Germany · renewables
Wind power in Osterholz
81 wind turbines with 139.2 MW of gross capacity were in operation in Osterholz (Niedersachsen) as of 2026-11-05, with a further 5 units (29.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Osterholz (Niedersachsen), and how large are they, as of 2026-11-05?
- 81 wind turbines with 139.2 MW of gross capacity were in operation in Osterholz (Niedersachsen) as of 2026-11-05, with a further 5 units (29.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Osterholz?
- 81 wind turbines with 139.2 MW of gross capacity were in operation in Osterholz as of 2026-11-05, with a further 5 units (29.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Osterholz in 2024?
- 2 wind turbines with 4.21 MW went into operation in Osterholz in 2024; the strongest year of the last two decades was 2016 with 56.8 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Osterholz?
- Windpark Hambergen GmbH & Co. KG operates 7 wind turbines with 21.4 MW in Osterholz, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Osterholz?
- ENERCON GmbH leads with 61 wind turbines and 137.0 MW in Osterholz (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Osterholz?
- The largest registered wind turbine in Osterholz has 7.00 MW of gross capacity and is operated by Alterric Deutschland GmbH, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Osterholz distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 3 | 0.03 MW | 3 | 0 |
| over 100 kW | 84 | 169.2 MW | 78 | 5 |
How much wind power capacity was commissioned in Osterholz each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2024 | 2 | 4.21 MW |
| 2023 | 1 | 0.01 MW |
| 2018 | 1 | 0.01 MW |
| 2017 | 2 | 6.10 MW |
| 2016 | 20 | 56.8 MW |
| 2015 | 8 | 24.9 MW |
| 2011 | 3 | 6.90 MW |
| 2010 | 1 | 0.80 MW |
| 2009 | 5 | 4.25 MW |
| 2008 | 1 | 0.80 MW |
| 2007 | 4 | 3.20 MW |
| 2006 | 13 | 10.4 MW |
How many wind turbines in Osterholz are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| in operation | 81 | 139.2 MW |
| planned | 5 | 29.5 MW |
| permanently decommissioned | 1 | 0.50 MW |
Which wind turbines are registered in Osterholz?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 3 Vollersode II | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Alterric Deutschland GmbH |
| WEA 1 Vollersode II | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Alterric Deutschland GmbH |
| WEA 2 Vollersode II | 7.00 MW | ENERCON GmbH | planned | planned 2030 | Alterric Deutschland GmbH |
| Lange Heide WEA 1 E-138 EP3 E3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | BFA Windkraft eGbR |
| Lange Heide WEA 2 E-138 EP3 E3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | BFA Windkraft eGbR |
| 1381165 | 4.20 MW | ENERCON GmbH | in operation | 2024-11-27 | Windpark GmbH & Co. Holste KG |
| Hahnenberg WEA 02 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-03-18 | Wind Hahnenberg GmbH & Co. KG |
| Hahnenberg WEA 03 | 3.20 MW | Senvion Deutschland GmbH | in operation | 2016-03-21 | Wind Hahnenberg GmbH & Co. KG |
| 3.2 M114 VG 300928 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-22 | Lange Heide Windkraft- Beteiligungs GmbH & Co. KG |
| Planet energy Windpark Schwanewede GmbH & Co. KG - WEA 1 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-04 | Planet energy Windpark Schwanewede GmbH & Co. KG |
| 3.2 M114 VG 300927 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-22 | Lange Heide Windkraft- Beteiligungs GmbH & Co. KG |
| Planet energy Windpark Schwanewede GmbH & Co. KG - WEA 4 | 3.17 MW | Senvion Deutschland GmbH | in operation | 2015-12-28 | Planet energy Windpark Schwanewede GmbH & Co. KG |
| 1011445 | 3.05 MW | ENERCON GmbH | in operation | 2017-11-09 | Windpark GmbH & Co. Vollersode KG |
| E 1011334-01 | 3.05 MW | ENERCON GmbH | in operation | 2016-06-29 | Windpark Hambergen GmbH & Co. KG |
| E 1011335-02 | 3.05 MW | ENERCON GmbH | in operation | 2016-08-18 | Windpark Hambergen GmbH & Co. KG |
| 03WEA1011118 | 3.05 MW | ENERCON GmbH | in operation | 2016-03-10 | Windpark Oldendorf GmbH & Co. KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2015-11-27 | Wind Klingenberg GmbH & Co. KG |
| 1011444 | 3.05 MW | ENERCON GmbH | in operation | 2017-09-26 | Windpark GmbH & Co. Vollersode KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2015-12-02 | Wind Klingenberg GmbH & Co. KG |
