Germany · renewables
Wind power in Peine
108 wind turbines with 311.0 MW of gross capacity were in operation in Peine (Niedersachsen) as of 2026-11-05, with a further 5 units (22.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Peine (Niedersachsen), and how large are they, as of 2026-11-05?
- 108 wind turbines with 311.0 MW of gross capacity were in operation in Peine (Niedersachsen) as of 2026-11-05, with a further 5 units (22.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Peine?
- 108 wind turbines with 311.0 MW of gross capacity were in operation in Peine as of 2026-11-05, with a further 5 units (22.4 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Peine in 2025?
- 6 wind turbines with 33.6 MW went into operation in Peine in 2025; the strongest year of the last two decades was 2024 with 61.9 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Peine?
- Windpark Bierbergen-Solschen GmbH & Co. KG operates 5 wind turbines with 28.0 MW in Peine, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Peine?
- Vestas Deutschland GmbH leads with 31 wind turbines and 151.3 MW in Peine (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Peine?
- The largest registered wind turbine in Peine has 7.20 MW of gross capacity and is operated by Windpark Bründeln GmbH & Co. KG, commissioned 2026-07-30 (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Peine distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 0 | 1 |
| over 100 kW | 122 | 350.4 MW | 108 | 4 |
How much wind power capacity was commissioned in Peine each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 2 | 12.8 MW |
| 2025 | 6 | 33.6 MW |
| 2024 | 11 | 61.9 MW |
| 2023 | 6 | 33.6 MW |
| 2018 | 2 | 8.40 MW |
| 2017 | 9 | 25.9 MW |
| 2016 | 4 | 11.9 MW |
| 2015 | 1 | 3.37 MW |
| 2014 | 4 | 12.4 MW |
| 2012 | 5 | 11.5 MW |
| 2011 | 2 | 4.30 MW |
| 2010 | 5 | 12.8 MW |
| 2009 | 3 | 6.00 MW |
| 2007 | 4 | 8.00 MW |
| 2006 | 7 | 13.5 MW |
How many wind turbines in Peine are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 108 | 311.0 MW |
| planned | 5 | 22.4 MW |
| permanently decommissioned | 10 | 17.0 MW |
Which wind turbines are registered in Peine?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| RP08 Clauen Repowering | 7.20 MW | Vestas Deutschland GmbH | in operation | 2026-07-30 | Windpark Bründeln GmbH & Co. KG |
| WP Mehrum WEA 15 Repowering | 7.00 MW | Nordex Energy GmbH | planned | planned 2027 | E&U GmbH |
| Barbecke 1 Repowering WEA 01 | 5.70 MW | Nordex SE | in operation | 2024-11-28 | RWE Wind Onshore & PV Deutschland GmbH |
| Barbecke 1 Repowering WEA 02 | 5.70 MW | Nordex SE | in operation | 2024-11-15 | RWE Wind Onshore & PV Deutschland GmbH |
| Barbecke 1 Repowering WEA 03 | 5.70 MW | Nordex SE | in operation | 2024-11-27 | RWE Wind Onshore & PV Deutschland GmbH |
| WEA 05 - V253042 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2026-01-21 | Windpark Bierbergen-Solschen GmbH & Co. KG |
| 250577 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-06 | enercity Windpark Münstedt II GmbH & Co. KG |
| 250578 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-05 | enercity Windpark Münstedt II GmbH & Co. KG |
| WP Solschen III WKA Ost | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-08-31 | Wind Power GmbH & Co. Bürgerwindpark Solschen III KG |
| WEA 01 - V253038 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-12-18 | Windpark Bierbergen-Solschen GmbH & Co. KG |
| WP Oelerse V Rep. 1. BA WEA 45 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| WP Münstedt MUE WEA 5 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-12 | Windpark Münstedt-Lahstedt GmbH & Co. KG |
| WP Solschen III WKA Mitte | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-07-13 | Windpark Solschen GmbH & Co. KG |
| WEA 02 - V253039 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-12-18 | Windpark Bierbergen-Solschen GmbH & Co. KG |
| WP Münstedt MUE WEA 8 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-20 | Windpark Münstedt-Lahstedt GmbH & Co. KG |
| WEA 04 - V253041 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-12-19 | Windpark Bierbergen-Solschen GmbH & Co. KG |
| WP Oelerse IX WEA 40 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-12-20 | Windpark Oelerse IX GmbH & Co. KG |
| Windpark Oelerse X WEA 42 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-08-20 | Windpark Oelerse X GmbH & Co. KG |
