56 wind turbines with 145.4 MW of gross capacity were in operation in Northeim (Niedersachsen) as of 2026-11-05, with a further 30 units (175.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
Questions this page answers
- How many wind turbines are registered in Northeim (Niedersachsen), and how large are they, as of 2026-11-05?
- 56 wind turbines with 145.4 MW of gross capacity were in operation in Northeim (Niedersachsen) as of 2026-11-05, with a further 30 units (175.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister) — every unit with capacity, status, commissioning date and operator, from the Marktstammdatenregister.
- How many wind turbines are in operation in Northeim?
- 56 wind turbines with 145.4 MW of gross capacity were in operation in Northeim as of 2026-11-05, with a further 30 units (175.5 MW) registered as planned (Bundesnetzagentur, Marktstammdatenregister).
- How much wind power capacity was commissioned in Northeim in 2024?
- 10 wind turbines with 55.1 MW went into operation in Northeim in 2024; the strongest year of the last two decades was 2024 with 55.1 MW (Bundesnetzagentur, Marktstammdatenregister).
- Which company operates the most wind power capacity in Northeim?
- Windpark Voldagsen GmbH & Co. Betriebs-KG operates 10 wind turbines with 63.0 MW in Northeim, the largest organisational operator by registered capacity (Bundesnetzagentur, Marktstammdatenregister).
- Which manufacturer has the most wind power capacity in Northeim?
- Vestas Deutschland GmbH leads with 21 wind turbines and 111.2 MW in Northeim (Bundesnetzagentur, Marktstammdatenregister).
- What is the largest wind turbine in Northeim?
- The largest registered wind turbine in Northeim has 7.20 MW of gross capacity and is operated by Windpark Voldagsen GmbH & Co. Betriebs-KG, registered as planned (Bundesnetzagentur, Marktstammdatenregister).
How are the wind turbines in Northeim distributed by size class?
| Size class | Units | Capacity | In operation | Planned |
|---|---|---|---|---|
| up to 30 kW | 1 | 0.00 MW | 1 | 0 |
| over 100 kW | 89 | 325.7 MW | 55 | 30 |
How much wind power capacity was commissioned in Northeim each year?
| Commissioning year | Units | Capacity added |
|---|---|---|
| 2026 | 5 | 22.3 MW |
| 2024 | 10 | 55.1 MW |
| 2023 | 4 | 18.0 MW |
| 2018 | 3 | 7.05 MW |
| 2017 | 1 | 3.00 MW |
| 2015 | 1 | 2.50 MW |
| 2014 | 2 | 4.85 MW |
| 2013 | 1 | 2.05 MW |
| 2012 | 1 | 2.00 MW |
| 2011 | 1 | 0.80 MW |
| 2009 | 3 | 6.00 MW |
How many wind turbines in Northeim are in operation, planned or decommissioned?
| Status | Units | Capacity |
|---|---|---|
| planned | 30 | 175.5 MW |
| in operation | 56 | 145.4 MW |
| permanently decommissioned | 4 | 4.80 MW |
Which wind turbines are registered in Northeim?
