01 MW | – | in operation | 2024-08-23 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2026-09-05 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | in operation | 2023-07-25 | private individual |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2023 | private individual |
Which organisations operate the most wind power capacity in Uelzen?
| Operator | Units | Capacity |
|---|---|---|
| JWE Bürgerwindpark Könau-Ostedt-Suhlendorf GmbH & Co. KG | 14 | 80.5 MW |
| Solventus WP Hanstedt II | 9 | 59.4 MW |
| Windpark Altenmedingen-Römstedt GmbH & Co. Betriebs-KG | 9 | 50.0 MW |
| ewz Windpark Dörmte II | 7 | 42.0 MW |
| Windpark Müssingen GmbH & Co. KG | 7 | 38.8 MW |
| Bürgerwindpark Dalldorf-Grabau GmbH & Co. KG | 7 | 38.5 MW |
| Windpark Bankewitz GmbH & Co. KG | 7 | 38.5 MW |
| EnBW Windkraftprojekte GmbH | 6 | 34.2 MW |
| wpd Windpark Aljarn GmbH & Co. KG | 5 | 34.0 MW |
| Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG | 6 | 31.8 MW |
Which manufacturer accounts for the most wind power capacity in Uelzen?
| Manufacturer | Units | Capacity |
|---|---|---|
| GE Wind Energy GmbH | 67 | 283.9 MW |
| ENERCON GmbH | 63 | 259.5 MW |
| Vestas Deutschland GmbH | 52 | 210.0 MW |
| Siemens Gamesa Renewable Energy GmbH & Co. KG | 12 | 79.2 MW |
| Nordex Germany GmbH | 7 | 47.6 MW |
| Nordex Energy GmbH | 9 | 32.0 MW |
| REpower Systems SE | 20 | 30.6 MW |
| VENSYS Energy AG | 4 | 14.0 MW |
| Senvion Deutschland GmbH | 7 | 13.5 MW |
| General Electric Deutschland Holding GmbH | 8 | 12.0 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Uelzen (Niedersachsen), and how large are they, a can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.