| E 1011339-06 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-07 | Windpark Hambergen GmbH & Co. KG |
| E 1011340-07 | 3.05 MW | ENERCON GmbH | in operation | 2016-08-18 | Windpark Hambergen GmbH & Co. KG |
| E 1011338-05 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-20 | Windpark Hambergen GmbH & Co. KG |
| 04WEA1011413 | 3.05 MW | ENERCON GmbH | in operation | 2016-12-09 | Windpark Oldendorf GmbH & Co. KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2015-11-26 | Wind Klingenberg GmbH & Co. KG |
| 02WEA1011116 | 3.05 MW | ENERCON GmbH | in operation | 2016-02-24 | Windpark Oldendorf GmbH & Co. KG |
| E 1011336-03 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-29 | Windpark Hambergen GmbH & Co. KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2015-11-26 | Wind Klingenberg GmbH & Co. KG |
| E 1011337-04 | 3.05 MW | ENERCON GmbH | in operation | 2016-09-09 | Windpark Hambergen GmbH & Co. KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2016-02-08 | Wind Klingenberg GmbH & Co. KG |
| Wind Klingenberg GmbH & Co. KG | 3.05 MW | ENERCON GmbH | in operation | 2016-01-27 | Wind Klingenberg GmbH & Co. KG |
| E 826575-02 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-23 | Windpark Lange Heide GmbH & Co. KG |
| E 826578-05 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-26 | Windpark Lange Heide GmbH & Co. KG |
| WP Lange Heide Wo 1 | 2.30 MW | ENERCON GmbH | in operation | 2016-12-14 | Wolters Wind |
| Windpark Meyenburg - WEA3 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-20 | Windpark Meyenburg GmbH & Co. KG |
| Windpark Meyenburg - WEA1 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-05 | Windpark Meyenburg GmbH & Co. KG |
| E 826577-04 | 2.30 MW | ENERCON GmbH | in operation | 2016-03-31 | Windpark Lange Heide GmbH & Co. KG |
| E 826579-06 | 2.30 MW | ENERCON GmbH | in operation | 2016-04-27 | Windpark Lange Heide GmbH & Co. KG |
| E 826576-03 | 2.30 MW | ENERCON GmbH | in operation | 2016-05-26 | Windpark Lange Heide GmbH & Co. KG |
| Windpark Meyenburg - WEA2 | 2.30 MW | ENERCON GmbH | in operation | 2011-09-12 | Windpark Meyenburg GmbH & Co. KG |
| 701075_Krokhorst | 1.80 MW | ENERCON GmbH | in operation | 2003-11-07 | RWE Wind Onshore & PV Deutschland GmbH |
| 701072_Krokhorst | 1.80 MW | ENERCON GmbH | in operation | 2003-11-28 | RWE Wind Onshore & PV Deutschland GmbH |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2002-12-23 | ENOVA Windpark Loge GmbH & Co. KG |
| 701074_Krokhorst | 1.80 MW | ENERCON GmbH | in operation | 2003-11-18 | RWE Wind Onshore & PV Deutschland GmbH |
| 701073_Krokhorst | 1.80 MW | ENERCON GmbH | in operation | 2003-11-19 | RWE Wind Onshore & PV Deutschland GmbH |
| Enercon | 1.80 MW | ENERCON GmbH | in operation | 2002-12-23 | ENOVA Windpark Loge GmbH & Co. KG |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | in operation | 2001-12-10 | private individual |
| unit operated by a private individual | 1.50 MW | Tacke GmbH & Co. KG | in operation | 2001-12-10 | private individual |
| Oberende - WEA02 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2009-08-11 | Ingka Deutschland Windfarms GmbH |
| Oberende - WEA03 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2009-08-11 | Ingka Deutschland Windfarms GmbH |
| Oberende - WEA05 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2009-08-13 | Ingka Deutschland Windfarms GmbH |
| Oberende - WEA04 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2009-08-07 | Ingka Deutschland Windfarms GmbH |
| Oberende - WEA01 | 0.85 MW | Gamesa Corporación Tecnológica S.A. | in operation | 2009-08-17 | Ingka Deutschland Windfarms GmbH |
| Lange Heide WEA 2 | 0.80 MW | ENERCON GmbH | in operation | 2007-09-07 | B & A Windkraft GbR II |
| 48746 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-14 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2007-09-12 | private individual |
| 48749 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-05 | Windpark GmbH & Co. Weserbrise KG |
| 48751 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-20 | Windpark GmbH & Co. Weserbrise KG |
| 53993 | 0.80 MW | ENERCON GmbH | in operation | 2010-05-18 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2007-08-27 | private individual |