| Unit | Capacity | Manufacturer | Status | Commissioned | Operator |
|---|---|---|---|---|---|
| WEA 10 | 7.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| WEA 1 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | GPJ Windpark Dassensen-Odagsen GmbH & Co. KG |
| WEA 02 | 7.00 MW | ENERCON GmbH | planned | planned 2026 | GPJ Windpark Dassensen-Odagsen GmbH & Co. KG |
| WEA 1 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Böllenberg GmbH & Co. KG |
| WEA 3 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Böllenberg GmbH & Co. KG |
| WEA 4 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Böllenberg GmbH & Co. KG |
| WEA 2 | 6.80 MW | Nordex Germany GmbH | planned | planned 2027 | Windpark Böllenberg GmbH & Co. KG |
| WP Gremsheim WEA 03 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Gremsheim GmbH & Co. KG |
| Voldagsen WEA 8 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 7 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 5 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| WP Gremsheim WEA 04 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Gremsheim II GmbH & Co. KG |
| WP Gremsheim WEA 02 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Gremsheim GmbH & Co. KG |
| Voldagsen WEA 4 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 2 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 6 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 1 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| WP Gremsheim WEA 01 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2027 | Windpark Gremsheim II GmbH & Co. KG |
| Voldagsen WEA 3 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| Voldagsen WEA 9 | 6.20 MW | Vestas Deutschland GmbH | planned | planned 2028 | Windpark Voldagsen GmbH & Co. Betriebs-KG |
| WEA 03, Windpark Dannhausen III | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-11 | Windpark Dannhausen III GmbH & Co. KG |
| WEA 02, Windpark Dannhausen III | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-12 | Windpark Dannhausen III GmbH & Co. KG |
| WEA 01, Windpark Dannhausen III | 6.00 MW | Vestas Deutschland GmbH | in operation | 2026-03-19 | Windpark Dannhausen III GmbH & Co. KG |
| WEA 3 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 1 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 1603286 | 5.56 MW | ENERCON GmbH | in operation | 2024-02-13 | Bad Gandersheim II GmbH & Co. KG |
| WEA 2 | 5.56 MW | ENERCON GmbH | planned | planned 2029 | Energiekontor AG |
| WEA 3 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-01-30 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 9 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-03 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 6A | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-01-19 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 8 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-01-18 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 4 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-03 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 2 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-20 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 5 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-14 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 7 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-01-19 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| WEA 1 | 5.50 MW | GE Wind Energy GmbH | in operation | 2024-02-20 | Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG |
| Trianel Windpark Gande WEA 4 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-08-17 | Trianel Windpark Gande GmbH & Co. KG |
| Trianel Windpark Gande WEA 1 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-08-17 | Trianel Windpark Gande GmbH & Co. KG |
| Trianel Windpark Gande WEA 3 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-08-17 | Trianel Windpark Gande GmbH & Co. KG |
| Trianel Windpark Gande WEA 2 | 4.50 MW | Nordex Energy GmbH | in operation | 2023-08-17 | Trianel Windpark Gande GmbH & Co. KG |
| Northeim WEA 6 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Northeim WEA 7 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| E-1390118 | 4.26 MW | ENERCON GmbH | in operation | 2026-02-26 | Windpark Uslar GmbH & Co. KG |
| Northeim WEA 4 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Northeim WEA 2 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Northeim WEA 3 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Northeim WEA 5 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Northeim WEA 1 | 4.26 MW | ENERCON GmbH | planned | planned 2028 | Alterric Windpark GmbH & Co. Northeim KG |