| WP Münstedt MUE WEA 7 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-20 | Windpark Münstedt-Lahstedt GmbH & Co. KG |
| WP Oelerse IX WEA 38 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-12-20 | Windpark Oelerse IX GmbH & Co. KG |
| WP Oelerse IX WEA 39 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-12-20 | Windpark Oelerse IX GmbH & Co. KG |
| WP Oelerse V Rep. 1. BA WEA 47 | 5.60 MW | Vestas Deutschland GmbH | planned | planned 2026 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| Windpark Oelerse X WEA 41 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-09-20 | Windpark Oelerse X GmbH & Co. KG |
| WP Solschen III WKA West | 5.60 MW | Vestas Deutschland GmbH | in operation | 2023-07-27 | Wind Power GmbH & Co. Bürgerwindpark Solschen III KG |
| 250579 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-05 | enercity Windpark Münstedt II GmbH & Co. KG |
| WEA 03 - V253040 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2025-12-18 | Windpark Bierbergen-Solschen GmbH & Co. KG |
| 250580 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-05 | enercity Windpark Münstedt II GmbH & Co. KG |
| WP Münstedt MUE WEA 4 | 5.60 MW | Vestas Deutschland GmbH | in operation | 2024-12-16 | Windpark Münstedt-Lahstedt GmbH & Co. KG |
| WEA 03 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-20 | Windpark Hofschwicheldt GmbH & Co. KG |
| WEA 04 | 4.20 MW | ENERCON GmbH | in operation | 2018-06-19 | Windpark Hofschwicheldt GmbH & Co. KG |
| MEH 02 RP | 4.20 MW | ENERCON GmbH | planned | planned 2027 | RENNERT Energieprojekte GmbH |
| WP Klein Solschen WEA 2 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2014-02-18 | Blowwind Schaper GmbH & Co. KG |
| WP Clauen II WEA 5 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2010-12-29 | Wind Power GmbH & Co. Windpark Clauen III KG |
| WP Clauen II WEA 4 | 3.37 MW | Senvion Deutschland GmbH | in operation | 2010-12-14 | Wind Power GmbH & Co. Windpark Clauen III KG |
| WEA Haskampsmühle | 3.37 MW | Senvion Deutschland GmbH | in operation | 2015-01-19 | Haskampsmühle GmbH & Co. KG |
| Oelerse VIIIb RP03 | 3.30 MW | Vestas Deutschland GmbH | in operation | 2017-09-15 | Windpark Oelerse VIII GmbH & Co. KG |
| WP Schwicheldt WEA 4 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-10-20 | Thopa GmbH & Co. Oelerse V KG |
| WP Schwicheldt WEA 2 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-09-29 | Thopa GmbH & Co. IV. Bonus KG |
| WP Schwicheldt WEA 5 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-10-31 | Wind-Power GmbH & Co. Repowering IV KG |
| WP Schwicheldt WEA 1 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2017-09-26 | windagrar WEA Schwicheldt GmbH & Co. Fünfte KG |
| WEA 01 | 3.05 MW | ENERCON GmbH | in operation | 2014-10-07 | Energiepark Hofschwicheldt GmbH & Co. KG |
| WEA 02 | 3.00 MW | ENERCON GmbH | in operation | 2014-10-07 | Energiepark Hofschwicheldt GmbH & Co. KG |
| WEA 06 | 3.00 MW | ENERCON GmbH | in operation | 2017-02-16 | Windenergie Hofschwicheldt GmbH & Co. KG |
| WP Mehrum WEA 12 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2014-08-26 | Thopa GmbH & Co. Betriebs KG |
| WP Mehrum WEA 10 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2016-08-29 | Wind-Power GmbH & Co. Repowering X KG |
| WP Mehrum WEA 11 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2016-08-29 | LWP GmbH & Co. Windpark Mehrum KG |
| WP Schwicheldt WEA 8 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2016-09-14 | Wind-Power GmbH & Co. Repowering VIII KG |
| WP Mehrum WEA 13 | 2.97 MW | Senvion Deutschland GmbH | in operation | 2016-09-08 | Wind-Power GmbH & Co. Repowering XIII KG |
| Oelerse VIII RP01 | 2.35 MW | ENERCON GmbH | in operation | 2017-09-28 | Windpark Oelerse VIII GmbH & Co. KG |
| Oelerse VIII RP02 | 2.35 MW | ENERCON GmbH | in operation | 2017-10-26 | Windpark Oelerse VIII GmbH & Co. KG |
| Oelerse VII WEA 1 | 2.30 MW | ENERCON GmbH | in operation | 2012-10-19 | Windpark Oelerse VII GmbH & Co. KG |
| AN-19-636 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2005-11-10 | Windpark Oelerse II ApS & Co. KG |
| Oelerse VII WEA 4 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-20 | Windpark Oelerse VII GmbH & Co. KG |
| Oelerse VII WEA 2 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-01 | Windpark Oelerse VII GmbH & Co. KG |
| AN 2300-638-18 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2005-11-08 | Windpark Oelerse I GmbH & Co. KG |