| 48750 | 0.80 MW | ENERCON GmbH | in operation | 2006-06-30 | Windpark GmbH & Co. Weserbrise KG |
| 48500 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-13 | Windpark GmbH & Co. Weserbrise KG |
| 48503 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-24 | Windpark GmbH & Co. Weserbrise KG |
| 48498 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-13 | Windpark GmbH & Co. Weserbrise KG |
| 48501 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-21 | Windpark GmbH & Co. Weserbrise KG |
| 48753 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-13 | Windpark GmbH & Co. Weserbrise KG |
| unit operated by a private individual | 0.80 MW | ENERCON GmbH | in operation | 2007-08-30 | private individual |
| 48502 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-24 | Windpark GmbH & Co. Weserbrise KG |
| 48747 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-12 | Windpark GmbH & Co. Weserbrise KG |
| 48499 | 0.80 MW | ENERCON GmbH | in operation | 2006-02-07 | Windpark GmbH & Co. Weserbrise KG |
| Enercon | 0.80 MW | ENERCON GmbH | in operation | 2008-01-04 | Horstmann GbR |
| 48748 | 0.80 MW | ENERCON GmbH | in operation | 2006-07-10 | Windpark GmbH & Co. Weserbrise KG |
| Greenwind Hambergen GmbH & Co. KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 2001-06-22 | Greenwind Hambergen GmbH & Co. KG |
| Greenwind Hambergen GmbH & Co. KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 2001-06-22 | Greenwind Hambergen GmbH & Co. KG |
| Greenwind Hambergen GmbH & Co. KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 2001-06-22 | Greenwind Hambergen GmbH & Co. KG |
| Greenwind Hambergen GmbH & Co. KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 2001-06-22 | Greenwind Hambergen GmbH & Co. KG |
| Greenwind Hambergen GmbH & Co. KG | 0.66 MW | Vestas Deutschland GmbH | in operation | 2001-06-22 | Greenwind Hambergen GmbH & Co. KG |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-07-13 | private individual |
| 50209 | 0.60 MW | DeWind GmbH | in operation | 2001-10-31 | SAGA Energy GmbH & Co. KG. |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | in operation | 2001-07-13 | private individual |
| 50208 | 0.60 MW | DeWind GmbH | in operation | 2001-10-31 | SAGA Energy GmbH & Co. KG. |
| Windkraftanlage 1 Schneiderberg | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-03-31 | Verlüßmoorer Windkraft GmbH |
| unit operated by a private individual | 0.50 MW | Nordtank Energy Group | permanently decommissioned | 1995-12-20 | private individual |
| Windpark Langen Heide 0 | 0.50 MW | ENERCON GmbH | in operation | 1996-07-31 | Bohak GmbH&Co.KG |
| Lilienthal | 0.25 MW | Nordex SE | in operation | 1994-07-08 | LiSa GmbH & Co. KG |
| unit operated by a private individual | 0.01 MW | BRAUN Windturbinen GmbH | in operation | 2024-07-19 | private individual |
| unit operated by a private individual | 0.01 MW | PSW-Energiesysteme GmbH | in operation | 2018-10-29 | private individual |
| unit operated by a private individual | 0.01 MW | Sonstige | in operation | 2023-09-01 | private individual |
Which organisations operate the most wind power capacity in Osterholz?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Hambergen GmbH & Co. KG | 7 | 21.4 MW |
| Alterric Deutschland GmbH | 3 | 21.0 MW |
| Wind Klingenberg GmbH & Co. KG | 6 | 18.3 MW |
| Windpark Lange Heide GmbH & Co. KG | 5 | 11.5 MW |
| Windpark GmbH & Co. Weserbrise KG | 14 | 11.2 MW |
| Windpark Oldendorf GmbH & Co. KG | 3 | 9.15 MW |
| BFA Windkraft eGbR | 2 | 8.52 MW |
| RWE Wind Onshore & PV Deutschland GmbH | 4 | 7.20 MW |
| Windpark Meyenburg GmbH & Co. KG | 3 | 6.90 MW |
| Wind Hahnenberg GmbH & Co. KG | 2 | 6.40 MW |
Which manufacturer accounts for the most wind power capacity in Osterholz?
| Manufacturer | Units | Capacity |
|---|---|---|
| ENERCON GmbH | 61 | 137.0 MW |
| Senvion Deutschland GmbH | 6 | 19.1 MW |
| Gamesa Corporación Tecnológica S.A. | 5 | 4.25 MW |
| Tacke GmbH & Co. KG | 3 | 3.60 MW |
| Vestas Deutschland GmbH | 5 | 3.30 MW |
| DeWind GmbH | 2 | 1.20 MW |
| Nordtank Energy Group | 1 | 0.50 MW |
| Nordex SE | 1 | 0.25 MW |
| BRAUN Windturbinen GmbH | 1 | 0.01 MW |
| PSW-Energiesysteme GmbH | 1 | 0.01 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Osterholz (Niedersachsen), and how large are they can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.