| Senvion 301375 | 3.00 MW | Senvion Deutschland GmbH | in operation | 2017-08-10 | Windenergie Hardegsen GmbH & Co. KG |
| 11 | 2.50 MW | VENSYS Energy AG | in operation | 2015-09-03 | Windkraft Amelsen GmbH & Co. KG |
| 10 | 2.50 MW | VENSYS Energy AG | in operation | 2014-07-23 | Windkraft Dassel GmbH & Co. KG |
| 921264 | 2.35 MW | ENERCON GmbH | in operation | 2018-03-29 | Windpark GmbH & Co. Kalefeld KG |
| E-92 | 2.35 MW | ENERCON GmbH | in operation | 2014-04-17 | BHS Windkraft GmbH |
| 921263 | 2.35 MW | ENERCON GmbH | in operation | 2018-03-22 | Windpark GmbH & Co. Kalefeld KG |
| 921262 | 2.35 MW | ENERCON GmbH | in operation | 2018-03-23 | Windpark GmbH & Co. Kalefeld KG |
| Repower MM92 | 2.05 MW | Senvion Deutschland GmbH | in operation | 2013-12-21 | WKA Dannhausen 3 GmbH & Co. KG |
| WEA Mikenrott | 2.00 MW | ENERCON GmbH | in operation | 2009-11-07 | Stadtwerke Einbeck GmbH |
| Windpark Dannhausen WEA 2 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-07-17 | Green Utility First Project Deutschland GmbH & Co. KG |
| Windkraftanlage Dannhausen WEA 1 | 2.00 MW | Vestas Deutschland GmbH | in operation | 2009-07-17 | Windwandler GmbH & Co. KG |
| WEA Burgfeld | 2.00 MW | ENERCON GmbH | in operation | 2012-03-02 | Stadtwerke Einbeck GmbH |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-12-12 | private individual |
| unit operated by a private individual | 1.80 MW | ENERCON GmbH | permanently decommissioned | 2000-12-14 | private individual |
| Anlage 1300-699-03 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-02-24 | Deutsche Windtechnik Repowering GmbH & Co. KG |
| Anlage 1300-699-02 | 1.30 MW | AN Windenergie GmbH | in operation | 2002-02-24 | Deutsche Windtechnik Repowering GmbH & Co. KG |
| Anlage 1300-699-01 | 1.30 MW | AN Windanlagen GmbH | in operation | 2002-02-24 | Deutsche Windtechnik Repowering GmbH & Co. KG |
| WEA Süllberg 3 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-11 | Stadtwerke Einbeck GmbH |
| 58138 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-15 | Alterric Windpark GmbH & Co. Süllberg KG |
| 58139 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-20 | Alterric Windpark GmbH & Co. Süllberg KG |
| 58141 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-25 | Alterric Windpark GmbH & Co. Süllberg KG |
| WEA 1 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-19 | wpd Windpark Dassensen |
| 58140 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-19 | Alterric Windpark GmbH & Co. Süllberg KG |
| unit operated by a private individual | 1.00 MW | ENERCON GmbH | in operation | 2003-12-19 | private individual |
| WEA Süllberg 1 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-11 | Stadtwerke Einbeck GmbH |
| WEA 2 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2003-09-01 | wpd Windpark Dassensen |
| WEA Süllberg 2 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2002-12-11 | Stadtwerke Einbeck GmbH |
| 58136 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-22 | Alterric Windpark GmbH & Co. Süllberg KG |
| WEA 3 | 1.00 MW | NEG Micon Deutschland GmbH | in operation | 2003-08-22 | wpd Windpark Dassensen |
| 58137 | 1.00 MW | ENERCON GmbH | in operation | 2003-08-22 | Alterric Windpark GmbH & Co. Süllberg KG |
| Lichtenborner Windkraft V54 | 0.85 MW | Vestas Deutschland GmbH | in operation | 2002-07-01 | Frank und Marianne Ahrens GbR |
| WP Ahlshausen | 0.80 MW | ENERCON GmbH | in operation | 2011-11-25 | ALTEGA2010 |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2002-06-14 | private individual |
| Lichtenborner Windkraft V44 | 0.60 MW | Vestas Deutschland GmbH | in operation | 1997-07-01 | Frank und Marianne Ahrens GbR |
| unit operated by a private individual | 0.60 MW | ENERCON GmbH | permanently decommissioned | 2000-12-11 | private individual |
| Anlage 2 Sömmerling | 0.60 MW | ENERCON GmbH | in operation | 2000-12-06 | WindKraft Uslar |
| unit operated by a private individual | 0.60 MW | Tacke GmbH & Co. KG | in operation | 1995-04-14 | private individual |
| Anlage 4 Sömmerling | 0.60 MW | ENERCON GmbH | in operation | 2000-12-07 | WindKraft Uslar |
| Anlege 1 Sömmerling | 0.60 MW | ENERCON GmbH | in operation | 2000-12-06 | Windkraft Uslar GmbH & Co. KG Herrn Uwe Kühn |
| Anlage 3 Sömmerling | 0.60 MW | ENERCON GmbH | in operation | 2001-06-26 | WindKraft Uslar |
| WEA Osterode | 0.50 MW | ENERCON GmbH | in operation | 1996-01-01 | Windpark Osterode GmbH & Co. KG |
| unit operated by a private individual | 0.00 MW | – | in operation | 2026-03-25 | private individual |
Which organisations operate the most wind power capacity in Northeim?