| AN 2300-637-21 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2005-11-23 | Windpark Oelerse IV GmbH & Co. KG |
| Oelerse VII WEA 3 | 2.30 MW | ENERCON GmbH | in operation | 2012-11-19 | Windpark Oelerse VII GmbH & Co. KG |
| MEH 01 | 2.30 MW | ENERCON GmbH | in operation | 2011-12-16 | RENNERT Energieprojekte GmbH |
| WP Solschen WEA 2 | 2.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-11-01 | Wind Power GmbH & Co. Windpark Solschen KG |
| Enercon E 82 | 2.30 MW | ENERCON GmbH | in operation | 2012-12-12 | Helios-Sonterra GmbH & Co. KG |
| WP Leiberg WEA 1 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-01 | JARN Wind GbR |
| WP Leiberg WEA 3 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2017-08-31 | Wind-Power GmbH & Co. Windpark Leiberg KG |
| WP Leiberg WEA 2 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2010-06-01 | Wind-Power GmbH & Co. Windpark Leiberg KG |
| LA02 Lahstedt 02 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-01 | ENOVA Windpark Lahstedt GmbH & Co. KG |
| LA03 Lahstedt 03 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-06 | ENOVA Windpark Lahstedt GmbH & Co. KG |
| LA02 Lahstedt 05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-02-24 | ENOVA Windpark Lahstedt GmbH & Co. KG |
| WEA Schacht Konrad | 2.00 MW | ENERCON GmbH | in operation | 2007-06-11 | Ventus GmbH & Co. KG |
| WP Bierbergen WEA 1 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2006-12-28 | Wind Power GmbH & Co. Windenergie Bierbergen KG |
| MEH 02 | 2.00 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2002-11-08 | RENNERT Energieprojekte GmbH |
| WKA Osterteich | 2.00 MW | ENERCON GmbH | in operation | 2011-11-24 | WKA Osterteich GmbH & Co. KG |
| Auguste Energie GmbH | 2.00 MW | – | in operation | 2004-11-22 | Auguste Energie GmbH |
| LA04 Lahstedt 04 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-03-03 | ENOVA Windpark Lahstedt GmbH & Co. KG |
| LA02 Lahstedt 01 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2006-02-14 | ENOVA Windpark Lahstedt GmbH & Co. KG |
| WP Clauen II WEA 1 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2009-10-30 | Wind Power GmbH & Co. Windpark Engelrod KG |
| WP Clauen II WEA 2 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2009-10-22 | Wind Power GmbH & Co. Windpark Engelrod KG |
| WEA 05 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2007-11-08 | Windenergie Hofschwicheldt GmbH & Co. KG |
| Groß Bülten WEA1 | 2.00 MW | ENERCON GmbH | in operation | 2009-04-17 | Windpark Groß Bülten GmbH & Co. KG |
| 781541_Lesse C | 2.00 MW | ENERCON GmbH | in operation | 2007-09-03 | RWE Wind Onshore & PV Deutschland GmbH |
| WP Clauen II WEA 3 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2010-10-08 | Wind-Ganz GbR |
| WP Klein Solschen WEA 1 | 2.00 MW | Senvion Deutschland GmbH | in operation | 2007-09-28 | Wind Power GmbH & Co. Beteiligungs KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-04 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-04 | private individual |
| WEA Alvesse A03 | 1.80 MW | ENERCON GmbH | in operation | 2002-04-12 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-05 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-20 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-04 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-03 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-06-04 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2002-12-23 | private individual |
| WP Bierbergen WEA 2 | 1.50 MW | Senvion Deutschland GmbH | in operation | 2006-12-30 | Wind Power GmbH & Co. Windenergie Bierbergen KG |
| Oelerse IV WEA 17 | 1.30 MW | AN Windenergie GmbH | in operation | 2001-11-08 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-10-01 | private individual |
| Oelerse II WEA 07 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-29 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| WP Mehrum WEA 15 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-11-30 | Wind-Ganz GbR |
| WP Gadenstedt WEA 2 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-11-13 | Thopa GmbH & Co. Betriebs KG |
| AN-Bonus 1300 1300-263-03 (Hühnerbusch) | 1.30 MW | AN Windenergie GmbH | in operation | 2000-11-23 | AEOLOS-Oberg Windpark Peine-Süd |
| Oelerse IV WEA 14 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-10-18 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| WP Meerdorf WEA 2 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-12-13 | TBS-Transportbeton Stuttgart GmbH Investitionsgesellschaft & Co.KG |
| Oelerse II WEA 06 | 1.30 MW | AN Windenergie GmbH | in operation | 2000-06-27 | Dr. R. Leitz und N. Leitz |
| Oelerse II WEA 10 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-07-14 | WindStrom Energieanlagen GmbH & Co. KG |
| MEER 03 | 1.30 MW | AN-Maschinenbau- und Umweltschutzanlagen GmbH | in operation | 2001-12-13 | RENNERT Energieprojekte GmbH |
| WP Gadenstedt WEA 1 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-11-05 | Wind Power GmbH & Co. Windpark Gadenstedt KG |
| WP Gadenstedt WEA 3 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-11-12 | Thopa GmbH & Co. III. Bonus KG |
| AN1300-979-01 Solschen "Franzi" | 1.30 MW | AN Windenergie GmbH | in operation | 2003-10-01 | H&B erneuerbare Energien GbR |
| Oelerse II WEA 11 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-08-03 | WindStrom Energieanlagen GmbH & Co. KG |
| WP Mehrum WEA 19 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2003-12-29 | Wind Power GmbH & Co. Silberkamp KG |
| WP Mehrum WEA 16 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-04-19 | Thopa GmbH & Co. Betriebs KG |
| WEA Meerdorf | 1.30 MW | AN Windenergie GmbH | in operation | 2002-02-07 | 10. Projektgesellschaft Krummbek UG (haftungsbeschränkt) & Co. KG |
| WP Mehrum WEA 14 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-12-13 | Wind-Ganz GbR |
| WP Kakenberg WEA 1 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2002-06-26 | Wind-Power GmbH & Co. Windpark Kakenberg KG |
| Oelerse IV WEA 15 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-11-06 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| Oelerse IV WEA 16 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-11-07 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| Oelerse IV WEA 13 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2001-10-17 | WindStrom Erneuerbare Energien GmbH & Co. KG |
| WP Kakenberg WEA 2 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2002-06-28 | Wind-Power GmbH & Co. Windpark Kakenberg KG |
| unit operated by a private individual | 1.30 MW | Siemens Wind Power GmbH & Co. KG | permanently decommissioned | 2003-11-07 | private individual |
| WP Mehrum WEA 17 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2000-12-20 | WEA Mehrum GbR |
| WEA Leiberg 4 | 1.30 MW | Siemens Wind Power GmbH & Co. KG | in operation | 2005-11-18 | Wind Power GmbH & Co. Leiberg 4 KG |
| AN-Bonus 1000 1000-233-02 (mittlerer Weg) | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-21 | AEOLOS-Oberg Windpark Peine-Süd |
| AN-Bonus 1000 1000-226-01 | 1.00 MW | AN Windenergie GmbH | in operation | 1999-07-28 | AEOLOS-Oberg Windpark Peine-Süd |
| WEA Bierbergen | 0.60 MW | AN Windenergie GmbH | in operation | 1998-12-29 | Blowwind Schaper GmbH & Co. KG |
| Enercon E40 43011 (mittlerer Weg) | 0.50 MW | ENERCON GmbH | in operation | 1999-08-01 | AEOLOS-Oberg Windpark Peine-Süd |
| Enercon E40 43012 Gadenstedt | 0.50 MW | ENERCON GmbH | in operation | 1999-07-15 | AEOLOS-Oberg Windpark Peine-Süd |
| unit operated by a private individual | 0.00 MW | SkyWind GmbH | planned | planned 2024 | private individual |
Which organisations operate the most wind power capacity in Peine?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Bierbergen-Solschen GmbH & Co. KG | 5 | 28.0 MW |
| enercity Windpark Münstedt II GmbH & Co. KG | 4 | 22.4 MW |
| Windpark Münstedt-Lahstedt GmbH & Co. KG | 4 | 22.4 MW |
| WindStrom Erneuerbare Energien GmbH & Co. KG | 9 | 20.8 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 4 | 19.1 MW |
| Windpark Oelerse IX GmbH & Co. KG | 3 | 16.8 MW |
| Wind Power GmbH & Co. Bürgerwindpark Solschen III KG | 2 | 11.2 MW |
| Windpark Oelerse X GmbH & Co. KG | 2 | 11.2 MW |
| ENOVA Windpark Lahstedt GmbH & Co. KG | 5 | 10.0 MW |
| RENNERT Energieprojekte GmbH | 4 | 9.80 MW |
Which manufacturer accounts for the most wind power capacity in Peine?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 31 | 151.3 MW |
| ENERCON GmbH | 29 | 65.3 MW |
| Senvion Deutschland GmbH | 22 | 58.8 MW |
| Siemens Wind Power GmbH & Co. KG | 25 | 37.2 MW |
| Nordex SE | 3 | 17.1 MW |
| AN Windenergie GmbH | 9 | 10.4 MW |
| Nordex Energy GmbH | 1 | 7.00 MW |
| AN-Maschinenbau- und Umweltschutzanlagen GmbH | 1 | 1.30 MW |
| SkyWind GmbH | 1 | 0.00 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Peine (Niedersachsen), and how large are they, as can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.