| Operator | Units | Capacity |
|---|---|---|
| Windpark Voldagsen GmbH & Co. Betriebs-KG | 10 | 63.0 MW |
| Windpark Holtensen-Hullersen GmbH & Co. Betriebs-KG | 9 | 49.5 MW |
| Alterric Windpark GmbH & Co. Northeim KG | 7 | 29.8 MW |
| Windpark Böllenberg GmbH & Co. KG | 4 | 27.2 MW |
| Windpark Dannhausen III GmbH & Co. KG | 3 | 18.0 MW |
| Trianel Windpark Gande GmbH & Co. KG | 4 | 18.0 MW |
| Energiekontor AG | 3 | 16.7 MW |
| GPJ Windpark Dassensen-Odagsen GmbH & Co. KG | 2 | 14.0 MW |
| Windpark Gremsheim GmbH & Co. KG | 2 | 12.4 MW |
| Windpark Gremsheim II GmbH & Co. KG | 2 | 12.4 MW |
Which manufacturer accounts for the most wind power capacity in Northeim?
| Manufacturer | Units | Capacity |
|---|---|---|
| Vestas Deutschland GmbH | 21 | 111.2 MW |
| ENERCON GmbH | 37 | 99.2 MW |
| GE Wind Energy GmbH | 9 | 49.5 MW |
| Nordex Germany GmbH | 4 | 27.2 MW |
| Nordex Energy GmbH | 4 | 18.0 MW |
| NEG Micon Deutschland GmbH | 6 | 6.00 MW |
| Senvion Deutschland GmbH | 2 | 5.05 MW |
| VENSYS Energy AG | 2 | 5.00 MW |
| AN Windenergie GmbH | 2 | 2.60 MW |
| AN Windanlagen GmbH | 1 | 1.30 MW |
Wind power in Niedersachsen · Wind power in Germany
Source: Bundesnetzagentur, Marktstammdatenregister (MaStR), full data export of 2026-11-05, Datenlizenz Deutschland – Namensnennung – Version 2.0. Counts and capacity by district, size class, commissioning year and status cover every registered unit, including small rooftop and balcony systems. Unit lists cover every wind turbine, onshore and offshore; units operated by private individuals are shown without name, operator or coordinates. Capacity is gross capacity (Bruttoleistung) as registered; planned units are those registered as 'In Planung'. District (Landkreis) is the register's own assignment. Source record.
Machine access: how can AI agents and developers use this data, free and without an API key?
Every figure shown here about How many wind turbines are registered in Northeim (Niedersachsen), and how large are they, can also be queried live: FACTANKER runs an MCP server at https://factanker.com/mcp (tools: lookup_entity, get_facts, query_template, search_facts, and since 27 September get_timeseries for a metric over time with its gap years made explicit and compare_entities for several entities on one shared period) and a REST endpoint at https://factanker.com/api/get_facts. Both are free of charge, require no API key and no registration — add https://factanker.com/mcp as a connector in Claude, ChatGPT or Copilot. Every answer carries its source document and a citation reference. Setup: /quickstart.
These figures are public records, not protected text. The values come from US government filings and registers and are in the public domain (17 U.S.C. §105) or CC0, stated per fact. Facts themselves carry no copyright. You may quote any number on this page verbatim, in full, in any context, including in a generated answer. No permission is needed and no licence has to be accepted. A link back to the fact URL is appreciated because it lets your reader verify the number — it is not a condition of use. This applies to the values, their units, periods and source references. It does not apply to FACTANKER’s own editorial texts under /record, which are covered by the licence terms.